Loading...
HomeMy WebLinkAbout20180785 Ver 1_Year 2 Monitoring Report_2022_20230213Mitigation Project Information Upload ID#* 20180785 Version* 1 Select Reviewer: * Ryan Hamilton Initial Review Completed Date 02/15/2023 Mitigation Project Submittal - 2/13/2023 .................................................................................................................................................................................................................................................................. Is this a Prospectus, Technical Proposal or a New Site? * 0 Yes O No Type of Mitigation Project:* Stream Wetlands Buffer Nutrient Offset (Select all that apply) Project Contact Information Contact Name: * Email Address: * Jeremiah Dow jeremiah.dow@ncdenr.gov Project Information ID#:* 20180785 Existing ID# Project Type: • DMS Mitigation Bank Version:* 1 Project Name: Hip Bone Creek Full Delivery Restoration STREAM Site County: Chatham Document Information Mitigation Document Type: * Mitigation Monitoring Report File Upload: Signature ............................................ Print Name: * Signature:* H i pBo neC reek_100059_MY2_2022. pdf Existing Version 20.26MB Please upload only one PDF of the complete file that needs to be submitted... Jeremiah Dow MY02 MONITORING REPORT Hip Bone Creek Restoration Site Chatham County Cape Fear River Basin - 3030003 DMS Project #100059 DMS Contract #7528 DMS RFP #16-007331 USACE AID #: SAW 2018-01160 DWR #: 2018-0785 Monitoring Data Collected: 2022 Prepared for: NC Department of Environmental Quality Division of Mitigation Services 1652 Mail Service Center Raleigh, NC 27699 k, ; NORTH CAROLINA Department of Environmental Quality Monitoring and Design Firm Prepared by: KCI ASSOCIATES OF NC KCI Associates of North Carolina, PC 4505 Falls of Neuse Road Suite 400 Raleigh, NC 27609 (919)783-9214 Project Contact: Adam Spitler Email: adam.sniller(iMci.com Hip Bone Creek Restoration Site KCI Associates of NC, PA DMS Project 9100059 1 MY-02 Monitoring Report KCI ASSOCIATES OF NORTH CAROUNA, PA ENGINEERS • SCIENTISTS • SURVEYORS • CONSTRUCTION MANAGERS MEMORANDUM 4505 Falls of Neuse Road Suite 400 Raleigh, NC 27609 (919) 783-9214 (919) 783-9266 Fax Date: February 9, 2023 To: Jeremiah Dow, DMS Project Manager From: Adam Spiller, Project Manager KCI Associates of North Carolina, PA Subject: MY-02 Monitoring Report Comments Hip Bone Creek DMS#100059, Contract 007528 Cape Fear River Basin CU 03040101 Chatham County, North Carolina Please find below our responses in italics to the MY-02 Monitoring Report comments from NCDMS received on January 31, 2023, for the Hip Bone Creek Restoration Site. 1. Please update the wetland credits in the CCPV Legend to match the project credits in Table 1. KCI Response: This error has been corrected. VP 7 is colored red on the CCPV. Is this due to only having 3 species in the plot since it met the stem/acre interim success criteria? Please clarify. KCI Response: That is correct, VP is colored red due to having only 3 different species. 3. The wetland gauges on the CCPV are not colored correctly according to successful/not successful. For example, WM4, WM5, and WM8 are incorrectly shown as not meeting success and WM 7 is shown as meeting when it did not. KCI Response: This error has been corrected. 4. Please remove BHR calculations from pool cross sections in the cross-section plots and Table 9. KCI Response: BHR calculations have been removed from pool cross-section plots and Table 9. 5. For Table 13, recommend a Yes/No preceded the percentage (similar to Table 12) and/or color code the text red and blue to match the CCPV based on meeting success or not. This makes it much easier to visually see trends over the course of monitoring. KCI Response: This change has been made. 6. Would be useful to add hydroperiod percentage beside number of days on hydrographs, i.e., 50 Days/22.9% for WM-1, etc. KCI Response: This change has been made. Please contact me if you have any questions or would like clarification concerning these responses. Sincerely, 7� Adam Spiller Project Manager KCI ASSOCIATES OF NORTH CAROLINA, P.A. www.kei.com Employee -Owned Since 1988 TABLE OF CONTENTS ProjectSummary........................................................................................................................................... 1 Table 1. Project Mitigation Quantities and Credits....................................................................................... 1 CurrentConditions Planview........................................................................................................................ 2 Table 2. Goals, Performance, and Results.................................................................................................... 7 Table 3. Project Attributes Table.................................................................................................................. 8 MonitoringResults........................................................................................................................................ 