Loading...
HomeMy WebLinkAboutNC0020451_Pretreatment_20151013North Carolina Department of Environmental Quality Pat McCrory Governor October 13, 2015 Mr. Charles Call Town of West Jefferson P.O. Box 490 West Jefferson, NC 28694 SUBJECT: Pretreatment Compliance Inspection Town of West Jefferson NPDES # NCO020451 Ashe County Dear Mr. Call: Donald R. van der Vaart Secretary A Pretreatment Compliance Inspection (PCI) was performed on October 8, 2015 by George Smith of this office. Mr. Charles Call, Water Resources Director was present for the inspection. The purpose of this inspection was to determine the effectiveness of the Town's pretreatment program by reviewing the files, which include, POTW plant performance, industry monitoring data, and adherence to the enforcement response plan (ERP). Background This is a 0.5 MGD permitted facility. The Town has one (1) significant industrial user. POTW Interview There was a monthly average violation for BOD during May 2015. The reason for the violation is unknown. Pretreatment Program Elements Review The Headworks Analysis (HWA) was approved June 20, 2014. The next HWA is due April 1, 2019. The Industrial Waste Survey (IWS) was approved June 23, 2014. The next IWS is due April 1, 2019. The Sewer Use Ordinance (SUO) was last approved on January 10, 2013 The Enforcement Response Plan (ERP) was approved on August 18, 2005. Short Term Monitoring Plan (STMP) is satisfactory and was approved on August 21, 2014. 450 W Hanes Mill Rd., Suite 300, Winston-Salem, NC 27105 Phone: 336-776-98001Internet: www.ncdenr.gov An Equal Opportunity 1 AHirmaAve Action Employer —Made in part by recycled paper STMP File Review The Short Term Monitoring Plan (STMP) is being conducted at the proper locations and frequencies. The proper detection levels are used and all data is maintained in a spreadsheet. There are no POTW modifications that require a change in the STMP. Industrial User Permit (IUP) File Review The file review for Ashe Cheese (#0003) showed that the monitoring data was kept well organized. Action Items The next Pretreatment Annual Report (PAR) is due on March 1, 2016. Mr. Call implements the pretreatment program in an excellent manner. If you have any questions please contact George Smith or me at (336) 776-9800. Sincerely, , W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ cc: PERCS Unit — Monti Hassan WSRO Files NORTH CAROLINA DIVISION OF WATER QUALITY PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT BACKGROUND INFORMATION [Complete Prior To PCI; Review Program Info Database Sheet(s)] 1. Control Authority(POTW)Name: Town Of M.<7- ,%E6F'ev5o✓ 2. Control Authority Representative(s): I ./aa ,/ c 3. Title(s): 4. Last Inspection Date: It, -.3 - / % Inspection Type (Check One): PCI ❑ Audit 5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? 6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES [ NO Order Type, Number, Parameters: PCS CODING Trans.Code Main Program Permit Number I I N I C 1 0 I 0 I�_101y1 s1/ l YES ❑ NO Are Milestone Dates Being Met? n�= ��: ; MM/DD/YY Inspec.Type Inspector Fac. Type /01 s,I/sl I P I —S I (DTIA) (TYPI) (INSP) u (FACC) 7. Current Number Of Significant Industrial Users (SNs)? © SIUS 8. Current Number Of Categorical Industrial Users (CIUs)? 