Loading...
HomeMy WebLinkAboutNCC230444_ESC Approval Submitted_20230215ROY COOPER Governor" �s ELIZABETH S. BISER t Secretary DOUGLAS R. ANSEL Interim Director NORTH CAROLINA Environmental Quality February 10, 2023 LETTER OF APPROVAL WITH MODIFICATIONS Westside Partners Developers, LLC Attention: Ingram Walters, Member -Manager & Organizer 3220 West Highway 74 Monroe, North Carolina 28110 RE: Project Name: Safehouse Subdivision Acres Approved: 13.08 Project ID: UNION-2022-063 County: Union, City: Monroe Address: Hwy 200 River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Matthew Kirchner, PE, Eagle Engineering Date Received by LQS: January 30, 2023 Plan Type: Revised Dear Mr. Walters: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 413 .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704-663-1699 Letter of Approval with Modifications Westside Partners Developers, LLC February 10, 2023 Page 2 of 3 The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land - disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Shannon Leonard Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGOI Fact Sheet c: Inspection Department ec: Matthew Kirchner, PE Letter of Approval with Modifications Westside Partners Developers, LLC February 10, 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Safehouse Subdivision Project ID: UNION-2022-063 County: Union 1. Permit approval is only for the land disturbance and/or improvements shown on the plans. Approval does not include any land disturbance associated with lot development (e.g. house, septic, etc.). A separate permit shall be submitted and approved prior to the start of any land disturbance activities associate with lot development. 2. The top of dam for Basin A shall be installed to Elev. 653.5'. 3. The top of dam for Basin D shall be installed to Elev. 648.5'. In addition, the Emergency Spillway (EMS) shall be installed to Elev. 647.0'. 4. On Sheet 3.1, adequate measures (e.g. silt fence, straw wattles, etc.) shall be installed below the access areas to existing utilities located S/SE of Trap TS-H and SE of Basin C. 5. Adequate diversion berms shall be provided to divert runoff into basins as necessary (e.g. Sheet C-3.1 to Basin C and Trap TS-H). 6. On Sheet 3.7, Rock Pipe Inlet Protection shall be provided for both existing 18" RCP's (e.g. FES-200 and FES-210) located under Lancaster Hwy. In addition, adequate outlet protection shall be provided for outlet below FES-210. 7. Adequate ditch liners shall be provided for all temporary and/or permanent ditches where the velocity is 2 fps or greater.