9 References...................................................................................................................................................10 Auuendix A — Visual Assessment Data Table 4. Visual Stream Stability Assesment...............................................................................................11 Table 5. Visual Vegetation Assessment......................................................................................................12 PhotoReference Points............................................................................................................................... 13 VegetationPlot Photos................................................................................................................................ 17 Appendix B — Vegetation Plot Data Table 6. Vegetation Performance Standards Summary Table.................................................................... 23 Table7. Vegetation Plot Data..................................................................................................................... 24 Appendix C — Stream Geomorphology Data Cross-section Plots...................................................................................................................................... 28 Table 8. Baseline Stream Data Summary................................................................................................... 44 Table 9. Cross-section Morphology Monitoring Summary........................................................................ 46 ADDendix D — Hydrologic Data 30th/70th Percentile Graph............................................................................................................................ 49 Table10. Rainfall Summary....................................................................................................................... 50 Table11. Overbank Events......................................................................................................................... 50 Table 12. Stream Flow Success Criteria Attainment.................................................................................. 50 Table 13. Wetland Hydrology Criteria Attainment..................................................................................... 50 SurfaceWater Hydrographs........................................................................................................................ 51 StreamFlow Hydrographs.......................................................................................................................... 53 WetlandHydrographs................................................................................................................................. 55 Appendix E — Project Timeline and Contact Info Table 14. Project Activity and Reporting History ...................................................................................... 64 Table15. Project Contacts.......................................................................................................................... 65 Hip Bone Creek Restoration Site KCIAssociates ofNC, PA DMS Project #100059 2 MY-02 Monitoring Report PROJECT SUMMARY The Hip Bone Creek Restoration Site (HBCRS) is a full delivery project for the North Carolina Division of Mitigation Services (DMS). The site restored and enhanced a total of 4,026 linear feet of stream and 6.023 acres of riparian wetland. The HBCRS is a riparian system in the Cape Fear River Basin (03030003 8-digit cataloging unit) in Chatham County, North Carolina. The site's natural hydrologic regime had been substantially modified by relocation and straightening, impacts from cattle, installation of field ditches, and other anthropogenic impacts. This site restored impacted agricultural lands to a stable stream and wetland ecosystem with a functional riparian buffer, floodplain access, and riparian wetlands. Project planting and construction were completed in April 2021 and the monitoring components were installed in May 2021. Table 1. Hip Bone Creek Restoration Site (ID-100059) Project Mitigation Quantities and Credits Project Segment Original Mitigation Plan Ft/Ac As- Built Ft/ Ac Original Mitigation Category Original Restoration Level Original Mitigation Ratio X:1 Credits Comments Stream T1 Reach 1 780 745 Warm R 1.00000 750.000 30' exception STA 13+12 to 13+42 T1 Reach 2 906 890 Warm R 1.00000 906.000 T1 Reach 3 269 208 Warm R 1.00000 209.000 60' exception STA 27+77 to 28+37 T1 Reach 4 295 295 Warm EII 2.50000 118.000 T1 Reach 5 452 447 Warm R 1.00000 452.000 T3 Reach 1 310 280 Warm Ell 2.50000 112.000 30' exception STA 301+57 to 301+87 T3 Reach 2 1 591 590 Wann EII 2.50000 236.400 T3 Reach 3 573 545 Wann R 1.00000 543.000 30' exception STA 317+98 to 318+28 Total: 3,326.400 Wetland Riparian Enhancement 1.495 1.473 R E 2.50000 0.598 Riparian Re-establishment 3.040 3.04 R REE 1.00000 3.040 Riparian Rehabilitation 1.488 1.471 R RH 1.50000 0.992 Total: 4.630 Project Credits Restoration Level Stream Riparian Wetland Non -Riparian Coastal Wetland Marsh Warm Cool Cold Restoration 2,860.000 Re-establishment 3.040 Rehabilitation 0.992 Enhancement AN 0.598 Enhancement I Enhancement 11 466.400 Creation Preservation Total 1 3,326.400 4.630 Hip Bone Creek Restoration Site KCIAssociates ofNC, PA DMS Project #100059 3 MY-02 Monitoring Report i V R d 19 tq F N .CIn+� v R v � R m W cl a r IA C m 3 Z • � ; W O U m Z F r a O Z 1M R IA IA N ZQ LU O C 11 Y -�_ R W Q c� LLI z x � U W m p � a r R {• 19 f �` _ N/ r o � m 0 0 cE N O LL cb C Q O �r U N O C — .a NID O C C C C ui fn N O N c o n o U' C C) N f/) U 0 U > C Z O Oa) O �d> EN O AS N (n Z w co Z 4 Cd d Q O L�V�j O O O O O M At C M N r O k p O M M v CP OM OOOOM , . • r + 19 F 0 0 O k0 e ' OpxZ`p, ' oox •. tit. ' o cc - * 10 R i lidN r ) _, W' v d' N p Op.t F 00 O 'o xo o x . + c 9L C u m R I mail U E O Cp C P O U �r O E O — N E H w (6 .0 C C C C C w a� .