HomeMy WebLinkAboutWQC 3697Water Quality Certification N°. 3697
GENERAL CERTIFICATION FOR PROJECTS ELIGIBLE FOR U.S. ARMY CORPS OF
ENGINEERS NATIONWIDE PERMIT NUMBER 17 (HYDROPOWER PROJECTS)
AND RIPARIAN AREA PROTECTION RULES (BUFFER RULES)
Water Quality Certification Number 3697 is issued in conformity with the requirements of Section
401, Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina
Division of Water Quality Regulations in 15A NCAC 2H, Section .0500 and 15A NCAC 2B .0200
for the discharge of fill material to waters and wetland areas as described in 33 CFR 330
Appendix A (B) (17) Hydropower Projects, and for the Riparian Area Protection Rules (Buffer
Rules) in 15A NCAC 2B .0200.
The State of North Carolina certifies that the specified category of activity will not violate
applicable portions of Sections 301, 302, 303, 306 and 307 of the Public Laws 92-500 and 95-217
if conducted in accordance with the conditions hereinafter set forth.
Any proposed fill or modification of wetlands or waters, including streams, under General Water
Quality Certification Number XXXX requires application to, and written approval from the Division
« „
of Water Quality (the Division ). Activities that are located within river basins with Riparian
Area Protection Rules (Buffer Rules) require written approval unless listed in the Table of
Uses as "EXEMPT".
In accordance with North Carolina General Statute Section 143-215.3D(e), any requirement for
written approval fora 401 Water Quality Certification must include the appropriate fee. If a
project also requires a CAMA Permit, then one payment to both agencies shall be submitted and
will be the higher of the two fees.
Conditions of Certification:
1. No Impacts Beyond those Authorized in the Written Approval
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas
beyond the footprint of the impacts authorized in the written approval from the Division,
including incidental impacts.
All construction activities, including the design, installation, operation, and maintenance of
sediment and erosion control Best Management Practices, shall be performed so that no
violations of state water quality standards, statutes, or rules occur.
2. Standard Erosion and Sediment Control Practices
Erosion and sediment control practices must be in full compliance with all specifications
governing the proper design, installation and operation and maintenance of such Best
Management Practices:
a. Design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the
most recent version of the North Carolina Sediment and Erosion Control Manual.
The devices shall be maintained on all construction sites, borrow sites, and waste
pile (spoil) projects, including contractor-owned or leased borrow pits associated with
the project.
b. For borrow pit sites, the erosion and sediment control measures must be designed,
installed, operated, and maintained in accordance with the most recent version of
the North Carolina Surface Mining Manual.
Water Quality Certification No. 3697
Water Quality Certification N°. 3697
c. Reclamation measures and implementation must comply with the reclamation in
accordance with the requirements of the Sedimentation Pollution Control Act and the
Mining Act of 1971.
d. Sufficient materials required for stabilization and/or repair of erosion control
measures and stormwater routing and treatment shall be on site at all times.
e. If the project occurs in waters or watersheds classified as Primary Nursery Areas
(PNA's), Trout (Tr), SA, WS-I, WS-II, High Quality (HQW), or Outstanding Resource
(ORW) waters, then the sediment and erosion control requirements contained within
Design Standards in Sensitive Watersheds (15A NCAC 04B .0124) supercede all
other sediment and erosion control requirements.
3. No Sediment and Erosion Control Measures in Wetlands or Waters
Sediment and erosion control measures should not be placed in wetlands or waters
without prior approval by the Division. If placement of sediment and erosion control
devices in wetlands and waters is unavoidable, then the design and placement of
temporary erosion control measures shall not be conducted in a manner that may result in
dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream and down
stream of the above structures. All sediment and erosion control devices shall be
removed and the natural grade restored within two (2) months of the date that the Division
of Land Resources or locally delegated program has released the project.
4. Construction stormwater Permit NCG010000
Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of
Land Resources (DLR) or a DLR delegated local erosion and sedimentation control
program, an NPDES General stormwater permit (NCG010000) administered by the
Division is automatically issued to the project. This General Permit allows stormwater to
be discharged during land disturbing construction activities as stipulated by conditions in
the permit. If your project is covered by this permit [applicable to construction projects
that disturb one (1) or more acres], full compliance with permit conditions including the
sedimentation control plan, self-monitoring, record keeping and reporting requirements
are required. A copy of this permit and monitoring report forms may be found at
http ~//h2o. enr. state. nc. us/su/Forms Documents. htm.
