Loading...
HomeMy WebLinkAboutNCG140242_Inspection Report_20230213ROY COOPER Governor ELIZABETH S. BISER Secretary DOUGLAS R. ANSEL Interim Director Argos Ready Mix Carolinas Corp. ATTN: Travis J. Reed 3015 Windward Plaza, Ste 300 Alpharetta, GA 30005 NORTH CAROLINA Environmental Quality February 13, 2023 Subject: Compliance Evaluation Inspection Ready Mix Concrete-Knightdale Plant Permit Number: NCG140242 Wake County Mr. Reed: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection conducted on February 01, 2023. Should you have any questions concerning this report, please contact me at (919) 791-4220 or by email at thad.valentineftcderingov. Sincerely,,Tk,X � � „" Thad Valentine Environmental Senior Specialist Land Quality Section Enclosure: Inspection Report D,E Qi;\� ✓North Carolina Department of Environmental Quality i Division of Energy, Mineral and Land Resources Raleigh Regional Office 1628 Mail Service Center 3800 Barrett Drive I Raleigh. North Carolina 27609 n - • , inn warannnn�.wr n.nwwwn` 0111, 919.7914200 DffQ� North Carolina Department of Environmental Quality l Division of Energy. Mineral and Land Resources Raleigh Regional Office 1628 Mail Service Center 13800 Barrett Drive I Raleigh. North Carolina 27609 a*wb—� r�r .i+�w\ �/ 9t9.791.4200 Compliance Inspection Report Permit: NCG140242 Effective: 07/01/22 Expiration: 06/30/27 Owner: Argos Ready Mix Carolinas Corp SOC: Effective: Expiration: Facility: Ready Mixed Concrete - Knightdale Plant County: Wake 6840 Forrestville Rd Region: Raleigh Raleigh NC 27604 Contact Person: Travis Reed Title: Phone: 678-392-2147 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 02/01/2023 Entry Time 10:30AM Primary Inspector: Thaddeus W Valentine Secondary Inspector(s): Certification: Phone: Exit Time: 11:50AM Phone: Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG140242 Owner - Facility: Argos Ready Mix Carolinas Corp Inspection Date: 02/01/2023 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: The documents required for the NCG140000 were available in degrees and after much searching. The following information needs to be updated or added and it would benifit to combine all the information in one place or at least to have the information localized. The site map showed most everything on site but doesn't identify both outfall areas on site teh SE & SW corners of the facility. The additional outfall location should be shown on the site map and sampled beginning at the next sample event which is quarterly on the new permit. Provide a list of spills for the last 3 years or the lack of for each year. We need to see a document identifing whether there were or were not any spills.(There is oil leaks from both sides of the shed rollup doors that should be cleaned up and documents in the SP3 as a spill and a facility checklist point). The feasability study was not performed and some type of facility review for improvements should be completed yearly The facility does have secondary containment on side for some of the tanks,but there are drums, polly tanks and other vessels on site outside of the secondary containments that most be placed within secondary containment, under cover or removed from the site. Large vessels without locks are not protected with covers or secondary containment. The BMP is incomplete and needs work listing site specific BMP's Spill prevention and response plan (SPRP)was provided, but the plan should include site specific areas that need attention such as the storage shed, fuel pump area and secondary containment area. Employee training should be included for everyone on site, The training materials should be provided as a video or other materials and not a review of the documents required for the permit. Update the list of responsible parties to include who is contacted first in case of a spill or other pollutant issue, with phone numbers, and who would be secondary contacts. It would benifit to provide spill response contacts in areas of potential contamination such as the fuel pump. The Stormwater pollution prevention plan (SP3) shoudl be updated annually. The site (SP3)inspection plan was not specific enough and should include the fuel pump area and any areas that can effect stormwater pollution issues. The concrete washoiut area is another area that should be included for inspection. Some qualitative and analytical samples were taken, but some are missing and none provide sample dates and signature of person sampling. Both qualitative and analytical samples should be taken at the same time and should be signed and dated. Our DMR is available on-line. The compressor area behind the shed has been leaking oil for some time and has not been identified on the facility inspections sheets and is not shown on the site map. You should clean up all oil on and around the compressor and drum it for disposal, along with the soil with oil leakage from inside the shed at the shed rollup door. The compressor area should be included in teh facility check list and should be noted as a spill in spill logs. A description of what was cleaned up, when, by who and how it was disposed and what was done to keep it from happening again for both areas should documents in the SP3. Page 2 of 3 Permit: NCG140242 Owner - Facility: Argos Ready Mix Carolinas Corp Inspection Date: 02/01/2023 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? E ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? M ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ E ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑ # Does the facility provide all necessary secondary containment? N ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ 0 ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? M ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ M ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: The spill prevention and response Man was available and iust needs some additional information and updates Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 00013 Comment: It has conducted qualitative monitoring, but some of the information is missinq Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? M ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ E ❑ Comment: Anabdical data was availble but sample data is missing Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? E000 # Were all outfalls observed during the inspection? E ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? 0000 # Has the facility evaluated all illicit (non stormwater) discharges? 111100 Comment: Information available Page 3 of 3