HomeMy WebLinkAboutNC0004626_Compliance Evaluation Inspection_20230120United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 u 3 I NC0004626 111 121 23/01/20 I17 18 LC] I 19 I s I 201 I
211IIIII 111111III II III III1 I I IIIII IIIIIIIII II r6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved -------------------
67
I 72 I ni I 71 I 74 79 I I I I I I I80
701 I 71 I LL -1 I I
LJ
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES Dermit Number)
09:OOAM 23/01/20
22/05/01
Lexington Manufacturing Facility
473 New Jersey Church Rd
Exit Time/Date
Permit Expiration Date
Lexington NC 27292
12:OOPM 23/01/20
27/03/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Kimerly Brett Burkhart/ORC/336-239-5956/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Kurt Christian,473 New Jersey Chruch Rd Lexington NC 27292//336-357-8151/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations & Maintenar Records/Reports
Self -Monitoring Progran 0 Sludge Handling Dispo: Facility Site Review Effluent/Receiving Wate
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Ron Boone Docusigned by: DWR/WSRO WQ/336-776-9690/
Seren Homer DWR/WSRO WQ/336-776-9698/ 2/8/2023
�P/1�3ri �a2r�ri1-
Jesse Barnes DWR/WSRO WQ/336-776-9701/
41797473D3194ED...
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
Docusigned by:
- T. 2/8/2023
FL
14bb4at22bUY4EA..
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type
NC0004626 I11 12I 23/01 /20 117 18 i c i
(Cont.)
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Jesse Barnes, of the North Carolina Division of Water Resources (DWR), Winston-Salem Regional
Office (WSRO), conducted a compliance evaluation inspection of the Electric Glass Fiber America,
LLC Lexington Manufacturing Facility on January 20, 2023. Kimerly Burkhart, Operator in
Responsible Charge (ORC), was present for the inspection. The facility was found to be compliant
with the subject permit. Inspection findings are detailed in the attached Water Compliance Inspection
Report.
The current permit, NC0004626, became effective April 15, 2022 and expires at midnight on March
31, 2027. The facility is as described in the permit and there are no special conditions. A fence
encloses the entire facility and security staff monitor the entrance. Operating staff granted access to
all areas of the facility for inspection.
All permit -required records were available, complete, and well organized. DMR data for April 2021
and October 2022 were analyzed for reporting, record -keeping, and transcription accuracy with no
errors found.
All parameter analyses were verified to be performed by either a certified field laboratory or a
certified contract laboratory. Laboratory refrigerator for field sample storage was within acceptable
temperature range, verified with thermometer and daily monitoring log. Field sample storage
appeared to be compliant with requirements.
The laboratory area and outdoor areas were neat and clean. The facility analyzes sufficient process
control parameters.
Quarterly upstream hardness grab sampling has been performed as required by the permit (most
recently in December 2022).
The mechanical bar screen system appeared to be operating appropriately.
The equalization basin appeared to not be used frequently, as it contained very little wastewater but
some sludge and vegetation. One surface aerator was observed in the EQ basin, but the operator
indicated that it is inoperable and out of service. With the aerator inoperable, the EQ basin has no
other means of aeration.
The primary clarifier appeared to be operating appropriately.
The aeration basin was observed operating with diffused aeration, minimal foam, and sufficient
mixing.
Minimal algal growth was noted in the secondary clarifier. Weirs were free of blockages from algal
growth. Some suspended solids/floc was observed in the weir overflow, but not excessive in nature
and effluent TSS is compliant with permit limits.
Significant corrosion was observed on the chlorine contact tank.
The indoor chemical storage area currently houses many drums, minibulks, and other containers of
various highly corrosive and/or reactive substances. No immediate containment issues were
observed.
Solids handling equipment is appropriately maintained and available for use as described in the
permit.
The whole -plant automatic backup generator is tested weekly. Weekly tests are neither conducted
Page#
Permit: NC0004626
Inspection Date: 01/20/2023
Owner - Facility: Lexington Manufacturing Facility
Inspection Type: Compliance Evaluation
under load, nor with the primary power source disconnected.
The effluent pipe was observed to be underwater at the time of inspection. Operators indicated that
this was due to the current high water level and the effluent pipe is normally not submerged.
