HomeMy WebLinkAbout20210019 Ver 2_OBerry Road Mitigation Bank Parcel - Site Walk Request Memo_20230209ID#* 20210019 Version* 2
Select Reviewer:
Katie Merritt
Initial Review Completed Date 02/15/2023
Mitigation Project Submittal - 2/9/2023
Is this a Prospectus, Technical Proposal or a New Site?* O Yes O No
Type of Mitigation Project:*
Stream Wetlands Buffer Nutrient Offset
(Select all that apply)
Project Contact Information
Contact Name:* Email Address:*
Kaitlyn Hogarth khogarth@wildlandseng.com
Project Information
.................................................................................................................................................................................................................................................................................
ID#:* 20210019 Version:* 2
Existing ID# Existing Version
Project Type: DMS • Mitigation Bank
Project Name: O'Berry Road Bank Parcel - BUFFER
County: Wayne
Document Information
Mitigation Document Type:*
Mitigation Bank Information
File Upload: OBerry Road Mitigation Bank Parcel - Site Walk
3.2M6
Request Memo.pdf
Please upload only one PDF of the complete file that needs to be submitted...
Signature
Print Name: * Kaitlyn Hogarth
Signature:
WILDLANDS
ENGINEERING
February 9, 2023
CREDIT RELEASE REQUEST FORM
To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator
From: Kaitlyn Hogarth (khogarth&wildlandseng.com, 540-907-9432)
Through: Wildlands Holdings III, LLC
We formally request a credit release for the O'Berry Road Mitigation Bank Parcel (2021-0019v2)
for completion of Task 2 per the approved credit release schedule, which is included in the
Attachments with this request. The following documents have been submitted to NCDWR for Task 2
and are pending review: Request for Site Walk Memorandum.
Credits requested for release are detailed below:
Credit Type
% Release
Credit Amount
Notes/Comments
include Units
Buffer Restoration
20%
52,403 ft2
0.20 x 262,015.00 ft2 =
52,403 ft2
Buffer Preservation
20%
1,746.76 ft2
0.20 x 8,733.800 ft2 =
1,746.76 ft2
Buffer Enhancement
Generated Nitrogen Nutrient
20%
5,550.815 lbs. N
0.20 x 27,754.074 lbs. N =
Offset
5,550.815 lbs. N
Delivered Nitrogen Nutrient
Offset Jordan sites only)
Generated Phosphorus Nutrient
Offset
Delivered Phosphorus Nutrient
Offset Jordan sites only)
Signature: u ({�„ J4 ,
Attachments:
1) BPDP approved Project Credit Table
2) UMBI approved Credit Release Schedule
BPDP approved Project Credit Table
O'Berry Road Mitigation Bank Parcel
Bank Parcel Development Package
Neuse 03020201 - Outside Falls Lake
Project Area
N Credit Conversion Ratio (ftZ/pound)
P Credit Conversion Ratio (ftZ/pound)
19.16394
N/A
Subject?
Total
Initial
Final
Delivered
Delivered
(enter NO
Feature
Mitigation
Min -Max
Total Area
(Creditable)
Credit
%Full
Credit
Convertible
Riparian
Convertible
Nutrient
Nutrient
Credit Type
Location
if
Buffer Width
Feature Name
Buffer
to Nutrient
ephemeral
Type
Activity
(ft)
(sf)
Area of Buffer
Ratio
Credit
Ratio
to Riparian
Credits
Offset?
Offset: N
Offset: P
Mitigation (sf)
(x:1)
(x:1)
Buffer?
