Loading...
HomeMy WebLinkAbout20230129 Ver 1_More Info Received_202302031 Anderson, Mitchell L From:Frank W Blackwell <blackwellf@charter.net> Sent:Friday, February 3, 2023 12:36 PM To:Anderson, Mitchell L Subject:[External] RE: FW: DWR 23-0129 Blackwell, 231 LAKEVIEW RD_ Additional Information Request CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to  Report Spam.    Mitchell, It was nice to speak with you this morning. Please see the info requested after each numbered paragraph and  picture at the bottom.  If You need anything else please let me know.  Thank you, Frank    Sent: Friday February 3 2023 9:44:41AM  Subject: DWR 23‐0129 Blackwell, 231 LAKEVIEW RD_ Additional Information Request  Hello Mr. Blackwell,  Thank you for emailing the Division of Water Resources.  On January 30, 2023, the Division of Water Resources (Division) received your application requesting a 401 Water  Quality Certification from the Division for the subject project. The Division has determined that your application is  incomplete and cannot be processed. The application is on‐hold until all of the following information is received:  1. The permanent impacts above the normal pool level proposed on your application are reported as 1 sqft  and impacts below the normal pool level are reported as 150 sqft. Staff believe this is a mistake on  your application and requires the proposed amount of disturbance above the normal pool level  associated with your project. Please provide the proposed permanent and temporary impacts  above the normal pool elevation associated with your project. [15A NCAC 02H  .0502(a)(9)]   ***   please see Proposed (Plan View) for information~  3'x150'/4'x150'    2. The site plan received with your application is unclear and staff are unable to determine impacts to the  shoreline above and below the normal water level. Please provide a site plan showing the location  of the impacts to the shoreline and/or lake bottom, and the location of any vegetated areas that  will be impacted (construction access corridors, etc.). In most cases the site plans do not have to  be professionally prepared. The template attached to this email may be used to assist with this  requirement. You may also draw proposed impacts directly on the attached imagery to create your  plans. Please email your completed plans to mitchell.anderson@ncdenr.gov [15A NCAC 02H  .0502(a)(9)]   ***   Please see Proposed (Plan View) for information  3. The application received indicates work will be conducted from the land. Please provide a description of  how work will be conducted, what type of equipment will be used, and a description of any  impacts to the protected Trout Buffer (if any), and a description of measures proposed to ensure  compliance with NC Water Quality Standards. [15A NCAC 02H .0502(a)(9)]   ****   The riprap will  be moved to the proposed location and installed by hand.  No industrial equipment will be used.  The trout buffer will not be impacted oor disturbed   2 4. Plans received with your application do not indicate the location or type of planned erosion control  measures (silt fencing, temporary or permanent ground cover). Please indicate the type and  location of any planned sedimentation and erosion control measures proposed for the control of  any sediment and erosion onsite to ensure compliance with General Condition II.4 of GC 4502.  [15A NCAC 02H . 0506( b)( 2); 15A NCAC 02H . 0507( c); 15A NCAC 02B . 0200; 15A NCAC 02B .  0231]   ***  There will not be any soil disturbance  The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.     Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the  proper consideration of the application. Please respond in writing within 30 calendar days. If all of the requested  information is not received within 30 calendar days of receipt of this letter, the Division will be unable to approve the  application and it will be denied as incomplete. The denial of this project will necessitate reapplication to the Division for  approval, including a complete application package and the appropriate fee. Please email all requested documents to  mitchell.anderson@ncdenr.gov .  Mitchell Anderson  Environmental Specialist, Division of Water Resources  North Carolina Department of Environmental Quality  Office: 828‐296‐4662  mitchell.anderson@ncdenr.gov  The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.   From: FrankB <blackwellf@charter.net>  Sent: Friday, February 3, 2023 9:51 AM  To: Anderson, Mitchell L <mitchell.anderson@ncdenr.gov>  Subject: [External] Re: DWR 23‐0129 Blackwell, 231 Lakeview Rd  CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to  Report Spam.  Good morning Mitchell. I’m following up to check the status of my application to have riprap installed along the seawall  at my property, 231 Lakeview Road, on Lake Lure. Please let me know as the TOLL has received permission from the  Corp. Thank you in advance for your help. ‐ Frank Blackwell  3 Sent from my iPhone    On Jan 30, 2023, at 10:23 AM, Anderson, Mitchell L <mitchell.anderson@ncdenr.gov> wrote:    Hello Mr. Blackwell,  Thank you for emailing the Division of Water Resources.  Application No. 20230129 V1 was submitted to the Division of Water Resources on 01/24/2023,  however the regional office records indicate the application review fee was not paid.  Applications are reviewed on a first come first serve basis once the review fee is paid. Please let me  know if you have paid the review fee for this application and our records are in error.  If you have not paid the review fee, you may do so by visiting the Wetlands ePayments webpage linked  below:  https://deq.nc.gov/about/divisions/water‐resources/water‐quality‐permitting/401‐buffer‐ permitting/wetlands‐epayments  Please note, the Division has a statutory review time of 60 days from receipt of fee payment. If the  application is incomplete, you will receive an additional information request. The statutory review time  resets once additional information is received.  However, based on current workloads and available staffing, the estimated review time is 2‐3 weeks  from fee receipt.  Please see the Division's FAQ page regarding the application processes and review times.  https://deq.nc.gov/about/divisions/water‐resources/water‐quality‐permitting/401‐buffer‐ permitting/frequently‐asked‐ questions#:~:text=What%20happens%20after%20my%20application%20is%20received%20by  Do not hesitate to ask further questions.  Mitchell Anderson  Environmental Specialist, Division of Water Resources  North Carolina Department of Environmental Quality  Office: 828‐296‐4662  mitchell.anderson@ncdenr.gov  <image001.png>  4 From: Frank W Blackwell <blackwellf@charter.net>  Sent: Monday, January 30, 2023 10:14 AM  To: Anderson, Mitchell L <mitchell.anderson@ncdenr.gov>  Cc: Williams, Michael C <mwilliams@townoflakelure.com>  Subject: FW: RE: [External] Seawall Rip Rap Approval Needed  CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an  attachment to Report Spam.  Good morning, Mitchell.  I apologize for the extra emails but between the TOLL, State and Corp I've lost track of where we stand  on approvals. Where we are in this process? Is there any other form I need to complete? What else do I  need to do? Thank you for your help. ‐Frank  ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  From: "Anderson, Mitchell L"  To: "Frank W Blackwell"  Cc:  Sent: Friday January 20 2023 9:36:35AM  Subject: RE: [External] Seawall Rip Rap Approval Needed  Hello Mr. Blackwell,  Thank you for providing this update. Once submitted, you will receive an email with your assigned  project number and request for application review fee payment (if not already paid upon submission).  This process is handled by Central Office. Once complete, your application will be released to the  Asheville Regional Office for review.  Please note, the attached document is the same information as the link with the error message. This  document has the template diagrams on the last few pages. Central Office staff has been notified of the  link complications.  Mitchell Anderson  Environmental Specialist, Division of Water Resources  North Carolina Department of Environmental Quality  Office: 828‐296‐4662  mitchell.anderson@ncdenr.gov  <~WRD0000.jpg>  From: Frank W Blackwell <blackwellf@charter.net>  Sent: Friday, January 20, 2023 10:31 AM  To: Anderson, Mitchell L <mitchell.anderson@ncdenr.gov>  Subject: RE: [External] Seawall Rip Rap Approval Needed  5 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an  attachment to Report Spam.  Hi. I had a friend convert the jpegs into pdf and I just submitted the application. I tried using the link you  circled below but I receive an "Error" message after it click on it. Hopefully what I've sent will be the info  you need but if not please let me know and I'll work to get you the rest of the info. Thank you for your  help. ‐Frank  ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  From: "Anderson, Mitchell L"  To: "Frank W Blackwell"  Cc:  Sent: Friday January 20 2023 9:14:15AM  Subject: RE: [External] Seawall Rip Rap Approval Needed  Hello,  <~WRD0000.jpg>  Is this the link providing the error message you reference when you state “In addition the link under #2 under Project Information gives me an Error message when I try to connect”?  