Loading...
HomeMy WebLinkAboutSW6230103_Design Calculations_20230131APPENDIX A Computations Minor System Grass Conveyance Swales ,WO911"If Erosion Control 69AL �. O4f41f Culvert Report Hydraflow Express Extension forAutoCAD® Civil 31® 2009 byAutodesk, Inc. FES 104 Invert Elev Dn (ft) = 199.03 Pipe Length (ft) = 20.00 Slope (%) = 3.00 Invert Elev Up (ft) = 199.63 Rise (in) = 18.0 Shape = Cir Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Inlet Edge = Projecting Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.5 Embankment Top Elevation (ft) = 202.50 Top Width (ft) = 18.00 Crest Wdth (ft) = 10.00 Elev (ft) 203.00 202.00 201.00 200.00 199.00 FES 104 Wednesday, Sep 21 2022 Calculations Qmin (cfs) = 6.71 Qmax (cfs) = 6.71 Tailwater Elev (ft) = Normal Highlighted Qtotal (cfs) = 6.71 Qpipe (cfs) = 6.71 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 8.35 Veloc Up (ft/s) = 5.32 HGL Dn (ft) = 199.73 HGL Up (ft) = 200.64 Hw Elev (ft) = 201.14 Hw/D (ft) = 1.01 Flow Regime = Inlet Control Hw Depth (ft) 3.37 -- lMetcuntrnI 2 4 6 8 Ca Cuh+eft -- HGL 2.37 1.37 0.37 -0,k3 -1.63 10 12 14 16 18 20 22 24 26 28 - Embank Reach (ft) Culvert Report Hydraflow Express Extension forAutoCAD® Civil 3D® 2009 byAutodesk, Inc. FES 204 Invert Elev Dn (ft) = 201.34 Pipe Length (ft) = 20.00 Slope (%) = 3.00 Invert Elev Up (ft) = 201.94 Rise (in) = 18.0 Shape = Cir Span (in) = 18.0 No. Barrels = 1 n-Value = 0.012 Inlet Edge = Projecting Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.5 Embankment Top Elevation (ft) = 204.84 Top Width (ft) = 18.00 Crest Width (ft) = 10.00 Efev fiti 205.00 204.00 203,00 202.00 201-00 200.00 0 2 4 Cir Culvert FES 204 Wednesday, Sep 212022 Calculations Qmin (cfs) = 6.53 Qmax (cfs) = 6.53 Tailwater Elev (ft) = Normal Highlighted Qtotal (cfs) = 6.53 Qpipe (cfs) = 6.53 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 8.29 Veloc Up (ft/s) = 5.26 HGL Dn (ft) = 202.03 HGL Up (ft) = 202.93 Hw Elev (ft) = 203.42 Hw/D (ft) = 0.99 Flow Regime = Inlet Control Hw Depth (ft) 3.06 k £k „ffi ffill;� b 8 to 12 14 — -- HGL-•---,- Embank 2.06 1.06 ROG -0.94 -1.94 1fi 18 20 22 24 26 28 Reach (ft) Permanent Channel # 1 => DA # PD 1 Calculate Flow - Rational Method 25-Yr Storm Q25 = CIA C= 0,35. 1= 5.92 in/hr CALC Tc Q25= 38.12 A= 18AO ac Channel Slope= 0.00 Channel Depth= 2.50 Channel Bottom Width= 4,00 Side Slopes= 3.00 Velocity-- 2.31 Soil Type 6-D Sondy loam Slopes= 0-10% Channel lining Shear Calculation T=yds y= 62.4 Ibs dmter= 1.86.ft T= 0.58032 Ibs/ft2 s= 0.005 ft/ft Temporary= NAGS758N - Permanent-- Foscue Permanent Channel # 2 => DA # PD 2 Calculate Flow - Rational Method 25-Yr Storm 025 = CIA C= 030 I= 8.99 in/hr Q25 = 5.87 A= 2.20 ac Channel S►ope= 1.60,11 Channel Depth= 2,50 Channel Bottom Width= 4.00' Side Slopes= 3.01Y Velo i = 3.97 Soil Types sandy loam Slopes= 0-10% Channel Lining Shear Calculation T=yds y= 62.4lbs dmter= 0.7:' ft T= 0.69888 Ibs/ft2 s= ' , , D." ft/ft Temporary= MAW ` Permanent= FesCVE Permanent Channel # 3 " => DA # 204 Calculate Flow - Rational Method 25-Yr Storm Q25 = CIA Q25= 6.53 Channel Slope= 1.00 Channel Depth= 1.00 Channel Bottom Width= 0.00 Side Slopes= 3.00 Veloci = 3.49 Soil Type 9 sandy loam Channel Linine Shear Calculation T=yds C= ' 0.35 1= 8.89in/hr A= 2.10 ac Slopes 0-1U � N° T= 0.246481bs/ft2 Temporary= NAG S75BN Permanent= Fescue CALC Tc y= 62.4 lbs dwater= 0•79 ft s= 0.005 ft/ft U.S. Department of Agriculture Natural Resources Conservation Service FL-ENG-21 B 06104 TR 55 Worksheet 3: Time of Concentration (TJ or Travel Time (TJ Project: Carter Farms Subdivison Location: Hoke County, NC Check one: V Present Developed Check one: V Tc Tt Designed By: MTB Date: Checked By: MDA through subarea DA #104 Date: NOTES: Space for as many as two segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet Flow (Applicable to T, only) 1. Surface description (Table 3-1) __............... 2. Manning's roughness coeff., n (Table 3-1) ... 3. Flow length, L (total L < 100 ft) ..................... 4. Two-year 24-hour rainfall, P2......................... 5. Land slope, s................................................ 6. Tt = 0.007 (nL) Of Compute Tt ... P20.5 s0.4 Shallow Concetrated Flow Segment ID I 1 7. Surface description (paved or unpaved) .............. _................... 8. Flow length, L.............................. __......... ........................... ... ft 9. Watercourse slope, s........................................................... ft/ft 10. Average velocity, V (Figure 3-1).......................................... ft/s 11. Tt = L Compute Tt ......................... hr 3600 V Channel Flow 12. Cross sectional flow area, a ...................... 13. Wetted perimeter, P,N................................. 14. Hydraulic radius, r = a Compute r .......... P, GRASS 0.04 100 0.1 0.050 0.18 + z UNPAVED 557 0.013 1.9 0.08 + Segment ID ..................... ftz 0.0 .................... ft 0.0 ...... I ... I........ ft 15. Channel Slope, s............................................................ ft/ft 16. Manning's Roughness Coeff., n............................................ 17. V = 1.49 /3 s1/2 Compute V ...................... ft!s n 18. Flow length, L...................................................................... ft 19. Tt = L Compute Tt.................................... hr 3600 V 20. Watershed or subarea T, or Tt (add Tt in steps 6, 11, and 19 ...................................................... hr 0.26 0.26= 15.6 mins Chapter 3 Time of Concentration and Travel Time Technical Release 55 Urban Hydroloa for Small Watersheds Figure 3-1 Average velocities for estimating travel time forshaltow concentrated flow .20 10 0 as 06 0 .04 ON .01 .005 L I 2 4 6 10 20 1.9 Average veloolty (ft/sec) .3--2 (210AVI-TR-55, Second FA, June 1986) Pre POI #01 POI#01 Pre Developmemt SCM01 SCM 1 DA SCM #01 C,9ucat Reach on LIreIC Carter Farm Subdivision PC01 Type 1124-hr 10-Year Rainfall=5.52" Prepared by Toshiba Printed 9/21/2022 HydroCADO 10.00-20 s/n 07811 © 2017 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment Pre POI #01: POI#01 Pre Developmemt Runoff = 2.96 cfs @ 12.02 hrs, Volume= 0.489 af, Depth= 0.32" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.52" Area (ac) CN Description 0.000 39 Woods 18.400 39 Grass 0.000 90 Pavement 0.000 90 Sidewalk 0.080 90 Buidling 18.480 39 Weighted Average 18.480 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment Pre POI #01: POI#01 Pre Developmemt Hydrograph 2.96 cfs - 3--Type 1124-h r 10-Year rainfall=5.52" 3 Runoff Area=18.480 ac 