Loading...
HomeMy WebLinkAboutNCC200198_Annual Fee NOD Letter (2023 Fee)_20230216ROY CDC) PER Ca�ernar EUZABETH S. i315ER Serretary' DOUCLAS IL ANSEL NORTH C;AROLINA fn mm Nrltrw Fnwra entalQuufltp 2/16/2023 Ray Wilson Solar, LLC Attn: Jonathan Burke 1447 South Tryon Street Suite 201 Charlotte. NC 28203 Subject: Notice of Deficiency - Failure to Pay Annual Fee Invoice No. NCC200198-2023 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater Permit NCGO10000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The annual fee was billed on 1/1/2023 and was due on 2/112023. The annual fee applies to the following construction site: Ray Wilson Solar 1090 128 Potts Road, Advance, NC Davie County Certificate of Coverage No. NCC200198 NC Reference No. NCG01-2020-0198 If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date, please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact me at toby.vinson@ncdenr.gov. Sincerely, William E. Vinson, Jr. Chief of Program Operations Division of Energy, Mineral, and Land Resources NonhCamllna 6epanmew er EmlYmrnenear $.ellty I Wnlmn of Energy. Wmeral and Land Re9ouroe5 IME 512 Norllh5aliabury'%r t 11{12h4iI 5rrric Ce Ul I Rk .Noeth Carolina 27694-1b12 414.767.92U0