HomeMy WebLinkAboutSWA000181_Application Form_20230126DEMLR USE ONLY
Date Received
Fee Paid
Permit Number
SW Program(s): ❑ Coastal SA-HQW ❑ Coastal SA-ORW ❑ Coastal FW-ORW ❑ Coastal Other
❑ Non -coastal HOW ❑ Non -coastal ORW ❑ Urbanizing Areas ❑ USMP
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER FAST TRACK PROCESS:
"AUTHORIZATION TO CONSTRUCT" (ATC) PERMIT APPLICATION FORM
Link to Application Instructions
k. ELIGIBII-ITY FOR FAST -TRACK PERMIT
To be considered for a Fast Track ATC Permit, all of the items below must be checked. If any item cannot
be checked, then the project must apply under the Standard Permitting Process.
® The project and all SCMs (including existing SCMs associated with the project) will meet all applicable
requirements of 15A NCAC 02H .1000 - .1062, including the Minimum Design Criteria (MDC), upon project
completion.
® The project is not proposing an alternative design.
® The project is not claiming an exemption from the MDC based on vested rights, a waiver or a Director's
Certification.
® The project is not out of compliance with an existing stormwater permit or any other environmental permit.
® The project is not applying for an offsite permit, an exemption, or a minor modification (as defined in 15A
NCAC 02H .1002(25)) to an existing state stormwater permit.
® The project application bears the signature and seal of a professional licensed pursuant to either Chapter 89A
or 89C of the NC General Statutes.
® I understand that at project completion, an application with the as -built stormwater plans (as described in 15A
NCAC 02H .1044 must be submitted, and DEQ will review the as -built stormwater plans to confirm
compliance with the MDC. Approval of the as -built stormwater plans will be required before the Erosion and
Sedimentation Control Plan for the project may be closed out.
® I understand that the Fast Track ATC Permit will expire five years after the date of issuance.
�- GENERAL INFORMATION
1 Project Name: HIBS Wolfspeed
2. Previous Project Name (if applicable): HIBS
3. Location of Project (street address): 1000 Carolina Core Parkway
City:Siler City County:Chatham Zip:27344
4. Directions to project (from nearest major intersection):
From US 421, turn onto US-64 Wand drive 6.2 miles towards Asheboro
From 1 74. take US-64 E to Greensboro Ave in Siler Citv. continue on US-64 E for 18 miles
5. Latitude:350 44' 28" N Longitude:79° 32' 21" W of the main entrance to the project.
C. PERMIT INFORMATION
1. Specify whether project is (check one):
® New, no previous application
❑ New, replacing a previous Fast Track ATC Permit -- provide previous permit number: SWA
By choosing this option, you are also requesting that DEQ rescind the previous Fast Track ATC Permit
upon issuance of the new Fast Track ATC Permit.
Stormwater Fast Track ATC Application Form Page 1 of 10 Feb. 10. 2018
❑ Major Modification, replacing an existing stormwater permit — provide existing permit number: SW
Status of construction? ❑ Not Started ❑ Partially Completed ❑ Completed
Maio[ modifications must be submitted by the original permittee and are allowed only if the SW permit is
not expired. Minor modifications must use Standard Permitting Process. By choosing this option, you
are also requesting that DEQ rescind the previous SW Permit upon issuance of the new Fast
Track ATC Permit.
❑ Transfer of existing Fast Track ATC Permit — provide existing ATC permit number: SWA
2. Applicable state stormwater program(s) (check all that apply):
❑ Coastal SA-HQW ❑ Urbanizing Areas (Phase 2)
❑ Coastal SA-ORW ❑ Non -Coastal HQW
Is any portion of the project within 575 feet
of SA-ORW waters? ❑ Yes ❑ No ❑ Non -Coastal ORW
❑ Coastal Freshwater ORW ❑ USMP
❑ Coastal — Other
3
4
Other Permits (as applicable; write "NA" for those permit types that are not applicable):
Project Name
Permit/Appl
Issue Date
Other Information
No.
CAMA Major
NA
NA
NA
NA
Erosion &
HIBS - Wolfspeed
Chath-2023-
1/4/2023
Disturbed Area
Sedimentation Control
236.66 acre
001
NPDES Industrial
NA
NA
NA
NA
Stormwater
404/401 Permit
NA
NA
NA
Proposed Impacts 0
If/ac
Local jurisdiction for building permits: Chatham County Central Permitting
Point of Contact:Kacey Hargrove Phone #: (919 ) 545-8474
D. CONTACT INFORMATION
1. Applicant/Financially Responsible Party (may be an Organization):Whiting-Turner
Signing Official Name & Title:Wes Feinman
Street Address:8529 Six Forks Road Forum IV Suite 150
City:Raleigh State:NC Zip:27615
Mailing Address (if different):
City: State: Zip:
Phone: ( 919 )256-6460 Fax: ( 1
Email: wes.feinman(o)whiting-turner.com
2. If the Applicant is a Corporation or LLC (Address must match address on file with NC Dept of the Secretary of
State):
Name of Registered Agent:The Whiting -Turner Contracting Co
Mailing Address:160 Mine Lake Ct Ste 200
City:Raleigh State:NC Zip:27615
Phone: ( ) Fax:
Email:wes.feinman (a)whiting-turner.com
Stormwater Fast Track ATC Application Form Page 2 of 10 Feb. 10, 2018
3. The Applicant is the (check all that apply):
❑ Property Owner
❑ Lessee (Attach a copy of the lease agreement & complete Item 4.)
