Loading...
HomeMy WebLinkAboutNC0085812_Quaterly Progress Report_20230207 (fp) UNIONCOUNTY WATER Mr. John Hennessy North Carolina Department of Water Resources �I`V,�D Water QualityPermitting Section/NPDES REC1617 Mail Service Center Raleigh,NC 27699-1617 FEB 0 7 2023 RE: EMC SOC WQ S20-001 February 2023 Quarterly Progress Report February 3, 2023 NCDEQ/DWR/NPDES Mr.Hennessy, Union County Water receieved the fully excuted SOC for the Grassy Branch WRF on June 21,2022. As a requirement of this SOC the County is to submit quarterly progress reports.This letter provides the February 2023 progress report. For Collections system permit WQCS00054 • Ongoing inflow and infiltration(I&I)rehabilitation in the Grassy Branch basin. o Manhole reparairs are complete. For NPDES Permit NC0085812 • Submit Contract documents for regulatory approval for Grassy Branch WWTP upgrade project. o Executed a task order with Hazen on November 28,2022 to develop a tech memo to evaluate unit processes and cost.This tech memo will serve as the design basis for final design and will be completed by April 30,2023. If you need any further information or have questions please let me know at 704-296-4215. Sincerely, ;447,61-- 1144 Andrew Neff,PE Water&Wastewater Division Director CC: Hyong Yi,UC Water Administrator John Shutak,Engineering Division Director Josh Brooks, Assistant Division Director,Water&Wastewater Greg Morgan,Utility Field Services Superintendent Jonathan Jordan,WRF Superintendent Union County Water 4600 Goldmine Rd Monroe, NC 28112 T 704 289 1434 unioncountync.gov/water