HomeMy WebLinkAbout17BP.5.R.86 Ver 2_401 Application_20230203Staff Review
Does this application have all the attachments needed to accept it into the review process?*
Yes No
ID#* Version* 2
17BP.5.R.86
Is this project a public transportation project?* Yes
No
Is this a DOT Yes No
project?*
Reviewer List: * Rob Rid ings:eads\rgridings
Select Reviewing Office:* Central Office - (919) 707-9000
Does this project require a request for payment to be sent?*
Yes
No
Project Submittal Form
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type: * For the Record Only (Courtesy Copy)
New Project
Modification/New Project with Existing ID
More Information Response
Other Agency Comments
Pre -Application Submittal
Re-Issuance\Renewal Request
Stream or Buffer Appeal
Pre -Filing Meeting Date Request was submitted on:
12/20/2022
Project Contact Information
Name: Christopher Andrew Murray
Who is submitting the information?
Email Address: camuray@ncdot.gov
Project Information
Existing ID #: Existing Version:
17BP.5.R.86 1
20170001 (no dashes) 1
Project Name: Replacement of Bridge 186 over Rocky Branch on SSR 2329 (Lizard Lick Road)
Is this a public transportation project?
Yes
No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
Yes No Unknown
TIP#: WBS#:
17BP.5.R.86
(Applies to DOT projects only)
County (ies)
Wake
Please upload all files that need to be submited.
Click the upload button or drag and drop files here to attach document
17BP.5.R.86 draft reverification file 02032023.pdf 15.03MB
Only pdf or kmz files are accepted.
Describe the attachments or
comments:
Reverification of this project is requested using GP 50. The project has and anticipated let date of June 14,
2023.
The NCDOT submitted an a-PCN application received on July 31, 2018 by the NCDEQ DWR and received by
the USACE on August 10, 2018. Previously issued WQC 4132 provided on August 3, 2018 (Project No.:
17BP.5.R.86). Action ID is the following: SAW-2016-01618 (on August 15, 2018)
There have been slight adjustments to the design and jurisdictional impacts since the original permit drawing
submittal. See attached updated permit drawings. See DMS mitigation letter providing 41 linear feet of stream
mitigation and 0.02 ac of wetland mitigation.
Section 7 issues have been resolved following coordination with USFWS. See attached survey information.
Archaeology No Survey Required Form on 10/21/2016.
Historic Architecture and Landscapes No Survey Required Form on 9/22/2016.
Response from Catawba Indian Nation on 1/17/2020.
MCDC document is are attached.
Sign and Submit
By checking the box and signing box below, I certify that:
• I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the
best of my knowledge and belief.
• I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
• I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act');
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act');
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a
written signature; AND
• I intend to electronically sign and submit the online form.
Signature:
C-r.9Td �-A 4191.�4Y
Submittal Date: 2/3/2023
Is filled in automatically.