HomeMy WebLinkAbout20180785 Ver 1_Year 2 Monitoring Report_2022_20230213Mitigation Project Information Upload
ID#* 20180785
Version* 1
Select Reviewer: *
Ryan Hamilton
Initial Review Completed Date 02/15/2023
Mitigation Project Submittal - 2/13/2023
..................................................................................................................................................................................................................................................................
Is this a Prospectus, Technical Proposal or a New Site? * 0 Yes O No
Type of Mitigation Project:*
Stream Wetlands Buffer Nutrient Offset
(Select all that apply)
Project Contact Information
Contact Name: *
Email Address: *
Jeremiah Dow jeremiah.dow@ncdenr.gov
Project Information
ID#:*
20180785
Existing ID#
Project Type:
• DMS Mitigation Bank
Version:* 1
Project Name: Hip Bone Creek Full Delivery Restoration
STREAM Site
County:
Chatham
Document Information
Mitigation Document Type: *
Mitigation Monitoring Report
File Upload:
Signature
............................................
Print Name: *
Signature:*
H i pBo neC reek_100059_MY2_2022. pdf
Existing Version
20.26MB
Please upload only one PDF of the complete file that needs to be submitted...
Jeremiah Dow
MY02 MONITORING REPORT
Hip Bone Creek Restoration Site
Chatham County
Cape Fear River Basin - 3030003
DMS Project #100059
DMS Contract #7528
DMS RFP #16-007331
USACE AID #: SAW 2018-01160 DWR #: 2018-0785
Monitoring Data Collected: 2022
Prepared for:
NC Department of Environmental Quality
Division of Mitigation Services
1652 Mail Service Center
Raleigh, NC 27699
k, ;
NORTH CAROLINA
Department of Environmental Quality
Monitoring and Design Firm
Prepared by:
KCI
ASSOCIATES OF NC
KCI Associates of North Carolina, PC
4505 Falls of Neuse Road
Suite 400
Raleigh, NC 27609
(919)783-9214
Project Contact: Adam Spitler
Email: adam.sniller(iMci.com
Hip Bone Creek Restoration Site KCI Associates of NC, PA
DMS Project 9100059 1 MY-02 Monitoring Report
KCI
ASSOCIATES OF
NORTH CAROUNA, PA
ENGINEERS • SCIENTISTS • SURVEYORS • CONSTRUCTION MANAGERS
MEMORANDUM
4505 Falls of Neuse Road Suite 400 Raleigh, NC 27609 (919) 783-9214 (919) 783-9266 Fax
Date: February 9, 2023
To: Jeremiah Dow, DMS Project Manager
From: Adam Spiller, Project Manager
KCI Associates of North Carolina, PA
Subject: MY-02 Monitoring Report Comments
Hip Bone Creek DMS#100059, Contract 007528
Cape Fear River Basin CU 03040101
Chatham County, North Carolina
Please find below our responses in italics to the MY-02 Monitoring Report comments from NCDMS
received on January 31, 2023, for the Hip Bone Creek Restoration Site.
1. Please update the wetland credits in the CCPV Legend to match the project credits in Table 1.
KCI Response: This error has been corrected.
VP 7 is colored red on the CCPV. Is this due to only having 3 species in the plot since it met the
stem/acre interim success criteria? Please clarify.
KCI Response: That is correct, VP is colored red due to having only 3 different species.
3. The wetland gauges on the CCPV are not colored correctly according to successful/not
successful. For example, WM4, WM5, and WM8 are incorrectly shown as not meeting success
and WM 7 is shown as meeting when it did not.
KCI Response: This error has been corrected.
4. Please remove BHR calculations from pool cross sections in the cross-section plots and Table 9.
KCI Response: BHR calculations have been removed from pool cross-section plots and Table 9.
5. For Table 13, recommend a Yes/No preceded the percentage (similar to Table 12) and/or color
code the text red and blue to match the CCPV based on meeting success or not. This makes it
much easier to visually see trends over the course of monitoring.
KCI Response: This change has been made.
6. Would be useful to add hydroperiod percentage beside number of days on hydrographs, i.e., 50
Days/22.9% for WM-1, etc.
KCI Response: This change has been made.
Please contact me if you have any questions or would like clarification concerning these responses.
Sincerely,
7�
Adam Spiller
Project Manager
KCI ASSOCIATES OF NORTH CAROLINA, P.A.
www.kei.com
Employee -Owned Since 1988
TABLE OF CONTENTS
ProjectSummary........................................................................................................................................... 1
Table 1. Project Mitigation Quantities and Credits....................................................................................... 1
CurrentConditions Planview........................................................................................................................ 2
Table 2. Goals, Performance, and Results.................................................................................................... 7
Table 3. Project Attributes Table.................................................................................................................. 8
MonitoringResults........................................................................................................................................ 9
References...................................................................................................................................................10
Auuendix A — Visual Assessment Data
Table 4. Visual Stream Stability Assesment...............................................................................................11
Table 5. Visual Vegetation Assessment......................................................................................................12
PhotoReference Points............................................................................................................................... 13
VegetationPlot Photos................................................................................................................................ 17
Appendix B — Vegetation Plot Data
Table 6. Vegetation Performance Standards Summary Table.................................................................... 23
Table7. Vegetation Plot Data..................................................................................................................... 24
Appendix C — Stream Geomorphology Data
Cross-section Plots...................................................................................................................................... 28
Table 8. Baseline Stream Data Summary................................................................................................... 44
Table 9. Cross-section Morphology Monitoring Summary........................................................................ 46
ADDendix D — Hydrologic Data
30th/70th Percentile Graph............................................................................................................................
49
Table10. Rainfall Summary.......................................................................................................................
50
Table11. Overbank Events.........................................................................................................................
50
Table 12. Stream Flow Success Criteria Attainment..................................................................................
50
Table 13. Wetland Hydrology Criteria Attainment.....................................................................................
50
SurfaceWater Hydrographs........................................................................................................................
51
StreamFlow Hydrographs..........................................................................................................................
53
WetlandHydrographs.................................................................................................................................
55
Appendix E — Project Timeline and Contact Info
Table 14. Project Activity and Reporting History ...................................................................................... 64
Table15. Project Contacts.......................................................................................................................... 65
Hip Bone Creek Restoration Site KCIAssociates ofNC, PA
DMS Project #100059 2 MY-02 Monitoring Report
PROJECT SUMMARY
The Hip Bone Creek Restoration Site (HBCRS) is a full delivery project for the North Carolina Division of
Mitigation Services (DMS). The site restored and enhanced a total of 4,026 linear feet of stream and 6.023
acres of riparian wetland. The HBCRS is a riparian system in the Cape Fear River Basin (03030003 8-digit
cataloging unit) in Chatham County, North Carolina. The site's natural hydrologic regime had been
substantially modified by relocation and straightening, impacts from cattle, installation of field ditches, and
other anthropogenic impacts. This site restored impacted agricultural lands to a stable stream and wetland
ecosystem with a functional riparian buffer, floodplain access, and riparian wetlands. Project planting and
construction were completed in April 2021 and the monitoring components were installed in May 2021.
