Loading...
HomeMy WebLinkAboutSite Inspection 2.13.23 NC 69Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20190210 NCDOT - NC 69 Widening (A-0011C) Clay NCDOT - NC 69 Widening (A-0011C) NC DOT Division 14 - Sylva 2/13/2023 Follow-up Site Inspection (DOT) Version: 2 Status:Issued Project Type:Road/Highway Widening Region:Asheville Longitude:-83° 49' 32''+35° 00' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant - Station 149+25 LT - Stream was walked down to the double barrel culvert at Y17. Some small pockets of residual sediment were observed at the beginning of the reach. These sediments were removed and follow up photos were recieved at the end of the day. Sediment cleanup is complete. - Station 159+00 LT - Energy dissipator - Structure downstream of dissipator was repaired to improve piping. Photos were received on 2.13. - Station 188+00 LT - Sand bags were removed from stream. Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Site inspection was conducted on February 13, 2023 by Kevin Mitchell with the Asheville Regional Office. Brian Luther was present during the inspection and his assistance is greatly appreciated. The site visit was a follow up inspection for a self reported sediment release that occured on February 6, 2023 at station 149+25 LT. page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20190210 2/13/2023 Blazer, Keith Site Inspection (DOT)Follow-up Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2