2 Runoff Volume=-0.489 of Runoff Depth=0.32" Tc=5.0 min - DN=39 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Carter Farm Subdivision PC01 Type/1 24-hr 10-Year Rainfall=5.52" Prepared by Toshiba Printed 9/21/2022 HydroCAD®10.00-20 s/n 07811 © 2017 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment SCM01: SCM 01 DA Runoff = 16.66 cfs @ 11.99 hrs, Volume= 1.035 af, Depth= 0.67" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.52" Area (ac) CN Description 2.390 90 Impervious 16.010 39 Pervious 18.400 46 Weighted Average 18.400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment SCM01: SCM 01 DA Hydrograph _ Runoff 1s 1 6.6 6 cfs - - ' 16 r Type 1124-h r = 15: - - -14-Year Rainfall=5-;52" 14 - 13- _ - _------ --'- Runoff area=18.400 aG 12: Runoff ilolume=1.035 of r - 11- - T T - - Runoff Depth=0.67" - 9 r-, - - -.- -,- -- T r LLTc 5.0 min 8 - - 7- -r - - -, CN=46 6 -T +4--1- 5: — + 2- 1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Carter Farm Subdivision PC01 Type 11 24-hr 10-Year Rainfall=5.52" Prepared by Toshiba Printed 9/21/2022 HydroCADO 10.00-20 s/n 07811 © 2017 HydroCAD Software Solutions LLC Page 4 Summary for Pond 01 P: SCM #01 Inflow Area = 18.400 ac, 0.00% Impervious, Inflow Depth = 0.67" for 10-Year event Inflow - 16.66 cfs @ 11.99 hrs, Volume= 1.035 of Outflow = 1.43 cfs @ 13.95 hrs, Volume= 1.034 af, Atten= 91 %, Lag= 117.5 min Primary = 0.47 cfs @ 13.95 hrs, Volume= 0.894 of Secondary = 0.96 cfs @ 13.95 hrs, Volume= 0.140 of Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Starting Elev= 197.00' Surf.Area= 3,765 sf Storage= 2,269 cf Peak Elev= 199.03' @ 13.95 hrs Surf.Area= 15,748 sf Storage= 21,549 cf (19,290 cf above start) Plug -Flow detention time= 591.6 min calculated for 0.983 of (95% of inflow) Center -of -Mass det. time= 530.0 min ( 1,451.4 - 921.4) Volume Invert Avail.Stora-ge Storage Description #1 194.00' 21,549 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq-ft) M (cubic -feet) (cubic -feet) 194.00 3,765 0.0 0 0 195.00 3,765 20.0 753 753 196.00 3,765 20.0 753 1,506 197.00 3,765 20.0 753 2,259 198.00 9,533 100.0 6,649 8,908 199.00 15,748 100.0 12,641 21,549 Device Routing Invert Outlet Devices #1 Primary 197.00' 1.500 in/hr Exfiltration over Surface area above 197.00' Conductivity to Groundwater Elevation=190.00' Excluded Surface area = 3,765 sf #2 Secondary 199.00' 55.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.47 cfs @ 13.95 hrs HW=199.03' (Free Discharge) 'L1=Exfiltration ( Controls 0.47 cfs) Secondary OutFlow Max=0.74 cfs @ 13.95 hrs HW=199.03' (Free Discharge) 2=Broad-Crested Rectangular Weir (Weir Controls 0.74 cfs @ 0.44 fps) Carter Farm Subdivision PC01 Type 11 24-hr 10-Year Rainfall=5.52" Prepared by Toshiba Printed 9/21/2022 HydroCAD® 10.00-20 s/n 07811 0 2017 HydroCAD Software Solutions LLC Page 5 Pond 01 P: SCM #01 Hydrograph 16.66 Cfs 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) D Inflow ;� Outflow Primary 0 Secondary Carter Farm Subdivision PC01 Type /l 24-hr 25-Year Rainfall=6.67" Prepared by Toshiba Printed 9/21/2022 HydroCAD®10.00-20 s/n 07811 © 2017 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment Pre POI #01: POI#01 Pre Developmemt Runoff = 13.80 cfs @ 12.00 hrs, Volume= 1.007 af, Depth= 