Loading...
HomeMy WebLinkAboutWQ0019179_Inspection_20230203ROY COOPER Governor ELIZABETH S. RISER Secretary RICHARD E. ROGERS, JR. Director Jonathan Russell City of Washington PO Box 1988 Washington, NC 27889-1988 NORTH CAROLINA Environmental Quoiity February 03, 2023 SUBJECT: Compliance Inspection Report Washington WWTP Non -discharge Permit No. WQ0019179 Beaufort County Dear Permittee: The North Carolina Division of Water Resources conducted an inspection of the Washington WWTP on 1/31/2023. This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in Non -discharge Permit No. WQ0019179. The findings and comments noted during this inspection are provided in the enclosed copy of the inspection report entitled ''Compliance Inspection Report". If you should have any questions, please do not hesitate to contact Robbie Bullock with the Water Quality Regional Operations Section in the Washington Regional Office at 252-946-6481 or via email at robert.e.bullock@ncdenr.gov. ATTACHMENTS Cc: Laserfiche Sincerely, RQdo t Te.4-444 Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Washington Regional Office Division of Water Resources, NCDEQ L D E North Carolina Department of EnNronmental Quality I Dlvlslon of Waler Resources Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889 252.946.6481 Compliance Inspection Report Permit: WQ0019179 Effective: 08/01/20 Expiration: 10/31/25 Owner : City of Washington SOC: Effective: Expiration: Facility: Washington WWTP County: Beaufort 1399 W Second St Region: Washington Washington NC 27889 Contact Person: Hope Jones Woolard Title: Water Resources Superintendei Phone: 252-975-9310 Directions to Facility: System Classifications: SI, Primary ORC: Lonnie Isaiah Woolard Secondary ORC(s): On -Site Representative(s): Related Permits: Certification: 1001750 Phone: 252-927-9374 NC0020648 City of Washington - Washington WWTP Inspection Date: 01/31/2023 Entry Time 10:30AM Exit Time: 11:OOAM Primary Inspector: Robert E Bullock Phone: 252-948-3843 Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: Reclaimed Water Facility Status: Compliant ❑ Not Compliant Question Areas: Miscellaneous Questions (See attachment summary) Inspection Type: Compliance Evaluation Record Keeping End Use -Reuse Page 1 of 4 Permit: WQ0019179 Owner - Facility: City of Washington Inspection Date: 01/31/2023 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: The review period for this inspection was December 2020 through November 2022. No violations were reported over the review period. Effluent from NPDES permit NC0020648 is sprayed under this permit. The facility was judged to be Compliant with permit WQ0019179. Page 2 of 4 Permit: WQ0019179 Owner - Facility: City of Washington Inspection Date: 01/31/2023 Inspection Type : Compliance Evaluation Reason for Visit: Routine Type Infiltration System Lagoon Spray, LR Single Family Spray, LR Activated Sludge Spray, LR Activated Sludge Spray, HR Activated Sludge Drip, LR Recycle/Reuse Single Family Drip Reuse (Quality) Record Keeping Is a copy of current permit available? Are monitoring reports present: NDMR? NDAR? Are flow rates less than of permitted flow? Are flow rates less than of permitted flow? Are application rates adhered to? Is GW monitoring being conducted, if required (GW-59s submitted)? Are all samples analyzed for all required parameters? Are there any 2L GW quality violations? Is GW-59A certification form completed for facility? Is effluent sampled for same parameters as GW? Do effluent concentrations exceed GW standards? Are annual soil reports available? # Are PAN records required? # Did last soil report indicate a need for lime? If so, has it been applied? Are operational logs present? Are lab sheets available for review? Do lab sheets support data reported on NDMR? Do lab sheets support data reported on GW-59s? Are Operational and Maintenance records present? Were Operational and Maintenance records complete? Has permittee been free of public complaints in last 12 months? Is a copy of the SOC readily available? Yes No NA NE • Yes No NA NE • ▪ ❑ ❑ ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ • ❑ ❑ ❑ ❑ • ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ▪ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ • ❑ Page 3 of 4 Permit: WQ0019179 Owner - Facility: City of Washington Inspection Date: 01/31/2023 Inspection Type : Compliance Evaluation Reason for Visit: Routine No treatment units bypassed since last inspection? Comment: Lonnie Woolard is the ORC with Hope Woolard as the Backup ORC. End Use -Reuse Is the acreage in the permit being utilized? Does the acreage specified in the permit correspond to the measured acreage at the site? Are all essential units provided in duplicate? Is an automatically activated standby power source available? Is the equalization capacity adequate? Is aerated flow equalization present? Has the turbidity meter been calibrated in the last 12 months? Does the turbidity meter have recording capabilities? Is all flow diverted at the appropriate times? Is all upset wastewater diverted from reuse storage unit? Is all upset wastewater treated, retreated, or disposed of acceptably? Is upset wastewater treated prior to discharge to irrigation storage? Is public access restricted from irrigation area during active site use? If golf course, is a sign posted in plain sight on the club house? Is the cover crop acceptable? Are buffers adequate? Is the site free of ponding/runoff? Is the acreage in the permit being utilized? Is the application equipment acceptable? Is the application area free of limiting slopes? How close is the closest water supply well? Are any supply wells within the CB? Are any supply wells within 250' of the CB? Is municipal water available in the area? Are GW monitoring wells required? Are GW monitoring wells located properly w/ respect to RB and CB? Are GW monitoring wells properly constructed, including screened interval? Comment: • ❑ ❑ ❑ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑•❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑•❑ • ❑ ❑ ❑ ❑ ❑•❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ❑• • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ❑• ❑ ❑ ❑• ❑ ❑ ❑• • ❑ ❑ ❑ ❑ ❑•❑ ❑ ❑•❑ ❑ ❑ • ❑ Page 4 of 4