HomeMy WebLinkAboutNC0085812_Quaterly Progress Report_20230207 (fp)
UNIONCOUNTY
WATER
Mr. John Hennessy
North Carolina Department of Water Resources �I`V,�D
Water QualityPermitting Section/NPDES
REC1617 Mail Service Center
Raleigh,NC 27699-1617 FEB 0 7 2023
RE: EMC SOC WQ S20-001 February 2023 Quarterly Progress Report
February 3, 2023 NCDEQ/DWR/NPDES
Mr.Hennessy,
Union County Water receieved the fully excuted SOC for the Grassy Branch WRF on June 21,2022. As a
requirement of this SOC the County is to submit quarterly progress reports.This letter provides the
February 2023 progress report.
For Collections system permit WQCS00054
• Ongoing inflow and infiltration(I&I)rehabilitation in the Grassy Branch basin.
o Manhole reparairs are complete.
For NPDES Permit NC0085812
• Submit Contract documents for regulatory approval for Grassy Branch WWTP upgrade project.
o Executed a task order with Hazen on November 28,2022 to develop a tech memo to
evaluate unit processes and cost.This tech memo will serve as the design basis for final
design and will be completed by April 30,2023.
If you need any further information or have questions please let me know at 704-296-4215.
Sincerely,
;447,61-- 1144
Andrew Neff,PE
Water&Wastewater Division Director
CC: Hyong Yi,UC Water Administrator
John Shutak,Engineering Division Director
Josh Brooks, Assistant Division Director,Water&Wastewater
Greg Morgan,Utility Field Services Superintendent
Jonathan Jordan,WRF Superintendent
Union County Water
4600 Goldmine Rd
Monroe, NC 28112
T 704 289 1434
unioncountync.gov/water