Loading...
HomeMy WebLinkAboutNCC211158_NOT Closeout Documents_20230203North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Forsyth Project: Old Town Park Drainage Improvements River basin: Yadkin-PeeDee Person financially responsible: City of Winston-Salem - Robert Prestwood Project #: FORSY-2021-033 Address: PO Box 2511, Winston-Salem, NC 27102 1. Project Location: 4550 Shattalon Dr., Winston-Salem Pictures: Yes - Digital 2. Weather and soil conditions: 70's, sunny, workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Title: Inspection report: Sent Report Date given/sent: November 03, 2022 9. Corrective action needed: 10. Comments: Aroutine site inspection was conducted on October 24, 2022. The site work appears to have been completed. Several biodegradable wattles are still in place in the diversion ditch at the site. These can be removed as the ground has been stabilized. Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO 1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edoes.deq.ne.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. If you have any questions, please contact the Winston Salem Regional Office or nate.gainerAancdenr.gov or 336-776-9660. Reported by: Nate Gainer Others present: Robby Deans Date of inspection: October 24, 2022 Time arriving on site: 1:30 PM Time leaving site: 1:45 PM Yes