Loading...
HomeMy WebLinkAboutNC0023876_Authorization to Construct_20110728Argil NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary July 28, 2011 Mr. Bob Patterson, P.E. City of Burlington P.O. Box 1358 Burlington, North Carolina 27216 SUBJECT: Authorization to Construct A to C No. 023876A02 City of Burlington South Burlington Wastewater Treatment Plant Nutrient Removal Improvements Alamance County Dear Mr. Patterson: A letter of request for an Authorization to Construct was received June 14, 2011, by the Division of Water Quality (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 12.0 MGD. South Burlington Wastewater Treatment Plant, with discharge of treated wastewater into Big Alamance Creek in the Cape Fear River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Improvements to the South Burlington Wastewater Treatment Plant, to include replacement of the influent pump station pumps with four (4) 8 MGD submersible pumps and one (1) 3.0 MGD suction -lift pump (and an existing 3.0 MGD suction -lift pump), and influent flow meter replacement; equalization basin improvements to include replacement of 4 (of the total 5) existing floating aerators with four (4) 20 Hp floating mixers, installation of electrically -operated flow controls; improvements to the aeration -basin distribution piping, including installation of a primary effluent distribution box, RAS distribution box, and an aeration -basin (mixed liquor) distribution box with dual 2 Hp submersible mixers; BNR improvements to existing 1617 Mail Service Center, Raleigh, North Carolinat27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 919-807-6492 \ Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal opportunity t Affirmative Action Employer NorthCarolina Mr. Bob Patterson, P.E. July 28, 2011. Page 2 Aeration Basin 1, to create dual 0.326 MG each anoxic/oxic swing Zones 1, dual 0.327 MG oxic Zones 2, and dual 1:302 MG oxic Zones 3, including a new fine bubble diffused system and four (4) 7,000 gpm NRCY window pumps and four (4) 5 Hp submersible mixers; BNR improvements to existing Aeration Basin 2, to create dual 0.225 MG each anoxic/oxic swing Zones 1, dual 0.233 MG oxic Zones 2, and dual 0.460 MG oxic Zones 3, including a new fine bubble diffused system and four (4) 7,000 gpm NRCY window pumps and four (4) 3 Hp submersible mixers; refurbishment of the existing six (6) blowers to provide 2,235 scfm capacity each, and associated air header piping; alum metering system; improvements to the secondary clarifier splitter box and improvements to the clarifier influent distribution piping; supplemental carbon (glycerin) storage and feed system; a 2,000 kW emergency backup generator; and yard piping and appurtenances, electrical controls, instrumentation, and site work; in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0023876 issued September 15, 2006, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0023876. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Winston-Salem Regional Office, telephone number (336) 771-5000, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to: Construction Grants & Loans, DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-1633. Mr. Bob Patterson, P.E. July 28, 2011 Page 3 Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatmentplant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Peiuiittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Failure to abide by the requirements contained in this. Authorization to Construct may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. Mr. Bob Patterson, P.E. July 28, 2011 Page 4 One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Seth Robertson, P.E. at telephone number (919) 715-6206. Sincerely, oz5' Coleen H. Sullins kp:sr cc: David Nailor, P.E., Hazen and Sawyer, 4011 WestChase Blvd, Raleigh, NC 27607 Alamance County Health Department DWQ Winston-Salem Regional Office, Surface Water Protection DWQ, Technical Assistance and Certification Unit DWQ, Point Source Branch, NPDES Program Ken Pohlig, P.E. ATC File City of Burlington South Burlington Wastewater Treatment Plant Nutrient Removal Improvements A To C No. 023876A02 Issued July 28, 2011 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the South Burlington WWTP, located on Boy Wood Road in Graham, Alamance County for the City of Burlington, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Improvements to the South Burlington Wastewater Treatment Plant, to include replacement of the influent pump station pumps with four (4) 8 MGD submersible pumps and one (1) 3.0 MGD suction -lift pump (and an existing 3.0 MGD suction -lift pump), and influent flow meter replacement; equalization basin improvements to include replacement of 4 (of the total 5) existing floating aerators with four (4) 20 Hp floating mixers, installation of electrically - operated flow controls; improvements to the aeration -basin distribution piping, including installation of a primary effluent distribution box, RAS distribution box, and an aeration -basin (mixed liquor) distribution box with dual 2 Hp submersible mixers; BNR improvements to existing Aeration Basin 1, to create dual 0.326 MG each anoxic/oxic swing Zones 1, dua1 0.327 MG oxic Zones 2, and dual 1.302 MG oxic Zones 3, including a new fine bubble diffused system and four (4) 7,000 gpm NRCY window pumps and four (4) 5 Hp submersible mixers; BNR improvements to existing Aeration Basin 2, to create dual 0.225 MG each anoxic/oxic swing Zones 1, dual 0.233 MG oxic Zones 2, and dual 0.460 MG oxic Zones 3, including a new fine bubble diffused system and four (4) 7,000 gpm NRCY window pumps and four (4) 3 Hp submersible mixers; refurbishment of the existing six (6) blowers to provide 2,235 scfm capacity each, and associated air header piping; alum metering system; improvements to the secondary clarifier splitter box and improvements to the clarifier influent distribution piping; supplemental carbon (glycerin) storage and feed system; a 2,000 kW emergency backup generator; and yard piping and appurtenances, electrical controls, instrumentation, and site work; in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Date Registration No. Mail this Certification to: Attn: Ken Pohlig, P.E. Construction Grants & Loans DENR/DWQ 1633 Mail Service Center Raleigh, NC 27699-1633