5. Construction Moratoriums and Coordination
All moratoriums established by NC Wildlife Resources Commission (WRC), US Fish and
Wildlife Service (USFWS), NC Division of Marine Fisheries (DMF), or National Marine
Fisheries Service (NMFS) to protect trout, anadromous fish, or other aquatic species must
be obeyed.
Work within the twenty-five (25) designated trout counties or identified state or federal
endangered or threatened species habitat shall be coordinated with the appropriate WRC,
USFWS, NMFS, and/or DMF personnel.
6. Riparian Area Protection (Buffer) Rules
Activities located in the protected 50-foot wide riparian areas (whether jurisdictional
wetlands or not) within the Neuse, Tar-Pamlico, Randleman, Catawba (or any other river
basin with buffer rules), shall be limited to "uses" identified within and constructed in
accordance with 15A NCAC 2B .0233, .0259, .0250, .0243, and shall be located, designed,
constructed, and maintained to have minimal disturbance to protect water quality to the
maximum extent practicable through the use of best management practices. All riparian
area protection rule requirements, including diffuse flow requirements, must be met.
Water Quality Certification No. 3697 2
Water Quality Certification N°. 3697
7. Water Supply Watershed Buffers
The 30-foot wide vegetative buffer (low-density development) or the 100-foot wide (high-
density development) shall be maintained adjacent to all perennial waters except for
allowances as provided in the Water Supply Watershed Protection Rules [15A NCAC 26
.0212 through .0215].
8. If concrete is used during the construction, then a dry work area should be maintained to
prevent direct contact between curing concrete and stream water. Water that inadvertently
contacts uncured concrete should not be discharged to surface waters due to the potential
for elevated pH and possible aquatic life/fish kills.
9. If an environmental document is required under NEPA or SEPA, then this General
Certification is not valid until a Finding of No Significant Impact (FONSI) or Record of
Decision (ROD) is issued by the State Clearinghouse.
10. Additional site-specific conditions may be added to the cover letter in order to ensure
compliance with all applicable water quality and effluent standards.
11. When written authorization is required for use of this certification, upon completion of all
permitted impacts included within the approval and any subsequent modifications, the
applicant shall be required to return the certificate of completion attached to the approval.
One copy of the certificate shall be sent to the DWQ Central Office in Raleigh at 1650 Mail
Service Center, Raleigh, NC, 27699-1650.
12. This General Certification shall expire three (3) years from the date of issuance of the
written approval or on the same day as the expiration date of these corresponding
Nationwide and Regional General Permits.. The conditions in effect on the date of
issuance of Certification for a specific project shall remain in effect for the life of the
project, regardless of the expiration date of this Certification. If the construction process
for approved activities will overlap the expiration and renewal date of the corresponding
404 Permit and the Corps allows for continued use of the 404 Permit, then the General
Certification shall also remain in effect without requiring re-application and re-approval to
use this Certification for the specific impacts already approved.
13. The applicant/permitteesnd their authorized agents shall conduct all activities in a manner
consistent with State water quality standards (including any requirements resulting from
compliance with §303(d) of the Clean Water Act), and any other appropriate requirements
of State and Federal Law. If the Division determines that such standards or laws are not
being met, including failure to sustain a designated or achieved use, or that State or
Federal law is being violated, or that further conditions are necessary to assure
compliance, then the Division may reevaluate and modify this General Water Quality
Certification.
Non-compliance with or violation of the conditions herein set forth by a specific fill project shall
result in revocation of this General Certification for the project and may result in criminal and/or
civil penalties.
The Director of the North Carolina Division of Water Quality may require submission of a formal
application for individual certification for any project in this category of activity, if it is determined
that the project is likely to have a significant adverse effect upon water quality, including state or
federally listed endangered or threatened aquatic species, or degrade the waters so that existing
uses of the wetland, stream or downstream waters are precluded.
Water Quality Certification No. 3697
Water Quality Certification N°. 3697
Public hearings may be held for specific applications or group of applications prior to a
Certification decision if deemed in the public's best interest by the Director of the North Carolina
Division of Water Quality.
Effective date: November 1, 2007
DIVISION OF WATER QUALITY
By
Coleen H. Sullins
Director
History Note: Water Quality Certification Number 3697 replaces Water Quality Certification
Number 3130 issued on Certification Number February 11, 199, 7 Water Quality Certification
Number 3354 issued on March 18, 2002, and Certification Number 3630 issued on March 19,
2007. This General Certification is rescinded when the U. S. Army Corps of Engineers re-
authorizes Nationwide Permit Number 17 or when deemed appropriate by the Director of the
Division of Water Quality.
Water Quality Certification No. 3697 4