Table 1. Hip Bone Creek Restoration Site (ID-100059) Project Mitigation Quantities and Credits
Project Segment
Original
Mitigation
Plan Ft/Ac
As-
Built
Ft/
Ac
Original
Mitigation
Category
Original
Restoration
Level
Original
Mitigation
Ratio
X:1
Credits
Comments
Stream
T1 Reach 1
780
745
Warm
R
1.00000
750.000
30' exception STA
13+12 to 13+42
T1 Reach 2
906
890
Warm
R
1.00000
906.000
T1 Reach 3
269
208
Warm
R
1.00000
209.000
60' exception STA
27+77 to 28+37
T1 Reach 4
295
295
Warm
EII
2.50000
118.000
T1 Reach 5
452
447
Warm
R
1.00000
452.000
T3 Reach 1
310
280
Warm
Ell
2.50000
112.000
30' exception STA
301+57 to 301+87
T3 Reach 2
1 591
590
Wann
EII
2.50000
236.400
T3 Reach 3
573
545
Wann
R
1.00000
543.000
30' exception STA
317+98 to 318+28
Total:
3,326.400
Wetland
Riparian Enhancement
1.495
1.473
R
E
2.50000
0.598
Riparian Re-establishment
3.040
3.04
R
REE
1.00000
3.040
Riparian Rehabilitation
1.488
1.471
R
RH
1.50000
0.992
Total:
4.630
Project Credits
Restoration Level
Stream
Riparian
Wetland
Non -Riparian Coastal
Wetland Marsh
Warm
Cool
Cold
Restoration
2,860.000
Re-establishment
3.040
Rehabilitation
0.992
Enhancement
AN
0.598
Enhancement I
Enhancement 11
466.400
Creation
Preservation
Total
1 3,326.400
4.630
Hip Bone Creek Restoration Site KCIAssociates ofNC, PA
DMS Project #100059 3 MY-02 Monitoring Report
i
V
R
d
19
tq
F
N
.CIn+�
v
R
v �
R
m W
cl a
r IA
C m 3 Z
• � ; W O U
m
Z
F r a O Z
1M R IA IA
N ZQ LU
O
C 11 Y
-�_ R W Q
c� LLI
z x
� U
W m p � a
r
R {•
19 f �`
_ N/
r
o �
m 0
0
cE
N O LL
cb C Q
O �r
U
N O C — .a NID
O C C C C ui fn N
O N
c o n o U'
C C) N f/) U 0 U
> C Z O Oa) O
�d> EN O AS N (n Z w co Z
4
Cd
d
Q
O
L�V�j
O
O O O O
M
At C
M
N
r
O
k
p O M
M
v
CP
OM
OOOOM
, . • r +
19
F
0
0
O
k0
e '
OpxZ`p, '
oox •.
tit. '
o
cc
- *
10
R i
lidN
r ) _, W'
v
d' N p Op.t
F 00 O 'o xo o
x
.
+ c 9L
C
u
m
R
I mail
U
E
O
Cp
C
P
O
U
�r
O
E
O
—
N
E
H
w
(6 .0
C
C
C C
C
w
a�
.°
s
a
U¢
o
()
o
O
> CC
N C
O
AR
N
N C
L
O
,
O
O O O
O O
d
C�
W
Z
� W
a_U
InU_
U_ co Z
41��>11
w
d
in Z
30
0 LL
0
N
0
0
CD
••3g+0�
35+00• r
R
d
4+00 �
00
�ryx v
r
u
• x0o d
19 • . OO M oo 19
r
v 9%00 C 19 o% • ,
19
00x
cc
' N
Li
�O
- tihxo N
o' C
u
N. M R
o
19 19
M •d• F
4P N 'To
N O
O
CO
U
C
O
Cp
C
C
O
2
�
C
O C
-
.a
O
N
�
°
o
(D
cD
aw
C
UO
C
()
CC
N
O
AS
N
O
m
O
O O
O O
d>
LL
L� L
U) Z
wO
n Z
30
0 LL
0
N
0
O
Table 2. Hip Bone Creek Restoration Site (ID-100059) Goals, Performance and Results
Likely
Performance
Cumulative
Goal
Objective/Treatment
Functional
Criteria
Measurement
Monitoring
Uplift
Results
Restore a
-Relocate channelized
Dispersion of high
BHR<1.2, ER>2.2,
16 cross-section
All 16 XS have
channelized
streams to historic
flows on the
and no change
surveys, 4 pressure
BHR<1.2 and
stream to a
landscape positions
floodplain,
>10% in BHR or
transducer stream
ER>2.2; 5 BKF
meandering
-Install a bankfull-sized
increase in
biogeochemical
ER between
monitoring events;
gauges (measuring
bankfull events on
event in 2022; T1-
C-type
channel cross-section
cycling within the
4 bankfull events;
T1-5 and T3-3 and
1 flow for 18
channel
- Install bedform diversity
system, and
continuous flow for
stream flow on T1-
days,
consecutive days,
with a
with pools, riffles, and
recharging of
at least 30 days
1 and T3-1), annual
T3-1 flow for 242
floodplain
habitat strucures
riparian wetlands.
each year
visual inspection
consecutive days
Buffer and
Fence intact around
Fencing
reduce
Demarcate the project
Reduction in
entire easement,
installation
sediment
easement boundaries and
sediment,
adequate
Annual visual
completed
impacts to
fence out livestock
nutrient, and fecal
round
present around
inspection
10/4/21, fence and
the project
coliform inputs to.
easement boundary
signs are in good
stream
condition
Reduction in
Survival rate of
floodplain
320 stems per acre
sediment inputs
at MY3, 260
All veg plots
Restorea
Plant the site with native
, from runoff,
planted stems per
>320 stems/acre;
forested
riparian
trees and shrubs and a
increased bank
stability,
acre at W5, and
18 vegetation plots
17 veg plots >4
community
herbaceous seed mix
increased LWD
210 stems per acre
native hardwood
and organic
at MY7; at least 4
species
material in
native hardwood
streams.
species in each plot
Restore a
Increase in
wetland
Reconnect streams to
wetland
hydroperiod andsaturation
Continuous
hydroperiod
floodplain; redevelop
biogeochemical
within
a
6/8 gauges >12 /o
to drained
wetland microtopography
cycling within the
12" of the soil
8 pressure
continuous
and/or
to slow the flow of
system, decrease
a
surface for 12 /o of
transducer gauges
saturation in 2022
livestock-
surface and subsurface
in sediment and
the growing season
impacted
drainage
(26 days)
land
nutrient inputs to
streams.
Hip Bone Creek Restoration Site KCIAssociates ofNC, PA
DMS Project #100059 7 MY-02 Monitoring Report
Table 3. Hip Bone Creek Restoration Site (ID-100059) Project Attribute Table
Project Name
Hip Bone Creek Restoration Site
County
Chatham County
Project Area (acres)
18.68
Project Coordinates (latitude and longitude decimal degrees)
35.6804 N,-79.4018 W
Project Watershed Summary Information
Physiographic Province
Piedmont
River Basin
Cape Fear
USGS Hydrologic Unit 8-digit
3030003
DWR Sub -basin
03-06-12
Project Drainage Area (acres)
158
Project Drainage Area Percentage of Impervious Area
1%
Land Use Classification
Pasture/Farmland (85%), Forest (9%), Open Water
(5%), and Rural Development (1%)
Reach SummaryInformation
Parameters
Reach 1
Reach 3
Pre -project length (feet)
2,439
1,403
Post -project (feet)
2,702
1,474
Valley confinement (Confined, moderately confined,
unconfined)
Unconfined
Unconfined
Drainage area (acres)
158
43
Perennial, Intermittent, Ephemeral
Intermittent
Intermittent
NCDWR Water Quality Classification
C
C
Dominant Stream Classification (existing)
G4
G4
Dominant Stream Classification (proposed)
C4/C4b
C4
Dominant Evolutionary class (Simon) if applicable
Channelized, Stage III
Channelized, Stage III
Wetland Summa
Information
Parameters
WA and WE
WB, WC, WD, WF, and WG
Pre -project (acres)
2.52
0.99
Post -project (acres)
2.78
2.67
Wetland Type (non -riparian, riparian)
Riparian
Riparian
Mapped Soil Series
Georgeville
Chewacla/Wehadkee
Soil Hydric Status
Non-hydric
Hydric
Regulatory Considerations
Parameters
Applicable?
Resolved?
Supporting Does?