0.65" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type 11 24-hr 25-Year Rainfall=6.67" Area (ac) CN Description 0.000 39 Woods 18.400 39 Grass 0.000 90 Pavement 0.000 90 Sidewalk 0.080 90 Buidling 18.480 39 Weighted Average 18.480 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment Pre POI #01: POI#01 Pre Developmemt Hydrograph ', 13.80 cfs - - - - - - 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Carter Farm Subdivision PC01 Type 11 24-hr 25-Year Rainfall=6.67" Prepared by Toshiba Printed 9/21/2022 HydroCAD®10.00-20 s/n 07811 © 2017 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment SCM01: SCM 01 DA Runoff = 33.74 cfs @ 11.98 hrs, Volume= 1.783 af, Depth= 1.16" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.67" Area (ac) CN Description 2.390 90 Impervious 16.010 39 Pervious 18.400 46 Weighted Average 18.400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment SCM01: SCM 01 DA Hydrograph 33.74 Cfs Runoff 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Carter Farm Subdivision PC01 Type 11 24-hr 25-Year Rainfall=6.67" Prepared by Toshiba Printed 9/21/2022 HydroCAD®10.00-20 s/n 07811 02017 HydroCAD Software Solutions LLC Page 8 Summary for Pond 01 P: SCM #01 Inflow Area = 18.400 ac, 0.00% Impervious, Inflow Depth = 1.16" for 25-Year event Inflow = 33.74 cfs @ 11.98 hrs, Volume= 1.783 of Outflow = 15.52 cfs @ 12.10 hrs, Volume= 1.783 af, Atten= 54%, Lag= 7.3 min Primary = 0.48 cfs @ 12.10 hrs, Volume= 0.914 of Secondary = 15.03 cfs @ 12.10 hrs, Volume= 0.869 of Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Starting Elev= 197.00' Surf.Area= 3,765 sf Storage= 2,259 cf Peak Elev= 199.23' @ 12.11 hrs Surf.Area= 15,748 sf Storage= 21,549 cf (19,290 cf above start) Plug -Flow detention time= 345.0 min calculated for 1.730 of (97% of inflow) Center -of -Mass det. time= 316.1 min ( 1,213.0 - 896.8 ) Volume Invert Avail.Storage Storage Description #1 194.00' 21,549 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq-ft) (%) (cubic -feet) (cubic -feet) 194.00 3,765 0.0 0 - 0 195.00 3,765 20.0 753 753 196.00 3,765 20.0 753 1,506 197.00 3,765 20.0 753 2,259 198.00 9,533 100.0 6,649 8,908 199.00 15,748 100.0 12,641 21,549 Device Routing Invert Outlet Devices #1 Primary 197.00' 1.500 in/hr Exfiltration over Surface area above 197.00' Conductivity to Groundwater Elevation = 190.00' Excluded Surface area = 3,765 sf #2 Secondary 199.00' 55.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 rimary OutFlow Max=0.48 cfs @ 12.10 hrs HW=199.23' (Free Discharge) 1=Exfiltration ( Controls 0.48 cfs) Secondary OutFlow Max=14.54 cfs @ 12.10 hrs HW=199.22' (Free Discharge) 2=113road-Crested Rectangular Weir (Weir Controls 14.54 cfs @ 1.18 fps) Carter Farm Subdivision PC01 Type 11 24-hr 25-Year Rainfall=6.67" Prepared by Toshiba Printed 9/21/2022 HydroCAD®10.00-20 s/n 07811 © 2017 HydroCAD Software Solutions LLC Page 9 Pond 01 P: SCM #01 Hydrograph 33.74 cfs - outflow - -- /�Prima Inflow Area- A aCi, - -' - 18.400 _ iSecondary 36 Elev=199.23' - - Pea 34k - -1 + r i- - -i -4 1- 32 --Storage=21-,549 cf, - 30- 28_'F t i i- 7 ,- -! _ » - - 26 : _ r - - - -: -r - - - . - - 24- ' - - - - ! i a t z2 15.52 cfs 20- 0 1 s �15,03 cfsAL LL 16 - 1 14 - 12� 10 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Carter Farm Subdivision PC01 Type 1124-hr 100-Year Rainfall=8.60° Prepared by Toshiba Printed 9/21/2022 HydroCAD® 10.00-20 s/n 07811 © 2017 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment Pre POI #01: POI#01 Pre Developmemt Runoff - 40.53 cfs @ 11.98 hrs, Volume= 2.184 af, Depth= 1.