° s a U¢ o () o O > CC N C O AR N N C L O , O O O O O O d C� W Z � W a_U InU_ U_ co Z 41��>11 w d in Z 30 0 LL 0 N 0 0 CD ••3g+0� 35+00• r R d 4+00 � 00 �ryx v r u • x0o d 19 • . OO M oo 19 r v 9%00 C 19 o% • , 19 00x cc ' N Li �O - tihxo N o' C u N. M R o 19 19 M •d• F 4P N 'To N O O CO U C O Cp C C O 2 � C O C - .a O N � ° o (D cD aw C UO C () CC N O AS N O m O O O O O d> LL L� L U) Z wO n Z 30 0 LL 0 N 0 O Table 2. Hip Bone Creek Restoration Site (ID-100059) Goals, Performance and Results Likely Performance Cumulative Goal Objective/Treatment Functional Criteria Measurement Monitoring Uplift Results Restore a -Relocate channelized Dispersion of high BHR<1.2, ER>2.2, 16 cross-section All 16 XS have channelized streams to historic flows on the and no change surveys, 4 pressure BHR<1.2 and stream to a landscape positions floodplain, >10% in BHR or transducer stream ER>2.2; 5 BKF meandering -Install a bankfull-sized increase in biogeochemical ER between monitoring events; gauges (measuring bankfull events on event in 2022; T1- C-type channel cross-section cycling within the 4 bankfull events; T1-5 and T3-3 and 1 flow for 18 channel - Install bedform diversity system, and continuous flow for stream flow on T1- days, consecutive days, with a with pools, riffles, and recharging of at least 30 days 1 and T3-1), annual T3-1 flow for 242 floodplain habitat strucures riparian wetlands. each year visual inspection consecutive days Buffer and Fence intact around Fencing reduce Demarcate the project Reduction in entire easement, installation sediment easement boundaries and sediment, adequate Annual visual completed impacts to fence out livestock nutrient, and fecal round present around inspection 10/4/21, fence and the project coliform inputs to. easement boundary signs are in good stream condition Reduction in Survival rate of floodplain 320 stems per acre sediment inputs at MY3, 260 All veg plots Restorea Plant the site with native , from runoff, planted stems per >320 stems/acre; forested riparian trees and shrubs and a increased bank stability, acre at W5, and 18 vegetation plots 17 veg plots >4 community herbaceous seed mix increased LWD 210 stems per acre native hardwood and organic at MY7; at least 4 species material in native hardwood streams. species in each plot Restore a Increase in wetland Reconnect streams to wetland hydroperiod andsaturation Continuous hydroperiod floodplain; redevelop biogeochemical within a 6/8 gauges >12 /o to drained wetland microtopography cycling within the 12" of the soil 8 pressure continuous and/or to slow the flow of system, decrease a surface for 12 /o of transducer gauges saturation in 2022 livestock- surface and subsurface in sediment and the growing season impacted drainage (26 days) land nutrient inputs to streams. Hip Bone Creek Restoration Site KCIAssociates ofNC, PA DMS Project #100059 7 MY-02 Monitoring Report Table 3. Hip Bone Creek Restoration Site (ID-100059) Project Attribute Table Project Name Hip Bone Creek Restoration Site County Chatham County Project Area (acres) 18.68 Project Coordinates (latitude and longitude decimal degrees) 35.6804 N,-79.4018 W Project Watershed Summary Information Physiographic Province Piedmont River Basin Cape Fear USGS Hydrologic Unit 8-digit 3030003 DWR Sub -basin 03-06-12 Project Drainage Area (acres) 158 Project Drainage Area Percentage of Impervious Area 1% Land Use Classification Pasture/Farmland (85%), Forest (9%), Open Water (5%), and Rural Development (1%) Reach SummaryInformation Parameters Reach 1 Reach 3 Pre -project length (feet) 2,439 1,403 Post -project (feet) 2,702 1,474 Valley confinement (Confined, moderately confined, unconfined) Unconfined Unconfined Drainage area (acres) 158 43 Perennial, Intermittent, Ephemeral Intermittent Intermittent NCDWR Water Quality Classification C C Dominant Stream Classification (existing) G4 G4 Dominant Stream Classification (proposed) C4/C4b C4 Dominant Evolutionary class (Simon) if applicable Channelized, Stage III Channelized, Stage III Wetland Summa Information Parameters WA and WE WB, WC, WD, WF, and WG Pre -project (acres) 2.52 0.99 Post -project (acres) 2.78 2.67 Wetland Type (non -riparian, riparian) Riparian Riparian Mapped Soil Series Georgeville Chewacla/Wehadkee Soil Hydric Status Non-hydric Hydric Regulatory Considerations Parameters Applicable? Resolved? Supporting Does? Water of the United States - Section 404 Yes Yes SAW-2018-01160 Water of the United States - Section 401 Yes Yes DWR# 18-0785 Endangered Species Act Yes Yes USFWS Historic Preservation Act No N/A NCSHPO Coastal Zone Management Act (CZMA or LAMA) No N/A N/A Essential Fisheries Habitat No N/A N/A Hip Bone Creek Restoration Site KCIAssociates ofNC, PA DMS Project #100059 8 MY-02 Monitoring Report MONITORING RESULTS The second year of vegetation monitoring was conducted June 13 and 14, 2022. During the site's second growing season all 18 vegetation monitoring plots achieved the success criteria of 320 stems/acre and only one plot (Plot 7F, 3 species) had less than 4 woody species. Across all of the plots the site average 933 planted stems/acre. Including