Water of the United States - Section 404
Yes
Yes
SAW-2018-01160
Water of the United States - Section 401
Yes
Yes
DWR# 18-0785
Endangered Species Act
Yes
Yes
USFWS
Historic Preservation Act
No
N/A
NCSHPO
Coastal Zone Management Act (CZMA or LAMA)
No
N/A
N/A
Essential Fisheries Habitat
No
N/A
N/A
Hip Bone Creek Restoration Site KCIAssociates ofNC, PA
DMS Project #100059 8 MY-02 Monitoring Report
MONITORING RESULTS
The second year of vegetation monitoring was conducted June 13 and 14, 2022. During the site's second
growing season all 18 vegetation monitoring plots achieved the success criteria of 320 stems/acre and only
one plot (Plot 7F, 3 species) had less than 4 woody species. Across all of the plots the site average 933
planted stems/acre. Including volunteers the site average 1,021 stems/acre. Two areas where Chinese privet
is growing are present on the site. These areas are mainly in and around the wetland enhancement areas
along T1 and T3 where there was existing tree cover prior to project construction. Scattered stems of
Chinese privet are present throughout the understory of these areas. KCI treated these areas on July 28,
2022. Further treatment is planned for the spring of 2023. Overall the site is well vegetated with many
planted and volunteer woody stems throughout the whole project and a robust and diverse herbaceous layer.
The MY02 cross-section survey was completed on July 12, 2022. The MY02 survey found that the stream
was functioning as designed with no problem areas identified. All 16 cross -sections had bank height ratios
less than 1.2 and entrenchment ratios greater than 2.2.
Based on the WETS table for Siler City 2 N Station in Siler City, NC, the growing season for the site
extends from April 2 until November 5 (218 days). The daily rainfall data was obtained from an on -site
rain gauge. In 2022, the months of March and November experienced average rainfall. February, April,
June, July, August, September, and October experienced below average rainfall while January and May
recorded above average rainfall. Overall the site experienced well below average rainfall during 2022.
According to the USACE's Antecedent Precipitation Tool (APT), the site experienced drier than normal
conditions for the month of February, before a large scale rain event at the beginning of March pushed it
into wetter than normal conditions until April 15. At this point the site remained within normal or drier than
normal conditions until November 12, except for a brief period at the beginning of June and a brief period
at the beginning of October when the site experienced wetter than normal conditions. During this period
from April 15 to November 12 (212 days), which roughly corresponds to the site's growing season, the site
experienced drier than normal conditions for 92 days (43%) and normal conditions for 96 days (45%). The
site experienced wetter than normal conditions for only 24 days (11%) during this period.
During the site's second growing season, 6 of the 8 gauges achieved the success criteria of 12% continuous
saturation (26 days). Both of the stream flow gauges recorded greater than 30 consecutive day of flow. This
data was further backed up by the flow cameras which also both showed greater than 30 consecutive days
of flow despite being obscured by vegetation for a large portion of the summer. Five bankfull events were
recorded in 2022.
Hip Bone Creek Restoration Site KCIAssociates ofNC, PA
DMS Project #100059 9 MY-02 Monitoring Report
REFERENCES
NCDENR, Ecosystem Enhancement Program. 2009. Cape Fear River Basin Restoration Priorities
2009. Raleigh, NC.
https://files.nc.gov/ncdeg/Mitigation%20Services/Watershed Planning/Cape Fear Rim
er Basin/RBRP%20CapeFear%202009%2ORevised%20032013.pdf
NCDEQ, Division of Mitigation Services. June 2017. "As -built Baseline Monitoring Report
Format, Data and Content Requirement."
https:Hfile s.nc. gov/ncdeq/Miti gation%20Services/Document%2OManagement%20Libra
ry/Guidance%20and%20Template%20Documents/6 AB_ Baseline_Rep _Templ_June
%202017.pdf
NCIRT. October 24, 2016. "Wilmington District Stream and Wetland Compensatory Mitigation
Update." https:Hsaw-reg.usace.army.mil/PN/2016/Wilmington-District-Mitigation-
Undate.pdf
USACE, Sprecher, S. W.; Warne, A. G. 2000. "Accessing and Using Meteorological Data to
Evaluate Wetland Hydrology."
hiips://ntrl.ntis.gov/NTRL/dashboard/searchResults/titleDetail/ADA378910.xhtml
USACE, Deters, J. C. 2021. "Antecedent Precipitation Tool." https:Hgithub.com/jDeters-
USACE/Antecedent-Precipitation-Tool/releases/tag/v 1.0.19
Hip Bone Creek Restoration Site KCIAssociates ofNC, PA
DMS Project #100059 10 MY-02 Monitoring Report
APPENDIX A
Visual Assessment Data
Hip Bone Creek Restoration Site KCI Associates of NC, PA
DMS Project 9100059 11 MY-02 Monitoring Report
�•o
0
0
0
0 0
0
a
w
o � �
o
0
0
0
ono
F
z�
H
za
o
Z cn
�
o
o
c
sOW.
rii •°
:�
o
0
0
sOW.
J-4.
OW
w
o 4, 4,
Z
o 0 0
0
ono
H
OOW
za
o Z cn
0
�
o
s
OW
~s°
O
rii
OW
•°
:�
o
0
OW
G.
0
sOW.
a
2
0
0
0
11
z
b
)k
) (
G
|)
u
-
f)
\rr
\}:
/)
)
/ |
!
\[
e
2 m f
ƒ
\ {
\)j
)
k�)
\ \
(
\ } \
.§@
\
Ag
}f.
o /|
{)\
/}\
a§g5k
%a%
&a34)
3(3
�
(
\
�
§
}
\
�
k
■
)
/
\§
/
PP - MY-00 - 5/24/21 PP - MY-02 - 11/18/22
PP2 - MY-00 - 5/24/21
PP3 - MY-00 - 5/24/21
PP2 - MY-02 - 11/18/22
PP3 - MY-02 - 11/18/22
Hip Bone Creek Restoration Site KCIAssociates ofNC, PA
DMS Project #100059 14 MY-02 Monitoring Report
PP4 - MY-00 - 5/24/21
PP5 - MY-00 - 5/24/21
PP6 - MY-00 - 5/24/21
PP4 - MY-02 - 11/18/22
PP5 - MY-02 - 11/18/22
PP6 - MY-02 - 11/18/22
Hip Bone Creek Restoration Site KCIAssociates ofNC, PA
DMS Project #100059 15 MY-02 Monitoring Report
PP7 - MY-00 - 5/24/21
PP8 - MY-00 - 5/24/21
PP9 - MY-00 - 5/24/21
PP7 - MY-02 - 11/18/22
PP8 - MY-02 - 11/18/22
PP9 - MY-02 - 11/18/22
Hip Bone Creek Restoration Site KCIAssociates ofNC, PA
DMS Project #100059 16 MY-02 Monitoring Report
PP 10 - MY-00 - 5/24/21
PP10 - MY-02 - 11/18/22
Hip Bone Creek Restoration Site KCIAssociates ofNC, PA
DMS Project #100059 17 MY-02 Monitoring Report
Vegetation Plot 1 — MY-00 — 5/14/21
Vegetation Plot 2 — MY-00 — 5/13/21
Vegetation Plot 3 — MY-00 — 5/13/21
Vegetation Plot 1— MY-02 — 6/13/22
Vegetation Plot 2 — MY-02 — 6/13/22
Vegetation Plot 3 — MY-02 - 6/13/22
Hip Bone Creek Restoration Site KCIAssociates ofNC, PA
DMS Project #100059 18 MY-02 Monitoring Report
Vegetation Plot 4 — MY-00 — 5/13/21
Vegetation Plot 5 — MY-00 — 5/13/21
Vegetation Plot 6 — MY-00 — 5/14/21
Vegetation Plot 4 — MY-02 — 6/14/22
Vegetation Plot 5 — MY-02 — 6/14/22
Vegetation Plot 6 — MY-02 — 6/13/22
Hip Bone Creek Restoration Site
DMS Project #100059
19
KCIAssociates of NC, PA
MY-02 Monitoring Report
Vegetation Plot 7 — MY-00 — 5/13/21
Vegetation Plot 8 — MY-00 — 5/13/21
Y
Vegetation Plot 9 — MY-00 — 5/13/21
Vegetation Plot 7 — MY-02 — 6/13/22
Vegetation Plot 8 — MY-02 — 6/14/22
Vegetation Plot 9 — MY-02 - 6/13/22
Hip Bone Creek Restoration Site KCIAssociates ofNC, PA
DMS Project #100059 20 MY-02 Monitoring Report
Vegetation Plot 10 — MY-00 — 5/13/21
Vegetation Plot RI — MY-02 — 6/13/22
Vegetation Plot R3 — MY-02 — 6/13/22
Vegetation Plot 10 — MY-02 — 6/14/22
Vegetation Plot R2 — MY-02 — 6/13/22
Vegetation Plot R4 — MY-02 — 6/13/22
Hip Bone Creek Restoration Site KCIAssociates ofNC, PA
DMS Project #100059 21 MY-02 Monitoring Report
Vegetation Plot R5 — MY-02 — 6/14/22
Vegetation Plot R7 — MY-02 — 6/14/22
Vegetation Plot R6 — MY-02 — 6/14/22
Vegetation Plot R8 — MY-02 — 6/14/22
Hip Bone Creek Restoration Site KCIAssociates ofNC, PA
DMS Project #100059 22 MY-02 Monitoring Report
APPENDIX B
Vegetation Plot Data
Hip Bone Creek Restoration Site KCI Associates of NC, PA
DMS Project 9100059 23 MY-02 Monitoring Report
Table 6. Vegetation Performance Standards Summary Table
Hip Bone Creek Restoration Site (ID-100059)
Veg Plot 1 F Veg Plot 2 F Veg Plot 3 F
Stems/ Av. Ht. Stems/ Av. Ht. % Stems/ Av. Ht.
