Loading...
HomeMy WebLinkAbout20141253 Ver 1_DCM Permit_20150202Permit Class NEW e-10 VA 2-53 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Permit Number 13 -15 Coastal Resources Commission Permit ° for 1 FE9 0 2 2015 X Major Development in an Area of pursuant to NCGS I I3A -118 X Excavation and/or filling pursuant to NCGS 113 -229 Issued to Perquimans County, PO Box 45, Herford, NC 27944 Authorizing development in Perquimans County adi. Perquimans River, at the end of W Granby Street. t ad'. N C Seafood Park Authority, as requested in the permittee's application dated 11/6/14 including the attached work plan drawings (13) all dated 11/6/14 • This permit, issued on January 28, 2015 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may tie subject to lines, imprisonment or civil action; or may cause the permit to be null and void. Upland Development 1) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including grading and paving of the parking area and construction of the bathroom facility, all as expressly and specifically set forth in the attached permit application and workplan drawings. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (252) 264 -3901 for this determination. (See attached sheets for Additional Conditions) this permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. Braxton C. Davis, Director ivision of Coastal Management This permit and its conditions are hereby accepted Signature of Permittee Perquimans County ! " Permit # 13 -15 Page 2 of 4 ADDITIONAL CONDITIONS Boat Rama 2) Unless specifically altered herein, this permit authorizes the construction of the boat ramp, all as indicated on the attached workplan drawings. 3) The boat ramp shall either be poured at an upland location and pushed into place once hardened, or poured entirely within a watertight containment structure. Live concrete shall not be allowed to contact waters of the State or waters that will enter waters of the State. Boat Ramp Access Piers, Vinyl Breakwater, Tie Pilings, and Groin 4) Unless specifically altered herein, this permit authorizes the construction of the floating docks, walkway, vinyl retaining walls, groins, tie pilings, and the other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this public boat ramp facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over public trust waters without permit modification. 5) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable water at or adjacent to authorized work. j 6) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 7) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. -8) - - -• The permittee shall - install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structures, including the vinyl groin, in order to make them more visible during hours of darkness or inclement weather 9) This permit does not authorize any formalized boat slips. Shoreline Stabilization 10) Unless specifically altered herein, this permit authorizes the riprap that is expressly and specifically set forth in the permit application and workplan drawings: 11) The authorized riprap shall adhere to the alignment depicted on the attached workplan drawings. Perquimans County Permit # 13 -15 Page 3 of 4 ADDITIONAL CONDITIONS 12) The riprap material shall be free from loose dirt or any pollutant. It must be of a size sufficient to prevent its movement from the approved alignment by wave or current action. 13) The riprap material shall consist of clean rock or masonry materials such as but not limited to granite, marl, or broken concrete. Sedimentation and Erosion Control NOTE: An Erosion and Sedimentation Control Plan shall be required for this project. This plan shall be filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Department of Environment and Natural Resources, Land Quality Section, Washington Square Mall, Washington, NC 27889 14) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 15) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). General 16) In order to protect anadromous fish, no in -water work shall be permitted between February 15 and June 30 of any year without prior approval from the Division of Coastal Management in coordination with the Wildlife Resources Commission. 17) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 18) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 19) The permittee and/or his contractor shall meet with a representative of the Division prior to project initiation. Perquimans County ADDITIONAL CONDITIONS Permit # 13 -15 I Page 4 of 4 NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be require, including any authorization required from the NC DEMLR Stormwater Section NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division of Coastal Management at (252) 264 -3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW- 201402243.