Loading...
HomeMy WebLinkAboutNC0021709_Compliance Evaluation Inspection_20151015 (2)North Carolina Department of Environmental Quality Pat McCrory Governor October 15, 2015 Mr. Tim Church Water Resources Director P.O. Box 67 Jefferson, NC 28640 SUBJECT: Compliance Evaluation Inspection Town of Jefferson WWTP NPDES Permit # NCO021709 Ashe County Dear Mr. Church: Donald R. van der Vaart Secretary A Compliance Evaluation Inspection was performed on the facility by George Smith on October 9, 2015. Mr. Tim Church, ORC, Grade IV was present for the inspection. The inspection is comprised of an overall evaluation of the facilities equipment, capability to meet effluent limits, and compliance with the NPDES permit. Permit Your new NPDES permit became effective September 1, 2011 and expires March 31, 2016. It is recommended that the Town register for eDMR. It will be a permit requirement in your next permit cycle. Please remember to submit your NPDES permit renewal application EPA Form 2A. Send to: Division of Water Resources WQ Permitting Section - NPDES 1617 Mail Service Center Raleigh, NC 27699-1617 Records & Reports The facility performs and documents process control of the following: microscopic examination, settleability, MLSS, pH (clarifier, oxidation ditch, and digester), dissolved oxygen in the oxidation ditch, Sludge Volume Index (SVI), and blanket height with a sludge judge. These records were in excellent order. The Performance Annual Report for the calendar year 2014 was sent to the NPDES Unit on June 9, 2015. Facility Site Review There are four influent pumps (two-300gpm and two-400gpm). The 3/8-inch automatic bar screen was properly operating. The oxidation ditch components and rotating contactors are in good working order, and there is a good earthy odor. The three rings of the ditch have sufficient dissolved oxygen. This treatment unit is performing very well. 450 W Hanes Mill Rd., Suite 300, Winston-Salem, NC 27105 Phone: 336-776-98001Internet; www.ncdenr.gov An Equal Opportunity \ Affirmative Action Employer — Made in part by recycled paper The secondary clarifier's effluent over the weirs was clear. Both units were functioning very well, and were well maintained. There was a very small amount of floating paper on the surface, which is discharged from the county jail. The tertiary filter is producing a clear effluent. The unit is properly maintained. In fact, the water was clear. The chlorine contact chamber contained a clear effluent with no solids present. Flow Measurement The flow is measured with a 90' V-notch sharp crested weir. A Chessel type flow recording device is used with a seven day circular chart. The calibration was performed and documented by the Town of Jefferson on July 28, 2015. Laboratory The municipal lab is field certified #5206, and performed the following: Total Residual Chlorine, Dissolved Oxygen, pH, and temperature. The total residual chlorine is performed using a Hach DR2500 spectrophotometer with the DPD method and using the flow thru cell. The annual five point calibration is scheduled to be performed during October 2015. The model `Hach One' pH meter is calibrated with a two -point buffer of 4 & 7 and check with a pH 10 buffer. A calibration log was kept for pH and dissolved oxygen, and temperature, which is traceable to NIST. Effluent/Receiving Waters The effluent, which discharges to Naked Creek, Class C + waters, was crystal clear and had no color, solids, or odor. The effluent showed no adverse to the stream. Operations & Maintenance The Class II facility was maintained by the following contingent: Tim Church, ORC, Grade IV and Fred Walters, Back-up ORC, Grade II. There were four biological rotators that had rebuilt drive motors. There are two remaining to be rebuilt. The oxidation ditch is maintained at a MLSS of 2730 mg/L. The settleable solids are 42%. The Sludge Volume Index (SVI) is 153. Chlorine gas is used for disinfection. Anhydrous sodium metabisulfite is used for dechlorination, which is prepared and dissolved in water as needed. Self -Monitoring Program The effluent is sampled by composite flow proportion method at 150 ml/10,000 gallons using Isco model 3710 ER samplers with refrigerator. They are well maintained, clean tubing and temperature is 1°C. All grab samples are taken at the end of the pipe 001 just before it discharges into Naked Creek, Class C waters. A review of the monthly self -monitoring reports from January 2015 through July 2015 showed no