❑ Purchaser (Attach a copy of the pending sales agreement & complete Item 4.)
® Developer (Attach a copy of the development agreement & complete Item 4.)
4. If the Applicant is NOT the Property Owner (skip to Item 5 if the Applicant IS the Property Owner):
Property Owner Name/Organization:G5 Investments LLC & Tims Farm and Forestry
Signing Official & Title:David Griffin Jr. & Timothy Booras
Street Address:20266 US 64 W (G5) & 7157 Bobby Jean Rd (TFF)
City:Siler City (G5) & Julian (TFF) State:NC Zip:27344(G5) 27283(TFF)
Mailing Address (if applicable):
City: State: Zip:
Phone: (336) 382-5200 (G5) Fax: (336) 362-2026 (TFF Phone Number)
Email:dhgriffinir(o)dhgriffin.com (G5) cotedefeve(cDgmail.com (TFF)
5. The licensed Design Professional that will be retained for the duration of the project, who may provide
information on the Applicant's behalf, and who will prepare and certify the as -built package:
Consulting Engineer/Landscape Architect: Everett Gupton
Consulting Firm: WSP USA
Mailing Address:434 Fayetteville St #1500, Raleigh, NC 27601
City:Raleigh State:NC Zip:27601
Phone: (919 ) 836-4040 Fax: ( )
Email: Everett. Gupton(o)wsp.com
6. [OPTIONAL] If you would like to designate another person to answer questions about the project:
Name & Title:
Organization:
Mailing Address:
City: State: Zip:
Phone: ( ) Fax: ( )
Email:
E. PROJECT INFORMATION
1. Specify the type of project (check one): ❑ Low Density ® High Density
2. Briefly summarize how the stormwater runoff will be treated/conveyed:
Stormwater Fast Track ATC Application Form Page 3 of 10 Feb. 10, 2018
5. Project area and density information:
Total Property Area
19,414,141
sf
Total Surface Water Area
327,365 sf
Considered to include:
• the normal pool of impounded structures'
• the area between the banks of streams and rivers' and
• the area below the Normal High Water (NHIM line or Mean High Water (MHW) line.
Total Coastal Wetlands Area
0 sf
Considered to include: coastal wetlands landward from the NHW (or MHW) line.
Total Project Area
19,086,776
sf
Excludes the surface water area and coastal wetland area identified above.
May or may not be the same as Property Area.
Built -Upon Area (BUA) associated with Existing Development
0 sf
"Existing development" means those projects that are built or those projects that have established a
vested right under North Carolina law as of the effective date of the state stormwater program or
applicable local government ordinance to which the project is subject.
Proposed New BUA
3,613,628
Includes proposed new BUA that is not associated with existing development.
sf
"BUA" is defined in N.C. G.S. 143-214.7(b2). It includes, but is not limited to: buildings, roads, parking
areas, sidewalks, and some gravel areas. The design volume of SCMs must take into account the runoff
from build out from all surfaces draining to the SCM in accordance with 15A NCAC 02H .1050(1).
Project Density
w/ Existing Development: Project Density = [New BUA]/[Total Project Area —Existing BUA] x 100 or
18.84 %
w/o Existing Development: Project Density = [New BUA]/Total Project Area] x 100
6. Anticipated construction start date 1/23
7. Is the project located within 5 miles of a public airport? ❑ No ® Yes
If `Yes,'see S.L. 2012-200, Part VI: http://www.ncleg.net/Sessions/2011/Bills/Senate/PDF/S229v6.pdf and
DEQ Stormwater Design Manual Chapter E-4 Airports.
8. For projects in Union County: Contact DEMLR Central Office Stormwater staff at 919-707-9200 to determine
if the project is located within a Threatened & Endangered Species watershed that may be subject to more
stringent stormwater requirements per 15A NCAC 02B .0600.
Stormwater Fast Track ATC Application Form Page 5 of 10 Feb. 10, 2018
The stormwater runoff will be treated throuah stormwater wet ponds with forebays to comply with the
designated minimum desiqn criteria defined by NCDEQ.
3. Stormwater runoff from this project drains to the Cape Fear River basin(s).
4. Receivina water information (if more than 3 receiving waters, provide additional information on an attached sheet):
Receiving
Water 1
Receiving
Water 2
Receiving
Water 3
Receiving Stream Name
Brush Creek
Stream Classification
C
Stream Index Number
17-23
Stormwater Fast Track ATC Application Form Page 4 of 10 Feb. 10, 2018
F. SUBMITTAL REQUIREME
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only application packages that include
all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
Initials
1. Two original signed hard copies and one electronic copy of this State Stormwater Fast Track
Process "Authorization to Construct" (ATC) Permit Application Form.
