Loading...
HomeMy WebLinkAboutNCC210629_NOT Closeout Documents_20230209North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215 County: Duplin Project: Rose Hill Methodist Church Person financially responsible: Rose MII Methodist Church - Robert Ward, Chairman Trustee Address: PO Box 177, Rose Hill, NC 28458 1. Project Location: 314 E. Church Street, Rose Hill Pictures: No 2. Weather and soil conditions: 60's partly cloudy workable 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: River basin: Cape Fear Project #: DUPLI-2021-003 Initial inspection: No If no, check violations below: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): aaron Inspection report: Sent Report 9. Corrective action needed: Title: smithson Date given/sent: February 09, 2023 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Forms/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. File closed. bria,n.lambe@ncdenr.gov Yes Reported by: Brian Lambe Others present: Date of inspection: February 09, 2023 Time arriving on site: 9:15 AM Time leaving site: 9:20 AM cc: