Loading...
HomeMy WebLinkAbout20210019 Ver 2_OBerry Road Mitigation Bank Parcel - Site Walk Request Memo_20230209ID#* 20210019 Version* 2 Select Reviewer: Katie Merritt Initial Review Completed Date 02/15/2023 Mitigation Project Submittal - 2/9/2023 Is this a Prospectus, Technical Proposal or a New Site?* O Yes O No Type of Mitigation Project:* Stream Wetlands Buffer Nutrient Offset (Select all that apply) Project Contact Information Contact Name:* Email Address:* Kaitlyn Hogarth khogarth@wildlandseng.com Project Information ................................................................................................................................................................................................................................................................................. ID#:* 20210019 Version:* 2 Existing ID# Existing Version Project Type: DMS • Mitigation Bank Project Name: O'Berry Road Bank Parcel - BUFFER County: Wayne Document Information Mitigation Document Type:* Mitigation Bank Information File Upload: OBerry Road Mitigation Bank Parcel - Site Walk 3.2M6 Request Memo.pdf Please upload only one PDF of the complete file that needs to be submitted... Signature Print Name: * Kaitlyn Hogarth Signature: WILDLANDS ENGINEERING February 9, 2023 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Kaitlyn Hogarth (khogarth&wildlandseng.com, 540-907-9432) Through: Wildlands Holdings III, LLC We formally request a credit release for the O'Berry Road Mitigation Bank Parcel (2021-0019v2) for completion of Task 2 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to NCDWR for Task 2 and are pending review: Request for Site Walk Memorandum. Credits requested for release are detailed below: Credit Type % Release Credit Amount Notes/Comments include Units Buffer Restoration 20% 52,403 ft2 0.20 x 262,015.00 ft2 = 52,403 ft2 Buffer Preservation 20% 1,746.76 ft2 0.20 x 8,733.800 ft2 = 1,746.76 ft2 Buffer Enhancement Generated Nitrogen Nutrient 20% 5,550.815 lbs. N 0.20 x 27,754.074 lbs. N = Offset 5,550.815 lbs. N Delivered Nitrogen Nutrient Offset Jordan sites only) Generated Phosphorus Nutrient Offset Delivered Phosphorus Nutrient Offset Jordan sites only) Signature: u ({�„ J4 , Attachments: 1) BPDP approved Project Credit Table 2) UMBI approved Credit Release Schedule BPDP approved Project Credit Table O'Berry Road Mitigation Bank Parcel Bank Parcel Development Package Neuse 03020201 - Outside Falls Lake Project Area N Credit Conversion Ratio (ftZ/pound) P Credit Conversion Ratio (ftZ/pound) 19.16394 N/A Subject? Total Initial Final Delivered Delivered (enter NO Feature Mitigation Min -Max Total Area (Creditable) Credit %Full Credit Convertible Riparian Convertible Nutrient Nutrient Credit Type Location if Buffer Width Feature Name Buffer to Nutrient ephemeral Type Activity (ft) (sf) Area of Buffer Ratio Credit Ratio to Riparian Credits Offset? Offset: N Offset: P Mitigation (sf) (x:1) (x:1) Buffer? (Ibs) (Ibs) or ditch 1) Buffer Rural Yes I / P Restoration 0-100 O'Berry Creek, 262,015 262,015 1 o 100% 1.00000 Yes 262,015.000 Yes 13,672.293 — UT1 Nutrient Rural Yes I / P Restoration 101-200 O'Berry Creek, 312,904 1 o 33/o No — Yes 16,327.749 — Offset UT1 Nutrient Rural No Ditch Restoration 0-200 Ditch A, Ditch B, 218,973 1 100% No — Yes 11,426.325 — Offset Ditch C, Ditch D Diffuse Flow Rural No Ditch Restoration Deductions 5,146 1 No — No — — Totals (ft2): 799,038 262,015 262,015.000 41,426.366 0.000 Total Buffer (ftZ): 262,015 262,015 531,877 N/A Total Nutrient Offset (ftZ): Total Ephemeral Area (ftZ) for Credit: 0 0 Total Eligible Ephemeral Area (ftZ): 90,755 0.0% Ephemeral Reaches as%TABM Eligible for Preservation (ftZ): 90,755 25.0% Preservation as%TABM Total Initial Final Feature Mitigation Min -Max Total Area (Creditable) Credit % Full Credit Riparian Credit Type Location Subject? Type Activity Buffer Width Feature Name (sf) Area for Buffer Ratio Credit Ratio Buffer (ft) Credits Mitigation (sf) (x:1) (x:1) Rural Yes I / P Preservation 0-100 O'Berry Creek, 201,412 87,338 10 a 100% 10.00000 8,733.800 UT1 O'Berry Creek, Rural Yes I / P Preservation 101-200 55,343 10 a 33/0 — UT1 Preservation Area Subtotals (ftZ): I 256,755 I 87,338 TOTAL AREA OF BUFFER MITIGATION (TABM) Mitigation Totals Square Feet Credits Restoration: 262,015 262,015.000 Enhancement: 0 0.000 Preservation: 87,338 8,733.800 Total Riparian Buffer: 1 349,353 1 270,748.800 TOTAL NUTRIENT