Loading...
HomeMy WebLinkAboutNCC205074_NOT Closeout Documents_20230201North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215 County: Columbus Project: Whiteville 115kV Substation River basin: Lumber Person financially responsible: Duke Energy Progress, Inc. - Alan Lewis, manager Project #: COLLTM-2021-004 Substation Engineering Address: 410 South Wilmington Street, Raleigh, NC 27601 1. Project Location: 555 Flitter Hill Road, Whiteville Pictures: Yes - Digital 2. Weather and soil conditions: 70's, clear, workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): None Title: Inspection report: Sent Report Date given/sent: January 04, 2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. The file will be closed. Project is released and coverage under NPDES General Permit for Construction Activities is terminated. Reported by: Garrett Elmo Others present: Date of inspection: January 04, 2023 Time arriving on site: 11:30 AM Time leaving site: 12:15 PM cc: