Loading...
HomeMy WebLinkAbout20042002 Ver 1_Time Ext Request_202301121/12/2023 Calabash Marina As of today, we have the following to complete. 1. Parking lot. 2. Cul de sac construction 3. Ship store 4. Dredging 5. Dock installation The boat buildings are under construct -ion and will be complete in a couple of weeks. The drive isle is scuduled to pour the first of February. Dredging will occur the first of March. We plan to be open the middle of April. Please let me know if you need any further information. Tim Moon General Manager Calabash Marina 1207 Riverview Drive Calabash, NC 28467 239-288-9621 I2-%r5Jz7 v►% 16.A Q--A-Jev.- NEW BU DINGS APPROVED a UL-DE-SAC AND RIG T OF WAY NE MARL 0 STACK B CONCRETE, ASPHALT, GRAVEL AROUND DRY LDINGS AND PARKING AEIJACENT DRIVEWAY NO CHANGES Legend PmjI1c1 Boundary NOTES: LILA/M701!s G11M1 R5 CS/...L.gaoae11.41 Irrt rlgarvZ,q.agash lAo•nY n•g C5 /DEN EXISTING 1 Cr CRETE RAMP (EXISTI G RETAINING WALL TO B REMOVED) USAGE S. TBACK -- OUTER EDGE O ARSH — APPROXIMATE MLW —f 1. E3ASE SURVEY PILE PROVJOE_O BY NORRIS AND WARD. 2. 2018 PARCELS AND 2016 AERIAL FROM NCONEMAP, 3. NOT A SURVEYED OR ENGINEERED DRAWING. FOR ENVIRONMENTAL PERMITTING ONLY. TECEIVED NI I II !1 .111i'I i 9dINATONTAP - Al( 442"C VOLAAea Q.1 Der S .c. L5 a..5.ez_upa„\\ `;v"-\°'" .5Icam ()AA.- ---ifi M°491(\ ..1)e4t3 c........p _...± eat' /9// c.4-"SeviTgars 23?. 243 e -q 6)2.1 \ COASTAL WETLAND LINE NHW PROPOSED BATHROOM BUILDING PROPOSED\O' X 8' PLATFORM PROPOSED 170' X fi' FIXED PIER (HANDICAP XCCESSIBLE) PROPOSE SSHIPS STORE PROPOSED WALKWAY EXISTING`DECK TO BE COV0p EXISTING CONCRETE TO REM__AI OSED FLOATIN XTENSION PRO OSED COVERED DECKS EXISTING DOCKS NO CHANGES, TO REMAIN �`— PROPOSED FLOATING DOCK EXIST/NG BULKHEAD TO BE REFACED 2' WATERWARD LMG In i ll sV.1 •,, ,1111 , APPROVED CUL-DE-SAC \X1ND RIGHT OF WAY /1 75 AEC ^— 30' BUFFER 404 WETLAND LINE G414114sI 1.14/ma 488+1114.1sr.4sn�e aNs 15 rly„Ca &,,, fl47 slu..11.ox! R14 plan V1414 2 n11