OFFSET MITIGATION Mitigation Totals Square Feet Credits Nutrient Offset: Nitrogen: 531,877 27,754.074 Phosphorus: 0.000 UMBI approved Credit Release Schedule O'Berry Road Mitigation Bank Parcel Umbrella Mitigation Banking Instrument Table 3.0 - Credit Release Schedule for Riparian Buffer Credits and Nutrient Offset Credits Credit Task Project Milestone Available for Sale Instrument and BPDP Approved by DWR, Conservation Easement 1 Recorded*, and Financial Assurance Posted 20 All mitigation activities including riparian earthwork, Planting and Installation of Monitoring Devices Completed; easement boundaries 2 adequately marked, and all applicable permits obtained, site visit 20 performed by DWR Monitoring Financial Assurance Posted and Approval of As -Built 3 Report 10 Monitoring Report #1: Approved by the DWR** & financial 4 assurance renewed 10 Monitoring Report #2: Approved by the DWR** & financial 5 assurance renewed 10 Monitoring Report #3: Approved by the DWR** & financial 6 assurance renewed 10 Item B (1) of Section X in this Instrument has been completed and 7 approved by DWR 5 No remaining credits will be released until Task 7 has been satisfied, assigning the conversation easement to an approved land trust or long-term steward. Monitoring Report #4: Approved by the DWR** & financial 8 assurance renewed 5 Monitoring Report #5: Approved by the DWR** and final site visit by 9 DWR has been conducted 10 Total 100% * For specification, please see Section V in this Instrument ** DWR Approval provided upon a determination that the site is meeting performance standards contained within the approved BPDP O'Berry Road Mitigation Bank Parcel — Memo kt� WILDLANDS ENGINEERING MEMORANDUM TO: Katie Merritt, Nutrient Offset & Buffer Banking Coordinator FROM: Andrea Eckardt, Project Manager Kaitlyn Hogarth, Environmental Scientist DATE: February 9, 2023 RE: Request for Site Visit MBI Task 2 Site Walk O'BERRY ROAD MITIGATION BANK PARCEL - Goldsboro, NC The O'Berry Road Mitigation Bank Parcel (Parcel) is in Wayne County approximately nine miles southwest of Goldsboro, North Carolina. The Parcel was restored to provide ecological and water quality enhancements to the Neuse River Basin by restoring the riparian buffer along two unnamed tributaries (O'Berry Creek and UT1) and four ditches (Ditches A, B, C, and D). The Parcel creates a protected riparian area from top of bank to a minimum of 30 feet along streams, or 50 feet along ditches, to a maximum of 200 feet. Prior to mitigation activities, much of the Parcel was used to produce row crops. However, the downstream half of O'Berry Creek and UT1 are surrounded by forest that has remained essentially the same since 1973. A small pond on the west side of UT1 is also protected by the conservation easement. Tables 1 and 2 contain project overview and credit applicability information. Table 1. Project Overview Project Name O'Berry Road Mitigation Bank Parcel Hydrologic Unit Code 03020201170040 River Basin Neuse (Excluding Falls Lake) Geographic Location (Lat, Long) 35.267644,-78.073667 Site Protection Instrument (DB, PG) BK P PG 69-E Total Credits 270,748.800 buffer mitigation credits and 27,754.074 lbs. N Types of Credits Riparian Buffer and Nutrient Offset BPDP Date August 2022 Initial Planting Date January 2023 Baseline Report Date February 2023 MY1 Report Date December 2023 MY2 Report Date December 2024 MY3 Report Date December 2025 MY4 Report Date December 2026 MY5 Report Date December 2027 Wildlands Engineering, Inc. page 1 February 9, 2023 O'Berry Road Mitigation Bank Parcel — Memo Table 2. Credit Viability Feature Name Feature Name Classification Buffer Credit Viable Nutrient Offset Viable (BPDP) (NCDWR Evaluation) Yes O'Berry Creek O'Berry Creek Stream Yes (non -forested areas only) Yes UT1 UT1 Stream Yes (non -forested areas only) Yes Ditch A D3 Ditch No (non -forested areas only) Ditch B D7 Ditch No Yes Ditch C D8 Ditch No Yes Yes Ditch D D6 Ditch No (non -forested areas only) Of the 27.29 acres protected under the conservation easement, the mitigation approach for 18.22 acres is riparian restoration. Of that 18.22 acres of restoration, 6.01 acres are proposed for buffer mitigation credit and 12.21 acres are proposed for nutrient offset credit. Buffer preservation covers approximately 5.89 acres, although only 2.00 acres are eligible for preservation credits. The Buffer Interpretation/Clarification Memo #2008-019 applies