limit violations. Sludge Disposal The Town is permitted to land apply the residuals. The digesters appeared to be functioning properly with approximately volume 50% left to waste. The sludge dryer appears to be well maintained. The facility generates approximately 50% Class A and 50% Class B residuals. The compliance evaluation inspection is considered satisfactory. Mr. Church does a very good job maintaining the POTW. If you have any questions please contact George Smith or me at (336) 776-9800. Sincerely, W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ cc: WSRO Files United Stales Environmental Protection Agency Form Approved. EPA Washington, D C 20,160 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 1 2 Iz I 3 I NCO021709 I11 121 15/10,09 I17 18 1 C I 19 I .c I 201 1 21III I I I I I I III I U I I I I I I I I I I I I I I I I I I I I II I I I I I166 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA---------------Reserved 67I I 7072 LnJ 731 74 75I I I� 701LJ 71 it1 80 Section 6: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 09:OOAM 15/10/09 11/09/01 Jefferson WWrP 1233 NO Hwy 16 S Exit Time/Date Permit Expiration Date Jefferson NO 28640 12:30PM 15/10/09 16/03/31 Name(s) of Onsite Representative(s)/-ritles(s)/Phone and Fax Number(s) Other Facility Data Timothy Church/ORC/336-246-2165/ Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Timothy Church,PO Box 67 Jefferson NO 286400067//336-246-2165/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit 0 Flow Measurement Operations & Maintenance E Records/Reports Self -Monitoring Program 0 Facility Site Review Effluent/Receiving Waters Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date George S Smith WSRO WQH336-776-9700/ .}g _Management Signature of Q A Reviewer Agency/Office/Phone and Fax Numbers Date - - �1sf�f, fsz�y=)„ — EPA Form 3560-3 fRev 9-94) Previous editions are obsolete. Page# Permit: NCO021709 Inspection Date: 10/09/2015 Owner -Facility: Jefferson WWM Inspection Type: Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? M ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable 0 ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ 0 ❑ ❑ application? Is the facility as described in the permit? 0 ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ 0 ❑ ❑ Is access to the plant site restricted to the general public? M ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑ Comment: Renewal notice was given with this report Record Keepina Yes No NA NE Are records kept and maintained as required by the permit? M ❑ ❑ ❑ Is all required information readily available, complete and current? M ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? 0 ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? 0 ❑ ❑ ❑ Is the chain -of -custody complete? 0 ❑ ❑ ❑ Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration - Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? 0 ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? 0 ❑ ❑ ❑ (If the facility is = or> 5 MGD permitted flow) Do they operate 24/7 with a certified operator ❑ ❑ 0 ❑ on each shift? Is the ORC visitation log available and current? 0 ❑ ❑ ❑ Is the; ORC certified at grade equal to or higher than the facility classification?. 0 ❑ ❑ Q Is the backup operator certified at one grade less or greater than the facility classification? 0 ❑ ❑ ❑ Is a copy of the current NPDES permit available on site? 0 ❑ ❑ ❑ Page# 3 Permit: NCO021709 Owner -Facility: Jefferson Ww-rP Inspection Date: 10/09/2015 Inspection Type: Compliance Evaluation Record Keeping Yes No NA NE Facility has copy of previous year's Annual Report on file for review? 0 ❑ ❑ ❑ Comment: Oxidation Ditches Yes No NA NE Are the aerators operational? 0 ❑ ❑ ❑ Are the aerators free of excessive solids build up? 0 ❑ ❑ ❑ # Is the foam the proper color for the treatment process? 0 ❑ ❑ ❑ Does the foam cover less than 25% of the basin's surface? 0 ❑ ❑ ❑ Is the DO level acceptable? 0 ❑ ❑ ❑ Are settleometer results acceptable (> 30 minutes)? 0 ❑ ❑ ❑ Is the DO level acceptable?(1.0 to 3.0 mg/I) N ❑ ❑ ❑ Are settelometer results acceptable?(400 to 800 ml/I in 30 minutes) 0 ❑ ❑ ❑ Comment: Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? 0 ❑ ❑ ❑ Is the site free of excessive buildup of solids in center well of circular clarifier? M ❑ ❑ ❑ Are weirs level? 0 ❑ ❑ ❑ Is the site free of weir blockage? 0 ❑ ❑ ❑ Is the site free of evidence of short-circuiting? 0 ❑ ❑ ❑ Is scum removal adequate? 0 ❑ ❑ ❑ Is the site free of excessive floating sludge? 