HomeMy WebLinkAboutNC0023884_authorization to construct_201612061fE
Ncoo 2,3Sef
City of Salisbury
City of Salisbury WWTP
Authorization to Construct No.02388403
Issued February 25, 2016
Engineer's Certification
PECEIVED/NCDEQ/DVVR
DEC 0 o 2016
Water Guaiity
Permitting Section
I, JAmes &• A0t4.4,4J , as a duly registered Professional Engineer in
the State of North Carolina, having been authorized to observe (periodically/weekly/full time)
the construction of the modifications and improvements to the City of Salisbury Wastewater
Treatment Plant, located in Rowan County, hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the following construction:
Removal of two (2) 30,000 gallon surplus sludge storage tanks; installation of one (1)
new 8,000 gallon lime slurry tank with 7.5 HP mixer, two.(2) new 21 GDH Iime slurry
feed pumps with VFD and water flush system, piping, and controls into the existing
tank containment area; in conformity with the project plans, specifications, and other
supporting data subsequently filed and approved by the Department of Environmental
Quality.
I certify that the construction of the above referenced project was observed to be built within
substantial compliance, intent and in conformity with all applicable regulations and statutes and
the project plans, specifications, and other supporting documentation comprising the
Authorization to Construct Permit Application package.
Signature Registration No. 62371/(0
•
\��.OSiiiiillr'//r
Date �\ Ikt.‘
Mail this Certification to:
Attn: Ron Berry
Complex Permitting Unit
DEQ/DWR/Water Quality Programs
1617 Mail Service Center
Raleigh, NC 27699-1617
PAT MCCRORY
Water Resources
ENVIRONMENTAL QUALITY
Governor
DONALD R. VAN DER VAART
Secretory
S. JAY ZIMMERMAN
February 25, 2016
Mr. Jim Behmer
Director
Salisbury -Rowan Utilities
P. O. Box 479
Salisbury, North Carolina 28145
SUBJECT: Authorization to Construct
A to C No. 023884A03
City of Salisbury
City of Salisbury WWTP
Dear Mr. Behmer:
Dire, TOP
A letter of request for an Authorization to Construct was received February 4, 2016, by the
Division of Water Resources (Division), and final plans and specifications for the subject project
have been reviewed and found to be satisfactory. Authorization is hereby granted for the
construction of modifications to the existing 12.5 MGD City of Salisbury WWTP, with discharge
of treated wastewater into the Yadkin River in the Yadkin -Pee Dee River Basin.
This authorization results in no increase in design or permitted capacity and is awarded for
the construction of the following specific modifications:
Removal of two (2) 30,000 gallon surplus sludge storage tanks; installation of one (1)
new 8,000 gallon lime slurry tank with 7.5 HP mixer, two (2) new 21 GDH lime slurry
feed pumps with VFD and water flush system, piping, and controls into the existing
tank containment area; in conformity with the project plans, specifications, and other
supporting data subsequently filed and approved by the Department of Environmental
Quality.
This Authorization to Construct is issued in accordance with Part III, Paragraph A of
NPDES Permit No. NC0023884 issued effective December 1, 2014, and shall be subject to
revocation unless the wastewater treatment facilities are constructed in accordance with the
conditions and limitations specified in Permit No. NC0023884.
The sludge generated from these treatment facilities must be disposed of in accordance
with G.S. 143-215.1 and in a manner approved by the Division.
In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as may
be required by the Division, such as the construction of additional or replacement wastewater
treatment or disposal facilities.
State of North Carolina I Environmental Quality I Water Resources
1617 Mail service Center I Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604, Archdale Building 9th Floor
Phone: 919 807 6300 / Fax: 919 807 9489
Mr. Jim Beluner, Director Salisbury -Rowan Utilities
February 25, 2016
Page 2 of 3
The Mooresville Regional Office, telephone number (704) 663 - 1690, shall be notified at
least forty-eight (48) hours in advance of operation of the installed facilities so that an on -site
inspection can be made. Such notification to the regional supervisor shall be made during the
noiinal office hours from 8:00 a.m: until 5:00 p.m. on Monday through Friday, excluding State
Holidays.
Upon completion of construction and prior to operation of this permitted facility, a
certification must be received from a professional engineer certifying that the permitted facility
has been installed in accordance with the NPDES Permit, this Authorization to Construct and the
approved plans and specifications. Mail the Certification to: Division of Water Resources, WQ
Permitting Section — NPDES, 1617 Mail Service Center, Raleigh, NC 27699-1617.
Upon classification of the facility by the Certification Commission, the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the
wastewater treatment facilities. The operator must hold a certificate of the type and grade at least
equivalent to or greater than the classification assigned to the wastewater treatment facilities by
the Certification Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and
grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each
Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding
weekends and holidays, must properly manage the facility, must document daily operation and
maintenance of the facility, and must comply with all other conditions of T15A:8G.0202.
A copy of the approved plans and specifications shall be maintained on file by the Permittee
for the life of the facility.
During the construction of the proposed additions/modifications, the permittee shall continue to
properly maintain and operate the existing wastewater treatment facilities at all times, and in such
a manner, as necessary to comply with the effluent limits specified in the NPDES Permit.
You are reminded that it is mandatory for the project to be constructed in accordance with
the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina
Dam Safety Act. In addition, the specifications must clearly state what the contractor's
responsibilities shall be in complying with these Acts.
Prior to entering into any contract(s) for construction, the recipient must have obtained all
applicable permits from the State.
Failure to abide by the requirements contained in this Authorization to Construct may
subject the Permittee to an enforcement action by the Division in accordance with North Carolina
General Statute 143-215.6A to 143-215.6C.
Mr. Jim Behmer, Director Salisbury -Rowan Utilities
February 25, 2016
Page 3 of 3
The issuance of this Authorization to Construct does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances which may be imposed by
other government agencies (local, state, and federal) which have jurisdiction.
If you have any questions or need additional information, please contact Ron Berry at
telephone number (919) 807-6396.
S. Jay Zimmerman
Director, Division of Water Resources
cc: Mr. James Holland, P.E.
W. K. Dickson & Co., Inc.
616 Colonnade Drive
Charlotte, NC 28205
DWR/Mooresville Regional Office, Water Quality Programs
Central Files
NPDES File
Without Engineer's Certificate attached:
Rowan County Health Department