(Ibs)
(Ibs)
or ditch 1)
Buffer
Rural
Yes
I / P
Restoration
0-100
O'Berry Creek,
262,015
262,015
1
o
100%
1.00000
Yes
262,015.000
Yes
13,672.293
—
UT1
Nutrient
Rural
Yes
I / P
Restoration
101-200
O'Berry Creek,
312,904
1
o
33/o
No
—
Yes
16,327.749
—
Offset
UT1
Nutrient
Rural
No
Ditch
Restoration
0-200
Ditch A, Ditch B,
218,973
1
100%
No
—
Yes
11,426.325
—
Offset
Ditch C, Ditch D
Diffuse Flow
Rural
No
Ditch
Restoration
Deductions
5,146
1
No
—
No
—
—
Totals (ft2):
799,038
262,015
262,015.000 41,426.366 0.000
Total Buffer
(ftZ):
262,015
262,015
531,877
N/A
Total Nutrient Offset (ftZ):
Total Ephemeral Area (ftZ) for Credit: 0 0
Total Eligible Ephemeral Area (ftZ): 90,755 0.0% Ephemeral Reaches as%TABM
Eligible for Preservation (ftZ): 90,755 25.0% Preservation as%TABM
Total
Initial
Final
Feature
Mitigation
Min -Max
Total Area
(Creditable)
Credit
% Full
Credit
Riparian
Credit Type
Location
Subject?
Type
Activity
Buffer Width
Feature Name
(sf)
Area for Buffer
Ratio
Credit
Ratio
Buffer
(ft)
Credits
Mitigation (sf)
(x:1)
(x:1)
Rural
Yes
I / P
Preservation
0-100
O'Berry Creek,
201,412
87,338
10
a
100%
10.00000
8,733.800
UT1
O'Berry Creek,
Rural
Yes
I / P
Preservation
101-200
55,343
10
a
33/0
—
UT1
Preservation Area Subtotals (ftZ): I 256,755 I 87,338
TOTAL AREA OF BUFFER MITIGATION (TABM)
Mitigation Totals
Square
Feet
Credits
Restoration:
262,015
262,015.000
Enhancement:
0
0.000
Preservation:
87,338
8,733.800
Total Riparian Buffer:
1 349,353
1 270,748.800
TOTAL NUTRIENT OFFSET
MITIGATION
Mitigation Totals
Square
Feet
Credits
Nutrient
Offset:
Nitrogen:
531,877
27,754.074
Phosphorus:
0.000
UMBI approved Credit Release Schedule
O'Berry Road Mitigation Bank Parcel
Umbrella Mitigation Banking Instrument
Table 3.0 - Credit Release Schedule for Riparian Buffer Credits and Nutrient Offset Credits
Credit
Task
Project Milestone
Available for Sale
Instrument and BPDP Approved by DWR, Conservation Easement
1
Recorded*, and Financial Assurance Posted
20
All mitigation activities including riparian earthwork, Planting and
Installation of Monitoring Devices Completed; easement boundaries
2
adequately marked, and all applicable permits obtained, site visit
20
performed by DWR
Monitoring Financial Assurance Posted and Approval of As -Built
3
Report
10
Monitoring Report #1: Approved by the DWR** & financial
4
assurance renewed
10
Monitoring Report #2: Approved by the DWR** & financial
5
assurance renewed
10
Monitoring Report #3: Approved by the DWR** & financial
6
assurance renewed
10
Item B (1) of Section X in this Instrument has been completed and
7
approved by DWR
5
No remaining credits will be released until Task 7 has been satisfied, assigning the conversation
easement to an approved land trust or long-term steward.