Upon request for additional information and clarification, the permittee submitted confirmation of
flow -proportional composite sampling methods via email- see filed correspondence. The effluent flow
meter signal is transmitted to the composite sampler and the sampler operates with variable timing,
constant volume. The sampler is programmed to pulse (at 240 gallons of flow per pulse) 41 times
between samples, and to take 130 mL aliquots.
Page#
Permit: NC0004626 Owner - Facility: Lexington Manufacturing Facility
Inspection Date: 01/20/2023 Inspection Type: Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ 0 ❑
application?
Is the facility as described in the permit? 0 ❑ ❑ ❑
# Are there any special conditions for the permit? ❑ 0 ❑ ❑
Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑
Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑
Comment: The current permit, NC0004626, became effective April 15, 2022 and expires at
midnight on March 31, 2027. The facility is as described in the permit and there are no
special conditions. A fence encloses the entire facility and security staff monitor the
entrance. Operating staff granted access to all areas of the facility for inspection.
Record Keeping
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain -of -custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility
classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
■ ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ■ ❑
Comment: All permit -required records were available, complete, and well organized. DMR data for
April 2021 and October 2022 were analyzed for reporting, record -keeping, and
transcription accuracy and no errors were found.
Page# 4
Permit: NC0004626
Inspection Date: 01/20/2023
Record Keeping
Owner - Facility: Lexington Manufacturing Facility
Inspection Type: Compliance Evaluation
Laboratory
Are field parameters performed by certified personnel or laboratory?
Are all other parameters(excluding field parameters) performed by a certified lab?
# Is the facility using a contract lab?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
Yes No NA NE
Yes
No
NA
NE
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
❑
❑
❑
■
❑
❑
❑
■
Comment: All parameter analyses were verified to be performed by either a certified field
laboratory or a certified contract laboratory. Laboratory refrigerator for field sample
storage was within acceptable temperature range, verified with thermometer and daily
monitoring log. Field sample storage appeared to be compliant with requirements.
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: The laboratory area and outdoor areas were neat and clean. The facility analyzes
sufficient process control parameters.
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type, ■ ❑ ❑ ❑
and sampling location)?
Comment: Quarterly upstream hardness grab sampling has been performed as required by the
permit (most recently in December 2022).
Bar Screens
Yes
No
NA NE
Type of bar screen
a.Manual
❑
b.Mechanical
Are the bars adequately screening debris?
0
❑
❑
❑
Is the screen free of excessive debris?
■
❑
❑
❑
Is disposal of screening in compliance?
0
❑
❑
❑
Is the unit in good condition?
0
❑
❑
❑
Comment: The mechanical bar screen system appeared to be operating appropriately.
Page# 5
Permit: NC0004626
Inspection Date: 01/20/2023
Owner - Facility: Lexington Manufacturing Facility
Inspection Type: Compliance Evaluation
Equalization Basins
Is the basin aerated?
Is the basin free of bypass lines or structures to the natural environment?
Is the basin free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Are audible and visual alarms operable?
# Is basin size/volume adequate?
Yes
No
NA
NE
❑
■
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
❑
❑
❑
■
❑
❑
❑
■
■
❑
❑
❑
Comment: The equalization basin appeared to not be used frequently, as it contained very little
wastewater but some sludge and vegetation. One surface aerator was observed in the
EQ basin, but the operator indicated that it is inoperable and out of service. With the
aerator inoperable, the EQ basin has no other means of aeration.
Primary Clarifier
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the sludge blanket level acceptable?
Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth)
Comment: The primary clarifier appeared to be operating appropriately.
Aeration Basins
Mode of operation
Type of aeration system
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin's surface?
Yes
No
NA
NE
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
Yes No NA NE
Ext. Air
Diffused
■ ❑ ❑ ❑
❑ ❑ ■ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
Page# 6
Permit: NC0004626
Inspection Date: 01/20/2023
Owner - Facility: Lexington Manufacturing Facility
Inspection Type: Compliance Evaluation
Aeration Basins
Yes
No
NA
NE
Is the DO level acceptable?
❑
❑
❑
Is the DO level acceptable?(1.0 to 3.0 mg/1)
❑
❑
❑
Comment: The aeration basin was observed operating
with diffused aeration, minimal foam,
and
sufficient mixing.
Secondary Clarifier
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the return rate acceptable (low turbulence)?
Is the overflow clear of excessive solids/pin floc?
Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth)
Yes
No
NA
NE
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
Comment: Minimal algal growth was noted in the secondary clarifier. Weirs were free of blockages
from algal growth. Some suspended solids/floc was observed in the weir overflow, but
not excessive in nature and effluent TSS is compliant with permit limits.
Disinfection -Liquid
Is there adequate reserve supply of disinfectant?
(Sodium Hypochlorite) Is pump feed system operational?
Is bulk storage tank containment area adequate? (free of leaks/open drains)
Is the level of chlorine residual acceptable?
Is the contact chamber free of growth, or sludge buildup?
Is there chlorine residual prior to de -chlorination?
Comment: Significant corrosion was observed on the chlorine contact tank.
De -chlorination
Type of system ?
Is the feed ratio proportional to chlorine amount (1 to 1)?
Is storage appropriate for cylinders?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Yes No NA NE
Liquid
❑ ❑ ❑ ■
❑ ❑ ■ ❑
Page# 7
Permit: NC0004626
Inspection Date: 01/20/2023
De -chlorination
Owner - Facility: Lexington Manufacturing Facility
Inspection Type: Compliance Evaluation
# Is de -chlorination substance stored away from chlorine containers?
Are the tablets the proper size and type?
Comment: None
Are tablet de -chlorinators operational?
Number of tubes in use?
Comment: None
Chemical Feed
Is containment adequate?
Is storage adequate?
Are backup pumps available?
Is the site free of excessive leaking?
Yes
No
NA
NE
❑
❑
❑
■
❑
❑
■
❑
❑
❑
■
❑
Yes
No
NA
NE
•
❑
❑
❑
•
❑
❑
❑
❑
❑
❑
■
■
❑
❑
❑
Comment: The indoor chemical storage area currently houses many drums, minibulks, and other
containers of various highly corrosive and/or reactive substances. No immediate
containment issues were observed.
Solids Handling Equipment
Is the equipment operational?
Is the chemical feed equipment operational?
Is storage adequate?
Is the site free of high level of solids in filtrate from filter presses or vacuum filters?
Is the site free of sludge buildup on belts and/or rollers of filter press?
Is the site free of excessive moisture in belt filter press sludge cake?
The facility has an approved sludge management plan?
Yes No NA NE
■ ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ ■ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ ❑ ■
Comment: Solids handling equipment is appropriately maintained and available for use as
described in the permit.
Standby Power
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up
power?
Yes No NA NE
■ ❑ ❑ ❑
❑ ■ ❑ ❑
❑ ■ ❑ ❑
❑ ❑ ❑ ■
• ❑ ❑ ❑
• ❑ ❑ ❑
Page# 8
Permit: NC0004626
Inspection Date: 01/20/2023
Standby Power
Is the generator fuel level monitored?
Owner - Facility: Lexington Manufacturing Facility
Inspection Type: Compliance Evaluation
Yes No NA NE
■ ❑ ❑ ❑
Comment: The whole -plant automatic backup qenerator is tested weekly. Weekly tests are neither
conducted under load, nor with the primary power source disconnected.
Effluent Pipe
Yes
No
NA
NE
Is right of way to the outfall properly maintained?
0
❑
❑
❑
Are the receiving water free of foam other than trace amounts and other debris?
M
❑
❑
❑
If effluent (diffuser pipes are required) are they operating properly?
❑
❑
0
❑
Comment: The effluent pipe was observed to be underwater at the time of inspection. Operators
indicated that this was due to the current high water level and the effluent pipe
is
normally not submerged.
Flow Measurement - Effluent
Yes
No
NA
NE
# Is flow meter used for reporting?
0
❑
❑
❑
Is flow meter calibrated annually?
❑
❑
❑
Is the flow meter operational?
0
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
❑
❑
❑
Comment: None
Effluent Sampling
Yes
No
NA
NE
Is composite sampling flow proportional?
0
❑
❑
❑
Is sample collected below all treatment units?
0
❑
❑
❑
Is proper volume collected?
0
❑
❑
❑
Is the tubing clean?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
0
❑
❑
❑
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
0
❑
❑
❑
representative)?
Comment: Upon request for additional information and clarification, the permittee submitted
confirmation of flow -proportional composite sampling methods via email- see filed
correspondence. The effluent flow meter signal is transmitted to the composite sampler
and the sampler operates with variable timing, constant volume. The sampler is
programmed to pulse (at 240 gallons of flow per pulse) 41 times between samples, and
to take 130 mL aliquots.
Page# 9