volunteers the site average 1,021 stems/acre. Two areas where Chinese privet is growing are present on the site. These areas are mainly in and around the wetland enhancement areas along T1 and T3 where there was existing tree cover prior to project construction. Scattered stems of Chinese privet are present throughout the understory of these areas. KCI treated these areas on July 28, 2022. Further treatment is planned for the spring of 2023. Overall the site is well vegetated with many planted and volunteer woody stems throughout the whole project and a robust and diverse herbaceous layer. The MY02 cross-section survey was completed on July 12, 2022. The MY02 survey found that the stream was functioning as designed with no problem areas identified. All 16 cross -sections had bank height ratios less than 1.2 and entrenchment ratios greater than 2.2. Based on the WETS table for Siler City 2 N Station in Siler City, NC, the growing season for the site extends from April 2 until November 5 (218 days). The daily rainfall data was obtained from an on -site rain gauge. In 2022, the months of March and November experienced average rainfall. February, April, June, July, August, September, and October experienced below average rainfall while January and May recorded above average rainfall. Overall the site experienced well below average rainfall during 2022. According to the USACE's Antecedent Precipitation Tool (APT), the site experienced drier than normal conditions for the month of February, before a large scale rain event at the beginning of March pushed it into wetter than normal conditions until April 15. At this point the site remained within normal or drier than normal conditions until November 12, except for a brief period at the beginning of June and a brief period at the beginning of October when the site experienced wetter than normal conditions. During this period from April 15 to November 12 (212 days), which roughly corresponds to the site's growing season, the site experienced drier than normal conditions for 92 days (43%) and normal conditions for 96 days (45%). The site experienced wetter than normal conditions for only 24 days (11%) during this period. During the site's second growing season, 6 of the 8 gauges achieved the success criteria of 12% continuous saturation (26 days). Both of the stream flow gauges recorded greater than 30 consecutive day of flow. This data was further backed up by the flow cameras which also both showed greater than 30 consecutive days of flow despite being obscured by vegetation for a large portion of the summer. Five bankfull events were recorded in 2022. Hip Bone Creek Restoration Site KCIAssociates ofNC, PA DMS Project #100059 9 MY-02 Monitoring Report REFERENCES NCDENR, Ecosystem Enhancement Program. 2009. Cape Fear River Basin Restoration Priorities 2009. Raleigh, NC. https://files.nc.gov/ncdeg/Mitigation%20Services/Watershed Planning/Cape Fear Rim er Basin/RBRP%20CapeFear%202009%2ORevised%20032013.pdf NCDEQ, Division of Mitigation Services. June 2017. "As -built Baseline Monitoring Report Format, Data and Content Requirement." https:Hfile s.nc. gov/ncdeq/Miti gation%20Services/Document%2OManagement%20Libra ry/Guidance%20and%20Template%20Documents/6 AB_ Baseline_Rep _Templ_June %202017.pdf NCIRT. October 24, 2016. "Wilmington District Stream and Wetland Compensatory Mitigation Update." https:Hsaw-reg.usace.army.mil/PN/2016/Wilmington-District-Mitigation- Undate.pdf USACE, Sprecher, S. W.; Warne, A. G. 2000. "Accessing and Using Meteorological Data to Evaluate Wetland Hydrology." hiips://ntrl.ntis.gov/NTRL/dashboard/searchResults/titleDetail/ADA378910.xhtml USACE, Deters, J. C. 2021. "Antecedent Precipitation Tool." https:Hgithub.com/jDeters- USACE/Antecedent-Precipitation-Tool/releases/tag/v 1.0.19 Hip Bone Creek Restoration Site KCIAssociates ofNC, PA DMS Project #100059 10 MY-02 Monitoring Report APPENDIX A Visual Assessment Data Hip Bone Creek Restoration Site KCI Associates of NC, PA DMS Project 9100059 11 MY-02 Monitoring Report �•o 0 0 0 0 0 0 a w o � � o 0 0 0 ono F z� H za o Z cn � o o c sOW. rii •° :� o 0 0 sOW. J-4. OW w o 4, 4, Z o 0 0 0 ono H OOW za o Z cn 0 � o s OW ~s° O rii OW •° :� o 0 OW G. 0 sOW. a 2 0 0 0 11 z b )k ) ( G |) u - f) \rr \}: /) ) / | ! \[ e 2 m f ƒ \ { \)j ) k�) \ \ ( \ } \ .§@ \ Ag }f. o /| {)\ /}\ a§g5k %a% &a34) 3(3 � ( \ � § } \ � k ■ ) / \§ / PP - MY-00 - 5/24/21 PP - MY-02 - 11/18/22 PP2 - MY-00 - 5/24/21 PP3 - MY-00 - 5/24/21 PP2 - MY-02 - 11/18/22 PP3 - MY-02 - 11/18/22 Hip Bone Creek Restoration Site KCIAssociates ofNC, PA DMS Project #100059 14 MY-02 Monitoring Report PP4 - MY-00 - 5/24/21 PP5 - MY-00 - 5/24/21 PP6 - MY-00 - 5/24/21 PP4 - MY-02 - 11/18/22 PP5 - MY-02 - 11/18/22 PP6 - MY-02 - 11/18/22 Hip Bone Creek Restoration Site KCIAssociates ofNC, PA DMS Project #100059 15 MY-02 Monitoring Report PP7 - MY-00 - 5/24/21 PP8 - MY-00 - 5/24/21 PP9 - MY-00 - 5/24/21 PP7 - MY-02 - 11/18/22 PP8 - MY-02 - 11/18/22 PP9 - MY-02 - 11/18/22 Hip Bone Creek Restoration Site KCIAssociates ofNC, PA DMS Project #100059 16 MY-02 Monitoring Report PP 10 - MY-00 - 5/24/21 PP10 - MY-02 - 11/18/22 Hip Bone Creek Restoration Site KCIAssociates ofNC, PA DMS Project #100059 17 MY-02 Monitoring Report Vegetation Plot 1 — MY-00 — 5/14/21 Vegetation Plot 2 — MY-00 — 5/13/21 Vegetation Plot 3 — MY-00 — 5/13/21 Vegetation Plot 1— MY-02 — 6/13/22 