2. Permit application processing fee of $505 payable to NCDEQ.
3. Two hard copies and one electronic copy of a USGS map identifying the project location
and GPS coordinates for the project. If the receiving water is Class SA or the receiving water
drains to Class SA waters within '/2 mile of the project boundary, include the '/2 mile radius
on the map. If the project is within 575 feet of Class SA-ORW waters, include the 575-foot
radius on the map.
4. Two original signed hard copies and one electronic copy of a site plan depicting the boundary
of the project or project phase currently being permitted, including the locations of SCMs,
streams, wetlands, and buffers.
EG 5. Two hard copies and one electronic copy of a construction sequence that discusses how any
future development on the project may be phased.
EG 6. A copy of the most current property deed. Deed book: See Page 11 Page No: See Page 11
EG 7. [IF APPLICABLE] When the applicant is a corporation or a limited liability corporation (LLC): Provide
two hard copies and one electronic copy of documentation from the NC Secretary of State, or other
official documentation, which supports the titles and positions held by the persons listed
in Section C.2 per 15A NCAC 2H. 1043(3)(b). The corporation or LLC must be listed as an active
corporation in good standing with the NC Department of the Secretary of State; otherwise, the
application will be returned. https://www.sosnc.,qov/search/index/corp
NA 8. [IF APPLICABLE] When the applicant is a Partnership or other person engaging in business under
an assumed name, attach a copy of the Certificate of Assumed Name.
EG 9. [IF APPLICABLE] When the applicant is not the property owner: Provide two hard copies and one
electronic copy of lease agreements, affidavits, pending sales agreement, development agreement,
or other documents showing that the applicant has obtained legal rights to submit a stormwater
permit application within the proposed project area.
NA 10. [IF APPLICABLE] If modifying an existing permit for completed or partially completed projects, a copy
of the designer's certification.
Stormwater Fast Track ATC Application Form Page 6 of 10 Feb. 10, 2018
I. PROPERTY OWNER'S AUTHORIZATION (IF APPLICANT IS NOT THE PROPERTY OWNER)
, (print or type name of the Property Owner) G5 Investments LLC
, certify that I own the property identified in this permit application, and thus give permission to (print or type name
of Applicant) Wes Feinman with (print or type name of Applicant's
organization) Whiting Turner
to develop the project as
currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the
submittal, which indicates the party responsible for the operation and maintenance of the stormwater system.
As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated
agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their
lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back
to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit
a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment
facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid
permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including
the assessment of civil penalties of up to $25 00 er d y, pursuant to NCGS 143-215.6.
Signature: '� Date: 1. 1 1. 2023
C7L�V lf} �j{S rl f}i-t��.s a Notary Public for the State of LVo Q}AA -o L4r4
County f Fc>f?-sy + H , do hereby certify that �Ay tF-> �Cxtt~� 1iU JR.
perso all appeared before me this ll day of JRi4\-,+r2-`i 2�z3 , and acknowledge the
due a ti application for a stormwater permit. Witness my hand and official seal,
an y-q
d O ;�� �pYAR Y �' •'
j;
S• • •......... rH CO
JJJJrJlJlIJ11,=�*�,
SEAL
My commission expi
C>3 . 'z3 • Zc2-7-
Stormwater Fast Track ATC Application Form Page 9 of 10 Feb. 10, 2018
I. PROPERTY OWNER'S AUTHORIZATION (IF APPLICANT IS NOT THE PROPERTY OWNER)
1, (print or type name of the Property Owner) Tim's Farm and Forestry, LLC
, certify that I own the property identified in this permit application, and thus give permission to (print or type name
of Applicant) Wes Feinman with (print or type name of Applicant's
organization) Whiting Turner
to develop the project as
currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the
submittal, which indicates the party responsible for the operation and maintenance of the stormwater system.
As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated
agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their
lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back
to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit
a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment
facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid
permit is a violation of NC General Statue 143-215,1 and may result in appropriate enforcement action including
the assessment of civil penalties o�i+ to $25,000 per day, pursuant to NCGS 143-215.6.
Signature: Date: }' - 2-c�23
I, QLi 1! A 13K EsN Ai h� a Notary Public for the State of _ �1oR-rH QAVXCU},t
County of F'p¢Su-rM do hereby certify that 1tyV,, 1 O?_AS
person II appeared fore me this Lk day of pr LuLt§,M Z4DZS , and acknowledge the
due ex tin lication for a stormwater permit. Witness my hand and official seal,
RES
J :�tission h' ••�
OE'UBL\G :�Q
-5IL3jVL
�s�• .
SEAL
My commission expires d3 - Z S - 2�2�
Stormwater Fast Track ATC Application Form Page 9 of 10 Feb. 10, 2018