Ac. (ft) #Species %Invasives Ac. (ft) #Species Invasives Ac. (ft) #Species Invasives
itoring Year 7
itoring Year 5
itoring Year 3
itoring Year 2
1093
3
8
0
1012
3
6
0
8
2 6
91111
0
itoring Year 1
2
8
0
972
2
6
0
72
2 6
0
itoring Year 0
1093
1
8
0
1174
2
0
688
2 6
Veg Plot 4 F
Veg Plot 5 F
Veg Plot 6 F
Stems/Ac.
Av. Ht.
# Species % Invasives
fftl
Stems/Ac.
Av. Ht.
(ft)
# Species
%
Tnvasives
Stems/Ac.
Av. Ht.
# Species
(ft)
%
Tnvac,vec
Monitoring Year 7
Monitoring Year 5
Monitoring Year 3
Monitoring Year 2
8500
2 6 0
1012
2
4
0
1012
3 5
Monitoring Year 1
850
2 6 0
891
2
4
0
810
2 5
Monitoring Year 0
769
1 0
1012
1 1
A
n
810
2
Veg Plot 7 F
Veg Plot 8 F
Veg Plot 9 F
Stems/Ac.
Av. Ht.
Av. Ht.
Stems/Ac.
ft
#Species
%
Invasives
Stems/Ac.
Av. Ht.
ft
#Speciesft
Invasives
Monitoring Year 7
Monitoring Year 5
JSpeciesjInvasives
Monitoring Year 3
Monitoring Year 2
2
850 3
5
0
1214
2
5
Monitoring Year 1
105
1
5
0
1093
2
4
0
Monitoring Year 0
1093
2
5
0
1174
1
5
0
Veg Plot 10 F
Veg Plot Group 1 R
Veg Plot Group 2 R
Stems/Ac.
Av. Ht.
% Invasives
ft
Stems/Ac.
Av. Ht.
ft
# Species
%Stems/Ac.
Invasives
Av. Ht. # Species
ft
%
Invasives
Monitoring Year 7
Monitoring Year 5
JSpecies
Monitoring Year 3
Monitoring Year 2
1214
20
891
3
5
0
850
3 5
0
Monitoring Year 1
1255
2 7
10 0
Monitoring Year 0
1498
2 7
10 0
Veg Plot Group 3 R
Veg Plot Group 4 R
Veg Plot Group 5 R
Stems/Ac.
Av. Ht.
ft # Species % Invasives
Stems/Ac.
Av. Ht.
ft
# Species
%
Invasives
Stems/Ac.
Av. Ht.
ft # Species
%
Invasives
Monitoring Year 7
Monitoring Year 5
Monitoring Year 3
Monitoring Year 2
0
769
4
4
5
931
0
Monitoring Year 1
Monitoring Year 0
Veg Plot Group 6 R
Veg Plot Group 7 R
Veg Plot Group 8 R
Stems/Ac.
Av. Ht.
ft
#Species %Invasives
Stems/Ac.
Av. Ht.
ft
#Species
%
Invasives
Stems/Ac.
Av. Ht.
ft
#Species
%
Invasives
Monitoring Year 7
Monitoring Year 5
Monitoring Year 3
Monitoring Year 2
2
6 0
2550
2
8
0
607
4
0
Monitoring Year 1
Monitoring Year 0
Hip Bone Creek Restoration Site KCIAssociates ofNC, PA
DMS Project #100059 _14 MP-02 Monitoring Report
y
N
F
o
P.
ou
�
cd
y
O
w
v
F
0
P.
ou
�
P.
0
w
M
F
0
P.
N
N
P.
m
N
N
F
0
P.
m
P.
YM
F
0
P.
ou
�
P.
r.
O
O
w
w
w
w
O
m
m
A
m
m
^o
m
m
m
m
m
m
m
m
m
H
o
m
o
Qj
Q O
¢QiQj
_
i5
w^
�
a
2
0
d
0
U
O
2
I
0
z
b
a
Q
o
ro
F
�
0
w
on
b
P.
m
m
o\
ro
F
0
w
a
w
00
�
w
w
N
w
a
on
F
b
P.
N
N
N
ro
F
w
on
b
P.
p
H
�
a
U
U
O
bfJ
a
2
0
0
U
O
5
I
x
0
a
Q
ou
F"
C4
0
0
a
x
�n
w
x
P-i
m
�
,-•
�
m
N
N
m
cv
cv
M
�
`n
�
N
o
�n
w
C4
N
W
�
H
x
�n
w
O
O
w
O
w
w
w
d
d
d
d
d
d
d
d
d
d
d
Qj
H
H
R
H
H
H
H
H
H
H
H
ti
ti
�
ti
ti
ti
ti
ti
ti
Q
o
mQj
5
°
0
o
•�, on -o
c
cn
cz
_ c
U
czQ r.r"
cz ��~ O
O
cz
to r
� Qcz
a,
� U
cz
cz .� 3
'to
cz
ti C bA
to U
cz
� o
U U
r $:, U
O
'C 'C
U S"y
c O P. cvv
U O C O
O
to
- to Q ¢
Ito
64
U
c O
c l ¢I ¢I
�Qto 0zz
81
at o¢ U U
-o� ���•on
U � O
a
2
0
d
0
U
O
0
0
I
0
z
IS
a
Q
LJ
ct
ct
Q
bA
O
O
0
0
ct
U
2,
0
a
0
0
m
oa
s
0
s
s
N
I
s
q
0
I
I
0
f
Il
—ate
5 4
rl
j.
rl
N
O
M
9
S
O
O
O
r
y
a
1
O
1
1
y
y
O
A
MMO
I�1
w
1
1
1
O
v
CI
O
o
I
0
� N
N
o
�xxo�H
W
ww
I
1
II
1
II
1
II
1
II
II
li
1
II
1
II
1
II
1
1
I
1
II
1
II
1
II
1
II
1
1
1
11
1
1
1
II
1
II
1
II
1
1
1
II
1
1
1
1
1
1
1
1
1
1
1
I
1
I
1
1
1
1
1
II
1
II
1
II
1
1
1
1
II
1
I
1
II
1
II
1
II
1
II
1
1
1
1
1
1
II
1
1
1
1
1
1
1
II
1
1.
1
II
1
1
I
1
II
1
II
1
II
1
II
1
II
1
1
I
1
II
1
II
1
II
1
II
1
II
1
II
1
II
1
II
1
II
1
II
1
II
1
II
1
II
1
II
1
II
1
1
I
i
li
5
O
a;
O
i+
O
O
�
y
ow
�i
OW
iOW
.