Monitoring Report #4: Approved by the DWR** & financial
8
assurance renewed
5
Monitoring Report #5: Approved by the DWR** and final site visit by
9
DWR has been conducted
10
Total
100%
* For specification, please see Section V in this Instrument
** DWR Approval provided upon a determination that the site is meeting performance
standards contained within the approved BPDP
O'Berry Road Mitigation Bank Parcel — Memo
kt�
WILDLANDS
ENGINEERING
MEMORANDUM
TO: Katie Merritt, Nutrient Offset & Buffer Banking Coordinator
FROM: Andrea Eckardt, Project Manager
Kaitlyn Hogarth, Environmental Scientist
DATE: February 9, 2023
RE: Request for Site Visit
MBI Task 2 Site Walk
O'BERRY ROAD MITIGATION BANK PARCEL - Goldsboro, NC
The O'Berry Road Mitigation Bank Parcel (Parcel) is in Wayne County approximately nine miles
southwest of Goldsboro, North Carolina. The Parcel was restored to provide ecological and water quality
enhancements to the Neuse River Basin by restoring the riparian buffer along two unnamed tributaries
(O'Berry Creek and UT1) and four ditches (Ditches A, B, C, and D). The Parcel creates a protected riparian
area from top of bank to a minimum of 30 feet along streams, or 50 feet along ditches, to a maximum of
200 feet. Prior to mitigation activities, much of the Parcel was used to produce row crops. However, the
downstream half of O'Berry Creek and UT1 are surrounded by forest that has remained essentially the
same since 1973. A small pond on the west side of UT1 is also protected by the conservation easement.
Tables 1 and 2 contain project overview and credit applicability information.
Table 1. Project Overview
Project Name
O'Berry Road Mitigation Bank Parcel
Hydrologic Unit Code
03020201170040
River Basin
Neuse (Excluding Falls Lake)
Geographic Location (Lat, Long)
35.267644,-78.073667
Site Protection Instrument (DB, PG)
BK P PG 69-E
Total Credits
270,748.800 buffer mitigation credits and 27,754.074 lbs. N
Types of Credits
Riparian Buffer and Nutrient Offset
BPDP Date
August 2022
Initial Planting Date
January 2023
Baseline Report Date
February 2023
MY1 Report Date
December 2023
MY2 Report Date
December 2024
MY3 Report Date
December 2025
MY4 Report Date
December 2026
MY5 Report Date
December 2027
Wildlands Engineering, Inc. page 1
February 9, 2023
O'Berry Road Mitigation Bank Parcel — Memo
Table 2. Credit Viability
Feature Name
Feature Name
Classification
Buffer Credit Viable
Nutrient Offset Viable
(BPDP)
(NCDWR Evaluation)
Yes
O'Berry Creek
O'Berry Creek
Stream
Yes
(non -forested areas only)
Yes
UT1
UT1
Stream
Yes
(non -forested areas only)
Yes
Ditch A
D3
Ditch
No
(non -forested areas only)
Ditch B
D7
Ditch
No
Yes
Ditch C
D8
Ditch
No
Yes
Yes
Ditch D
D6
Ditch
No
(non -forested areas only)
Of the 27.29 acres protected under the conservation easement, the mitigation approach for 18.22 acres
is riparian restoration. Of that 18.22 acres of restoration, 6.01 acres are proposed for buffer mitigation
credit and 12.21 acres are proposed for nutrient offset credit. Buffer preservation covers approximately
5.89 acres, although only 2.00 acres are eligible for preservation credits. The Buffer
Interpretation/Clarification Memo #2008-019 applies to Ditches A and D where maintenance of diffuse
flow into the easement is unattainable. Other areas within the conservation easement where no credit
is claimed include preservation areas along the northeast side of O'Berry Creek, areas which are less
than 50 feet from top of bank at the upstream end of Ditch B, areas which are over 200 feet from top of
bank, the pond along UT1, and the project feature channels.
The land use within 200 feet from top of bank of the project features had been maintained for row crop
agriculture in areas that are not currently forested or included in the pond footprint. Bare root trees
were planted using a dibble bar at a spacing of 7 feet by 12 feet, which resulted in a stem density of 540
stems per acre. Two small erosion areas on the south bank of O'Berry Creek near vegetation plot 4 were
stabilized by installing straw bales to divert overland flow and planting live stakes along the bank slope.
The sides of an erosional hole that had developed on the east bank of UT1 were graded by hand to
reduce the slope. Straw bales were installed around the edge to diffuse overland flow and live stakes
were planted in the graded slope. A temporary seed mix and pollinator blend was spread around all
three areas of bank stabilization. Additionally, the Parcel will be seeded in April 2023 with a combination
of warm season cover crops and permanent species seed mix. Table 3 includes a list of tree species
planted along with their density and composition at planting.
