Loading...
HomeMy WebLinkAbout20221770 Ver 1_CAMA Application_20221216Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Channel (NLW or NWL) Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater Other (excluding shoreline stabilization) Length 250' Av. Width 80' Avg. Existing Depth -2.65' NA NA Final Project Depth -4.0 NA NA 1. EXCAVATION ['This section not applicable a. Amount of material to be excavated from below NHW or NWL in cubic yards. 1,151 cubic yards b. Type of material to be excavated. Sand and Silt c. (i) Does the area to be excavated include coastal wetlands/marsh d. High -ground excavation in cubic yards. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL gNone (ii) Describe the purpose of the excavation in these areas: N/A 2. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a. Location of disposal area. c. (i) �DDoo/ you claim title to disposal area? UvYes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL gNone (ii) Describe the purpose of disposal in these areas: b. Dimensions of disposal area. Approx. 83' x 113' or 9,286 ft2 d. (i) Wi I a disposal area be available for future maintenance? es ❑No ❑NA (ii) If yes, where? f. (i) Does the disposal include any area in the water? M ❑Yes No ❑NA (ii) If yes, how much water area is affected? 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/26/06 Form DCM MP-2 (Excavation and Fill. Page 2 of 2) 3. SHORELINE STABILIZATION (If development is a wood groin. use MP-4 — Structures) ['This section not applicable a. Type of shoreline stabilization: Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: c. Average distance waterward of NHW or NWL: 5.7' e. Type of stabilization material: Vinyl Sheets g. Number of square feet of fill to be placed below water level. Bulkhead backfill 1,CM4 ft2 Riprap Breakwater/Sill Other Source of fill material. b. d. f. Length: zit Width: 1.5' Maximum distance waterward of NHW or NWL: -17' (i) Has there been shoreline erosion during preceding 12 months? 'Yes ❑No DNA (ii) If yes, state amount of erosion and source of erosion amount information. Unknown h. Type of fill material. Sand or clay mix Permitted offsite borrow and suitable material from maintenance excavation 4. OTHER FILL ACTIVITIES (Excluding Shoreline Stabilization) This section not applicable a. (i) Will fill material be brought to the site? ❑Yes If yes, (ii) Amount of material to be placed in the water (iii) Dimensions of fill area (iv) Purpose of fill ❑No DNA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? Spoil material will be sloped, graded and provided groung cover once material has dewatered in a dike) a}ruit dyed. Once dry oorne of the urydrrir, material, witl be hauled to an upland area offsite. c. (i) Will naviga tonal aids be required as a result of the project? ❑Yes ONo DNA (ii) If yes, explain what type and how they will be implemented. b. What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)? Equipment barge equiped with spoil containment structure, excavator, dumi Ruck, skid teer Loader. d. (i) Will wetlands be crosseq,in transporting equipment to project site? ❑Yes ❑No ONA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. July 10, 2022, Modified December 3, 2022 Date Atlantic Seafood Redevelopment Project Name Steve Trowell Agent for Ann O'Conner ApplicanfR Applicant Signature Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS ❑This section not applicable a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public? ECommercial ❑Public/Government Private/Community ❑Yes 'No c. (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? uYes ❑No (ii) Number 2 If yes: 84', 104„ 150'(ii)Number 7 (iii) Length (iv) Width 10', 6, 6" (iii) Length 15" (v) Floating ❑Yes EllNo (iv) Width 3' (v) Floating EYes 'No e. (i) Are Platforms included? ['Yes 'No f. (i) Are Boatlifts included? M/Yes ❑No If yes: If yes: (ii) Number (ii) Number 10 - 10,000 Ibs lifts (iii) Length (iii) Length 13', 10' (iv) Width (iv) Width 13', 8' (v) Floating ['Yes ❑No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. 10 (ii) Number of slips existing 0 i. Check the proposed type of siting: ❑ Land cut and access channel ❑ Open water; dredging for basin and/or channel ❑ Open water; no dredging required Other; please describe: Maintenance dredging of an existing land and open water cut k. Typical boat length: 17' to 25' m. (i) Will the facility have tie pilings? EYes No (ii) If yes number of tie pilings? ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ® Dockage ("wet slips") only, number of slips: 10 ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). open runabout I. (i) Will the facility be open to the general public? EYes No 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS 'This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: • Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 3 of 4) m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑ Yes 2/No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑ Yes M'No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑ CW ❑SAV ❑SB OWL 'None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes 'No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) [This section not applicable a. (i) Is the boathouse structure(s): ❑ Commercial ❑Public/Government ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) t "This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) [This section not applicable a. Length c. Maximum distance beyond NHW, NWL or wetlands b. Average distance from NHW, NWL, or wetlands 6. MOORING PILINGS and BUOYS 'This section not applicable a. Is the structure(s): ❑ Commercial ❑Public/Government ❑Private/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing b. Number d. Description of buoy (color, inscription, size, anchor, etc.) 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 4 of 4) 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. 15' to the West and 68' to the East There are no other active docking facilities in Harbor. Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 2 miles e. (i) Will navigational aids be required as a result of the project? ❑Yes 12No DNA (ii) If yes, explain what type and how they will be implemented. d. Water depth at waterward end of structure at NLW or NWL -4.0' N LW 8. OTHER EalThis section not applicable a. Give complete description: July 10, 2022, Modified December 3, 2022 Date Atlantic Seafood Redevelopment Project Name Steve Trowell Agent for Ann O'Conner Applicant Signature .r...,. ,_._ _4srtlt,,,.ariement,r.et revise;: 12/27/06 N Building and Debris To Be Removed Pier and 10 Slips Former Atlantic Seafood Carteret County Alantic, NC Date: July 6, 2022 Revised: December 3, 2022 Drawn By Steve Trowel) Sheet 1 0 12.5 25 50 Feet Dredge Plan Former Atlantic Seafood Carteret County Alantic, NC Building and Debris To Be Removed Additional Dredge Footprint Red Hatch Huntingquarters Fishhouse LLC Prop Maintenance Excavation 23,488 FT2 Date: July 6, 2022 Modfied December 10, 2022 Drawn By Steve Trowel) Sheet 2 0 20 40 80 Feet Atlantic Seafood Redevelopment Slip Detail Date: July 8, 2022, Mod December 3, 2022 Sheet 4 3' 13' 4 15' I I 3' 15' 6' Atlantic Seafood Redevelopment Cross Section B NTS — Dimensions Shown Date: July 8, 2022, Mod Dec. 3,2022 Sheet 6 Proposed 6' x 104' Dock 6' 1.5' 1 ■Y - -iVW-MIIMO- 1 1 Boatlift Slips 1 and 2 Final Grade 40' kJ - Legend Bulkhead Backfill Maintenance Excavation Existing Grade Existing Grade Proposed Bulkhead • •