Loading...
HomeMy WebLinkAboutNCC230444_Site Plan or Location Map_202302153AFEHOU 3E SUBDIVISION CONSTRUCTION PLANS SITE AND DEVELOPMENT DATA JURISDICTION UNION COUNTY TAX PARCEL(S): 042-22-015 SITE ADDRESS: 3715 LANCASTER HWY ZONING RA-40 USE CLASSIFICATION RESIDENTIAL TOTAL AREA 52.66 AC. AREA IN LOTS. 45.85 ACRES AREA IN EXISTING LOT 3.00ACRES SEPTIC EASEMENT 1.25 ACRES RIGHT-OF-WAY 5.56 ACRES MINIMUM FRONT SETBACK 40' MINIMUM CORNER/SIDE SETBACK 20%15' MINIMUM REAR SETBACK 40' MINIMUM LOT SIZE 40,000 SQ FT MINIMUM LOT WIDTH 120' DISTURBED AREA 13.08 AC. UNION COUNTY, NC 0 _J CO LU z pN pPE o �pN z_ 2 / SITE S RO N W E VICINITY MAP NOT TO SCALE EAGLE ENGINEERING PROJECT ENGINEER: STREET ADDRESS: CITY, STATE, ZIP PHONE: EMAIL: PREPARED FOR: STREET ADDRESS: CITY, STATE, ZIP: PHONE: EMAIL: CONTACT: FIRM LICENSE # C-0873 2013A Van Buren Avenue Indian Trail, NC 28079 (704) 882-4222 www.eagleonline.net o� -_ \A CARo�/ � 4 EAGLE ti9 n ENGINEERING, z m INC. O )3� No. C-0873 ��rF OF A01� MATTHEW C. KIRCHNER 2013A VAN B UREN AVENUE INDIAN TRAIL, NC 28079 704.882.4222 MKI RCHNER@EAGL EONL I NE. NET WESTSIDE PARTNERS DEVELOPERS, LLC Know what's below. Call before you dig. PO BOX 1561 CALL 1.800.632.4949 OR 811 MONROE, NC 28111 MM.NC811.ORG (704) 292-7447 NC ONE -CALL CENTER I NGRAM@ I NGRAMWAL TERS. COM IT'S THE LAW! I NGRAM WAL TERS Sheet List Table I NUMBER SHEET TITLE SHEET DESCRIPTION I SHEET C-0.0 COVER C-1.0 EXISTING CONDITIONS C-2.0 SITE PLAN (1 OF 2) C-2.1 SITE PLAN (2 OF 2) C-3.0 EROSION CONTROL & DEMOLITION PLAN PHASE 1 C-3.1 EROSION CONTROL & DEMOLITION PLAN PHASE 1 C-3.2 EROSION CONTROL & DEMOLITION PLAN PHASE 1 C-3.3 EROSION CONTROL & DEMOLITION PLAN PHASE 1 C-3.4 EROSION CONTROL PLAN PHASE 2 C-3.5 EROSION CONTROL PLAN PHASE 2 C-3.6 EROSION CONTROL PLAN PHASE 2 C-3.7 EROSION CONTROL PLAN PHASE 2 C-3.8 EROSION CONTROL PLAN CROSSING PIPES C-3.9 SKIMMER BASIN &DITCH CALCULATIONS C-4.0 OVERALL GRADING PLAN C-4.1 FORTY ACRE DRIVE PLAN & STA: 0+00 - PROFILE 18+40 C-4.2 FORTY ACRE DRIVE PLAN & STA: 18+40 - PROFILE 20+70 C-4.3 ROUGHEDGE DRIVE PLAN & STA: 0+00 - PROFILE 7+31 C-4.4 OASIS DRIVE PLAN & PROFILE STA: 0+00 - 6+26 C-4.5 HARTWELL LANE PLAN & PROFILE STA: 0+00 - 5+90 C-4.6 SWAL E & CROSS -PIPE CALCULATIONS C-5.0 OVERALL UTILITY PLAN C-5.1 UTILITY PLAN (1 OF 2) C-5.2 UTILITY PLAN (2 OF 2) C-6.0 LANDSCAPE PLAN C-7.0 SITE DETAILS C-7.1 UTILITY DETAILS (1 OF 2) C-7.2 UTILITY DETAILS (2 OF 2) C-7.3 EROSION CONTROL DETAILS (1 OF 2) C-7.4 EROSION CONTROL DETAILS (2 OF 2) C-7.5 CONSTRUCTION DETAILS C-7.6 NCG01 1 PRE-DA I PRE-DA DRAINAGE MAP I 1 POST-DA POST-DA DRAINAGE MAP POST-DA POST-DA DRAINAGE MAP ESC DITCHES POST-DA POST-DA DRAINAGE MAP STORM POST-DA POST-DA DRAINAGE MAP ESC BASIN Q9 _z Q C, o oN LUCL LU � U ¢ N N :thLU _z LU M LU C A R C�%'%, S SEAL < _ 04550 = ,T�FVw c Y � jrlZ.3 LU z U U 0 (3 U1 LU z � z v, � � z z o o LU � a a CL Q Q Q) > > z z wwwww CL CL CL CL a 00000 Q N N N N N N L C]+HL�j z w J Q z� cfl co cV ~ U �o �w�z cWU pomp 00 �w°z =z U �w Uj � o _ L �j m m o � z In = U � N w p N O Um W 0 0 � o o = co m o z c� W chi Sheet C-0.0