HomeMy WebLinkAbout20042002 Ver 1_Time Ext Request_202301121/12/2023
Calabash Marina
As of today, we have the following to complete.
1. Parking lot.
2. Cul de sac construction
3. Ship store
4. Dredging
5. Dock installation
The boat buildings are under construct -ion and will be complete in a couple of weeks.
The drive isle is scuduled to pour the first of February.
Dredging will occur the first of March.
We plan to be open the middle of April.
Please let me know if you need any further information.
Tim Moon
General Manager
Calabash Marina
1207 Riverview Drive
Calabash, NC 28467
239-288-9621
I2-%r5Jz7
v►% 16.A Q--A-Jev.-
NEW BU DINGS
APPROVED a UL-DE-SAC
AND RIG T OF WAY
NE
MARL 0
STACK B
CONCRETE, ASPHALT,
GRAVEL AROUND DRY
LDINGS AND PARKING
AEIJACENT DRIVEWAY
NO CHANGES
Legend
PmjI1c1 Boundary
NOTES:
LILA/M701!s G11M1 R5 CS/...L.gaoae11.41 Irrt rlgarvZ,q.agash lAo•nY n•g
C5
/DEN EXISTING 1
Cr CRETE RAMP
(EXISTI G RETAINING
WALL TO B REMOVED)
USAGE S. TBACK --
OUTER EDGE O ARSH —
APPROXIMATE MLW —f
1. E3ASE SURVEY PILE PROVJOE_O BY NORRIS AND WARD.
2. 2018 PARCELS AND 2016 AERIAL FROM NCONEMAP,
3. NOT A SURVEYED OR ENGINEERED DRAWING. FOR ENVIRONMENTAL
PERMITTING ONLY.
TECEIVED
NI I II !1 .111i'I
i 9dINATONTAP
- Al( 442"C VOLAAea Q.1 Der S .c. L5
a..5.ez_upa„\\ `;v"-\°'" .5Icam ()AA.- ---ifi M°491(\
..1)e4t3 c........p _...± eat' /9// c.4-"SeviTgars 23?. 243 e -q 6)2.1
\ COASTAL WETLAND LINE
NHW
PROPOSED BATHROOM BUILDING
PROPOSED\O' X 8' PLATFORM
PROPOSED 170' X fi' FIXED PIER
(HANDICAP XCCESSIBLE)
PROPOSE SSHIPS STORE
PROPOSED WALKWAY
EXISTING`DECK
TO BE COV0p
EXISTING CONCRETE
TO REM__AI
OSED FLOATIN
XTENSION
PRO OSED
COVERED DECKS
EXISTING DOCKS
NO CHANGES, TO REMAIN
�`— PROPOSED FLOATING DOCK
EXIST/NG BULKHEAD TO BE REFACED
2' WATERWARD
LMG
In i ll sV.1 •,, ,1111
, APPROVED CUL-DE-SAC
\X1ND RIGHT OF WAY
/1 75 AEC
^— 30' BUFFER
404 WETLAND LINE
G414114sI 1.14/ma
488+1114.1sr.4sn�e aNs 15
rly„Ca &,,, fl47
slu..11.ox!
R14
plan V1414
2 n11