Loading...
HomeMy WebLinkAboutSite Inspection 2.10.23 Br 3 ChinquapinWetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20211560 TPB NCDOT - Replace Bridge 3 on SR 1887 Haywood TPB NCDOT - Replace Bridge 3 on SR 1887 NC DOT Division 14 - Sylva 2/10/2023 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Replace bridge with bridge Region:Asheville Longitude:-82° 48' 41''+35° 25' 04'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Site inspection was conducted on February 10, 2023 by Kevin Mitchell with the Asheville Regional Office. Chris Barker was present during the inspection. Site is compliant with the 401 Water Quality Certification. NPDES records are up to date. page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20211560 2/10/2023 Blazer, Keith Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2