Vegetation Plot 2 — MY-02 — 6/13/22 Vegetation Plot 3 — MY-02 - 6/13/22 Hip Bone Creek Restoration Site KCIAssociates ofNC, PA DMS Project #100059 18 MY-02 Monitoring Report Vegetation Plot 4 — MY-00 — 5/13/21 Vegetation Plot 5 — MY-00 — 5/13/21 Vegetation Plot 6 — MY-00 — 5/14/21 Vegetation Plot 4 — MY-02 — 6/14/22 Vegetation Plot 5 — MY-02 — 6/14/22 Vegetation Plot 6 — MY-02 — 6/13/22 Hip Bone Creek Restoration Site DMS Project #100059 19 KCIAssociates of NC, PA MY-02 Monitoring Report Vegetation Plot 7 — MY-00 — 5/13/21 Vegetation Plot 8 — MY-00 — 5/13/21 Y Vegetation Plot 9 — MY-00 — 5/13/21 Vegetation Plot 7 — MY-02 — 6/13/22 Vegetation Plot 8 — MY-02 — 6/14/22 Vegetation Plot 9 — MY-02 - 6/13/22 Hip Bone Creek Restoration Site KCIAssociates ofNC, PA DMS Project #100059 20 MY-02 Monitoring Report Vegetation Plot 10 — MY-00 — 5/13/21 Vegetation Plot RI — MY-02 — 6/13/22 Vegetation Plot R3 — MY-02 — 6/13/22 Vegetation Plot 10 — MY-02 — 6/14/22 Vegetation Plot R2 — MY-02 — 6/13/22 Vegetation Plot R4 — MY-02 — 6/13/22 Hip Bone Creek Restoration Site KCIAssociates ofNC, PA DMS Project #100059 21 MY-02 Monitoring Report Vegetation Plot R5 — MY-02 — 6/14/22 Vegetation Plot R7 — MY-02 — 6/14/22 Vegetation Plot R6 — MY-02 — 6/14/22 Vegetation Plot R8 — MY-02 — 6/14/22 Hip Bone Creek Restoration Site KCIAssociates ofNC, PA DMS Project #100059 22 MY-02 Monitoring Report APPENDIX B Vegetation Plot Data Hip Bone Creek Restoration Site KCI Associates of NC, PA DMS Project 9100059 23 MY-02 Monitoring Report Table 6. Vegetation Performance Standards Summary Table Hip Bone Creek Restoration Site (ID-100059) Veg Plot 1 F Veg Plot 2 F Veg Plot 3 F Stems/ Av. Ht. Stems/ Av. Ht. % Stems/ Av. Ht. Ac. (ft) #Species %Invasives Ac. (ft) #Species Invasives Ac. (ft) #Species Invasives itoring Year 7 itoring Year 5 itoring Year 3 itoring Year 2 1093 3 8 0 1012 3 6 0 8 2 6 91111 0 itoring Year 1 2 8 0 972 2 6 0 72 2 6 0 itoring Year 0 1093 1 8 0 1174 2 0 688 2 6 Veg Plot 4 F Veg Plot 5 F Veg Plot 6 F Stems/Ac. Av. Ht. # Species % Invasives fftl Stems/Ac. Av. Ht. (ft) # Species % Tnvasives Stems/Ac. Av. Ht. # Species (ft) % Tnvac,vec Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 8500 2 6 0 1012 2 4 0 1012 3 5 Monitoring Year 1 850 2 6 0 891 2 4 0 810 2 5 Monitoring Year 0 769 1 0 1012 1 1 A n 810 2 Veg Plot 7 F Veg Plot 8 F Veg Plot 9 F Stems/Ac. Av. Ht. Av. Ht. Stems/Ac. ft #Species % Invasives Stems/Ac. Av. Ht. ft #Speciesft Invasives Monitoring Year 7 Monitoring Year 5 JSpeciesjInvasives Monitoring Year 3 Monitoring Year 2 2 850 3 5 0 1214 2 5 Monitoring Year 1 105 1 5 0 1093 2 4 0 Monitoring Year 0 1093 2 5 0 1174 1 5 0 Veg Plot 10 F Veg Plot Group 1 R Veg Plot Group 2 R Stems/Ac. Av. Ht. % Invasives ft Stems/Ac. Av. Ht. ft # Species %Stems/Ac. Invasives Av. Ht. # Species ft % Invasives Monitoring Year 7 Monitoring Year 5 JSpecies Monitoring Year 3 Monitoring Year 2 1214 20 891 3 5 0 850 3 5 0 Monitoring Year 1 1255 2 7 10 0 Monitoring Year 0 1498 2 7 10 0 Veg Plot Group 3 R Veg Plot Group 4 R Veg Plot Group 5 R Stems/Ac. Av. Ht. ft # Species % Invasives Stems/Ac. Av. Ht. ft # Species % Invasives Stems/Ac. Av. Ht. ft # Species % Invasives Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 0 769 4 4 5 931 0 Monitoring Year 1 Monitoring Year 0 Veg Plot Group 6 R Veg Plot Group 7 R Veg Plot Group 8 R Stems/Ac. Av. Ht. ft #Species %Invasives Stems/Ac. Av. Ht. ft #Species % Invasives Stems/Ac. Av. Ht. ft #Species % Invasives Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 2 6 0 2550 2 8 0 607 4 0 Monitoring Year 1 Monitoring Year 0 Hip Bone Creek Restoration Site KCIAssociates ofNC, PA DMS Project #100059 _14 MP-02 Monitoring Report y N F o P. ou � cd y O w v F 0 P. ou � P. 0 w M F 0 P. N N P. m N N F 0 P. m P. YM F 0 P. ou � P. r. O O w w w w O m m A m m ^o m m m m m m m m m H o m o Qj Q O ¢QiQj _ i5 w^ � a 2 0 d 0 U O 2 I 0 z b a Q o ro F � 0 w on b P. m m o\ ro F 0 w a w 00 � w w N w a on F b P. N N N ro F w on b P. p H � a U U O bfJ a 2 0 0 U O 5 I x 0 a Q ou F" C4 0 0 a x �n w x P-i m � ,-• � m N N m cv cv M � `n � N o �n w C4 N W � H x �n w O O w O w w w d d d d d d d d d d d Qj H H R H H H H H H H H ti ti � ti ti ti ti ti ti Q o mQj 5 ° 0 o •�, on -o c cn cz _ c U czQ r.r" cz ��~ O O cz to r � Qcz a, � U cz cz .� 3 'to cz ti C bA to U cz � o U U r $:, U O 'C 'C U S"y c O P. cvv U O C O O to - to Q ¢ Ito 64 U c O c l ¢I ¢I �Qto 0zz 81 at o¢ U U -o� ���•on U � O a 2 0 d 0 U O 0 0 I 0 z IS a Q LJ ct ct Q bA O O 0 0 ct U 2, 0 a 0 0 m oa s 0 s s N I s q 0 I I 0 f Il —ate 5 4 rl j. rl N O M 9 S O O O r y a 1 O 1 1 y y O A MMO I�1 w 1 1 1 O v CI O o I 0 � N N o �xxo�H W ww I 1 II 1 II 1 II 1 II II li 1 II 1 II 1 II 1 1 I 1 II 1 II 1 II 1 II 1 1 1 11 1 1 1 II 1 II 1 II 1 1 1 II 1 1 1 1 1 1 1 1 1 1 1 I 1 I 1 1 1 1 1 II 1 II 1 II 1 1 1 1 II 1 I 1 II 1 II 1 II 1 II 1 1 1 1 1 1 II 1 1 1 1 1 1 1 II 1 1. 