If so, the attached file is the same as the link circled in red above. The diagrams are at the bottom of the  attached document.  Converting jpegs to PDFs varies by computer and user. Some applicants use Microsoft word (or another  word processor) to save as a pdf.  This is done by importing the photo into a word document and then saving the document as a pdf.  <~WRD0000.jpg>  <~WRD0000.jpg>  There are many ways to convert files and this in only one example.  Feel free to send your jpegs directly to this office by attaching them to a response email.  Thank you,  Mitchell Anderson  Environmental Specialist, Division of Water Resources  North Carolina Department of Environmental Quality  Office: 828‐296‐4662  mitchell.anderson@ncdenr.gov  6 <~WRD0000.jpg>  From: Frank W Blackwell <blackwellf@charter.net>  Sent: Friday, January 20, 2023 9:55 AM  To: Anderson, Mitchell L <mitchell.anderson@ncdenr.gov>  Subject: RE: [External] Seawall Rip Rap Approval Needed  CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an  attachment to Report Spam.  Good morning. I've received the link you sent below several times and I’ve been trying to complete it. When I order to submit it says I have to upload a pdf file. I don’t have a way to convert my pictures to pdf. I’ve been stuck on this for days. In addition the link under #2 under Project Information gives me an Error message when I try to connect.  I'm not able to submit without attaching pdf files...which I'm not able to get. I'm stuck. How do I submit this form?  Please let me know what to do. I need to get the rip rap out asap while the water is down. Thank you  ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  From: "Anderson, Mitchell L"  To: "FrankB"  Cc:  Sent: Friday January 20 2023 8:30:39AM  Subject: RE: [External] Seawall Rip Rap Approval Needed  Hello Mr. Blackwell,  Please see the link to the shoreline stabilization help document below, as well as the attached file.  https://edocs.deq.nc.gov/WaterResources/DocView.aspx?dbid=0&id=2224026  The linked diagrams from the online application are on the last pages of this document.  If your application is missing information, you will receive an additional information request from this  office. Additional information not submitted with your application can be emailing to this office at that  time.  Please do not hesitate to ask further questions.  Thank you,  Mitchell Anderson  Environmental Specialist, Division of Water Resources  North Carolina Department of Environmental Quality  Office: 828‐296‐4662  7 mitchell.anderson@ncdenr.gov  From: FrankB <blackwellf@charter.net>  Sent: Wednesday, January 18, 2023 2:17 PM  To: Anderson, Mitchell L <mitchell.anderson@ncdenr.gov>  Subject: Re: [External] Seawall Rip Rap Approval Needed  CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an  attachment to Report Spam.  Good afternoon. I’ve been trying to complete the form you sent me. I order to submit it says I have to  upload a pdf file. I don’t have a way to convert my pictures to pdf. I’ve been stuck on this for days. In  addition the link under #2 under Project Information gives me an Error message when I try to connect.  Please let me know what to do. I need to get the rip rap out asap while the water is down. Thank you  Sent from my iPhone  On Jan 3, 2023, at 8:15 AM, Anderson, Mitchell L <mitchell.anderson@ncdenr.gov>  wrote:    Hello Mr. Blackwell,  Please submit and electronic submission of request for written confirmation for  coverage under WQC 4502 using the link below.  https://edocs.deq.nc.gov/Forms/Shoreline_Stabilization  Also attached to this email is a help guide for application completion. At the bottom of  this guide is a blank site plan and a blank elevation plan with examples. You may draw  on this template and submit it as the project site plan and elevation plan.  Do not hesitate to ask specific questions.  Thank you,  Mitchell Anderson  Environmental Specialist, Division of Water Resources  North Carolina Department of Environmental Quality  Office: 828‐296‐4662  mitchell.anderson@ncdenr.gov  <image001.png>  From: Frank W Blackwell <blackwellf@charter.net>  Sent: Monday, January 2, 2023 9:02 AM  8 To: Anderson, Mitchell L <mitchell.anderson@ncdenr.gov>  Subject: RE: [External] Seawall Rip Rap Approval Needed  CAUTION: External email. Do not click links or open attachments unless you verify. Send all  suspicious email as an attachment to Report Spam.  