O
�
w
a
x
i
1
1
O
O
a
O
R
0
cv
w
aca
ww
wcaH
�
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Y
1
1
1
1
1
1
1
1
1
1
1
1
1
1
\I
1
1
1
1
1�
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
F
w
a
o
o
%+
w
y
O
1
1
g.
x
0
w
1
1
1
0
N
P7
O
o
.a
0
>
c�
cv
R. m cv
v�
v�
v�
v�
v�
v� v�
v�
v�
v� v�
�xxo�H
(1aa,0
U011VAapg
a
R
�n
W
�n
�n �n
�n �n
�n �n
�n �n
�n �n
�n �n
�n �n
�n �n
�n �n
�n �n
�n �n
�n �n �n
�n
�n �n
�n �n
�n �n
�n
�n
C
�
3
=
av
�CAAw
C
d'
w
o
..
�
ca
ca
acawwwcaH
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
,
1
i
1
1
1
1
I
1
I
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
�
1
I
1
1
1
�
1
1
1
1
1
1
1
S(`
1
1
1
1
1
I
1
1
1
1
1
1
1
1
1
1
1
f
1
1
1
1
1
1
I
1
1
1
1
1
1
1
i
1
1
1 )
1
1
1
1
1
1
I
1
1
1
1
1
1
1
1
1
1
1
1
1
1
`
1
1
1
/e(
o
F
o
O
(O.
O
h
ow
O
O
�+
w
x
m
1
1
1
O
O
a
0
0
cv
a.
�xxo�H
(1aa,0
uouVAO/a
a
�
� �
�
� �
vi vi
vi vi
vi v
vi vi
vi vi
vi v
v v
v mi
mi mi
mi v
v v
v v
vi vi
vi vi
vi �
�
�
R
W
C
�
3
=
av
�CAAw
v
d'
R
L.
ai
s
=x
.� W
C R
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
�1
1
1
I
it
1
1
1
1
1
1
I
I
1
1
1
1
1
1
1
1
I"
I k
1
i
0
0
W c�
w o
�xxo
a
.
.
. .
. .
. v
v .
. .
. .
v v
v v
v v
v v
v v
. .
. .
. .
. .
.
R
W
C
�
3
=
9z
O�
V
v
d'
R
L.
F
O
Vl
u
C C
�
ca
ca
acaww���wcaH
O
r
1
1
1
1
1
1
\
1
1
1
1
1
1
1
1
ry
1
1
�
1
1
1
1
I
1
1
1
1
1
1
1
1
�
1
1
1
1
1
1
1
1
1
1
1
1
�
N
ti
1
1
1
1
F
1
1
may+
1
1
O
a
1
1
1
1
�
1
1
1
1
1
1
1
1
q
O
1
1
1
1
y
1
1
1
1
�
�
1
M
o
1
1
1
1
1
1
I
1
1
1
1
1
1
1
1
1
1
1
1
1
1
O
1
1
1
�
1
1
1
1
1
1
1
1
1
4
1
1
1
1
O
1
1
O
F"
1
1
1
1
1
1
J1
i
0
(1aa� uop;bnapg
49
OW
0
V
0�
V
v
7
C
d'
w
o
..
_
O
ui
v
u
�
ca
ca
acaww���wcaH
�
�
I
M
N
M
4
M
o
M
.1
1
N
ti
1
1
F
p
1
�
Qr
M
0
r
0
M
�
O
�
1
O
a
x
1
O
N
w
M
1
1
w
O
�
O
N
M
4
0
(;aa�
uop;bnapg
o
�
�
N
�
ti
F
SOW
G
�i
r
ai
�
�
O
o
r
A
t..
O
y
�i
w
�
O
0
o
M
d
x
w
1
1
1
0
w
1
1
1
0
°J
�
O
F
O
.a
0
W c�
� N
N
o
0
O N rui
t`
0
R.
c�xxo�H
(1aa,0
uoubnapg
a
--
N N
N N
N N
N N
v v
v v
v v
v v
N
v
N N
N N
N
O'
v
.
v
.
v v
. .
v v
. .
v v
. .
v v
. .
. .
. .
. .
. .
v
.
v v
v v
v v
v v
v v
v v
v
R
W
C
�
3
=
— N
N N
N N
N N
-
N N
- -
N N
- -
N N
N N
N N
M M
M V
Vl Vl
(V
Vl �O
v� l
�O �O
l
�O
av
�CAAw
7
C
d'
w
o
..
�
ca
ca
acaww���wcaH
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
�
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
I
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1]
1
1
1
1
1
1
1
1
1
1
1
1
i
1
I
1
I
1
I
1
I
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
o
N
F
IBC
49
0
r
A
s.
O
O
M
h
a
w
o
O
OW
�
O
O
C,
O
o
Uj
A:
9+
x
O
w
1
1
1
O
O
H
a
CA
0
0
� N
N
o
0
0 N rui
�D
V1
�
M
N
O
R.
c�xxo�H
u
a
s
11
it
q
4
11
it
it
4
11
11
it
11
I
I
I
I
I
q
11
11
it
it
4
11
11
it
11
11
11
1
1�
1
1�
1
1
1'
1
1
1
1
1
1
1
1
1
1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
0
0
cv
R.
c�xxo�H
a
v
v
v m
m m
m m
m m
m m
m m
m m
m m
m m
m m
m m
m m
m m
m m
m
R
W
C
�
3
=
av��CAAw
v
d'
7
C
d'
w
o
..
�
ca
ca
acaww���wcaH
O
t`
I
1
1
1
1
1
�Y
�
1
1
1
1
O
1
1
�
1
1
1
1
1
1
M
1
�
�
rl
I
p
�F+
�
�
1
I
0
�
C.
O
1
1
A
1
�
O
y
1
1
�
1
1
m
1
w
1
1
1
1
1
O
N
w
1
1
1
1
1
1
1
1
1
1
1
1
p
1
1
1
1
O
.Fa
1
1
1
1
1
1
1
h
0
h
h
h
h
h
h
h
(;aa�
uop;bnapg
M
ti
0
F
a
O
C.
O
r
A
s..
O
r
h
a
w
o
�
O
OW
O
M
�
9+
x
O
w
N
1
1
1
o
�
0
O
R
0
� N
N
o
0
�xxo�H
Vl
u
4
a
wcaH
1
1
1
1
1
1
1
1
1
1
1
1
1
I
I
I
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
I
I
I
I
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
O
0
N
w mo U
R.
�xxo�H
a
0 0 0
Y
7
C
d' w
� ca ca aca'w'w���wcaH
ti
�
N
O
0
0
H
a
�
N
ti
�
o
C
O
r
A
s.
h
OW
o
OW
OW
Z
O
OW
C.
O
O
Uj
ai
9+
x
O
w
1
1
1
O
O
a
v
O
O
R
0
� N
N
o
0
aca
ww
1
1
1
1
1
1
1
1
1
1
1
1
1
T
1
1
1
1
1
1
1
y
1
1
1
1
1
1
1
1
1
1
1
1
1
O
R
0
cv
� cv
n N
R.
�xxo�H
a
.
R
W
C
�
3
=
R o
o
av
�CAAw
7
C
d'
w
s
L
� �
� ai
R •
L L
R s
�
ca
ca
awcaH
1
1
11
1
11
1
1
11
11
1
11
Q
4
11
j
1
jl
1
o
1
1
1
1
1
1
1
1
1
1
1
1
M
rn
1
1
11
11
F
1
1
11
1
ti
1
11
ti
1
11
yC
i
I
1
�
q
0
1
1
1
so.
0
h
1
1
�
1
1
1
1
1
1
1
1
1
1
1
1
O
1
1
1
1
N
1
1
1
1
1
1
1
1
w
1
1
1
1
1
1
1
1
11
1
1
1
1�
1
1
1
O
1
1
1
11
1
11
O
1
11
11
.Fa
11
1
1
11
11
1
1
11
1
I
0
(�aa� uoubnalg
0
I
M
N1
H
O
�
O
Qr
�
7
r
V]
C.