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type 11 24-hr 100-Year Rainfall=8.60" Area (ac) CN Description 0.000 39 Woods 18.400 39 Grass 0.000 90 Pavement 0.000 90 Sidewalk * _ 0.080 90 Buidling 18.480 39 Weighted Average 18.480 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment Pre POI #01: POI#01 Pre Developmemt Hydrograph 40.53 cfs 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Carter Farm Subdivision PC01 Type/1 24-hr 100-Year Rainfall=8.60" Prepared by Toshiba Printed 9/21/2022 HydroCAD®10.00-20 s/n 07811 © 2017 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment SCM01: SCM 01 DA Runoff = 68.81 cfs @ 11.97 hrs, Volume= 3.331 af, Depth= 2.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=8.60" Area (ac) CN Description 2.390 90 Impervious " 16.010 39 Pervious 18.400 46 Weighted Average 18.400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment SCM01: SCM 01 DA Hydrograph 75 — - Runoff 68.81 cfs _ - 70 - - Type it 24-hr 65- 60= 100 Year Rainfali=$:60" 55-_' Runoff Area=18.400 ac -- 50 . 45 Runoff-Volume=3.331 of - ,.. _ - w 40 RunoffDepth=2.17'" LL 35 Tc=5.0 min 30 C N-46 25= 20 15 10 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Carter Farm Subdivision PC01 Type/1 24-hr 100-Year Rainfall=8.60" Prepared by Toshiba Printed 9/21/2022 HydroCADO 10.00-20 s/n 07811 © 2017 HydroCAD Software Solutions LLC Page 12 Summary for Pond 01 P: SCM #01 Inflow Area = 18.400 ac, 0.00% Impervious, Inflow Depth = 2.17" for 100-Year event Inflow - 68.81 cfs @ 11.97 hrs, Volume= 3.331 of Outflow = 81.44 cfs @ 11.99 hrs, Volume= 3.331 af, Atten= 0%, Lag= 1.3 min Primary = 0.50 cfs @ 11.99 hrs, Volume= 0.921 of Secondary = 80.94 cfs @ 11.99 hrs, Volume= 2.410 of Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Starting Elev= 197.00' Surf.Area= 3,765 sf Storage= 2,259 cf Peak Elev= 199.67' @ 11.99 hrs Surf.Area= 15,748 sf Storage= 21,549 cf (19,290 cf above start) Plug -Flow detention time= 184.6 min calculated for 3.279 of (98% of inflow) Center -of -Mass det. time= 170.3 min ( 1,043.4 - 873.2) Volume Invert Avail.Storage Storage Description #1 194.00' 21,549 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet) (sq-ft) (%) (cubic -feet) (cubic -feet) 194.00 3,765 0.0 0 0 195.00 3,765 20.0 753 753 196.00 3,765 20.0 753 1,506 197.00 3,765 20.0 753 2,259 198.00 9,533 100.0 6,649 8,908 199.00 15,748 100.0 12,641 21,549 Device Routing Invert Outlet Devices #1 Primary 197.00' 1.600 in/hr Exfiltration over Surface area above 197.00' Conductivity to Groundwater Elevation = 190.00' Excluded Surface area = 3,765 sf #2 Secondary 199.00' 55.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.50 cfs @ 11.99 hrs HW=199.63' (Free Discharge) L1=Exfiltration ( Controls 0.50 cfs) $econdary OutFlow Max=74.67 cfs @ 11.99 hrs HW=199.63' (Free Discharge) 2=Broad-Crested Rectangular Weir (Weir Controls 74.67 cfs @ 2.15 fps) Carter Farm Subdivision PC01 Type 11 24-hr 900-Year Rainfall=8.60" Prepared by Toshiba Printed 9/21/2022 HydroCAD®10.00-20 s/n 07811 OO 2017 HydroCAD Software Solutions LLC Page 13 Pond 01 P: SCM #01 Hydrograph _, r r ®Inflow --- 81.44 CfS .