STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
PAT L. MCCRORY ANTHONY J. TATA
GOVERNOR SECRETARY
March 12, 2015
Wilmington Regulatory Field Office N.C. Dept. of Environment & Natural Resources
US Army Corp. of Engineers Division of Coastal Management
69 Darlington Avenue 400 Commerce Avenue
Wilmington, NC 28403 Morehead City, NC 28557
ATTN: Brad Shaver ATTN: Stephen Lane
NCDOT Coordinator NCDOT Coordinator
Dear Sirs’:
Subject: Modification Request for Section 404 Nationwide Permit 23, Section 10
Permit, CAMA Major Development Permit, and Section 401 Water
Quality Certification for proposed widening of the US 17-74-76/NC 133 from
the NC 133/SR 1472 Interchange to the US 421/NC 133 Interchange,
Brunswick County. Federal Aid Project No. NHS-0017(68); TIP No. R-3601.
Debit $400.00 from WBS Element 38868.1.1
References: R-3601 Nationwide Permit 23 and 12, issued July 14, 2014 (SAW-2007-
03461-010)
R-3601 Major CAMA permit, issued July 22, 2014 (#89-13)
R-3601 401 Water Quality Certification, issued July 14, 2014 (DWR# 13-
0472v.4)
The purpose of this letter is to request modification/re-issuance of the issued permits on this
project to account for a change in clearance under bridges 107 and 108 crossing Alligator
Creek. Please find enclosed revised permit drawings and wetland impact summary table for
the above referenced project. Please replace permit drawings from the original submittal with
pages 28, 29, and 44 included with this modification request.
In order to allow for bridge inspection and maintenance, excavation is necessary on the
eastern side of the two bridges over Alligator Creek. The previous design called for four feet
of clearance however, impacts were not quantified on the previously submitted impact
drawings or in the impact summary. In order to minimize impacts, the clearance has been
MAILING ADDRESS:
NC DEPARTMENT OF TRANSPORTATION
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS
1548 MAIL SERVICE CENTER
RALEIGH NC 27699-1548
TELEPHONE: 919-707-6000
FAX: 919-212-5785
WEBSITE: WWW.NCDOT.ORG
LOCATION:
CENTURY CENTER BUILDING B
1020 BIRCH RIDGE DR.
RALEIGH, NC 27610
3/11/2015
3/11/2015
CAMA 404 Temp Hand Existing Existing
Permanent Permanent Temp. Excavation Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fill in Fill In Fill In in in Clearing in SW SW Impacts Impacts Stream
No.(From/To)Size / Type Wetlands Wetlands Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design
(ac)(ac)(ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft)
1 -Y2- 13+05 48" DRAINAGE PIPE 0.01 < 0.01 47 10
2
-LMED- 54+37 TO
54+75 RT 24" DRAINAGE PIPE < 0.01 < 0.01 0.02
3
64+43 LT & 'LMED
65+92 TO 66+26 LT
BRIDGE 24" DRAINAGE
PIPE 0.03 < 0.01 < 0.01 0.04
4
76+31 LT & -LMED-
74+99 TO 75+19 RT
ROADWAY FILL/36"
DRAINAGE PIPE 0.04 < 0.01 < 0.01 0.16
5
-LMED- 83+00 TO
83+21 RT
EXISTING DRAINAGE
PIPE < 0.01 < 0.01
6
-LRT- 85+81 TO 87+69
RT ROADWAY 0.01
7
-LLT- 90+25 TO 90+74
LT & -LLT- 94+00 TO
94+21 LT ROADWAY < 0.01 < 0.01 < 0.01
8
-LLT- 99+60 TO 99+97
LT 30" DRAINAGE PIPE < 0.01 0.01
9
-LRT- 101+06 TO
101+17 RT
EXISTING DRAINAGE
PIPE < 0.01
10
-LLT- 111+79 TO
113+14 RT & -LRT-
112+37 TO 114+59
BRIDGE 108 & BRIDGE
107 0.14 0.03 0.01 0.11
11
-LRT- 115+52 TO
118+61 RT & -LRT-
121+21 TO 121+77 RT ROADWAY 0.03
12 ' -Y2- 20+65
ROADWAY/36"
DRAINAGE PIPE 0.16 0.04
13 -Y- 34+98 TO 36+55 LT 42" DRAINAGE PIPE 0.02 < 0.01 44 37
13 -Y- 36+10 LT BANK STABILIZATION < 0.01 14
14 -Y- 38+30 RT ROADWAY < 0.01
TOTALS*:0.03 0.34 0.04 0.01 0.02 0.04 0.39 0.03 < 0.01 105 47 0.00
*Rounded totals are sum of actual impacts
NOTES:
Revised 2013 10 24 SHEET 44 OF 44
WETLAND PERMIT IMPACT SUMMARY
SURFACE WATER IMPACTS
BRUNSWICK AND NEW HANOVER COUNTY
US 17-74-76 FROM NC 133/SR 1472 INTERCHANGE
WETLAND IMPACTS
3. There will be 0.39 acre of hand clearing on this project. Additionally, there will be 0.04 acre of temporary fill in wetlands for erosion
control measures in ha nd clearing areas. There will also be a <0.01 acre (165 sq. ft.) of temporary fill in CAMA wetlands for erosion
control measures in hand clearing areas.
1.Permanent bridge pier surface water impacts = 0.04 acres
TO US 421 / NC 133 INTERCHANGE
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
R-3601 3/06/20152.Temporary bridge pier surface water impacts = 0.05 acres (Due to work bridges=0.02 acre; due to temporary excavation=0.03 acre)