0 ❑ ❑ ❑ Is the drive unit operational? 0 ❑ ❑ ❑ Is the return rate acceptable (low turbulence)? M ❑ ❑ ❑ Is the overflow clear of excessive solids/pin floc? 0 ❑ ❑ ❑ Is the sludge blanket level acceptable? (Approximately % of the sidewall depth) M ❑ ❑ ❑ Comment: Filtration (High Rate Tertiary) Yes No NA NE Type of operation: Down flow Is the filter media present? M ❑ ❑ ❑ Is the filter surface free of clogging? N ❑ ❑ ❑ Is the filter free of growth? 0 ❑ ❑ ❑ Page# 4 Permit: NCO021709 Inspection Date: 10/09/2015 Owner - Facility: Jefferson NNVTP Inspection Type: Compliance Evaluation Filtration (High Rate Tertiary) Yes No NA NE Is the air scour operational? 0 ❑ ❑ ❑ Is the scouring acceptable? E ❑ ❑ ❑ Is the clear well free of excessive solids and filter media? 0 ❑ ❑ ❑ Comment: Disinfection -Gas Yes No NA NE Are cylinders secured adequately? 0 ❑ ❑ ❑ Are cylinders protected from direct sunlight? 0 ❑ ❑ ❑ Is there adequate reserve supply of disinfectant? 0 ❑ ❑ ❑ Is the level of chlorine residual acceptable? 0 ❑ ❑ ❑ Is the contact chamber free of growth, or sludge buildup? 0 ❑ ❑ ❑ Is there chlorine residual prior to de -chlorination? ❑ ❑ ❑ Does the Stationary Source have more than 2500 Ibs of Chlorine (CAS No. 7782-50-5)? ❑ ❑ ❑ E If yes, then is there a Risk Management Plan on site? ❑ ❑ ❑ If yes, then what is the EPA twelve digit ID Number? (1000--_---) If yes, then when was the RMP last updated? Comment: De -chlorination Yes No NA NE Type of system ? Liquid Is the feed ratio proportional to chlorine amount (1 to 1)? ❑ ❑ 0 ❑ Is storage appropriate for cylinders? ❑ ❑ ❑ # Is de -chlorination substance stored away from chlorine containers? 0 ❑ ❑ ❑ Comment: Are the tablets the proper size and type? ❑ ❑ 0 ❑ Are tablet de -chlorinators operational? - ❑ ❑ E ❑ Number of tubes in use? Comment: Flow Measurement - Effluent Yes No NA NE # Is flow meter used for reporting? E ❑ ❑ ❑ Is flow meter calibrated annually? 0 ❑ ❑ ❑ Is the flow meter operational? 0 ❑ ❑ ❑ Page# 5 Permit: NCO021709 Inspection Date: 10/09/2015 Flow Measurement - Effluent Owner -Facility: Jefferson VJWrP Inspection Type: Compliance Evaluation (If units are separated) Does the chart recorder match the flow meter? Ce11=0 ; Effluent Sampling Is composite sampling flow proportional? Is sample collected below all treatment units? Is proper volume collected? Is the tubing clean? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type representative)? Comment: Effluent Pipe Is right of way to the outfall properly maintained? Are the receiving water free of foam other than trace amounts and other debris? If effluent (diffuser pipes are required) are they operating properly? Comment: Yes No NA NE ❑ ❑ ❑ ■ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ ■ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ■ ❑ ❑ ❑ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ■ ❑ Page# 6 Permit: NCG500601 Inspection Date: 10/14/2015 Permit Owner -Facility: white Oak Plant Inspection Type: Compliance Evaluation (If the present permit expires in 6 months or less). Has the permittee submitted a new application? Is the facility as described in the permit? # Are there any special conditions for the permit? Is access to the plant site restricted to the general public? Is the inspector granted access to all areas for inspection? Comment: The facility has the following outfalls: #005 (cooling tower and boiler blowdown) #006 (cooling water) Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ Reviewed sample date for both outfalls taken on 12/16/14 and 6/23/15. The data included flow, temperature, pH. and COD. They also collected upstream and downstream temperatures. The facilitv also has the abilitv to discharge non -contact cooling water. air washers and chillers and boiler blowdown to their pretreatment system. Exactly what is discharged to surface waters and the pretreatment system is difficult to determine due to the old piping system and the size of the facility. Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? M ❑ ❑ ❑ Are the receiving water free of foam other than trace amounts and other debris? M ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ 0 ❑ Comment: Outfall #005 has a concrete rectangular weir and is located at the back of the facility. Live minnows were observed below the outfall, which comingles with stormwater/groundwater. Outfall #006 is located in a headwall lust below the 16th Street bridge. Flow is measured with bucket and stopwatch. Page# 3