Loading...
HomeMy WebLinkAboutNCG030308_Request for Regulatory Relief_20230125MAILING P.O. BOX 1147 DUNN, NORTH CAROLINA 28335 910-892-0141 Michael Lawyer, CPSWQ Environmental Program Consultant 225 Green Street, Suite 714 Fayetteville, NC 28301 Dear Mr. Lawyer, ■ o w►nrM Manufacturing Co., Inc. LOCATION 17666 U.S. 421 SOUTH DUNN, NORTH CAROLINA 28334 800-892-0181 Fax 910-892-7402 January 25, 2023 Since the renewal of our General Permit for Metal Fabrication in July 2021, Godwin Manufacturing has had benchmark exceedances for Zinc. All other parameters have been meeting the benchmarks. This exceedance has put us into the Tier One Status. The following are dates that our stormwater samples were taken and show when zinc was elevated. June 23,2021 No Discharge (this was for the V half of the year) September 212021 Outfall 2- Zinc sample .151 (3`d quarter sample) Outfall 3- Zinc sample .144 Started Tier One Status December 8,2021 All samples are in range (4'h quarter sample) March,2022 No Discharge (15, quarter sample) April18,2022 Outfall 3- Zinc sample .146 (2"dquarter sample) September 30, 2022 No Discharge (3rd quarter sample) December 15, 2022 Outfall 3-Zinc sample .20 (4th quarter sample) A walk around inspection was made and there was no evidence that there had been any leaks or spills that would cause the Zinc sample to be elevated. It was determined that Zinc levels were high due to industrial activities such as brake dust from traffic of forklifts and vehicles. Plus, the buildings on site are metal, there is chain linked fence around the property, and gutters are on all of our buildings. This is our second sample in a row at Outfall 3 that has reported Zinc to be high. This will put us into Tier Two- monthly monitoring. Godwin Manufacturing would like to request regulatory relief for the Zinc exceedances. We thank you in advance for your consideration of this request. Sincerely, /ee-l/? Ryan Taylor CEO The Godwin Group A Godwin Group Company