Hi Mitchell. Would we be able to have a quick call with me to help me with the forms  that need to be competed to allow me to put rip rap allow my seawall at Lake Lure. I've  been trying off and on for several months to get this project started but I've yet to be  able to figure out the paperwork that needs to be completed. Please let me know a  convenient time to call you or you may call me directly at 864‐421‐5939. Thank you,  Frank  ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  From: "Anderson, Mitchell L"  To: "Frank W Blackwell"  Cc: Michael C", Joey"  Sent: Wednesday December 21 2022 8:02:03AM  Subject: RE: [External] Seawall Rip Rap Approval Needed  Hello,  Thank you for emailing the Division of Water Resources.  Work that impacts the waters of the US may require a 404 Certification from the United  States Army Corps of Engineers (USACE) and a 401 Water Quality Certification from  NCDWR.  Please follow the link below for more information on 404 and 401 permitting:  https://deq.nc.gov/about/divisions/water‐resources/water‐quality‐permitting/401‐ buffer‐authorization/frequently‐asked  If you project is eligible for coverage under Regional General Permit #30 with the USACE  your project may be eligible for coverage under the corresponding NCDWR Water  Quality Certification #4502.  Written confirmation of coverage from NCDWR is required for coverage under WQC  4502.  ( https://edocs.deq.nc.gov/WaterResources/DocView.aspx?dbid=0&id=2152989&cr=1 )  Please follow the online submittal link and submit a shoreline stabilization application  for review.  https://deq.nc.gov/about/divisions/water‐resources/water‐quality‐permitting/401‐ buffer‐authorization/application‐forms  9 If project activities exceed any of the thresholds of the General Certification (GC) linked  above, or cannot meet all the conditions of the GC, an individual Water Quality  Certification may be required.  If an individual Water Quality Certification is required for your projects, a PCN must be  submitted to the Division of Water Resources. Please use the online submission page,  linked below, to submit a PCN in the event an Individual Certification is required.  Please ensure to confirm coverage or secure the appropriate authorization before  commencing any work. This includes but is not limited to authorization from DWR,  USACE‐ Brandee Boggs (brandee.c.boggs@usace.army.mil ), the Town of Lake Lure‐  Mike Williams (mwilliams@townoflakelure.com), and Stan Aiken with NCDEMLR.  As Lake Lure is classified trout waters, a trout buffer authorization may be required for  impacts to the trout buffer. Please contact Stan Aiken regarding the approval process  for impacts to the trout buffer.  Below are reference links for convenience:  NCDEQ online submission page.  https://deq.nc.gov/about/divisions/water‐resources/water‐quality‐permitting/401‐ buffer‐authorization/application‐forms  NCDWR FAQs for 401 permitting:  https://deq.nc.gov/about/divisions/water‐resources/water‐quality‐permitting/401‐ buffer‐permitting‐branch/frequently  Trout Buffer FAQ:  https://files.nc.gov/ncdeq/Environmental%20Assistance%20and%20Customer%20Servic e/Permit%20Assistance/DEMLR%20Buffer%20Document.pdf  Trout Buffer Variance Information:  https://files.nc.gov/ncdeq/Environmental%20Assistance%20and%20Customer%20Servic e/Permit%20Handbook%20Documents/2016_Revisions/Water%20Trout%20Buffer%20 Variance.pdf  Please do not hesitate to ask any questions.  Thank you,  Mitchell Anderson  Environmental Specialist, Division of Water Resources  North Carolina Department of Environmental Quality  Office: 828‐296‐4662  10 mitchell.anderson@ncdenr.gov  <~WRD2148.jpg>  From: Frank W Blackwell <blackwellf@charter.net>  Sent: Tuesday, December 20, 2022 10:30 AM  To: Anderson, Mitchell L <mitchell.anderson@ncdenr.gov>  Cc: Williams, Michael C <mwilliams@townoflakelure.com>  Subject: [External] Seawall Rip Rap Approval Needed  CAUTION: External email. Do not click links or open attachments unless you verify. Send all  suspicious email as an attachment to Report Spam.  Hi Mitchell. I got your information from Michael Williams over at Lake Lure.  I need to put rip rap along my seawall at Lake Lure. I have completed the Lake Structure  Permit Application For Shoreline Stabilization. My understanding is the NC DEpt of  Environmental Quality also needs to approve the rip rap project. I'm needing to  complete this project ASAP seeing as how the lake will only be lowered for a limited  time...starting 1/1/23. Please let me know what you need from me in order to obtain an  approval.  Thank you in advance for your help. Happy Holidays. ‐Frank  Frank Blackwell  864‐421‐5939  <SSGP04‐2022_ShorelineAppInstructions_04202022 (1).pdf>