Loading...
HomeMy WebLinkAbout17BP.5.R.86 Ver 2_401 Application_20230203Staff Review Does this application have all the attachments needed to accept it into the review process?* Yes No ID#* Version* 2 17BP.5.R.86 Is this project a public transportation project?* Yes No Is this a DOT Yes No project?* Reviewer List: * Rob Rid ings:eads\rgridings Select Reviewing Office:* Central Office - (919) 707-9000 Does this project require a request for payment to be sent?* Yes No Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * For the Record Only (Courtesy Copy) New Project Modification/New Project with Existing ID More Information Response Other Agency Comments Pre -Application Submittal Re-Issuance\Renewal Request Stream or Buffer Appeal Pre -Filing Meeting Date Request was submitted on: 12/20/2022 Project Contact Information Name: Christopher Andrew Murray Who is submitting the information? Email Address: camuray@ncdot.gov Project Information Existing ID #: Existing Version: 17BP.5.R.86 1 20170001 (no dashes) 1 Project Name: Replacement of Bridge 186 over Rocky Branch on SSR 2329 (Lizard Lick Road) Is this a public transportation project? Yes No Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No Unknown TIP#: WBS#: 17BP.5.R.86 (Applies to DOT projects only) County (ies) Wake Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document 17BP.5.R.86 draft reverification file 02032023.pdf 15.03MB Only pdf or kmz files are accepted. Describe the attachments or comments: Reverification of this project is requested using GP 50. The project has and anticipated let date of June 14, 2023. The NCDOT submitted an a-PCN application received on July 31, 2018 by the NCDEQ DWR and received by the USACE on August 10, 2018. Previously issued WQC 4132 provided on August 3, 2018 (Project No.: 17BP.5.R.86). Action ID is the following: SAW-2016-01618 (on August 15, 2018) There have been slight adjustments to the design and jurisdictional impacts since the original permit drawing submittal. See attached updated permit drawings. See DMS mitigation letter providing 41 linear feet of stream mitigation and 0.02 ac of wetland mitigation. Section 7 issues have been resolved following coordination with USFWS. See attached survey information. Archaeology No Survey Required Form on 10/21/2016. Historic Architecture and Landscapes No Survey Required Form on 9/22/2016. Response from Catawba Indian Nation on 1/17/2020. MCDC document is are attached. Sign and Submit By checking the box and signing box below, I certify that: • I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. • I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form. Signature: C-r.9Td �-A 4191.�4Y Submittal Date: 2/3/2023 Is filled in automatically.