O
r
O
y
O
M
�y
o
A
O
O
�
m lvi
g
x
O
w
1
1
1
O
O
N
a
O
R
0
o N
(1aa0 uouVAOjy
a
............
v
R
W
C
�
3
=
R
av��CAAw
n �
�
N �
v
d'
R
L.
L L
R s
�
ca
ca
aca'w'ww
caH
1
1
1
1
1
1
1
1
1
1
1
� 1
1
1
1
1
1
1
1�
I�1
11
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
M
�
F
07
w
0
�
P
A
O
r
r
�
o
O
m
�
O
O
�
�
FQ
�
g.
x
w
1
1
1
0
w
1
1
1
O
v]
O
a
Oti
R
0
cv
v
a v N U
a.vi
v
a
(1aa,0
uouVAOIy
a
v
v
v v
v v
v v
v v
v v
v v
v v
v v
v v
v v
v v
v v
v v
v
R
W
C
�
3
=
U
R
R
ci
.
cv
M M
cv cv
.
. cv cv
cv cv
cv cv
cv cv
cv
av��CAAw
v
d'
R
L.
L L
R s
�
ca
ca
aca'w'w���wcaH
I
1
11
11
11
1
1
11
I
1
u
1
11
1
1,
1
1
1
1
1
1
11
1
11
1
11
1
1
1
11
1
11
1
11
1
11
1
11
1
1
I
1
11
1
11
1
11
1
11
1
1
1
11
1
11
1
11
1
11
1
11
1
1
1
1
1
1
1
1
1
1
1
1
1
11
1
1
I
1
11
1
11
1
11
1
11
1
1
1
11
1
1
1
1
1
I
1
I
1
I
1
11
1
11
1
11
1
11
1
1
I
1
11
1
11
1
11
1
11
1
I
1
11
1
11
1
11
1
11
1
1
I
1
11
1
11
1
11
1
11
1
11
1
11
1
11
11
11
1
1
11
I
i
it
0
�
M
M
F
e
DC
ai
A
0
r
r
�
w
U
�
c
�
CC
W
w
O
�
N
'
1
0
0
F
O
R
0
Ll
� U
cv
....
....
O N
m Q" V] O '• �/j
7
7
7 7
7 7
��xxo�H
Vl
Vl
Vl Vl
Vl Vl
(Jaa,o uounnalg
a
�
� vi
vi
vi vi
vi vi
v v
v v
v mi
mi mi
�i N
N N
cn mi
mi v
v v
v v
v v
v v
vi vi
vi vi
�
v
.
v
.
v v
. .
v v
. .
v v
. .
v v
. .
v v
. .
v v
. .
v v
. .
v v
. .
v v
. .
v v
. .
v v
. .
v v
. .
v v
. .
v v
. .
v v
. .
v v
. .
v
.
R
W
C
�
3
=
,-.
N N
N N
N -
- N
N N
av��CAAw
Y
7
C
o
..
L L
R s
aca'w'wwcaH
y
u
u
a
I'
I'
Ij
u
n
I�
I,
y
u
u
a
1
1
1
1
1
1
p
I'
I'
Ij
U
p
I'
I'
Ij
U
I�
I�
I�
I,
II
U
p
1
1
1
p
p
I'
I'
II
1
U
J
p
I�
1
1
I'
I'
II
U
p
I�
I,
I,
II
I�
I�
I�
I,
II
U
p
I�
I
I'
U
I�
I�
I�
I,
II
N
U
oc
N
~
O
A
O
Fr"
N
N
N
N
N
N
N
N
M
0�
Vl
M
Vl
O�
01
N
C."
O
a+
U
M
O
N
N
`.J
o
00
O
O
E'�
Ci
m
C7
op
O
�
W
O
to
to
i.n
O
O
C
co
co
C."
O
�Q
MC.
W
O
�
O
O
A
N
�
N
�
to
a+
�
Y
O
S
N
to00
7-r
�
to
to
CC
CSC
�
�
00
�
�
�
`�
�
�
�
to
O
�
f�•,
cyC
o
�
�
�
O
y
A
N
U
O
Fr"
N
N
N
N
N
N
N
N
CV
O
CV
N
V1
N
0�OC
N
01
N
C."
O
a+
oc
�O
N
O
U
O
�
W
�
M
�
O
�
y
i.n
QI
M
N
oc
^
N
O
N
O
O
C
00
U
N
o
4
4
N
C."
O
�Q
MC.
W
O
�
�
O
O
00
CC
CSC
�
�
00
�
�
�
�
`�
�
�
�
�
�
to
O
�
f�•,
w
�
cyC
2
O
o
�
01
O
00
N
U
O
M
O
M
0�
00
N
N
0�
--i
bA
`o
U
00
oNo
O
A
O
00
M
O
N
M
Ci
O
a+
kn
^O
U
N
O
N
N
N
N
O
SJ
U
YE
W
O
CC
to
w
to
Q-I
c
00
M
N
O
O
N
N
Vl
N
O
O
C
co
to
U
N
O
V
M
to
Ci
O
�Q
MC.
W
O
�
U]
^
a+
CC
A
N
�
^
to
a+
y
to
i"i
,y
N
N
�
O
F7
b4
O
to
0
U
.to
to
00
`�
U
T
ouu
CC
H
CSC
a,
a
a
w
a
a
a
w
a
O
x
a
f�•,
cyC
�:
I o
00
Vl
DD
.7T
M
�
•�
to
A
M
N
�
U
�
00
M
~
~O
O
oo
p
(n
l
l
N
�
N
Ci
O
a+
M
C."
�
00
C7
�
N
O
O
CC
W
to
to
i
QI
00
^
O
N
O
O
N
N
O
O
C
co
to
Uto
N
O
V
M
C:
O
�Q
MC.
W
O
�
�
O
O
A
to
to
�
CC
to
toto
CSC
�
�
0
00
Q
�
N
�
�
�
N
C/�
U
�
`�
�
O
.to
�
�
�
�
N
F�7
�
U
O
b4
�
T
f�•,
w
^
62
cyC
2
O
f
O�
Ncc
I
O
MIc
�
116
o
M
o
M
O
N
N
O N
N�
o
�
�
cn
�
Ic
Cc',
Ic
Ic
o0
�
o
�
o
cM
0
'JOi
M
Vl
O
rSr
O
O
O
O
rSr
N
O
N
Ip
Ip
Ip
M
Ic
M
M
p�
O
.
.
7
o
I4
�
Ic
Ic
Ic
o
ri
v'i
vmi
v'i
O v�
�''
(V
't
(V
Nt
c�+'
'o
o
.y
r�
�o
�o
N
o
M
r
M
o
o
�n
o
o
o
M
1
M
O
G,
I
Ic
O
Ic
Ic
0
o
�;
m
�n
'"
'�;
hi
hi
�O
�;
�O
M
�O
�O
o
I
I
r.