to Ditches A and D where maintenance of diffuse flow into the easement is unattainable. Other areas within the conservation easement where no credit is claimed include preservation areas along the northeast side of O'Berry Creek, areas which are less than 50 feet from top of bank at the upstream end of Ditch B, areas which are over 200 feet from top of bank, the pond along UT1, and the project feature channels. The land use within 200 feet from top of bank of the project features had been maintained for row crop agriculture in areas that are not currently forested or included in the pond footprint. Bare root trees were planted using a dibble bar at a spacing of 7 feet by 12 feet, which resulted in a stem density of 540 stems per acre. Two small erosion areas on the south bank of O'Berry Creek near vegetation plot 4 were stabilized by installing straw bales to divert overland flow and planting live stakes along the bank slope. The sides of an erosional hole that had developed on the east bank of UT1 were graded by hand to reduce the slope. Straw bales were installed around the edge to diffuse overland flow and live stakes were planted in the graded slope. A temporary seed mix and pollinator blend was spread around all three areas of bank stabilization. Additionally, the Parcel will be seeded in April 2023 with a combination of warm season cover crops and permanent species seed mix. Table 3 includes a list of tree species planted along with their density and composition at planting. Table 3. Tree Species Selected for Planting Species Common Name Number Planted % of Total Betula nigra River Birch 1,522 (81 stems/acre) 15% Platanus occidentalis American Sycamore 1,522 (81 stems/acre) 15% Acer negundo Boxelder 1,015 (54 stems/acre) 10% Magnolia virginiana Sweetbay Magnolia 1,015 (54 stems/acre) 10% Quercus pagoda Cherrybark Oak 1,015 (54 stems/acre) 10% Wildlands Engineering, Inc. page 2 February 9, 2023 O'Berry Road Mitigation Bank Parcel — Memo Species Common Name Number Planted % of Total Quercus phellos Willow Oak 1,015 (54 stems/acre) 10% Ulmus americana American Elm 812 (43 stems/acre) 8% Populus deltoides Eastern Cottonwood 710 (38 stems/acre) 7% Diospyros virginiana Persimmon 507 (27 stems/acre) 5% Nyssa sylvatica Black Gum 507 (27 stems/acre) 5% Quercus michauxii Swamp Chestnut Oak 507 (27 stems/acre) 5% Easement boundaries have been identified in the field to ensure clear distinction between the Parcel and adjacent properties. Boundaries are identified by 6 foot "t posts" with attached easement placards at approximately 100-foot intervals or tree -blazing as allowed by site conditions. Attachments: Credit Service Area Map Monitoring Map Vegetation Plot Photographs Erosion Stabilization Photographs Wildlands Engineering, Inc. page 3 February 9, 2023 �I.. . 03020201 j j j Naren Owes r•-. % Lilllrgton Cfeek Coat, , i -'4 •� ILt6. 469 ff Erwin Cr unn j Walkerlown ff SF-rlr)g Lake to :a - 2 WYLDLANDS 0 5 10Miles % &V ENGINEERING I I I I I ED County Boundary M H UC 03020201 I Service Area for Project's Credits Ir O'Berry Road Mitigation Bank Parcel Location i- Louisburg �'• �r 0 Credit Service Area Map O'Berry Road Mitigation Bank Parcel Site Walk Request Memo Neuse River Basin (03020201) Wayne County, NC Monitoring Map W I L D L A N D S O'Berry Road Mitigation Bank Parcel E N G I N E E RI N G 0 250 500 US Feet Site Walk Request Memo I i I i I N Neuse River Basin (03020201) Wayne County, NC VEGETATION PLOT PHOTOGRAPHS O'Berry Road Mitigation Bank Parcel Site Walk Request Memo —Vegetation Plot Photographs VEG PLOT 7 (111812023) 1 VEG PLOT 8 (111812023) 1 VEG PLOT 9 (111812023) 1 VEG PLOT 10 (111812023) 1 VEG PLOT 11(111812023) VEG PLOT 12 (111812023) O'Berry Road Mitigation Bank Parcel Site Walk Request Memo —Vegetation Plot Photographs VEG PLOT 13 (111812023) 1 VEG PLOT 14 (111812023) 1 VEG PLOT 15 (111812023) O'Berry Road Mitigation Bank Parcel Site Walk Request Memo —Vegetation Plot Photographs EROSION STABILIZATION PHOTOGRAPHS O'Berry Creek - Erosion Reduction via Overland Flow Diversion & Live Staking (111812023) O'Berry Creek - Erosion Reduction via Overland Flow Diversion & Live Staking (111812023) O'Berry Road Mitigation Bank Parcel Site Walk Request Memo — Erosion Stabilization Photographs LIT1- Erosion Reduction via Overland Flow Diversion & Live Staking (111812023) 1 O'Berry Road Mitigation Bank Parcel Site Walk Request Merno — Erosion Stabilization Photographs