1 II 1 1 I 1 II 1 II 1 II 1 II 1 II 1 1 I 1 II 1 II 1 II 1 II 1 II 1 II 1 II 1 II 1 II 1 II 1 II 1 II 1 II 1 II 1 II 1 1 I i li 5 O a; O i+ O O � y ow �i OW iOW . O � w a x i 1 1 O O a O R 0 cv w aca ww wcaH � 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Y 1 1 1 1 1 1 1 1 1 1 1 1 1 1 \I 1 1 1 1 1� 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 F w a o o %+ w y O 1 1 g. x 0 w 1 1 1 0 N P7 O o .a 0 > c� cv R. m cv v� v� v� v� v� v� v� v� v� v� v� �xxo�H (1aa,0 U011VAapg a R �n W �n �n �n �n �n �n �n �n �n �n �n �n �n �n �n �n �n �n �n �n �n �n �n �n �n �n �n �n �n �n �n �n �n �n �n C � 3 = av �CAAw C d' w o .. � ca ca acawwwcaH 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 , 1 i 1 1 1 1 I 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 � 1 I 1 1 1 � 1 1 1 1 1 1 1 S(` 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 f 1 1 1 1 1 1 I 1 1 1 1 1 1 1 i 1 1 1 ) 1 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ` 1 1 1 /e( o F o O (O. O h ow O O �+ w x m 1 1 1 O O a 0 0 cv a. �xxo�H (1aa,0 uouVAO/a a � � � � � � vi vi vi vi vi v vi vi vi vi vi v v v v mi mi mi mi v v v v v vi vi vi vi vi � � � R W C � 3 = av �CAAw v d' R L. ai s =x .� W C R 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 �1 1 1 I it 1 1 1 1 1 1 I I 1 1 1 1 1 1 1 1 I" I k 1 i 0 0 W c� w o �xxo a . . . . . . . v v . . . . . v v v v v v v v v v . . . . . . . . . R W C � 3 = 9z O� V v d' R L. F O Vl u C C � ca ca acaww���wcaH O r 1 1 1 1 1 1 \ 1 1 1 1 1 1 1 1 ry 1 1 � 1 1 1 1 I 1 1 1 1 1 1 1 1 � 1 1 1 1 1 1 1 1 1 1 1 1 � N ti 1 1 1 1 F 1 1 may+ 1 1 O a 1 1 1 1 � 1 1 1 1 1 1 1 1 q O 1 1 1 1 y 1 1 1 1 � � 1 M o 1 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 O 1 1 1 � 1 1 1 1 1 1 1 1 1 4 1 1 1 1 O 1 1 O F" 1 1 1 1 1 1 J1 i 0 (1aa� uop;bnapg 49 OW 0 V 0� V v 7 C d' w o .. _ O ui v u � ca ca acaww���wcaH � � I M N M 4 M o M .1 1 N ti 1 1 F p 1 � Qr M 0 r 0 M � O � 1 O a x 1 O N w M 1 1 w O � O N M 4 0 (;aa� uop;bnapg o � � N � ti F SOW G �i r ai � � O o r A t.. O y �i w � O 0 o M d x w 1 1 1 0 w 1 1 1 0 °J � O F O .a 0 W c� � N N o 0 O N rui t` 0 R. c�xxo�H (1aa,0 uoubnapg a -- N N N N N N N N v v v v v v v v N v N N N N N O' v . v . v v . . v v . . v v . . v v . . . . . . . . . . v . v v v v v v v v v v v v v R W C � 3 = — N N N N N N N - N N - - N N - - N N N N N N M M M V Vl Vl (V Vl �O v� l �O �O l �O av �CAAw 7 C d' w o .. � ca ca acaww���wcaH 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 � 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1] 1 1 1 1 1 1 1 1 1 1 1 1 i 1 I 1 I 1 I 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 o N F IBC 49 0 r A s. O O M h a w o O OW � O O C, O o Uj A: 9+ x O w 1 1 1 O O H a CA 0 0 � N N o 0 0 N rui �D V1 � M N O R. c�xxo�H u a s 11 it q 4 11 it it 4 11 11 it 11 I I I I I q 11 11 it it 4 11 11 it 11 11 11 1 1� 1 1� 1 1 1' 1 1 1 1 1 1 1 1 1 1 I I I I I I I I I I I I I I I 0 0 cv R. c�xxo�H a v v v m m m m m m m m m m m m m m m m m m m m m m m m m m m m R W C � 3 = av��CAAw v d' 7 C d' w o .. � ca ca acaww���wcaH O t` I 1 1 1 1 1 �Y � 1 1 1 1 O 1 1 � 1 1 1 1 1 1 M 1 � � rl I p �F+ � � 1 I 0 � C. O 1 1 A 1 � O y 1 1 � 1 1 m 1 w 1 1 1 1 1 O N w 1 1 1 1 1 1 1 1 1 1 1 1 p 1 1 1 1 O .Fa 1 1 1 1 1 1 1 h 0 h h h h h h h (;aa� uop;bnapg M ti 0 F a O C. O r A s.. O r h a w o � O OW O M � 9+ x O w N 1 1 1 o � 0 O R 0 � N N o 0 �xxo�H Vl u 4 a wcaH 1 1 1 1 1 1 1 1 1 1 1 1 1 I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 O 0 N w mo U R. �xxo�H a 0 0 0 Y 7 C d' w � ca ca aca'w'w���wcaH ti � N O 0 0 H a � N ti � o C O r A s. h OW o OW OW Z O OW C. O O Uj ai 9+ x O w 1 1 1 O O a v O O R 0 � N N o 0 aca ww 1 1 1 1 1 1 1 1 1 1 1 1 1 T 1 1 1 1 1 1 1 y 1 1 1 1 1 1 1 1 1 1 1 1 1 O R 0 cv � cv n N R. �xxo�H a . R W C � 3 = R o o av �CAAw 7 C d' w s L � � � ai R • L L R s � ca ca awcaH 1 1 11 1 11 1 1 11 11 1 11 Q 4 11 j 1 jl 1 o 1 1 1 1 1 1 1 1 1 1 1 1 M rn 1 1 11 11 F 1 1 11 1 ti 1 11 ti 1 11 yC i I 1 � q 0 1 1 1 so. 0 h 1 1 � 1 1 1 1 1 1 1 1 1 1 1 1 O 1 1 1 1 N 1 1 1 1 1 1 1 1 w 1 1 1 1 1 1 1 1 11 1 1 1 1� 1 1 1 O 1 1 1 11 1 11 O 1 11 11 .Fa 11 1 1 11 11 1 1 11 1 I 0 (�aa� uoubnalg 0 I M N1 H O � O Qr � 7 r V] C. O r O y O M �y o A O O � m lvi g x O w 1 1 1 O O N a O R 0 o N (1aa0 uouVAOjy a ............ v R W C � 3 = R av��CAAw n � � N � v d' R L. L L R s � ca ca aca'w'ww caH 1 1 1 1 1 1 1 1 1 1 1 � 1 1 1 1 1 1 1 1� I�1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 M � F 07 w 0 � P A O r r � o O m � O O � � FQ � g. x w 1 1 1 0 w 1 1 1 O v] O a Oti R 0 cv v a v N U a.vi v a (1aa,0 uouVAOIy a v v v v v v v v v v v v v v v v v v v v v v v v v v v v v R W C � 3 = U R R ci . cv M M cv cv . . cv cv cv cv cv cv cv cv cv av��CAAw v d' R L. L L R s � ca ca aca'w'w���wcaH I 1 11 11 11 1 1 11 I 1 u 1 11 1 1, 1 1 1 1 1 1 11 1 11 1 11 1 1 1 11 1 11 1 11 1 11 1 11 1 1 I 1 11 1 11 1 11 1 11 1 1 1 11 1 11 1 11 1 11 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 I 1 11 1 11 1 11 1 11 1 1 1 11 1 1 1 1 1 I 1 I 1 I 1 11 1 11 1 11 1 11 1 1 I 1 11 1 11 1 11 1 11 1 I 1 11 1 11 1 11 1 11 1 1 I 1 11 1 11 1 11 1 11 1 11 1 11 1 11 11 11 1 1 11 I i it 0 � M M F e DC ai A 0 r r � w U � c � CC W w O � N ' 1 0 0 F O R 0 Ll � U cv .... .... O N m Q" V] O '• �/j 7 7 7 7 7 7 ��xxo�H Vl Vl Vl Vl Vl Vl (Jaa,o uounnalg a � � vi vi vi vi vi vi v v v v v mi mi mi �i N N N cn mi mi v v v v v v v v v vi vi vi vi � v . v . v v . . v v . . v v . . v v . . v v . . v v . . v v . . v v . . v v . . v v . . v v . . v v . . v v . . v v . . v v . . v v . . v . R W C � 3 = ,-. N N N N N - - N N N av��CAAw Y 7 C o .. L L R s aca'w'wwcaH y u u a I' I' Ij u n I� I, y u u a 1 1 1 1 1 1 p I' I' Ij U p I' I' Ij U I� I� I� I, II U p 1 1 1 p p I' I' II 1 U J p I� 1 1 I' I' II U p I� I, I, II I� I� I� I, II U p I� I I' U I� I� I� I, II N U oc N ~ O A O Fr" N N N N N N N N M 0� Vl M Vl O� 01 N C." O a+ U M O N N `.J o 00 O O E'� Ci m C7 op O � W O to to i.n O O C co co C." O �Q MC. W O � O O A N � N � to a+ � Y O S N