N
m
,
.�06�
M
M
cn
ri
N
� O
ro
ro
g
O
ro=
ro
ro
g
O
ro=
ro
ro
g
O
ro=
ro
ro
g
O
ro=
p
=
p
Fy
a
ti
O
=
p
=
p
F�
a
O
��
ro
ro
ro
ro
ro
ro
ro
ro
o
y
F �
�
N
�y M
o
yFSi',
W H
� M
V� O
NO
0o
O\
h
U
O
zzLr^
7
O
Nj
7
7
O\
O
O\
M
r
O
O M
aM
H
� O
�
M
�Or
!•
U M
N �
� O
m
N
O
�
oo
h
o0
o
a
N
ry
7
7
7
7
O
O
M
oo
7
N
r
7
M
oo
7
M
7
O
O
O
W M
O
O M
O
y
W �
a
U
N
�
o ro
O�
av
i'
�
o0
0
o ro
o
a
c�i
a
i
m
0o
O\
oo
.y
h
N
O
pp
pp
O
N
h
N
IS
m
U
U
vC
ro
ro
o
a
E
2
APPENDIX D
Hydrologic Data
Hip Bone Creek Restoration Site KCI Associates of NC, PA
DMS Project 9100059 49 MY-02 Monitoring Report
ZZ-nON
ZZ-100
ZZ-doS
ZZ-5nv
ZZ-lnf
ZZ-un f
ZZ—,�Sw e��C
A
ZZ-zdV
ZZ-it?W
ZZ-aad
ZZ-UVf
i Z-OaQ
i Z-nON
0 0 0 0 0 0 0 0
(ui) II�3ui�g
Table 10. Rainfall Summary,
Hip Bone Creek Restoration Site (ID-100059)
MYl
2021
MY2
20 2
MY3
2023
MY4
2024
MY5
2025
MY6
2026
MY7
2027
Annual Precip Total
38.49
21.76
WETS 30th Percentile
29.73
29.73
WETS 70th Percentile
1 53.88
1 53.88
Normal
I Y
I N
Table 11. Overbank Events, Hip Bone Creek Restoration Site (ID-100059)
Gage ID
MYl
2021
MY2
2022
MY3
2023
MY4
2024
MY5
2025
MY6
2026
MY7
2027
T1-5
none
3
T3-3
none
5
Table 12. Stream Flow Criteria
Attainment, Hip Bone Creek Restoration Site (ID-100059)
Greater than 30 Days of Flow/Max Consecutive Days
MYl
MY2
MY3
MY4
MY5
MY6
MY7
2021
2022 dk
2023
2024
2025
2026
2027
T1-1
Yes/105
Yes/218
(Gauge)
------------------------------
------------
--------------------------•------------
------------
-------------•------------
T1-1 (Camera)
Yes/90
Yes/69
T3-1
Yes/205
Yes/242
(Gauge)
T3-1
Yes/39
Yes/108
(Camera)
Table 13. Wetland Hydrology Criteria Attainment, Hip Bone Creek Restoration Site (ID-100059)
Performance Standard: 12
WETS Station: Siler City 2N
Growing Season: 4/2 to 11/5 (217 days)
Max. Consecutive Hydroperiod (%)
Monitoring Gauge
MYl
2021
MY2
2022
MY3
2023
MY4
2024
MY5
2025
MY6
2026
MY7
2027
WM-1
5.5%
22.9%
WM-2
6.0%
6.4%
WM-3
30.9%
38.5%
WM-4
5.1%
12.4%
WM-5
3.2%
23.4%
WM-6
19.8%
38.5%
WM-7
28.1%
9.6%
WM-8
2.3%
22.9%
Hip Bone Creek Restoration Site KCIAssociates ofNC, PA
DMS Project #100059 51 MP-02 Monitoring Report
�Q
CL
F"-
Rainfall (in)
0 0 0 0 0
M M M N
M M M M
(13) UOIjUAal:j a2VjS nUUaaJS
27-Dec-22
18-Dec-22
9-Dec-22
30-Nov-22
21-Nov-22
12-Nov-22
3-Nov-22
25-Oct-22
16-Oct-22
7-Oct-22
28-Sep-22
19-Sep-22
10-Sep-22
1-Sep-22
23-Aug-22
14-Aug-22
5-Aug-22
27-Jul-22
18-Jul-22
9-Jul-22
30-Jun-22
21-Jun-22
12-Jun-22
3-Jun-22
25-May-22
16-May-22
7-May-22
28-Apr-22
19-Apr-22
10-Apr-22
1-Apr-22
23-Mar-22
14-Mar-22
5-Mar-22
24-Feb-22
15-Feb-22
6-Feb-22
28-Jan-22
19-Jan-22
10-Jan-22
1-Jan-22
0
W
cz
ro
m
It
I
�Q
CL
F"-
Rainfall (in)
0 0 0 0 0
M M M
(13) UOIjUAal:j a2VjS nUUaaJS
27-Dec-22
18-Dec-22
9-Dec-22
30-Nov-22
21-Nov-22
12-Nov-22
3-Nov-22
25-Oct-22
16-Oct-22
7-Oct-22
28-Sep-22
19-Sep-22
10-Sep-22
1-Sep-22
23-Aug-22
14-Aug-22
5-Aug-22
27-Jul-22
18-Jul-22
9-Jul-22
30-Jun-22
21-Jun-22
12-Jun-22
3-Jun-22
25-May-22
16-May-22
7-May-22
28-Apr-22
19-Apr-22
10-Apr-22
1-Apr-22
23-Mar-22
14-Mar-22
5-Mar-22
24-Feb-22
15-Feb-22
6-Feb-22
28-Jan-22
19-Jan-22
10-Jan-22
1-Jan-22
0
W
cz
ro
m
It
I
W.
Rainfall
0 0 0 0 0
o C� oc r—
(13) UOIIUAal:I atU)S nUUaaJS
27-Dec-22
18-Dec-22
9-Dec-22
30-Nov-22
21-Nov-22
12-Nov-22
3-Nov-22
25-Oct-22
16-Oct-22
7-Oct-22
28-Sep-22
19-Sep-22
10-Sep-22
1-Sep-22
23-Aug-22
14-Aug-22
5-Aug-22
27-Jul-22
18-Jul-22
9-Jul-22
30-Jun-22
21-Jun-22
12-Jun-22
3-Jun-22
25-May-22
16-May-22
7-May-22
28-Apr-22
19-Apr-22
10-Apr-22
1-Apr-22
23-Mar-22
14-Mar-22
5-Mar-22
24-Feb-22
15-Feb-22
6-Feb-22
28-Jan-22
19-Jan-22
10-Jan-22
1-Jan-22
A
W.
Rainfall (in)
0 0 0 0 0
M M M M M M
(13) UOIIUAal:l 32PJS MU;)AJS
27-Dec-22
18-Dec-22
9-Dec-22
30-Nov-22
21-Nov-22
12-Nov-22
3-Nov-22
25-Oct-22
16-Oct-22
7-Oct-22
28-Sep-22
19-Sep-22
10-Sep-22
1-Sep-22
23-Aug-22
14-Aug-22
5-Aug-22
27-Jul-22
18-Jul-22
9-Jul-22
30-Jun-22
21-Jun-22
12-Jun-22
3-Jun-22
25-May-22
16-May-22
7-May-22
28-Apr-22
19-Apr-22
10-Apr-22
1-Apr-22
23-Mar-22
14-Mar-22
5-Mar-22
24-Feb-22
15-Feb-22
6-Feb-22
28-Jan-22
19-Jan-22
10-Jan-22
1-Jan-22
A
t9
7�
I
Cs,
x
Rainfall (in)
m m N N C C
(1j) uoi;ee31:1 .13IRtApuno af)aAi;eiag
27-Dec-22
18-Dec-22
9-Dec-22
30-Nov-22
21-Nov-22
12-Nov-22
3-Nov-22
25-Oct-22
16-Oct-22
7-Oct-22
28-Sep-22
19-Sep-22
10-Sep-22
1-Sep-22
23-Aug-22
14-Aug-22
5-Aug-22
27-Jul-22
18-Jul-22
9-Jul-22
30-Jun-22 c,
21-Jun-22 A
12-Jun-22
3-Jun-22
25-May-22
16-May-22
7-May-22
28-Apr-22
19-Apr-22
10-Apr-22
1-Apr-22
23-Mar-22
14-Mar-22
5-Mar-22
24-Feb-22
15-Feb-22
6-Feb-22
28-Jan-22
19-Jan-22
10-Jan-22
1-Jan-22
i
o.
