Loading...
HomeMy WebLinkAboutNC0023884_authorization to construct_201612061fE Ncoo 2,3Sef City of Salisbury City of Salisbury WWTP Authorization to Construct No.02388403 Issued February 25, 2016 Engineer's Certification PECEIVED/NCDEQ/DVVR DEC 0 o 2016 Water Guaiity Permitting Section I, JAmes &• A0t4.4,4J , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the City of Salisbury Wastewater Treatment Plant, located in Rowan County, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Removal of two (2) 30,000 gallon surplus sludge storage tanks; installation of one (1) new 8,000 gallon lime slurry tank with 7.5 HP mixer, two.(2) new 21 GDH Iime slurry feed pumps with VFD and water flush system, piping, and controls into the existing tank containment area; in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environmental Quality. I certify that the construction of the above referenced project was observed to be built within substantial compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature Registration No. 62371/(0 • \��.OSiiiiillr'//r Date �\ Ikt.‘ Mail this Certification to: Attn: Ron Berry Complex Permitting Unit DEQ/DWR/Water Quality Programs 1617 Mail Service Center Raleigh, NC 27699-1617 PAT MCCRORY Water Resources ENVIRONMENTAL QUALITY Governor DONALD R. VAN DER VAART Secretory S. JAY ZIMMERMAN February 25, 2016 Mr. Jim Behmer Director Salisbury -Rowan Utilities P. O. Box 479 Salisbury, North Carolina 28145 SUBJECT: Authorization to Construct A to C No. 023884A03 City of Salisbury City of Salisbury WWTP Dear Mr. Behmer: Dire, TOP A letter of request for an Authorization to Construct was received February 4, 2016, by the Division of Water Resources (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 12.5 MGD City of Salisbury WWTP, with discharge of treated wastewater into the Yadkin River in the Yadkin -Pee Dee River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Removal of two (2) 30,000 gallon surplus sludge storage tanks; installation of one (1) new 8,000 gallon lime slurry tank with 7.5 HP mixer, two (2) new 21 GDH lime slurry feed pumps with VFD and water flush system, piping, and controls into the existing tank containment area; in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environmental Quality. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0023884 issued effective December 1, 2014, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0023884. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. State of North Carolina I Environmental Quality I Water Resources 1617 Mail service Center I Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604, Archdale Building 9th Floor Phone: 919 807 6300 / Fax: 919 807 9489 Mr. Jim Beluner, Director Salisbury -Rowan Utilities February 25, 2016 Page 2 of 3 The Mooresville Regional Office, telephone number (704) 663 - 1690, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on -site inspection can be made. Such notification to the regional supervisor shall be made during the noiinal office hours from 8:00 a.m: until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to: Division of Water Resources, WQ Permitting Section — NPDES, 1617 Mail Service Center, Raleigh, NC 27699-1617. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. Mr. Jim Behmer, Director Salisbury -Rowan Utilities February 25, 2016 Page 3 of 3 The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. If you have any questions or need additional information, please contact Ron Berry at telephone number (919) 807-6396. S. Jay Zimmerman Director, Division of Water Resources cc: Mr. James Holland, P.E. W. K. Dickson & Co., Inc. 616 Colonnade Drive Charlotte, NC 28205 DWR/Mooresville Regional Office, Water Quality Programs Central Files NPDES File Without Engineer's Certificate attached: Rowan County Health Department