Loading...
HomeMy WebLinkAboutGW1-2023-00913_Well Construction - GW1_20230120 i I . I WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: r �- 1 1.Well Contractor Information: Landon Phillips 14.WATER ZONES' ( FROM TO DESCRIPTION i Well Contractor Name ft. I ft. eA11401 i 3441 A t 7 5 rt. ft. A NC Well Contractor Certification Number 15.OUTER CASING for multi-cased wells OR LiNER if n ilicable NW Poole Well and Pump Company FROa1 TO DI .heAllt Tu.C-N ss afATEIiI,\L rr. fr. in. �pw Company Name s ��3CASING OR TUBING colhcrmal closed-loop 2.Well Construction Permit#'-; FROM TO DIA\PETER THICKNESSESESS a[,\TERIAL List all applicable yell constriecdon pernrirr(i.e.UIC,Calmly,State,Variance,e(a) ff. ft. 3.Well Use(citech well use): ft• ft. tn, 17.SCREEN Witter Supply Well: rnoAl TO DUAIETER SLOT SIZE TIIICKNESS MATERIAL ❑Agricullurai ❑Municipal/Public ft. ft. la ❑Geolhennal(1leating/Cooling Supply) kResidential Water Supply(single) ft• ft• to j ❑Industrial/Commercial ❑Residential Water Supply(shared) 18,GROUT j ❑Irrl ation ❑Wells>100,000 GPD FROM I TO D ATERb1L EAIPLACEhIENT 5 LT110D&AMOUNT j Non-Water Supply Well: O ft. ft. �p 1 ❑Moniloring ❑Recovery, ft. rL Injection Well: ft. ft. { ❑Aquifer Recharge ❑Groundwater Rernediation 19.SAND/GRAVEL PACK if a licablc ❑Aquifer Storage and Recovery ❑Salinity Barrier FRO51 TO MATERIAL EMPLACEMENT ArETnorl - y ft. ft. ❑Aquifer Test ❑Stontttvater Drainage ❑Experimental Technology ❑Subsidence Control ft• ft. j ❑Geothermal(Closed Loop) ❑Tracer 20.DRILLING LOG aunch additional sheets If necessary) r•Ro51 TO DESCRIPTION color,hardness,solprock f e, rain size,etc.) I ❑Geolhennal(Fleating/Cooling Return) ❑Other(explain under#21 Remarks) tt. fr. i 4.Dntc 1Vcll(s)Completed: _1 -2 Wcli IDl/ tt. S ft. 1C /61 y I 5u.Well Location: ft• rt. ��kh facility/Owner Name n Facility iDP(if applicable) ft. ft. 3 JoZ� ��tACG �9'G..r-�-t' wC �G►�� '�0 C�$od rr. rt. Physical Address,City,and Zip NZ `?�g ft. ft. 21.REMARKS r C tA/ Parcel identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (ifss•cll field,one]at/long is sufficient) 22,Certifrcnt' N �Q�.5qo15 W I _ r r-z� 6,•Is(are)the wcll(s): LAPernia tent or ❑Temporary Signature of Certified Well Contractor Date By signing this form,I hereby certlfj,that ilia irelf(s)eras(were)constructed in accordance with 7.Is this a repair to nit existing well: ❑Yes or 8No 15A NCAC 02C.0100 or 15A NCAC 02C.0200 11'ell Construction Standards and that a cap) y'rin/s is a repair,fill out known we/1 construction information and explain ilia nature of ilia of this record has been provided to ilia well of ter. i repair under it21 remarks section at-on rite back of this form. 23.Site diagram or additional'tvcll details: S.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only I GW-i is heeded. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: t 24.SUBNUT"TALINSTRUCTIONS 9.Total well depth below land surface: �O S (ft.) Submit this GW-1 within 30 clays of well completion per the following: For multiple trells list all depths ifd 'erent(example-3@200'and 2@100� q O 24a. For All Wells: Original font to Division of Water Resources (DWIZ), 10.Static water level below lop of casing: 0 (ft.) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 Ifirater level is above casing,use'•+" 11.Borehole diameter: (in,) 24b.For Injection Wells:Copy to DWR,Underground Injection Control(fUC) Rotary Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over I"'00 GP Copy to DWR,CCPCUA BIOW Permit Program,1611 MSC,Raleigh,NC 27699-161 l 131.Yield(gpin) Method of test: HTH 1 lb. 13b.Disinfection type: Amount- North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018