Loading...
HomeMy WebLinkAboutNC0024406_Other Correspondence_20160502Wang, Shuying From: Snider, Lon Sent: Monday, May 02, 2016 3:33 PM To: Wang, Shuying Subject: FW: Close out of Sewage treament plant at DRSS I forgot to CC you on my reply to her. I told her that this would be ok. From: Newcomb, Dana H [mailto:Dana.Newcomb@duke-energy.com] Sent: Monday, May 02, 2016 1:46 PM To: Snider, Lon <lon.snider@ncdenr.gov> Subject: Close out of Sewage treament plant at DRSS Lon, When you were here at Dan River last September, we briefly discussed close out of the sewage package plant at the retired steam station. What do we need to do to properly close this system out? The package plant has been pumped out, "cleaned", and all influent lines have been cut. Do we need to pull this system out of the ground or would it be acceptable to remove all above ground structures and fill it with concrete? If you could provide us some guidance, I would greatly appreciate it. Thanks Dana Dana Newcomb EHS Professional Dan River CC/ Rockingham CT phone: 336-635-3186 cell phone: 336-514-2412