Loading...
HomeMy WebLinkAbout20141039 Ver 1_Approval Letter_20150213Pat McCrory Governor NCDENR North Carolina Department of Environment and Natural Resources April 30, 2015 United States Coast Guard, Civil Engineering Unit Cleveland CDR Pete Carroll 1240 East Ninth Street, Room 2179 Cleveland, Ohio 44199 -2060 Donald R. van der Vaart Secretary DWR # 14 -1039 Pasquotank County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS Project: USCG Base Elizabeth City — Dredging at MWR Boat Ramp Pasquotank River Basin, Pasquotank River [PAS 50, 30- 3 -(12); SB] Dear Commander Carroll: You have our approval for the impacts listed below for the purpose described in your application dated September 3; 2014, received by the Division of Water Resources (Division) September 26, 2014. These impacts are covered by the attached Water Quality General Certification Number 3894 (GC 3894). This General Certifications) allows you to use Regional General Permit(s) 198200277 when issued by the US Army Corps of Engineers (USAGE). Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non- Discharge, and Water Supply Watershed regulations. This project has been on Hold while it went through the NEPA process and was reported issued a Finding of No Significant Impact (FONSI). This approval requires you to follow the conditions listed in the enclosed certification or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. Division of Water Resources — Water Quality Regional Operations Section — Washington Regional Office 943 Washington Square Mali, Washington, NO 27889 Phone: 252 - 946 -64811 FAX: 252- 975.37161 internet: www.ncdenr,gov An Equal Opportunity\ Affirmative Action Employer United States Coast Guard, Civil Engineering Unit Cleveland CDR Pete Carroll April 30, 2015 Page 2 of 3 Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Stream Site 1 (linear feet) 444/401 Wetlands Site 1 (acres) (acres) Coastal Wetlands Site 1 (acres) (acres) Open Waters Site 1 0.18 (acres) Dredge (acres) Buffers —Zone 1 Site 1 (square feet) (square feet) Buffers — Zone 2 Site 1 (square feet) (square feet) 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification /Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certifications) and is responsible for complying with all conditions. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight /Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty(60) calendar days. A petition farm may be obtained from the OAH at http:/ /www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431- 3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during United States Coast Guard, Civil Engineering Unit Cleveland CDR Pete Carroll April 30, 2015 Page 3 of 3 normal office hours (Monday through Friday between 8:OOam and 5:OOpm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431 -3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: if sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699 -6714 If sending via delivery service (UPS, Fed Ex, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609 -6285 One (1) copy of the petition must also be served to DENR: Lacy Presnell, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699 -1601 This letter completes the review of the Division under section 401 of the Clean Water Act. Please contact Roberto Scheller by phone at 252 - 948 -3940 or by email at roberto.schellerCa@ncdenr.gov if you have any questions or concerns. Sincerely, ?4-�A Robert Tankard Assistant Regional Supervisor Division of Water Resources Enclosures: GC 3894 Certification of Completion cc: Jennifer Jones, AECOM, email: Jennifer.Jones @aecom.com Chet Bigelow, USACE, Washington Regulatory Field Office DWR401 & Buffer Permitting Unit File