Loading...
HomeMy WebLinkAbout20221759 Ver 1_USACE Permit_20230203 Homewood, Sue From:Phillips, George L CIV USARMY CESAW (USA) <George.L.Phillips@usace.army.mil> Sent:Friday, February 3, 2023 11:25 AM To:earnhardt254@gmail.com; Philip May Cc:Homewood, Sue Subject:\[External\] SAW-2022-02678 / Magnolia Village / 4602 Archdale Road / Trinity / Randolph County / NWP 29 Attachments:NWP29.pdf Follow Up Flag:Follow up Flag Status:Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Dear Ms. Bernice Ingram Earnhardt and Mr. Phil May, A preconstruction notification application (PCN) dated 12/13/2022 was submitted for the proposed activities, and additional information was received on 01/30/2023. Due to workload, the Corps was unable to provide timely formal written verification for impacts proposed in your preconstruction notification application. General Condition number 32, which lists the notification requirements for nationwide permits, states that "The prospective permittee shall not begin the activity: (1) Until notified in writing ...., or (2) If 45 calendar days have passed from the district engineer's receipt of the complete PCN and the prospective permittee has not received written notice from the district or division engineer." Accordingly, on 01/27/2023, the applicant, Bernice Ingram Earnhardt, was authorized to place fill or dredged material into waters, associated with the construction of the Magnolia Village project, under nationwide permit number 29, as proposed in the permit application dated 12/13/2022. I have attached a copy of the applicable permit conditions. The expiration date for the permit verification is March 14, 2026. Please note that your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the permit conditions and your submitted plans (see attached). Any violation of the conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order and/or appropriate legal action. It is your responsibility to contact the North Carolina Division of Water Resources (NCDWR) Raleigh Regional Office to determine the 401 requirements for this project. Please note that, if an Individual 401 WQC is required from NCDWR, the conditions of the Individual 401 WQC, once issued, are also conditions of the NWP referenced above. You may not conduct the activity authorized by the above referenced NWP without a valid 401 Water Quality Certification. Please let me know if you have any questions regarding this statutory verification, or any of the conditions of the permit. Lyle Phillips Regulatory Specialist US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 25. Fax: (919) 562-0421 1