- - - A Inflow aC; D Outflow ® Primary 90 85 80.94 Cfs Cfs ,Area=1.8.400 -Peak E1ev=199.67' ® Secondary 60 - _ 75m , -Storage=21_,549 cf .. 70 - 65R. .r 60- 55' 50 U " ,` - -' -' - 3 45 - 0 u. 40 35 30 ;. 25 -, 15 -, 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Sediment Basin # 1 Calculate Flow - Rational Method 10-Yr Storm Qla = CIA 2-Yr Storm Q2 = CIA Qlo = 30.88 Q2 = 23.92 Calculate Reauired Surface Area SA=Qlo x 435 sf/cfs SA= 13433.93 ft2 Side Slopes = 3.00 :1 Pond Depth= 4.00 ft Basin Dims (Per SA) C= 0.30 1= 7.98 A= 12.90 C= 0.30 1= 6.18 A= 12.90 Q10 = 30.88 25-Yr Storm Q25 = CIA Q25 — Top = 79.00 x 213.00 = Weir = 67.00 x 201.00 = Bottom = 43.00 x 177.00 = Volume Required VR=Ax1800 cf/ac VR= 23220.00 ft3 Volume Proposed Vp=((Top Area + Bottom Area)/2)xD VP= 48876.00 ft3 Skimmer Sizing Calculate Dewater Time A= 12.90 ac Top= 16827.00 sf Bottom= 7611.00 sf D= 4.00 ft 34.40 16827 ft2 13467 ft2 7611 ft2 C= 0.30 1= 8.89 A= 12.90 Qd=V/Td Qd= 4644.00 cf/day Calculate Orifice Diameter D=sgrt((Qd/(2310sgrt(h))) D= 1.87 Use 4 Principle Spillway Sizing_ L=Q2/(cH"') L= 4.20 ft Riser Sizing V= 23220.00 ft3 Td= 5 3-5 days typ Qd= 4644.00 h= 0.33 " Skimmer w/ 1.87 " Orifice L= ? ft H= 1.50 ft c= 3.10 C=pi X D C= 4.20 ft pi= 3.14 D= 16.05 in D= ? ft Material= CMP. Use 24.00 "CMP Riser Barrel Sizing Q2= CA X sgrt(2gh) C= 0.60 A= ? sf A= 2.12 Q2= 23.92 cfs h= 5.50 ft A=pi X r2 g= 32.20 ft/s A= 19.71 in Material= CMP Use M00 "CMP Barrel Size Riser/Barrel Base Calculate Bouyance Force on Riser Cross -sectional area A=(pi x r2) x 2 A= 6.28 sf Riser Volume V=A x L V= 25.12 Bouyance Force FB=qV FB= 1567.49lbs/cf r= 1.00 A= 6.28 L= 4.00 q= 62.40lbs V= 25.12 ft3 Concrete Base Sizing (Concrete = 120 Ibs/cf) - (weight of water = 62.4 Ibs/cf) = 57.6 Ibs/cf x 1.1 SAFETY FACTOR Base Volume 29.93 cf Base Dims = 5.47 ft x 5.47 ft x 1.00 ft Weir Sizing Per AutoCad Hydraflow Software L= 10.00 ft D= 2.00 ft dwater= 1.00 ft Q25= 34.40 cfs Velocity= 3.37 ft/s Weir Lining Shear Calculation T=yds y= 62.4lbs dwater= 1 ft T= 0.624 Ibs/ft2 s= 0.01 ft/ft Required Liner= Class A Rip Rap Proposed Liner= Class A Rip Rap Temporary Diversion/Berm # 1 => DA # EC401 Calculate Flow - Rational Method 25-YrStorm Q25 = CIA C= 0,40 1*= 5.92 in/hr *Intensity perTc Q25 = 23.68 A= 10.00 ac Channel Slope = 0.20 Channel Depth = 2.50 Bottom Width = 4.00 Side Slopes = 3.00 Velocity = 3A2 Soil Type @ Loamy Sand Slopes = 040% Channel Linin¢ Shear Calculation T=yds y= 62.4 Ibs d-., 1.3: ft T= 0.4056 Ibs/ft2 S= 0.005 ft/ft Temporary= NAG S7$BN Permanent= NAG MON Temporary Diversion/Berm #.- 2 => DA # EC402 Calculate Flow - Rational Method 25-Yr Storm Q25 = CIA C= 0.40 I*= 6.38 in/hr *Intensity per Tc Q25= 4.59 A= 1.80 a Channel Slope = 0.00 Channel Depth= 2.OD Bottom Width= 4.00 Side Slopes = 3,00 Veloci = 1.40 Soil Type kD Loamy Sand Slopes= 0-10% Channel Linine Shear Calculation T=yds y= 62.4lbs dwater= 1.05ft T= 0.3276 1bS/ft2 S= 0.005 ft/ft Temporary= NAG S75iN Permanent= NAGS758N Barrel Outlet Protection #1 New York Method 8.06.5 Manual Diameter of Barrel = Velocity= Zone= 18.001, La= 8 ft 5.5ft/s W= 6ft 1 Stone Diameter= Class a Stone d= 12 in