Loading...
HomeMy WebLinkAboutNC0026689_2022_PAR_Review_20230202Regional Pretreatment Annual Report (PAR) Review Is the PAR on time? Yes ® No ❑ Does it have two copies? Yes ® No ❑ Did they send any other submissions with it? Yes ❑ No Included? Adequate? Narrative ® Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA PPS Form ® Yes ❑ No ® Yes ❑ No SNCR Yes ❑ No ® Yes ❑ No IDSF ® Yes ❑ No ® Yes ❑ No Allocation Table 0 Yes ❑ No 0 Yes ❑ No For modified programs, evaluate shaded items only. A Narrative is req'd for a modified program ONLY if there are SIUs in SNC Compliance Schedule ❑ Yes ❑ No NA ❑ Yes ❑ No ® NA Public Notice ❑ Yes ❑ No ®NA ❑ Yes ❑ No ® NA Program Information ❑ Yes & No ❑ Yes ❑ No Historical SNC ❑ Yes ❑ No ® NA ❑ Yes ❑ No 0 NA D EQ>� Regional Office: Winston Salem POTW: Town of Denton NPDES Permit # NCO026689 Report Period: 1/1/22 to 12/31/22 ❑ Full ® Modified* POTW noted Corrections? ❑ Yes ® No *PT Program Info Database was not included in PAR. Needs ❑ Yes ❑ No NA updating to reflect changes in PT contact, regional & central office contact. If Wo ; check recommendation below: 1. Have at least 90% of SIU permits been issued with 180 days 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ of expiration? (See Allocation Table) Yes No Not Req'd NOD NOV QNCR NCP CPA 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 2. Were at least 80% of SIUs inspected? (See PPS Form) Yes No Not Req'd NOD NOV QNCR NCP CPA 3. Has effective enforcement been taken against industries in ❑ ❑ ® ❑ ❑ ❑ ❑ ❑ SNC, including those causing pass -through or interference? Yes No NA NOD NOV QNCR NCP CPA (See Narrartive and SNCR Form) ❑ ❑ ® ❑ ❑ ❑ ❑ ❑ 4. Does public notice cover all SIUs in SNC? Yes No NA NOD NOV QNCR NCP CPA Note: Exceptions should be explained in the comment section below: STMP was updated 11/25/22 to show addtion of TN, TP, Dichlorobromomethane and Bis (2-Ethylhexyl) Phthalate to POC as change to Metal PQL to Method 200.8. AT showed over allocation to Zn and Ag. The over allocation is being rectified by conducting monthly uncontrolled sampling. Reviewed by: j4_,ue,;,- L&w.� Date: 2/2/2023