LETTER OF APPROVAL WITH MODIFICATIONS
BOMA North Carolina, LLC
Attention: Debbie Joyce, Agent
7206 SW 146" Street Cir
Palmetto Bay, FL 33158
RE: Project Name: Amenities Center, Phase 1 (formerly MU-4 at Calebs Creek)
Project ID: FORSY-2019-030
Acres Approved: 8.8
County: Forsyth
City: Kemersville
Address: Teague Lane
River Basin: Yadkin - PeeDee
Stream Classification: WS-III
Submitted By: SEH
Date Received by LQS: December 30, 2022
Plan Type: Revised
Dear Debbie Joyce:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
modifications required for approval are listed on the attached page. This plan approval shall expire three
(3) years following the date of approval, if no land -disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit. After the form is reviewed and found to be complete, you will receive a
link with payment instructions for the $100 annual permit fee. After the fee is processed, you will
receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for
this project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at dea nc.gov/NCGOI. Please direct questions about
the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of
this project changes in the future, the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCGO10000 permit require that the following documentation be
kept on file at the job site:
D_E North Carolina Department of Environmental Quality I Division ofEmergy, Mlaeral, end Land Resources
Winston-Salem Regional office 1450 West Hanes Mill Road, Suite 3001 Winston-Salem, North Carolima 27105
336-776.9800
Letter of Approval with Modifications
BOMA North Carolina, LLC
January 13, 2023
Page 2 of 3
'• 1. The approved E&SC plan as well as any approved deviation.
*' 2. The NCGO1 permit and the COC, once it is received.
ig 3. Records of inspections made during the previous 12 months.
Vt
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
} insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
theAct. office may require revisions to the plan
the and implementation of the revisions to ensure compliance with
i{
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
r; quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply
to this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
1 r
Financial Responsibility Form, which you provided. You are requested to file an amended form if there
is any change in the information included on the form. In addition, it would be helpful if you notify this
office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
ION a
NVWI: Tamera Epfi , PE
--� Regional Engineer
rsteei: Land Quality Section
tttsrt �
snsi Enclosures: Certificate of Approval
at
Modifications Required for Approval
c: Short Elliott Hendrickson Inc.
Attention: Tren Imdieke, PE
400 Locust Avenue, Suite 2
Charlottesville, VA 22902-4858
Letter of Approva� with Modifications
BOMA North Carolina, LLC
January 13, 2023
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Amenities Center, Phase 1 (formerly MU-4 at Caleb Creek)
Project ID: FORSY-2019-030
County: Forsyth
Modifications pursuant to a licable North Carolina General Statutes and/or Regulations:
1. Modification to the associated post -construction stormwater permit may be necessary. Please
evaluate and apply for the modification as appropriate.
2. Any off -site borrow and waste required for this project must come from a site with an
approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill
regulated by the Division of Solid Waste Management. Trash/debris from demolition
activities or generated by any activities on site must be disposed of at a facility regulated by
the Division of Solid Waste Management or per Division of Solid Waste Management or
Division of Water Resources rules and regulations. [15A NCAC 413 .0110]
3. Additional measures may be required - The applicant is responsible for the control of
sediment on -site. If the approved erosion and sedimentation control measures prove
insufficient, the applicant must take those additional steps necessary to stop sediment from
leaving this site. [15A NCAC 4B .0115]
4. The NCGO1 has a $100 yearly fee and our office often receives closure inspection requests
days prior to yearly NCGO1 fee payment due dates. Be advised the project requires a closure
inspection report by DEMLR prior to filing the Notice of Termination (NOT) to terminate
NCGOl coverage. The closure inspection should not be requested until after the site has
achieved full vegetative stabilization and measures have been removed. The removal of
temporary ESC measures, including basins, requires prior approval. Often, a full growing
season is necessary between initial seeding/mulching and removal of measures. Please plan
your construction accordingly to avoid contacting our office prematurely for a closure
inspection. Also be advised you may be asked for representative site pictures prior to a
closure inspection. [General Comment]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities