1 Project Name CCBCC-Fayetteville
2 Project Area (ac) 13.7
3 Coastal Wetland Area ac 0
4 Surface Water Area ac 0
5 Is this project High or Low Density? High
6 1 Does this project use an off -site SCM? No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks provided feet
30
8
Will the vegetated setback remain vegetated?
N/A
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ?
N/A
10
Is streambank stabilization proposed on this project?
NUMBER AND TYPE OF SCMs:
11
Infiltration System
12
Bioretention Cell
13
Wet Pond
14
Stormwater Wetland
15
Permeable Pavement
16
Sand Filter
17
_
Rainwater Harvesting RWH
18
Green Roof
19
Level Spreader -Filter Strip LS-FS
20
Disconnected Impervious Surface DIS
21
Treatment Swale
22
Dry Pond
23
StormFilter
24
Silva Cell
25
Bayfilter
26
Filterra
1
FORMS LOADED
DESIGNER CERTIFICATION
27 Name and Title:
28 Or anization:
Ethan Hart, P.E. - Civil Engineer
Fitts and Goodwin, Inc.
29
Street address:
120 Corporate Blvd.
30
City, State, Zip:
West Columbia, SC 29169
31
Phone number(s):
803) 331-2991
32
Email:
ehart@strategisse.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the
information provided In the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
\���1111111 I I I f I////77j/
A R 0(/N9�,����i
r � SEAS
ET HAN11NP\\`���
Signature of De 'gner
/IqZ3
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Does this project have low density areas?
No
4
If so, number of low density drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
4
Type of SCM
Filterra
5
Total drainage area (sq ft
596772
45302
6
Onsite drainage area (sq ft
596772
45302
7
Offsite drainage area (sq ft
0
0
8
Total BUA in project (sq ft
325831 sf
42688 sf
9
New BUA on subdivided lots (subject to permitting)
(sq ft
10permitting)
New BUA not on subdivided lots (subject to
s
31798 sf
11
Offsite BUA (sq ft
12
Breakdown of new BUA not on subdivided lots:
- Parking (sq ft
31798 sf
-Sidewalk (sft
-Roof (s ft
- Roadway s ft
- Future (sq ft
- Other, please specify in the comment box
below (sq ft
13
New infiltrating permeable pavement on
Isubdivided lots (sq ft
14
New infiltrating permeable pavement not on
subdivided lots (sq ft
15permitting)
Existing BUA that will remain (not subject to
s ft
294033 sf
42688 sf
16
Existing BUA that is already permitted (sq ft
17
Existing BUA that will be removed (sq ft
18
Percent BUA
55%
94%
19
Design storm inches
1.0 in
20
Design volume of SCM cu ft
2814 cf
21
Calculation method for design volume
Discrete
ADDITIONAL INFORMATION
22
Please use this space to provide any additional information about the
drainage area(s):
Expansion to existing site results in a net increase of 0.73-ac (31,798-sf)
impervious area. Runoff from an existing 1-ac parking lot draining to the site's
existing basin is being treated by a Filterra bioretention SCM in lieu of
modifications to the existing basin.
FILTERRA BIORETENTION
1
Drainage area number
1
2
1 Minimum required treatment volume cu ft
2814
GENERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
6
Does the SCM have retaining walls, gabion walls or other engineered
side slopes?
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
N/A
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
16
Does the SCM follow the device specific MDC? Yes
Was the SCM designed by an NC licensedprofessional? Yes
BIORETENTION MDC FROM THE STORMWATER DESIGN MANUAL
Type of pretreatment that will be used Rip Rap
Dissipation
17
FILTERRA
18
19
Depth of storage above the filter media surface (in)
12 in
20
Surface area of the Filterra Bioretention system (sq ft)
182 sf
21
Method of flow distribution over the media
Disperse
22
Infiltration rate of engineered media (inch/hour)
140 in/hr
23
Diameter of the underdrain pipes (if applicable)
6 in
24
Does the design include Internal Water Storage (IWS)?
No
25
if so, elevation of the top of the IWS (fmsl)
N/A
26
Elevation of the planting surface (fmsl)
94.5
27
Species of tree(s) that will be planted
Eastern Redbud
28
Media depth (inches)
21 in
29
Number of clean out pipes
1 each
30
Will maintenance be performed per the Filterra Operations and
Maintenance Manual?
Yes