Table 3. Tree Species Selected for Planting
Species
Common Name
Number Planted
% of Total
Betula nigra
River Birch
1,522 (81 stems/acre)
15%
Platanus occidentalis
American Sycamore
1,522 (81 stems/acre)
15%
Acer negundo
Boxelder
1,015 (54 stems/acre)
10%
Magnolia virginiana
Sweetbay Magnolia
1,015 (54 stems/acre)
10%
Quercus pagoda
Cherrybark Oak
1,015 (54 stems/acre)
10%
Wildlands Engineering, Inc. page 2
February 9, 2023
O'Berry Road Mitigation Bank Parcel — Memo
Species
Common Name
Number Planted
% of Total
Quercus phellos
Willow Oak
1,015 (54 stems/acre)
10%
Ulmus americana
American Elm
812 (43 stems/acre)
8%
Populus deltoides
Eastern Cottonwood
710 (38 stems/acre)
7%
Diospyros virginiana
Persimmon
507 (27 stems/acre)
5%
Nyssa sylvatica
Black Gum
507 (27 stems/acre)
5%
Quercus michauxii
Swamp Chestnut Oak
507 (27 stems/acre)
5%
Easement boundaries have been identified in the field to ensure clear distinction between the Parcel
and adjacent properties. Boundaries are identified by 6 foot "t posts" with attached easement placards
at approximately 100-foot intervals or tree -blazing as allowed by site conditions.
Attachments:
Credit Service Area Map
Monitoring Map
Vegetation Plot Photographs
Erosion Stabilization Photographs
Wildlands Engineering, Inc. page 3
February 9, 2023
�I.. .
03020201
j j
j Naren
Owes r•-.
% Lilllrgton Cfeek Coat, ,
i
-'4
•� ILt6.
469 ff Erwin
Cr unn j
Walkerlown ff
SF-rlr)g Lake to
:a
-
2
WYLDLANDS 0 5 10Miles
% &V ENGINEERING I I I I I
ED County Boundary
M H UC 03020201
I
Service Area for Project's Credits Ir
O'Berry Road Mitigation Bank Parcel Location
i-
Louisburg �'•
�r
0
Credit Service Area Map
O'Berry Road Mitigation Bank Parcel
Site Walk Request Memo
Neuse River Basin (03020201)
Wayne County, NC
Monitoring Map
W I L D L A N D S O'Berry Road Mitigation Bank Parcel
E N G I N E E RI N G 0 250 500 US Feet Site Walk Request Memo
I i I i I N Neuse River Basin (03020201)
Wayne County, NC
VEGETATION PLOT PHOTOGRAPHS
O'Berry Road Mitigation Bank Parcel
Site Walk Request Memo —Vegetation Plot Photographs
VEG PLOT 7 (111812023) 1 VEG PLOT 8 (111812023) 1
VEG PLOT 9 (111812023) 1 VEG PLOT 10 (111812023) 1
VEG PLOT 11(111812023)
VEG PLOT 12 (111812023)
O'Berry Road Mitigation Bank Parcel
Site Walk Request Memo —Vegetation Plot Photographs
VEG PLOT 13 (111812023) 1 VEG PLOT 14 (111812023) 1
VEG PLOT 15 (111812023)
O'Berry Road Mitigation Bank Parcel
Site Walk Request Memo —Vegetation Plot Photographs
EROSION STABILIZATION PHOTOGRAPHS
O'Berry Creek - Erosion Reduction via Overland Flow Diversion & Live Staking (111812023)
O'Berry Creek - Erosion Reduction via Overland Flow Diversion & Live Staking (111812023)
O'Berry Road Mitigation Bank Parcel
Site Walk Request Memo — Erosion Stabilization Photographs
LIT1- Erosion Reduction via Overland Flow Diversion & Live Staking (111812023) 1
O'Berry Road Mitigation Bank Parcel
Site Walk Request Merno — Erosion Stabilization Photographs