Loading...
HomeMy WebLinkAbout#5038 09 Final INSPECTION REPORT ROUTING SHEET To be attached to all inspection reports in-house only. Laboratory Cert. #: 5038 Laboratory Name: Wastewater Management L.L.C. Inspection Type: Field Maintenance Inspector Name(s): Jeffrey R. Adams Inspection Date: December 29, 2009 Date Report Completed: January 15, 2010 Date Forwarded to Reviewer: January 15, 2010 Reviewed by: Ramon L. Cook Date Review Completed: January 20, 2010 __________________ Cover Letter to use: Insp. Initial X Insp. Reg. Insp. No Finding Insp. CP Unit Supervisor: Dana Satterwhite Date Received: January 20, 2010 Date Forwarded to Alberta: January 22, 2010 Date Mailed: _____________________________________________________________________ On-Site Inspection Report LABORATORY NAME: Wastewater Management, L.L.C. NPDES PERMIT #: NC0023442, WQ0002927, WQ0020808, WQ0024461, WQ0021204, NC0048429, WQ0019754, & WQ0013502 ADDRESS: 704 Sanford Rd Pittsboro, NC 27312 CERTIFICATE #: 5038 DATE OF INSPECTION: December 29, 2009 TYPE OF INSPECTION: Field Maintenance AUDITOR(S): Jeffrey R. Adams LOCAL PERSON(S) CONTACTED: Randall Jarrell I. INTRODUCTION: This laboratory was inspected to verify its compliance with the requirements of 15A NCAC 2H .0800 for the analysis of environmental samples. II. GENERAL COMMENTS: The laboratory was neat. Records were well maintained and organized, however, some quality control procedures need to be implemented. The laboratory was given copies of the Technical Assistance Documents for all field parameters during the inspection. III. FINDINGS, REQUIREMENTS, COMMENTS AND RECOMMENDATIONS: Total Residual Chlorine – Standard Methods, 18th Edition, 4500 Cl G A. Finding: The laboratory is not using an instrument that will detect and measure Total Residual Chlorine at concentrations that are below the permitted discharge requirement for all the facilities it services. Requirement: Each facility must have glassware, chemicals, supplies, equipment, and a source of distilled or deionized water that will meet minimum criteria of the approved methodologies. Ref: 15 NCAC 02H .0805 (g) (4). Requirement: In accordance with the directive from the Division of Water Quality, permittees must utilize an instrument or method that will detect and measure Total Residual Chlorine (TRC) concentrations to levels that are below the permit discharge requirements. The use of hand-held meters, sometimes referred to as pocket colorimeters, is only permissible when a facility has no effluent limit for TRC. Ref: Division of Water Quality letter dated August 14, 2001. Comment: One of the waste facilities that the laboratory is monitoring has a Total Residual Chlorine permit limit of 17 µg/L. The laboratory is using a Pocket Colorimeterâ„¢. These instruments are generally reliable only at concentrations of 100 µg/L or greater. Page 2 #5038 Wastewater Management, L.L.C. IV. PAPER TRAIL INVESTIGATION: The paper trail consisted of comparing contract lab reports to Discharge Monitoring Reports (DMRs ) and Non Discharge Wastewater Monitoring Reports (NDMRs) submitted to the North Carolina Division of Water Quality. Data were reviewed for Cedar Village (NPDES permit #NC0048429), Domtar (Non Discharge permit #WQ0002927), 3M Pittsboro (Non Discharge permit #WQ0020808), White Cross VFD (Non Discharge permit #WQ0024461), North Chatham VFD (Non discharge permit #WQ0021204), Luck Stone (Non Discharge permit #WQ0019754, and Towers (Non Discharge permit #WQ0013502) for September, October and November, 2009. The following errors were noted: For the Cedar Village facility, the permit compliance limit for Total Residual Chlorine (TRC) is 17 µg/L. The laboratory is reporting TRC values in mg/L on the DMRs yet the DMR header lists the units of measure as µg/L (i.e., the 0.34 µg/L recorded should have been 0.34 mg/L or 340 µg/L) for September and October, 2009. The problem was detected and corrected in November, 2009. In order to avoid questions of legality, it is recommended that you contact the appropriate Regional Office for guidance as to whether amended Discharge Monitoring Reports will be required for the months of September and October. A copy of this report will be forwarded to the Regional Office. V. CONCLUSIONS: Correcting the above-cited finding will help this lab to produce quality data and meet certification requirements. The inspector would like to thank the staff for its assistance in the inspection and data review process. Please respond to all findings. Report prepared by: Jeffrey R. Adams Date: January 15, 2010 Report reviewed by: Ramon Cook Date: January 20, 2010