Loading...
HomeMy WebLinkAbout#5169 09-final INSPECTION REPORT ROUTING SHEET To be attached to all inspection reports in-house only. Laboratory Cert. #: 5169 Laboratory Name: Smith Industries Inspection Type: Field Maintenance Inspector Name(s): Ramon L. Cook Inspection Date: August 25, 2009 Date Report Completed: August 28, 2009 ____________ Date Forwarded to Reviewer: May 4, 2010_______ Reviewed by__ Jason Smith________ Date Review Completed: May 4, 2010_____________ Cover Letter to use: Insp. Initial Insp. Reg. X Insp. No Finding Insp. CP Unit Supervisor: Dana Satterwhite Date Received: May 5, 2010 Date Forwarded to Alberta: May 5, 2010 Date Mailed: May 5, 2010 _____________________________________________________________________ On-Site Inspection Report LABORATORY NAME: Smith Industeries NPDES PERMIT #: NC0065412 ADDRESS: 235 Richardson Road Reidsville, NC 28621 CERTIFICATE #: 5169 DATE OF INSPECTION: August 25, 2009 TYPE OF INSPECTION: Field Maintenance AUDITOR(S): Ramon L. Cook LOCAL PERSON(S) CONTACTED: Paul Smith I. INTRODUCTION: This laboratory was inspected to verify its compliance with the requirements of 15A NCAC 2H .0800 for the analysis of environmental samples. II. GENERAL COMMENTS: The facility has all the equipment necessary to perform the analyses. The Inspector would like to thank Mr. Smith for his help and cooperation. The records were well organized and concise. III. FINDINGS, REQUIREMENTS, COMMENTS AND RECOMMENDATIONS: No findings were noted. IV. PAPER TRAIL INVESTIGATION: The paper trail consisted of comparing field testing records and contract lab re ports to Discharge Monitoring Reports (DMRs) submitted to the North Carolina Division of Water Quality. Data were reviewed for Smith Industries (NPDES permit #NC 0065412) for January, February and March, 2009. No transcription errors were detected. The facility appears to be doing a good job of accurately transcribing data. V. CONCLUSIONS: No findings were noted during the inspection. The inspector would like to thank the staff for its assistance during the inspection and data review process. No response is required. Report prepared by: Ramon L. Cook Date: August 28, 2009 Report reviewed by: Jason Smith Date: May 04, 2010