HomeMy WebLinkAbout20141229 Ver 1_DCM Permit_20150202Permit Class ^ ,,,. kq �� )_q
NEW ` � 1 1
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
Permit
for
X Major Development in an Area of Environmental
pursuant to NCGS I I3A -118
Excavation and/or filling pursuant to NCGS 113 -229
Issued to Potters Marine c/o Matthew Potter, 266 Zinkie Lane Bath NC 27808
Permit Number
15 -15
0 2 2015 i
Authorizing development in Beaufort County adl. to North Creek. at 266 Zinkie Lane.
Ransomville Community- near Bath as requested in the permittee's application dated 11/6/14 (MP -1) and
10/28/14 (MP -4), including the attached worknlan drawings (3) 1 dated 10/22/14 and I dated 10/27/14
This permit, issued on .lanu= 29.2015 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Marina
1) Prior to the occupancy of any new slips authorized under this permit, a marine pumpout sewage disposal
facility shall be installed in an easily accessible location. The pumpout shall be operable and maintained
for the life of the marina.
2) Prior to the occupancy of any slips authorized by this permit, the permittee shall meet on -site with a
representative of the Division of Coastal Management to ensure that the required pumpout facility is in
place and operable.
3) The marina shall display a sign showing the location of the on -site pumpout facility, including other
appropriate waste disposal information, at the entrance and exit from the main piers.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR
other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission.
date
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2018
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
U " If
Braxton C. Davis, Director
`Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Potters Marine Permit # 15 -15 ,
Page 2 of 3
ADDITIONAL CONDITIONS
4) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the
marina. Any sewage discharge at the marina shall be considered a violation of this permit for which the
permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence
of the permitted structure.
5) Unless specifically altered herein, this permit authorizes only the reconfiguration and construction of the
docks, piers, and other structures and uses located in or over the water that are expressly and specifically
set forth in the permit application. No other structure, whether floating or stationary, shall become a
permanent part of this marina facility without permit modification. No non -water dependent uses of
structures may be conducted on, in or over public trust waters without permit modification
6) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
7) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party.
8) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee will not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
interest.
9) This permit authorizes 36 additional slips for a maximum of 46 formalized boat slips. At no time shall
more than 46 vessels be moored or docked at the authorized facility without permit modification. The
restriction on the number of vessels shall apply to all marine vessel types, including but not limited to
motorboats, sailing vessels and personal watercraft.
Easement
10) The permittee may be required to apply for a submerged land lease from the Department of
Administration's State Property Office. Contact the Department of Administration's State Property
Office directly at (919) 807 -4650 for this determination. Should it be determined that an Easement is
required, the permittee shall supply a copy of the easement to the Division within 30 days of issuance of
the Easement.
General
11) The permittee understands and agrees that, if future operations by the United States requires the
removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon
due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions
caused thereby, without expense to the United States or the state of North Carolina. No claim shall be
made against the United States or the state of North Carolina on account of any such removal or
alteration.
Potters Marine
ADDITIONAL CONDITIONS
Permit # 15 -15
Page 3 of 3
12) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
13) The permittee and/or contractor shall meet with a representative of the Division of Coastal Management
prior to project initiation in order to discuss the conditions set forth in this permit.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 946 -6491, prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal water level.
NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No.
SAW-201402242.