Q
0
0
x
Rainfall (in)
(1j) u011CA31:1 .13JUMpunO.a19 aAi;eiag
27-Dec-22
18-Dec-22
9-Dec-22
30-Nov-22
21-Nov-22
12-Nov-22
3-Nov-22
25-Oct-22
16-Oct-22
7-Oct-22
28-Sep-22
19-Sep-22
10-Sep-22
1-Sep-22
23-Aug-22
14-Aug-22
5-Aug-22
27-Jul-22
18-Jul-22
9-Jul-22
30-Jun-22
21-Jun-22
12-Jun-22
3-Jun-22
25-May-22
16-May-22
7-May-22
28-Apr-22
19-Apr-22
10-Apr-22
1-Apr-22
23-Mar-22
14-Mar-22
5-Mar-22
24-Feb-22
15-Feb-22
6-Feb-22
28-Jan-22
19-Jan-22
10-Jan-22
1-Jan-22
i
e�
A
P
x
Rainfall (in)
(1j) u011CA31:1 .13JUMpunO.a19 aAi;eiag
27-Dec-22
18-Dec-22
9-Dec-22
30-Nov-22
21-Nov-22
12-Nov-22
3-Nov-22
25-Oct-22
16-Oct-22
7-Oct-22
28-Sep-22
19-Sep-22
10-Sep-22
1-Sep-22
23-Aug-22
14-Aug-22
5-Aug-22
27-Jul-22
18-Jul-22
9-Jul-22
30-Jun-22
21-Jun-22
12-Jun-22
3-Jun-22
25-May-22
16-May-22
7-May-22
28-Apr-22
19-Apr-22
10-Apr-22
1-Apr-22
23-Mar-22
14-Mar-22
5-Mar-22
24-Feb-22
15-Feb-22
6-Feb-22
28-Jan-22
19-Jan-22
10-Jan-22
1-Jan-22
i
e�
A
P
x
Rainfall (in)
(1j) uoi;ee31:1 .13IRtApuno af)aAi;eiag
27-Dec-22
18-Dec-22
9-Dec-22
30-Nov-22
21-Nov-22
12-Nov-22
3-Nov-22
25-Oct-22
16-Oct-22
7-Oct-22
28-Sep-22
19-Sep-22
10-Sep-22
1-Sep-22
23-Aug-22
14-Aug-22
5-Aug-22
27-Jul-22
18-Jul-22
9-Jul-22
30-Jun-22
21-Jun-22
12-Jun-22
3-Jun-22
25-May-22
16-May-22
7-May-22
28-Apr-22
19-Apr-22
10-Apr-22
1-Apr-22
23-Mar-22
14-Mar-22
5-Mar-22
24-Feb-22
15-Feb-22
6-Feb-22
28-Jan-22
19-Jan-22
10-Jan-22
1-Jan-22
e�
A
Cs,
x
Rainfall (in)
m m N N
(1j) uoi;eeai:j .13j9tApuno af) aAi;eiag
27-Dec-22
18-Dec-22
9-Dec-22
30-Nov-22
21-Nov-22
12-Nov-22
3-Nov-22
25-Oct-22
16-Oct-22
7-Oct-22
28-Sep-22
19-Sep-22
10-Sep-22
1-Sep-22
23-Aug-22
14-Aug-22
5-Aug-22
27-Jul-22
18-Jul-22
9-Jul-22
30-Jun-22
21-Jun-22
12-Jun-22
3-Jun-22
25-May-22
16-May-22
7-May-22
28-Apr-22
19-Apr-22
10-Apr-22
1-Apr-22
23-Mar-22
14-Mar-22
5-Mar-22
24-Feb-22
15-Feb-22
6-Feb-22
28-Jan-22
19-Jan-22
10-Jan-22
1-Jan-22
i
e�
A
K
x
Rainfall (in)
m m N N
(1j) uoi;ee31:1 .13IRtApuno af)aAi;eiag
27-Dec-22
18-Dec-22
9-Dec-22
30-Nov-22
21-Nov-22
12-Nov-22
3-Nov-22
25-Oct-22
16-Oct-22
7-Oct-22
28-Sep-22
19-Sep-22
10-Sep-22
1-Sep-22
23-Aug-22
14-Aug-22
5-Aug-22
27-Jul-22
18-Jul-22
9-Jul-22
30-Jun-22 A
21-Jun-22
12-Jun-22
3-Jun-22
25-May-22
16-May-22
7-May-22
28-Apr-22
19-Apr-22
10-Apr-22
1-Apr-22
23-Mar-22
14-Mar-22
5-Mar-22
24-Feb-22
15-Feb-22
6-Feb-22
28-Jan-22
19-Jan-22
10-Jan-22
1-Jan-22
i
C7
x
Rainfall (in)
(1j) uoi;ee31:1 .13IRtApuno af)aAi;eiag
27-Dec-22
18-Dec-22
9-Dec-22
30-Nov-22
21-Nov-22
12-Nov-22
3-Nov-22
25-Oct-22
16-Oct-22
7-Oct-22
28-Sep-22
19-Sep-22
10-Sep-22
1-Sep-22
23-Aug-22
14-Aug-22
5-Aug-22
27-Jul-22
18-Jul-22
9-Jul-22
30-Jun-22 A
21-Jun-22
12-Jun-22
3-Jun-22
25-May-22
16-May-22
7-May-22
28-Apr-22
19-Apr-22
10-Apr-22
1-Apr-22
23-Mar-22
14-Mar-22
5-Mar-22
24-Feb-22
15-Feb-22
6-Feb-22
28-Jan-22
19-Jan-22
10-Jan-22
1-Jan-22
x
Rainfall (in)
�z
Q
O
'd
Q
W
0
won
o
N
N
�
27-Dec-22
18-Dec-22
9-Dec-22
30-Nov-22
21-Nov-22
12-Nov-22
3-Nov-22
25-Oct-22
16-Oct-22
7-Oct-22
28-Sep-22
19-Sep-22
10-Sep-22
1-Sep-22
23-Aug-22
14-Aug-22
5-Aug-22
27-Jul-22
18-Jul-22
9-Jul-22
30-Jun-22 A
21-Jun-22
12-Jun-22
3-Jun-22
25-May-22
16-May-22
7-May-22
28-Apr-22
19-Apr-22
10-Apr-22
1-Apr-22
23-Mar-22
14-Mar-22
5-Mar-22
24-Feb-22
15-Feb-22
6-Feb-22
28-Jan-22
19-Jan-22
10-Jan-22
1 J 22
- an-
�
(1j) uoi;ee31:1 .13IRtApuno af)aAi;eiag
1
APPENDIX E
Project Timeline and Contact Info
Hip Bone Creek Restoration Site KCI Associates of NC, PA
DMS Project 91000059 64 MY-02 Monitoring Report
Table 14. Project Activity & Reporting History
Hip Bone Creek Restoration Site (ID-100059)
Activity or Report
Data Collection Complete
Actual Completion or
Delivery
Project Instituted
Aril 23, 2018
Mitigation Plan
March 17, 2020
Final Design - Construction Plans
March 17, 2020
Construction Grading Completed
April 16, 2021
Planting Completed
April 30, 2021
Baseline Monitoring/Report
May 2021
July 2021
Vegetation Monitoring
May 14, 2021
Stream Survey
May 21,2021
Year 1 Monitoring
December 2021
January 2022
Vegetation Monitoring
November 17, 2021
Stream Survey
December 13, 2021
Invasive Treatment
July 28, 2022
Year 2 Monitoring
November 2022
December 2022
Vegetation Monitoring
August 22, 2022
Stream Survey
July 15, 2022
Hip Bone Creek Restoration Site KCIAssociates ofNC, PA
DMS Project #1000059 65 MY-02 Monitoring Report
Table 15. Project Contacts
Hip Bone Creek Restoration Site (ID-100059)
Design Firm
KCI Associates of North Carolina, PC
4505 Falls of Neuse Road
Suite 400
Raleigh, NC 27609
Contact: Mr. Adam Spiller
Phone: (919) 278-2514
Fax: (919) 783-9266
Construction Contractor
Chatham Civil Contracting
811 Archie Johnson Road
Siler City, NC 27344
Contact: Mr. Stephen James
Phone: 919 704-4442
Planting_ Contractor
Shenandoah Habitats
1983 Jefferson Highway
Waynesboro, VA 22980
Contact: Mr. David Coleman
Phone: 540 941-0067
Monitoring Performers
KCI Associates of North Carolina, PC
4505 Falls of Neuse Road
Suite 400
Raleigh, NC 27609
Contact: Mr. Adam Spiller
Phone: (919) 278-2514
Fax: (919) 783-9266
Hip Bone Creek Restoration Site KCIAssociates ofNC, PA
DMS Project #1000059 66 MY-02 Monitoring Report