HomeMy WebLinkAboutNCC193375_Annual Fee NOD Letter (2023 Fee)_20230216ROY CDC) PER
Ca�ernar
EUZABETH S. 815ER
Serretary'
DOUCLAS IL ANSEL NORTH C;AROLINA
fn mm Nrltrw Fnwra entalQuufltp
2/16/2023
Birch Lane Development Group, LLC
Attn: Ken Jackson
P.O. Box 1157
Arden. NC 28803
Subject: Notice of Deficiency - Failure to Pay Annual Fee
Invoice No. NCC193375-2023
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater
Permit NCGO10000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The
annual fee was billed on 1/1/2023 and was due on 2/112023. The annual fee applies to the following construction site:
Birch Lane Subdivision
95 Birch Lane Ext, Arden, NC
Buncombe County
Certificate of Coverage No. NCC193375
NC Reference No. NCG01-2019-3375
If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date,
please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact me at toby.vinson@ncdenr.gov.
Sincerely,
William E. Vinson, Jr.
Chief of Program Operations
Division of Energy, Mineral, and Land Resources
NonhCamllna 6epanmew er EmlYmrnenear $.ellty I Wnlmn of Energy. Wmeral and Land Re9ouroe5
IME 512 Norllh5aliabury'%r t 11{12h4iI 5rrric Ce Ul I Rk+gh.Noeth Carolina 27694-1b12
414.767.92U0