Loading...
HomeMy WebLinkAbout20200393 Ver 2_Permit Drawings from B-4590 Permits Packet_20200304_20230207L a a T L Q� O O N / c L L 0 E c 0 L c w 0 H 1/�]\` JL�/� STATE ®JL NORTH ®JL JL lL JL `il (g �}� ®JLd JL i tl 81'wTH BTATH P__ HHPPR_ N0. 11- 10TAL N0. HHEE'IE N,C, B-4590 � DIVISION OF HIGHWAYS P.APHam DHB TIP Ia 38420.1.2 BRNHS-117 5 PE 38420.1.2 BRNHS-117 5 ROW NEW HANOVER COUNTY LOCATION: BRIDGE NO. 640029 OVER SMITH CREEK PROJECT OCATION ON SR 2812 (CASTLE HAYNE ROAD) TYPE OF WORK: GRADING, DRAINAGE, PAVING AND STRUCTURE (BRIDGE) L•� �31 V I WETLAND AND SURFACE WATER IMPACTS PERMIT 0 DETOUR VICINITY MAP N.T.S. SITE 1 END BRIDGE PERMIT DRAWING BEGIN BRIDGE —L— POT STA.19 + 76.00 SHEET 1 OF 10 —L— POT STA.17 + 13.00 \ BEGIN PROJECT —L— PDT STA. 14 + 00.00 �. END PROJECT T STA 2 2 + 50.00 PO �r EAD END _ -L- SR 2812 END CONSTRUCTION —Y— POT STA.10 + 90.00 L js J RS&H V—Y— BEGIN CONSTRUCTION POT STA.10 + 14.05 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED �• • THERE IS NO CONTROL OF ACCESS ON THIS PROJECT. V SCALES DESIGN DATA PROJECT LENGTH PreparedGRAPHIC RSt�'Hrlce of: HYDRAULICS ENGINEER 50 25 0 50 100 ADT 2015 = 2800 ADT 2035 = 4200 ARCHITECTS -ENGINEERS -PLANNERS, INC. 8521 SIX FORKS ROAD, SUITE 406 RALEIGH, NC 27615 NOR 2018 STANDARD SPECIFICATIONS K = 9 % LENGTH ROADWAY = 0.138 MILES RICHARD BOLLINGER, PE 0 PLANS 50 25 0 50 100 RIGHT OF WAY DATE: D = 6O ��D T 7 % — LENGTH STRUCTURE 0.050 MILES P.E. SIGNATURE: PROJECT ENGINEER y ^i V = 40 MPH = TOTAL LENGTH 0.188 MILES DECEMBER 18, 2018 CHARLES YOUNG, PE ROADWAY DESIGN ENGINEER �� a PROFILE HORIZONTAL (HORIZONTAL) PROJECT DESIGN FNGINF,FR TTST = 1 DUAL = 6 O 10 5 0 10 20 FUNC CLASS = LETTING DATE: LOCAL APRIL 21, 2020 V SUBREGIONAL TIER P.E. SIGNATURE: PROFILE (VERTICAL) NCDOT CONTACT