Loading...
HomeMy WebLinkAboutNCG021010_Scanned Site Plan_20230206rfze+/ 10 M(NL'-'�) At2 Eon lcs LLe- oat4w*t 2:I 4rmrlvtnw.q aEYI?f/ CQo55 _ Sr`,C�7to.J rAOT - TO - SfAG-b rzItte'rerz Z' t SLOPE AgovE W ATE 12 � 2:1 SLOPE \-i 13LAC.K 9WEIZ Froa2nns. LLC \NE!t-PrJa5 ty?a �Irk Ott J2 11 ors PcRmrr T3oVNOA2 ti7 �� �h� MIM I ►11 N G NING LIMIT 5 orGi� C UtaG� ��TL4MC� �\\\\\ `LlrrstT ���1 r JPgi7 LIMIT, rVN&'KPJaT0 i�"LOPEf1TY LltyE / 3 tRMI j BOUN,,� VfGER ------- LIMIT, FEEL v S4" NG Notes: MtN1 1. NCDOT /5 stone is preferred . Pod to be 100 ft. L x 20 R. W x 6 in. fhick (min). I 2. Turning radius sufficient to accomodate forge trucks. 3. !dust be maintained in a condition which will prevent tracking or direct flow of mud onto streets Periodic topdressing may be necessary, - Not To Scale Fart-i45-_.-LU-.. J w2FSgxre 1b5. Gravel Constmetion Entrance ♦ P% t W .,v:... j : .--^> t' }`�--.1 i leis Loc;q'�-noi.4 Mkp VSCLS ROWAtJ QVAO. 1- 2 T-oaKS LLC , f✓ 1 � � q r z � N N N Zyt�� L WECUAND { WhItT j{ WEtLarR? r 7 1 vo tnup♦ ` MiN1N4 \\I urarF--Xr" 1 So- 8'urrr-=n nER�rne« 1� MIaIING Li ruff r MIN' M4 Aize q E2 �fr aFf2 '3oUa eGFFee �q4\ �r t�B�C ryp�w7 �AVT y�LC �o� E�4 \VVE L2h u u a. IQ' A,a se- PAIN IIJG \ ,n 1L,Jr4 U el(L c3.,f� So guGFEtz ��_ 1! Jt YRoc'�R Y `14 / PEF-Mrr Jos' mrr Iwl W E'Ct�>Jfl 3 50� UNDtSTVfj�� BI F .. 4 ram/ A w M►N 1134 MEN {zq.(o 4me3 L 9 t MPCh G. XmMoN ' f �L-c- N1cT�TZ roRKS,LLC 1 It, \ 4 ; jZnea E($v2r ray H 2�1rJING 9� :can P� g.5 t 7.6 VN4l5 rURfSEV ..L f3VF962 T �Z.y � kJN�I STVrCL3c� h4 '(ZoNALn,tTEmPtE SMrrN poLN•t / 'RPNMONO iip`j� l �l KaNEsccrtti6 0°J�� fft�Obxtctt aaH� F p2k.y L� c ly p f?•f� / fm�or+«ro,v ATteA NC66�-1010 CATEGORY CURRENT AFFECTED PROPOSED CHANGE TO TOTAL AFFECTED ACREAGE AFFECTED ACREAGE ACREAGE Taflings/Sediment Ponds 0.00 0.00 Stockpiles 3.00 3.00 Waste piles 0.00 0.00 Processing Areas/Haul Roads 4.50 4.50 Mine Excavations 427.70 129.60 557.30 Other (Please explain) Total Affected Acreage 435.20 564.80 Total Permitted Acreage 515.00 665.00 T3c4�.� mlKJINs AT2eeA L.00r �ZOgC� i VQf2M. 0LC_- �QM'r ltl`It2q SPyrcE 3 f t. Min. <-56elzTZILL MC INN US MEV-C.Awr t LE I I "r-3Ear LL C- J f}ousr-+WELL tvaoJAoE +ZEYELvYMEN-J \ C6NTZQ IQ-NovSC-+wELL tlwELl Flow 2 (or Flatter) ��//\\///\\///\\ 2 (or Flatter) Direction 3 ft.\Sail Berm Berm Construction Specifications: 1. Construct berm by placement of topsoil and overburden token from initially disturbed areas. T Prior to placement of moteriols for bem formation, cut vegetation nearly flush with ground. 3. Compact nuateriols in Ift. lifts by construction traffic. Not To Scale Figure 12-3. Temporary Diversion Berm Detail 2023 Modification This modification adds 150 acres to the permitted area, with 129.6 acres of this new area to be disturbed by mining. The new area is adjacent to the existing mine, connected by a 50 foot wide access. The mined sand and gravel will be hauled to the existing processing plant. All disturbed areas are surrounded by a perimeter berm, which prevents any offsite sedimentation. This mine does not discharge any stormwater or groundwater. Any dewatering of the new mining area will be pumped into the existing mine, which allows excess water to be infiltrated into the soil without any discharge. Upon completion of mining, all excavations will be reclaimed as a pond. Any disturbed areas above water table will be graded and deeded according to approved revegetation schedule. IVAN90E PIT *2. - PEtZrYitl /� _ SCALE DRAWN aY � ( St'aYV P i (L7U c� 1-3 REVISED REVIsej--) 23 AMEntGAIV MA-r .TL1AL.5 Cof%APRt.ry Iy LLC DATE _ CA2ouMA rE0W4VJ►- Sc (•tic DRAWING NUMBER RF-�ts1 o 4-14 -OS (2 Z$ D� 1ib8ox 4-25,C nmm ^vc z?S7q { cot 3