HomeMy WebLinkAbout20141252 Ver 1_DCM Permit_20150202NEWt Class
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
Permit
for
X Major Development in an Area of
pursuant to NCGS 113A -118
Permit Number
14 -15
FEB 0 2 2015
Excavation and/or filling pursuant to NCGS 113 -229
Issued to Wayne Hauck, 102 Bridge Pointe Drive, New Bern, NC 28562
Drive. New Bern , as requested in the permittee's application dated 11/5/14 (MP -1) and
9/9/14 (MP -4), including the attached workplan drawing (4), all dated received in MHC on 11/14/14
This permit, issued on January 29 2015 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Docking Facility
1) Unless specifically altered herein, this permit authorizes the docking facility and uses located in or
over the water that are expressly and specifically set forth in the permit application. No other
structure, whether floating or stationary, shall become a permanent part of this reconfigured docking
facility without permit modification. No non -water dependent uses of structures shall be conducted
on, in or over public trust waters without permit modification.
2) The associated structures shall have a minimum setback distance of 15 feet between any.parts of the
.structure and the adjacent property owner's riparian access corridors.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2018
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission. '
P/L, Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
- I Signature of Permittee
Wayne Hauck Permit # 14 -15
Page 2 of 3
ADDITIONAL CONDITIONS
3) No attempt will be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
4) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party.
5) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
6) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
7) This permit authorizes one formalized boat slip.
General
8) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
interest.
9) The permittee understands and agrees that, if future operations by the United States requires the
removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon
due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions
caused thereby, without expense to the United States or the state of North Carolina. No claim shall be
made against the United States or the state of North Carolina on account of any such removal or
alteration.
10) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
11) The permittee and/or his contractor shall meet with a representative of the Division prior to project
initiation in order to discuss the conditions set forth in this permit.
Wayne Hauck Permit # 14 -15
Page 3 of 3
ADDITIONAL CONDITIONS
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 808 -2808 prior to the commencement of any
such activity for this determination. The permittee is further advised that many development or
land disturbing activities are not allowed within the Environmental Management Commission's
Neuse River Basin. Contact a representative of the Division of Water Resources at (252) 946-
6481 for more information concerning allowable uses within the Neuse River Buffer.
- -The U.S. -Army Corps of Engineers authorized the proposed project under COEAction Id. No._
SAW-201402244.