HomeMy WebLinkAboutNC0005762_Inspection_20230125ROY COOPER
Governor
ELIZABETH S. RISER
Secretary
RICHARD E. ROGERS, JR.
Director
Kevin Patterson
Scotland County
507 W Covington St
Laurinburg, NC 28352
NORTH CAROLINA
Environmental Quality
February 03, 2023
SUBJECT: Compliance Inspection Report
Wagram plant
NPDES WW Permit No. NC0005762
Scotland County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Wagram plant on
1/25/2023. This inspection was conducted to verify that the facility is operating in compliance with the
conditions and limitations specified in NPDES WW Permit No. NC0005762. The findings and comments
noted during this inspection are provided in the enclosed copy of the inspection report entitled
"Compliance Inspection Report".
There were no significant issues or findings noted during the inspection and therefore, a response to this
inspection report is not required.
If you should have any questions, please do not hesitate to contact Hughie White with the Water
Quality Regional Operations Section in the Fayetteville Regional Office at 910-433-3300.
Sincerely,
DocuSigned by:
/14-0514
E 69br248
Mark Brantley, Asst. Regional Supervisor
Water Quality Regional Operations Section
Fayetteville Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS
Cc: WQS Fayetteville Regional Office (HW)
Dk9
North Carolina Department of Environmental Qua1Ry I Division of Water Resources
Fayetteville Regional ice 1225 Green Street Same 714 I Fayetteville. North Carolina 25201
910.4333300
United States Environmental Protection Agency
EPA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code
1 IN I 2 L
21IIIIII
NPDES yr/mo/day Inspection
I 3 I NC0005762 111 121 23/01/25 117
Type
1810I
IIIIIIIIIII
Inspector Fac Type
19I S I 2011
IIIIIIIIIII IIIIIII I IIIIII
P6
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
671 I 7° I I 711 172 I N I 731 1 74 71
I I
I I I I I I 180
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES Dermit Number)
Wagram plant
19320 Air Base Rd
Wagram NC 28396
Entry Time/Date
09:30AM 23/01/25
Permit Effective Date
14/11/01
Exit Time/Date
10:30AM 23/01/25
Permit Expiration Date
19/07/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Mickey Lee Oxendine/ORC/910-844-5081/
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Kevin Patterson,507 W Covington St Laurinburg NC 28352//910-277-2406/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Records/Reports Facility Site Review
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s)
Hughie White
of Inspector(s) Agency/Office/Phone and Fax Numbers
f--Docusigneaby: DWR/FRO WQ/910-433-3300 Ext.708/
h4. ZOh44G
"-49E06C80007E432...
Date
2/3/2023
Signature of Management
Mark Brantl€(44
Q A Reviewer Agency/Office/Phone and Fax Numbers Date
DocuSigned by:
bra,, tap/R/FRO WQ/910-433-3300 Ext.727/ 2/13/2023
�E4E1A9691 DB248E...
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page# 1
31
NPDES yr/mo/day
NC0005762 111 121 23/01/25
I17
Inspection Type
18 [j
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
The ORC visitation log appeared to be complete and current. A copy of the NPDES permit was
available for review. This facility has not had an effluent discharge since 2014 and is currently shut
down. Wastewater equipment, such as pumps and aerators, are occasionally exercised to help
maintain their functionality.
Page# 2
Permit: NC0005762
Inspection Date: 01/25/2023
Owner - Facility: Wagram plant
Inspection Type: Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new El El ❑
application?
Is the facility as described in the permit? • ❑ ❑ ❑
# Are there any special conditions for the permit? ❑ ❑ • ❑
Is access to the plant site restricted to the general public? • ❑ ❑ ❑
Is the inspector granted access to all areas for inspection? • ❑ ❑ ❑
Comment:
Record Keeping
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain -of -custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility
classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Comment:
Yes No NA NE
•❑ ❑ ❑
❑ ❑ • ❑
Page# 3