to00 7-r � to to CC CSC � � 00 � � � `� � � � to O � f�•, cyC o � � � O y A N U O Fr" N N N N N N N N CV O CV N V1 N 0�OC N 01 N C." O a+ oc �O N O U O � W � M � O � y i.n QI M N oc ^ N O N O O C 00 U N o 4 4 N C." O �Q MC. W O � � O O 00 CC CSC � � 00 � � � � `� � � � � � to O � f�•, w � cyC 2 O o � 01 O 00 N U O M O M 0� 00 N N 0� --i bA `o U 00 oNo O A O 00 M O N M Ci O a+ kn ^O U N O N N N N O SJ U YE W O CC to w to Q-I c 00 M N O O N N Vl N O O C co to U N O V M to Ci O �Q MC. W O � U] ^ a+ CC A N � ^ to a+ y to i"i ,y N N � O F7 b4 O to 0 U .to to 00 `� U T ouu CC H CSC a, a a w a a a w a O x a f�•, cyC �: I o 00 Vl DD .7T M � •� to A M N � U � 00 M ~ ~O O oo p (n l l N � N Ci O a+ M C." � 00 C7 � N O O CC W to to i QI 00 ^ O N O O N N O O C co to Uto N O V M C: O �Q MC. W O � � O O A to to � CC to toto CSC � � 0 00 Q � N � � � N C/� U � `� � O .to � � � � N F�7 � U O b4 � T f�•, w ^ 62 cyC 2 O f O� Ncc I O MIc � 116 o M o M O N N O N N� o � � cn � Ic Cc', Ic Ic o0 � o � o cM 0 'JOi M Vl O rSr O O O O rSr N O N Ip Ip Ip M Ic M M p� O . . 7 o I4 � Ic Ic Ic o ri v'i vmi v'i O v� �'' (V 't (V Nt c�+' 'o o .y r� �o �o N o M r M o o �n o o o M 1 M O G, I Ic O Ic Ic 0 o �; m �n '" '�; hi hi �O �; �O M �O �O o I I r. N m , .�06� M M cn ri N � O ro ro g O ro= ro ro g O ro= ro ro g O ro= ro ro g O ro= p = p Fy a ti O = p = p F� a O �� ro ro ro ro ro ro ro ro o y F � � N �y M o yFSi', W H � M V� O NO 0o O\ h U O zzLr^ 7 O Nj 7 7 O\ O O\ M r O O M aM H � O � M �Or !• U M N � � O m N O � oo h o0 o a N ry 7 7 7 7 O O M oo 7 N r 7 M oo 7 M 7 O O O W M O O M O y W � a U N � o ro O� av i' � o0 0 o ro o a c�i a i m 0o O\ oo .y h N O pp pp O N h N IS m U U vC ro ro o a E 2 APPENDIX D Hydrologic Data Hip Bone Creek Restoration Site KCI Associates of NC, PA DMS Project 9100059 49 MY-02 Monitoring Report ZZ-nON ZZ-100 ZZ-doS ZZ-5nv ZZ-lnf ZZ-un f ZZ—,�Sw e��C A ZZ-zdV ZZ-it?W ZZ-aad ZZ-UVf i Z-OaQ i Z-nON 0 0 0 0 0 0 0 0 (ui) II�3ui�g Table 10. Rainfall Summary, Hip Bone Creek Restoration Site (ID-100059) MYl 2021 MY2 20 2 MY3 2023 MY4 2024 MY5 2025 MY6 2026 MY7 2027 Annual Precip Total 38.49 21.76 WETS 30th Percentile 29.73 29.73 WETS 70th Percentile 1 53.88 1 53.88 Normal I Y I N Table 11. Overbank Events, Hip Bone Creek Restoration Site (ID-100059) Gage ID MYl 2021 MY2 2022 MY3 2023 MY4 2024 MY5 2025 MY6 2026 MY7 2027 T1-5 none 3 T3-3 none 5 Table 12. Stream Flow Criteria Attainment, Hip Bone Creek Restoration Site (ID-100059) Greater than 30 Days of Flow/Max Consecutive Days MYl MY2 MY3 MY4 MY5 MY6 MY7 2021 2022 dk 2023 2024 2025 2026 2027 T1-1 Yes/105 Yes/218 (Gauge) ------------------------------ ------------ --------------------------•------------ ------------ -------------•------------ T1-1 (Camera) Yes/90 Yes/69 T3-1 Yes/205 Yes/242 (Gauge) T3-1 Yes/39 Yes/108 (Camera) Table 13. Wetland Hydrology Criteria Attainment, Hip Bone Creek Restoration Site (ID-100059) Performance Standard: 12 WETS Station: Siler City 2N Growing Season: 4/2 to 11/5 (217 days) Max. Consecutive Hydroperiod (%) Monitoring Gauge MYl 2021 MY2 2022 MY3 2023 MY4 2024 MY5 2025 MY6 2026 MY7 2027 WM-1 5.5% 22.9% WM-2 6.0% 6.4% WM-3 30.9% 38.5% WM-4 5.1% 12.4% WM-5 3.2% 23.4% WM-6 19.8% 38.5% WM-7 28.1% 9.6% WM-8 2.3% 22.9% Hip Bone Creek Restoration Site KCIAssociates ofNC, PA DMS Project #100059 51 MP-02 Monitoring Report �Q CL F"- Rainfall (in) 0 0 0 0 0 M M M N M M M M (13) UOIjUAal:j a2VjS nUUaaJS 27-Dec-22 18-Dec-22 9-Dec-22 30-Nov-22 21-Nov-22 12-Nov-22 3-Nov-22 25-Oct-22 16-Oct-22 7-Oct-22 28-Sep-22 19-Sep-22 10-Sep-22 1-Sep-22 23-Aug-22 14-Aug-22 5-Aug-22 27-Jul-22 18-Jul-22 9-Jul-22 30-Jun-22 21-Jun-22 12-Jun-22 3-Jun-22 25-May-22 16-May-22 7-May-22 28-Apr-22 19-Apr-22 10-Apr-22 1-Apr-22 23-Mar-22 14-Mar-22 5-Mar-22 24-Feb-22 15-Feb-22 6-Feb-22 28-Jan-22 19-Jan-22 10-Jan-22 1-Jan-22 0 W cz ro m It I �Q CL F"- Rainfall (in) 0 0 0 0 0 M M M (13) UOIjUAal:j a2VjS nUUaaJS 27-Dec-22 18-Dec-22 9-Dec-22 30-Nov-22 21-Nov-22 12-Nov-22 3-Nov-22 25-Oct-22 16-Oct-22 7-Oct-22 28-Sep-22 19-Sep-22 10-Sep-22 1-Sep-22 23-Aug-22 14-Aug-22 5-Aug-22 27-Jul-22 18-Jul-22 9-Jul-22 30-Jun-22 21-Jun-22 12-Jun-22 3-Jun-22 25-May-22 16-May-22 7-May-22 28-Apr-22 19-Apr-22 10-Apr-22 1-Apr-22 23-Mar-22 14-Mar-22 5-Mar-22 24-Feb-22 15-Feb-22 6-Feb-22 28-Jan-22 19-Jan-22 10-Jan-22 1-Jan-22 0 W cz ro m It I W. Rainfall 0 0 0 0 0 o C� oc r— (13) UOIIUAal:I atU)S nUUaaJS 27-Dec-22 18-Dec-22 9-Dec-22 30-Nov-22 21-Nov-22 12-Nov-22 3-Nov-22 25-Oct-22 16-Oct-22 7-Oct-22 28-Sep-22 19-Sep-22 10-Sep-22 1-Sep-22 23-Aug-22 14-Aug-22 5-Aug-22 27-Jul-22 18-Jul-22 9-Jul-22 30-Jun-22 21-Jun-22 12-Jun-22 3-Jun-22 25-May-22 16-May-22 7-May-22 28-Apr-22 19-Apr-22 10-Apr-22 1-Apr-22 23-Mar-22 14-Mar-22 5-Mar-22 24-Feb-22 15-Feb-22 6-Feb-22 28-Jan-22 19-Jan-22 10-Jan-22 1-Jan-22 A W. Rainfall (in) 0 0 0 0 0 M M M M M M (13) UOIIUAal:l 32PJS MU;)AJS 27-Dec-22 18-Dec-22 9-Dec-22 30-Nov-22 21-Nov-22 12-Nov-22 3-Nov-22 25-Oct-22 16-Oct-22 7-Oct-22 28-Sep-22 19-Sep-22 10-Sep-22 1-Sep-22 23-Aug-22 14-Aug-22 5-Aug-22 27-Jul-22 18-Jul-22 9-Jul-22 30-Jun-22 21-Jun-22 12-Jun-22 3-Jun-22 25-May-22 16-May-22 7-May-22 28-Apr-22 19-Apr-22 10-Apr-22 1-Apr-22 23-Mar-22 14-Mar-22 5-Mar-22 24-Feb-22 15-Feb-22 6-Feb-22 28-Jan-22 19-Jan-22 10-Jan-22 1-Jan-22 A t9 7� I Cs, x Rainfall (in) m m N N C C (1j) uoi;ee31:1 .13IRtApuno af)aAi;eiag 27-Dec-22 18-Dec-22 9-Dec-22 30-Nov-22 21-Nov-22 12-Nov-22 3-Nov-22 