HomeMy WebLinkAbout20140750 Ver 1_DCM Permit_20140929Permit Class
NEW
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and -
Coastal Resources Commission
Permit
for
X Major Development in an Area of Ei
pursuant to NCGS 113A -118
Permit Number
82 -14
-
SEP 2 9 2014
Concern
Excavation and/or filling pursuant to NCGS 113 -229
Issued to Sharon Burtner,12035 Waples Mill Road, Oakton, VA 22124 2117
Authorizing development in Perauimans County adi to the Little River, at 1234 Otter Way,
New Hope Township , as requested in the permittee's application dated 6/24/14. including the
attached worknlan drawing (2), 1 dated 6/10/14 and 1 dated 6/11/14.
This permit, issued on September 22, 2014 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action, or may cause the permit to be null and void.
1) In accordance with the permittee's email dated 9/7/17, the original proposal to fill non - coastal
wetlands is hereby removed from this project. Any reference to the wetland fill in the attached
application is hereby null and void.
Observation Pier
2) Unless specifically altered herein, this permit authorizes the construction of the observation pier
located in or over the water that are expressly and specifically set forth in the permit application. No
other structure, whether floating or stationary, shall become a permanent part of this reconfigured
docking facility without permit modification. No non -water dependent uses of structures shall be
conducted on, in or over public trust waters without permit modification.
3) No attempt will be made by the permittee to prevent the full and free use by the public of all
navigable waters at or adjacent to the authorized work
(See attached sheet for Additional Conditions)
This nemit action may he. annealed by the nermittee nr Sioned by the anthnnty of the Serretary of t)PNR and the
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance
Any maintenance work or project modification not covered
hereunder requires further Division approval
All work must cease when the permit expires on
December 31, 2017
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program
Chairman of the Coastal Resources Commission
Braxton C Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Sharon Burtner Permit # 82 -14
Page 2 of 2
ADDITIONAL CONDITIONS
4) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party.
5) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
interest.
6) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather. — -
7) This permit does not authorize any formalized boat slips.
General
8) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
interest.
9) The permittee understands and agrees that, if future operations by the United States requires the
removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon
due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions
caused thereby, without expense to the United States or the state of North Carolina. No claim shall be
made against the United States or the state of North Carolina on account of any such removal or
alteration.
10) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
11) The permittee and/or his contractor shall meet with a representative of the Division prior to project
initiation in order to discuss the conditions set forth in this permit.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 264 -3901 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal water level.
NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No.
SAW - 2201401381.