Loading...
HomeMy WebLinkAboutNCC230435_NOI Application_20230216Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 2/14/2023 1:22:24 PM (NCG01 NOI Submission) Approve by Brooklyn. Broussard 2/15/2023 5:47:13 AM (Review - NOI 127237 Royal Farms #488) • The task was assigned to Brooklyn. Broussard by round robin distribution 2/14/2023 1:22 PM • The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: February 17, 2023 5:00 PM. The priority is: High 2/14/2023 1:22 PM by Workflow 2/15/2023 5:47:22 AM (Workflow Start Event) Submit by Tev.Holloman 2/16/2023 1:18:24 PM (Payment Verification for NCC230435) F Peter Ratcliffe • Tev.Holloman assigned the task to Tev.Holloman 2/16/2023 1:17 PM • The task was assigned to DEMLR NCG01 Payment Team. The due date is: March 29, 2023 5:00 PM. The priority is: High 2/15/2023 5:47 AM �a NORTH CAROLINA, Enri--tn! C2-1;ly A. Project Information Part A. Project Location and Waterbody Information ................................................................................................................... . Are you submitting an NOI that was rejected before? No Yes la. Project Name* Royal Farms #488 1b. Specific Lot Numbers This field may be used to list specifc lot numbers. 1c. Parcel ID Number(s) (PIN) List all PINs associated with this project. 7993972938 2. County* Pasquotank 3. Highway or Street Address 3795 Conlon Way Street name only is acceptable if no address number assigned yet 4. City or Township* Elizabeth City 5. State* NC 6. Zip Code* 27909 7. Latitude* Enter the latitude in decimal degrees 36.2947 8. Longitude* Enter the longitude in decimal degrees (MUST be negative) -76.2892 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 05/01/2023 Estimated Construction Project Start Date 10. Date to End* 11/01/2023 Estimated Construction Project End Date 11. SIC (Primary)* Commercial (1542) Standard Industrial Classification for Development 12. Acres to be 5.31 disturbed* (including off -site borrow and waste areas) 13. Total site area 57.41 (acres) * 14. Post -construction 2.14 impervious area (Estimated) (acres)* Project Tracking ID NCC-PASQU-2023-Royal Farms #488 Assigned automatically (not used) Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Waterbody* Pasquotank River Name of waterbody into which stormwater runoff will discharge 15b. Waterbody Index No.* 30-3-(7) NC Waterbody Index Number Stormwater discharges will flow to additional waters* No Yes 16a. Is this project subject to the NC Sediment Pollution Control Act?* Yes No, not subject to NC SPCA 17. Is this project funded with ARPA (American Rescue Plan Act) grant funds? No Yes This question was added to the eNO1 on 1 /26/2023 and will not be answered in applications submitted prior to that date. Reviewer may update if status is known. B. Permittee Information Part B. Permittee Information - Legally Responsible Entity and Individual ........................................................................................................................................................................ Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form must be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Permittee* Legally Responsible Entity Two Farms, Inc If permittee is an individual, enter first and last name in this field. Otherwise, enter organization/business name. Note: If the permittee is a business, the business must be registered with the NC Secretary of State. You can verify the registration here. Permittee must be the same entity that is responsible for the land -disturbing activity as listed on the NC SPCA Financial Responsibility/Ownership (FRO) Form. 2. First Name* Joshua If Corporation, enter Registered Agent First Name 3. Last Name* Wolfe If Corporation, enter Registered Agent Last Name 3b. Title CFO 4. Permitee E-mail bill@ratcliffearchitects.com Address* 5. Permittee 410-484-7010 Telephone No.* 6. Permittee Mailing Street Address Address* 3611 Roland Avenue Address Line 2 City State / Province / Region Baltimore MD Postal / Zip Code Country 21211 USA Check box if the Yes street address the same as mailing address 7. Permittee Street Street Address Address* 3611 Roland Avenue Address Line 2 City State / Province / Region Baltimore MD Postal / Zip Code Country 21211 USA 8. Type of Ownership is only individual if an individual is named in B.1. above. Ownership* Non -Government C. Site Contact Information Part C. Project Site Contact Information 1. Primary Site Mike Contact - First Name* 2. Primary Site Mason Contact - Last Name* 3. Title Construction Project Manager 4. Site Contact E-mail mmason@royalfarms.com Address* 5. Site Contact 410-889-0200 Telephone No.* 6. Organization Name Royal Farms 7. Site Contact Mailing Address* 8. Consultant Name Street Address 3611 Roland Avenue Address Line 2 City Baltimore Postal / Zip Code 21211-2408 (Optional) First and Last name 9. Consultant E-mail This person will be copied on all correspondence. 10. Consultant Telephone No. 11. Billing E-mail (For Annual Fee correspondence) bill@ratcliffearchitects.com Default is legally responsible person e-mail 12. Billing Telephone (For Annual Fee correspondence) 410-484-7010 Default is legally responsible person telephone State / Province / Region MD Country us D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Plan Approval Information 1. Date E&SC Plan 01/11/2023 Approved * 2. E&SC Plan Project PASQU-2023-009 Number/ID* Assigned by agency or local program 3. E&SC Plan State DEQ Office Approved by* Local Program 4. State DEQ Office* Washington (WaRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can include the beginning point and end point coordinates in the "Notes" box below). 5. E&SC Plan Pasqu-2023-009 Royal Farms #488 01112023-NCEQ Approval letter or Approval.pdf 1.33MB Grading Permit Must be PDF format 6. Signed FRO Financial Responsibility/Ownership Form RF #488 FRO.pdf 1.61 MB Must be PDF format 7. Site Location Map Must be PDF format (limit 20 MB) Parcel Map EC - 488.pdf 460.47KB Please do not upload entire set of E&SC plans. 8. Notes (Optional) Provide any additional information that might help the reviewer better understand how uploaded documents support the application. Include additional waterbodies if necessary. 9. NOI Certification NCG01-eNOI-Certification-Form-20210917-DEMLR- Form 695.65KB SW.pdf Must be PDF format This is an Express No Review Project* Yes E. Certification North Carolina General Statute 143-215.613 (i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: * I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* The Legally Responsible Person named on this Notice of Intent Authorized Responsible Person' (signing on behalf of Legally Responsible Person named in Part B) Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Joshua Wolfe Title CFO Organization Legally Responsible Entity Two Farms, Inc Date * 02/14/2023 F. Tracking and COC Info NOI Tracking No. 127237 NC Reference No. NCG01-2023-0435 Indicates NCG01 or NCG25. Uses NOI number until approved, then uses NUMBER incremented by SP (passed from workflow if eNOI approved) Certificate of NCC230435 Coverage (COC) No.* Uses NOI number until approved, then uses NUMBER incremented by SIP (formatted and passed from workflow if eNOI approved) Initial Invoice No. NCC230435-2023 Invoice Due Date 3/17/2023 Initial Fee $ 100.00 Invoice Status OPEN