25-Oct-22 16-Oct-22 7-Oct-22 28-Sep-22 19-Sep-22 10-Sep-22 1-Sep-22 23-Aug-22 14-Aug-22 5-Aug-22 27-Jul-22 18-Jul-22 9-Jul-22 30-Jun-22 c, 21-Jun-22 A 12-Jun-22 3-Jun-22 25-May-22 16-May-22 7-May-22 28-Apr-22 19-Apr-22 10-Apr-22 1-Apr-22 23-Mar-22 14-Mar-22 5-Mar-22 24-Feb-22 15-Feb-22 6-Feb-22 28-Jan-22 19-Jan-22 10-Jan-22 1-Jan-22 i o. Q 0 0 x Rainfall (in) (1j) u011CA31:1 .13JUMpunO.a19 aAi;eiag 27-Dec-22 18-Dec-22 9-Dec-22 30-Nov-22 21-Nov-22 12-Nov-22 3-Nov-22 25-Oct-22 16-Oct-22 7-Oct-22 28-Sep-22 19-Sep-22 10-Sep-22 1-Sep-22 23-Aug-22 14-Aug-22 5-Aug-22 27-Jul-22 18-Jul-22 9-Jul-22 30-Jun-22 21-Jun-22 12-Jun-22 3-Jun-22 25-May-22 16-May-22 7-May-22 28-Apr-22 19-Apr-22 10-Apr-22 1-Apr-22 23-Mar-22 14-Mar-22 5-Mar-22 24-Feb-22 15-Feb-22 6-Feb-22 28-Jan-22 19-Jan-22 10-Jan-22 1-Jan-22 i e� A P x Rainfall (in) (1j) u011CA31:1 .13JUMpunO.a19 aAi;eiag 27-Dec-22 18-Dec-22 9-Dec-22 30-Nov-22 21-Nov-22 12-Nov-22 3-Nov-22 25-Oct-22 16-Oct-22 7-Oct-22 28-Sep-22 19-Sep-22 10-Sep-22 1-Sep-22 23-Aug-22 14-Aug-22 5-Aug-22 27-Jul-22 18-Jul-22 9-Jul-22 30-Jun-22 21-Jun-22 12-Jun-22 3-Jun-22 25-May-22 16-May-22 7-May-22 28-Apr-22 19-Apr-22 10-Apr-22 1-Apr-22 23-Mar-22 14-Mar-22 5-Mar-22 24-Feb-22 15-Feb-22 6-Feb-22 28-Jan-22 19-Jan-22 10-Jan-22 1-Jan-22 i e� A P x Rainfall (in) (1j) uoi;ee31:1 .13IRtApuno af)aAi;eiag 27-Dec-22 18-Dec-22 9-Dec-22 30-Nov-22 21-Nov-22 12-Nov-22 3-Nov-22 25-Oct-22 16-Oct-22 7-Oct-22 28-Sep-22 19-Sep-22 10-Sep-22 1-Sep-22 23-Aug-22 14-Aug-22 5-Aug-22 27-Jul-22 18-Jul-22 9-Jul-22 30-Jun-22 21-Jun-22 12-Jun-22 3-Jun-22 25-May-22 16-May-22 7-May-22 28-Apr-22 19-Apr-22 10-Apr-22 1-Apr-22 23-Mar-22 14-Mar-22 5-Mar-22 24-Feb-22 15-Feb-22 6-Feb-22 28-Jan-22 19-Jan-22 10-Jan-22 1-Jan-22 e� A Cs, x Rainfall (in) m m N N (1j) uoi;eeai:j .13j9tApuno af) aAi;eiag 27-Dec-22 18-Dec-22 9-Dec-22 30-Nov-22 21-Nov-22 12-Nov-22 3-Nov-22 25-Oct-22 16-Oct-22 7-Oct-22 28-Sep-22 19-Sep-22 10-Sep-22 1-Sep-22 23-Aug-22 14-Aug-22 5-Aug-22 27-Jul-22 18-Jul-22 9-Jul-22 30-Jun-22 21-Jun-22 12-Jun-22 3-Jun-22 25-May-22 16-May-22 7-May-22 28-Apr-22 19-Apr-22 10-Apr-22 1-Apr-22 23-Mar-22 14-Mar-22 5-Mar-22 24-Feb-22 15-Feb-22 6-Feb-22 28-Jan-22 19-Jan-22 10-Jan-22 1-Jan-22 i e� A K x Rainfall (in) m m N N (1j) uoi;ee31:1 .13IRtApuno af)aAi;eiag 27-Dec-22 18-Dec-22 9-Dec-22 30-Nov-22 21-Nov-22 12-Nov-22 3-Nov-22 25-Oct-22 16-Oct-22 7-Oct-22 28-Sep-22 19-Sep-22 10-Sep-22 1-Sep-22 23-Aug-22 14-Aug-22 5-Aug-22 27-Jul-22 18-Jul-22 9-Jul-22 30-Jun-22 A 21-Jun-22 12-Jun-22 3-Jun-22 25-May-22 16-May-22 7-May-22 28-Apr-22 19-Apr-22 10-Apr-22 1-Apr-22 23-Mar-22 14-Mar-22 5-Mar-22 24-Feb-22 15-Feb-22 6-Feb-22 28-Jan-22 19-Jan-22 10-Jan-22 1-Jan-22 i C7 x Rainfall (in) (1j) uoi;ee31:1 .13IRtApuno af)aAi;eiag 27-Dec-22 18-Dec-22 9-Dec-22 30-Nov-22 21-Nov-22 12-Nov-22 3-Nov-22 25-Oct-22 16-Oct-22 7-Oct-22 28-Sep-22 19-Sep-22 10-Sep-22 1-Sep-22 23-Aug-22 14-Aug-22 5-Aug-22 27-Jul-22 18-Jul-22 9-Jul-22 30-Jun-22 A 21-Jun-22 12-Jun-22 3-Jun-22 25-May-22 16-May-22 7-May-22 28-Apr-22 19-Apr-22 10-Apr-22 1-Apr-22 23-Mar-22 14-Mar-22 5-Mar-22 24-Feb-22 15-Feb-22 6-Feb-22 28-Jan-22 19-Jan-22 10-Jan-22 1-Jan-22 x Rainfall (in) �z Q O 'd Q W 0 won o N N � 27-Dec-22 18-Dec-22 9-Dec-22 30-Nov-22 21-Nov-22 12-Nov-22 3-Nov-22 25-Oct-22 16-Oct-22 7-Oct-22 28-Sep-22 19-Sep-22 10-Sep-22 1-Sep-22 23-Aug-22 14-Aug-22 5-Aug-22 27-Jul-22 18-Jul-22 9-Jul-22 30-Jun-22 A 21-Jun-22 12-Jun-22 3-Jun-22 25-May-22 16-May-22 7-May-22 28-Apr-22 19-Apr-22 10-Apr-22 1-Apr-22 23-Mar-22 14-Mar-22 5-Mar-22 24-Feb-22 15-Feb-22 6-Feb-22 28-Jan-22 19-Jan-22 10-Jan-22 1 J 22 - an- � (1j) uoi;ee31:1 .13IRtApuno af)aAi;eiag 1 APPENDIX E Project Timeline and Contact Info Hip Bone Creek Restoration Site KCI Associates of NC, PA DMS Project 91000059 64 MY-02 Monitoring Report Table 14. Project Activity & Reporting History Hip Bone Creek Restoration Site (ID-100059) Activity or Report Data Collection Complete Actual Completion or Delivery Project Instituted Aril 23, 2018 Mitigation Plan March 17, 2020 Final Design - Construction Plans March 17, 2020 Construction Grading Completed April 16, 2021 Planting Completed April 30, 2021 Baseline Monitoring/Report May 2021 July 2021 Vegetation Monitoring May 14, 2021 Stream Survey May 21,2021 Year 1 Monitoring December 2021 January 2022 Vegetation Monitoring November 17, 2021 Stream Survey December 13, 2021 Invasive Treatment July 28, 2022 Year 2 Monitoring November 2022 December 2022 Vegetation Monitoring August 22, 2022 Stream Survey July 15, 2022 Hip Bone Creek Restoration Site KCIAssociates ofNC, PA DMS Project #1000059 65 MY-02 Monitoring Report Table 15. Project Contacts Hip Bone Creek Restoration Site (ID-100059) Design Firm KCI Associates of North Carolina, PC 4505 Falls of Neuse Road Suite 400 Raleigh, NC 27609 Contact: Mr. Adam Spiller Phone: (919) 278-2514 Fax: (919) 783-9266 Construction Contractor Chatham Civil Contracting 811 Archie Johnson Road Siler City, NC 27344 Contact: Mr. Stephen James Phone: 919 704-4442 Planting_ Contractor Shenandoah Habitats 1983 Jefferson Highway Waynesboro, VA 22980 Contact: Mr. David Coleman Phone: 540 941-0067 Monitoring Performers KCI Associates of North Carolina, PC 4505 Falls of Neuse Road Suite 400 Raleigh, NC 27609 Contact: Mr. Adam Spiller Phone: (919) 278-2514 Fax: (919) 783-9266 Hip Bone Creek Restoration Site KCIAssociates ofNC, PA DMS Project #1000059 66 MY-02 Monitoring Report