0 CIUS 9. Number of SIDS Not Inspected By POTW in the Last Calendar Year? 0 10. Number of SNs Not Sampled By POTW in the Last Calendar Year? 11. Enter the Higher Number of 9 or 10 0 NOIN 12. Number of SIDS With No [UP, or With an Expired IUP ® NOCM 13. Number of SNs in SNC for Either Reporting or Limits Violations During Either of the Last 2 Semi -Annual Periods (Total Number of SIUS in SNC) PSNC 14. Number of SNs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods © MSNC 15. Number of SNs In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods F-7-F-7 SNPS 16. Number of SNs In SNC For Both Reporting and Limits Violations During Either of the Last 2 Semi-annual Periods II V II 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What are the Parameters and How are these Problems Being Addressed? , NTC PJVT7r" (DM doC — ADT_ fv/'� Pz afD✓L FaY UI01400'1 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed? 19. Which Industries have been in SNC for Limits or Reporting during INC for either of the Last 2 Semi -Annual Periods? Not Been Published for SNC for Public Notice?(May refer to PAR if Excessive SNs in SNC) Not Put 20. Which Industries are on Compliance Schedules or Orders? For all SNs on an Order, Has a Signed Copy of the Order been sent to the Division? 21. Are Any Permits Or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? E�rYES [INO 1Jn 6o- 01AY100 (00-4tN) ❑ YES [( O Limits: Reporting: dished: AA N)a n -(— %1llo 4 ❑ YES O LTMP/STMP FILE REVIEW: 22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? �-YESEI NO 23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ES ❑ NO 24. Is LTMP/STMP Data Maintained in a Table or Equivalent? ❑'DES ❑ NO Is Table Adequate? MY ES ❑ NO 25, All LTMP/STMP effluent data reported on Discharge Monitoring Report? [DYES ❑ NO DWQ Inspector, please verify yourself! 26, If NO to 23 - 26, list violations V 1 - � 27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? [IY ES EIWO If yes, which ones? Eliminated: N 4 Added: N 114 NC DWQ Pretreatment Compliance Inspection (PCI) Form l.ipdated 7/25/07 Page 1 28. PRETREATMENT PROGRAM ELEMENTS REVIEW— Please review POTW files, verity POTW has copy of Program Element in their" Files, complete with su ( rting documents and copy of PERCS Approval Letter, and dates consistent with Program Info: Program Element Last Submittal Date In file? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis WA ❑ Yes ❑ No 2 es ❑ No / /17 Industrial Waste Survey (IWS) ❑ Yes ❑ No Yes ❑ No ij/ c Sewer Use Ordinance SUO ❑ Yes ❑ No I I'D 145 [�ay'Y'es ❑ No Enforcement Response Plan (ERP) ❑ Yes ❑ No / S lv 3— u es ❑ No Long Term Monitoring Plan (LTMP) ❑ Yes ❑ No lrt /cy Yes ❑ No INDUSTRLAL USER PERMIT (HIP) FILE REVIEW (3 IUP FILE REVIEWS OR I FILE REVIEW AND 1 IU INSPECTION) 29. User Name 1. 4$S t ,�oit C�,erl.e 2. 3. 30. RIP Number D DO J 00 31. Does File Contain Current Permit? Yes ❑ No ❑ Yes ❑ No ❑Yes ❑ No 32. Permit Expiration Date J 0, d o 1 c 33. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or N/A 34. Does File Contain Permit Application Completed Within One Year Prior es ❑ No ❑Yes ❑ No ❑Yes ❑ No to Permit Issue Date? 35. Does File Contain an Inspection Completed Within Last Calendar Year? F E J—Yes ❑ No 36. a. Does the File Contain a Slug/Spill Control Plan? a. ❑Yes EKo a. ❑Yes ❑No a. ❑Yes ❑No b. If No, is One Needed? (See Inspection Form from POTW) b. [-]Yes pNo b. ❑Yes ❑No b. [_-]Yes ❑No 37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic []YespNopNTA ❑YespNopN/A pYespNopN/A Organic Management Plan (TOMP)? 38. a. Does File Contain Original Permit Review Letter from the Division? a EKes []No a. ❑Yes ❑No a. [-]Yes ❑No b. All Issues Resolved? b [jYes[03No / I b.oYesoNoON/A b.pYesONoON/A 39. During the Most Recent Semi -Annual Period, Did the POTW Complete © es ❑ No ❑Yes ❑ No ❑Yes ❑ No its Sampling as Required by IUP, including flow? 40. Does File Contain POTW Sampling Chain -Of -Custody Forms? es ❑ No ❑Yes ❑ No ❑ Yes ❑ No 41. During the Most Recent Semi -Annual Period, Did the SIU Complete its es❑NopN/A ❑YespNo❑N/A []YespNo❑N/A Sampling as Required b > RIP, including flow? 41b. During the Most Recent Semi -Annual Period, Did SIU submit all reports es❑NopN/A ❑Yes❑No❑N/A ❑YespNo❑N/A on time? 42a. For categorical lUs with Combined Wastestream Formula (CWF), does []YespNo ❑YespNopN/A []YespNo[]N/A file include process/dilution flows as Required by IUP? 42b. For categorical IUs with Production based limits, does file include []YespNo A ❑YespNopN/A []YespNoON/A production rates and/or flows as Required by IUP? 43a. During the Most Recent Semi -Annual Period, Did the POTW Identify 0 Yes D. No ❑Yes ❑ No ❑ Yes ❑ No All Limits Non -Compliance from Both POTW and SIU Sampling? fJ0 viu(accon s 43b. During the Most Recent Semi -Annual Period, Did the POTW Identify ❑Yes❑NoUKA ❑YespNoON/A ❑Yes❑NopN/A All Re ortin Non -Compliance from SIU Sampling? 44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- a.oYesoNooN'A a.oYesoNooN/A a.oYesoNopN/A Monitoring Violations? b.oYesoNo 3N A b. Did Industry Reaample and submit results to POTW Within 30 Days? b.oYesoNooN/A b.DYesoNoMN/A c. If applicable, Did POTW resample within 30 days of becoming aware c.oYesoNo®N/A of SIU limit violations in the POTW's sampling of the SIU? c.oYesoNooN/A e.oYesoNooN/A 46. During the Most Recent Semi -Annual Period, Was the SIU in SNC? I ❑Yes 0 NoI ❑ Yes ❑ No ❑ Yes ❑ No 47. During the Most Recent Semi -Annual Period, Was Enforcement Taken []YespNomN7A ❑YespNopN/A ❑YespNo[]N/A as Specified in the POTW's ERP (NOVs, Penalties, timing, etc.)? 48. Does the File Contain Penalty Assessment Notices? []Yes❑No[]N%A pYes[]NoON/A ❑YespNopN/A 49. Does The File Contain Proof Of Penalty Collection? pYespNof A ❑YespNopN/A ❑YespNoON/A 50. a. Does the File Contain Any Current Enforcement Orders? a.oYesoNo /A azYesciNooN/A a.AYesoNooN/A b. Is SIU in Compliance with Order? b.oYesoNomg b.L1YesONo0N/A b.DYesoNaON/A 51. Did the POTW Representative Have Difficulty in Obtaining Any of This ❑Yes No ❑Yes ❑ No ❑Yes ❑ No Requested Information For You? NC DWQ Pretreatment Compliance Inspection (PCI) Form Lipdated 7/25/07 Page 2 FILE REVIEW COMMENTS: Main Program Permit Number INI 1. Industry Inspected: 2. Industry Address: 3. Type of Industry/Product: 4. Industry Contact: MM/DD/YY Inspec.Type Inspector Fac. Type U/L 2 (DTIA) (TYPFY (INSP) (FACC) Title: Phone: j 5. Does the POTW Use the Division Model Inspection Form or Equival, 6. Did the POTW Contact Conduct the Following Parts of the Industrial Comments: A. Initial Interview ❑ YES ❑ NO B. Plant Tour ❑ YES ❑ NO C. Pretreatment Tour ❑ YES ❑ NO D. Sampling Review ❑ YES ❑ NO -E:'ExitInterview ❑ YES ❑ NO Industrial Inspection Comments: OVERALL SUMMARY AND COMMENTS: Comments: Requirements: Recommendations: NOD: ❑ YES [,i]'�NO NOV: ❑ �y YES 'NO QNCR: ❑ YES D-KO POTW Rating: PCI COMPLETED Fax: ❑ YES ❑ NO action Thoroughly? UnSatisfactory NC DWQ Pretreatment Compliance Inspection (PCI) Form Updated 9/25/09 Page 3