Loading...
HomeMy WebLinkAboutNC0023884_Authorization to construct_19961226State of North Carolina Department of Environment, Health and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor,: Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director, September 26, 1996 Honorable Margaret H. Klutz, Mayor City. of Salisbury-- P. O. Box 479• Salisbury, North Carolina 28145-0479 Dear Mayor Klutz: .AALA CoEHNR SUBJECT: City of Salisbury Permit No. NC0023884 Authorization to Construct Wastewater Treatment Facilities Grant's Creek WWTP Project No. E-SBF-T-95-0013 Rowan County The final plans and specifications for the subject project have been reviewed and found to be satisfactory. This Authorization to Construct supersedes and voids the Authorization to Construct issued September 30, 1994. Authorization is hereby granted for the construction and operation of additions and modifications to the existing 7.5 MGD Grant's Creek WWTP with no increase in capacity to include the replacement of the four existing bar screens with four new mechanical bar screens; the replacement of the four existing grit removal units with four new mechanical grit collectors; two new screenings conveyors; modification of the influent pump station to include the replacement of the existing 7.5 MGD and 5.0 MGD pumps with new 7.5 MGD and 5.0 MGD pumps utilizing the existing motors and replacement of the existing 5-ton manual hoist with a 5-ton electric hoist; modification of the existing chlorine contact basin and post aeration basins to accommodate four - 100 hp, 4,300 gpm vertical turbine effluent pumps; a new 30,000 gallon gravity sludge. thickener; approximately 4,160 linear feet of 36-inch effluent force main; approximately 2,820 linear feet of 60-inch gravity effluent outfall; approximately 6,250linear .feet of Construction Grants & Loans Section P.O. Box 29579., Raleigh, North Carolina 27626-0579 Voice 919-733-6900 FAX 919-715-6229 An Equal Opportunity/Affirmative Action Employer 50% recycles/ 10% post -consumer paper -2- 12 ft. wide gravel access road; ultraviolet disinfection; 48-inch Parshall flume; cascade post -aeration; river diffuser with twin 36-inch outfalls (three 14-inch ID diffusers each); a new 500 Kw standby generator; a new 4,380 sq. ft. maintenance building with gravel parking lot; renovations to the existing laboratory building; a paved 6,500 sq. ft. parking lot; and associated appurtenances, site work, yard piping and electrical work. When funding is desired, construction should not proceed until the Authorization - to -Award package, EEO, and MBE documentation/certification have been reviewed, and you are in receipt of our approval. The Permittee shall employ a State certified wastewater treatment plant operator to be in responsible charge of the wastewater treatment facilities. Such operator must hold a valid State Certificate of the grade at least equivalent to the classification assigned to the wastewater treatment facilities by the Certification Commission. When a new chief operator must be obtained to be in responsible charge of the new facilities, it is required that this be done by the time the construction of the facilities is 50% complete. The Authorization -to -Construct is issued in accordance with Part III, Paragraph C of NPDES Permit No. NC0023884, issued April 1, 1996 and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the approved plans, specifications, and supporting documents; and are in compliance with the conditions and limitations specified in Permit No. NC0023884. The Permittee shall have an acceptable sludge analysis and a sludge toxicity analysis which have been approved by the Division of Water Quality prior to the disposal of any sludge from the new wastewater treatment plant. Copies of the analyses, supporting documents, and approvals shall be submitted to the Division of Water Quality's Mooresville Regional Office. The disposing, selling or free distribution of wet, dried, composted sludge or sludge -like materials from wastewater facilities without prior review and approval by this Division is illegal. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. .-3- You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. One (1) set of final approved plans and specifications is to be forwarded to you for your files. The copy of the approved plans and specifications shall be maintained on file by the Owner for the life of the project. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a Professional Engineer certifying that the permitted facility has been installed in accordance with the approved plans and specifications. Mail the Certification to the Permits and Engineering Unit, P. O. Box 29535, Raleigh, North Carolina 27626-0535. (Engineer's Certification Form is attached.) If you have any questions or need additional information, please contact Mr. Cecil G. Madden Jr., P.E., (919) 715-6203. Sincerely, 1-1 . Preston Howard, Jr., P.E. Attachment BG:nw cc: Peirson & Whitman, P. A. Mr. Don Safrit DWQ Mooresville Regional Office Mr. Tom Fahnestock Mr. Don Evans Ms. Valerie Lancaster Mr. Bennie Goetze, Jr., P. E. Operator Certification Ms. Nancy Owens DMU SBF