HomeMy WebLinkAboutWQ0016247_Staff Report_20220712DocuSign Envelope ID: 1B51581A-23DF-46EC-9DB8-86E079E8E408
;s State of North Carolina
Division of Water Resources
Water Quality Regional Operations Section
Environmental Staff Report
Quality
To: ❑ NPDES Unit ® Non -Discharge Unit
Attn: Erick Saunders
From: Chris Smith
Raleigh Regional Office
Application No.: WQ0016247
Facility name: Synagro Central, LLC
RLAP (503)
Note: This form has been adapted from the non -discharge facility staff report to document the review of both non -
discharge and NPDES permit applications and/or renewals. Please complete all sections as they are gpplicable.
I. GENERAL AND SITE VISIT INFORMATION
1. Was a site visit conducted? ® Yes or ❑ No
a. Date of site visit: July 6, 2022
b. Site visit conducted by: Chris Smith (RRO) and Caitlin Caudle (WSRO)
c. Inspection report attached? ❑ Yes or ® No
d. Person contacted and their contact information: Ryan Copeland (336) 607-4494
e. Driving directions:
2. Discharge Point(s):
Latitude: Longitude:
Latitude: Longitude:
3. Receiving stream or affected surface waters:
Classification:
River Basin and Subbasin No.
Describe receiving stream features and pertinent downstream uses:
FORM: WQROSSR 04-14 Page 1 of 9
DocuSign Envelope ID: 1B51581A-23DF-46EC-9DB8-86E079E8E408
III. EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS
1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ® Yes ❑ No ❑ N/A
ORC: Robert N. Roth Certificate #: 1001672 Backup ORC: Adam Brigman Certificate 9:1006653
2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal
system? ® Yes or ❑ No
There are no new source facilities proposed for counties covered by the Raleigh Regional Office. Source
facilities were not visited for this permit modification.
3. Are the site conditions (e.g., soils, topography, depth to water table, etc) maintained appropriately and adequately
assimilating the waste? ® Yes or ❑ No
4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance
boundary, new development, etc.)? ❑ Yes or ® No
5. Is the residuals management plan adequate? ® Yes or ❑ No
6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? ® Yes or ❑ No
7. Is the existing groundwater monitoring program adequate? ❑ Yes ❑ No ® N/A
8. Are there any setback conflicts for existing treatment, storage, and disposal sites? ® Yes or ❑ No
See Additional Regional Staff Review Items and attached maps.
9. Is the description of the facilities as written in the existing permit correct? ❑ Yes or ❑ No ®N/A
10. Were monitoring wells properly constructed and located? ❑ Yes ❑ No ® N/A
FORM: WQROSSR 04-14 Page 2 of 9
DocuSign Envelope ID: 1B51581A-23DF-46EC-9DB8-86E079E8E408
11. Are the monitoring well coordinates correct in BIMS? ❑ Yes ❑ No ® N/A
12. Has a review of all self -monitoring data been conducted (e.g., DMR, NDMR, NDAR, GW)? ❑ Yes or ❑ No
® N/A
13. Are there any permit changes needed in order to address ongoing BIMS violations? ❑ Yes or ® No
14. Check all that apply:
® No compliance issues ❑ Current enforcement action(s) ❑ Currently under JOC
❑ Notice(s) of violation ❑ Currently under SOC ❑ Currently under moratorium
Have all compliance dates/conditions in the existing permit been satisfied? ® Yes ❑ No ❑ N/A
15. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit?
❑ Yes ® No ❑ N/A
IV. REGIONAL OFFICE RECOMMENDATIONS
1. Do you foresee any problems with issuance/renewal of this permit? ❑ Yes or ® No
2. List any items that you would like the NPDES Unit orNon-Discharge Unit Central Office to obtain through an
additional information request:
Item
Reason
CPLR for NC-CH-72-3
A cumulative pollutant loading rate report needs to be provided
for this field
CPLR for NC-CH-73-3, 4, 5, 6, and 10
Cumulative pollutant loading rate reports need to be provided for
these fields
LASC for NC-CH-73-2, 7, 8, and 9
LASC forms need to be provided for these fields. See Additional
Regional Sta Review Items
LOA for NC-CH-73-2, 7, 8, and 9
LOA documents need to be provided for these fields. See
Additional Regional Sta Review Items
CPLR for NC-CH-73-2, 7, 8, and 9
Cumulative pollutant loading rate reports need to be provided for
these fields. See Additional Regional Sta Review Items
CPLR for NC-CH-78-3 and 5
Cumulative pollutant loading rate reports need to be provided for
these fields
Soils Test Results for NC-CH-81-1 and 2
Soils analyses results need to be provided for these fields
An updated site map is needed to show additional buffered areas
including: rock outcroppings, ditches/drainage features, and a
Updated Site Map for NC-CH-44-13
stream inside the tree line North-West of the field labeled "NC-
CH-44-13 West" in the attached maps. See Additional Regional
Sta Review Items and attached maps.
An updated site map is needed to show additional buffered areas
including: rock outcroppings, ditches/drainage features, a stream
Updated Site Map for NC-CH-81-1
entering the pond in the southern part of the field, and a stream
crossing the southern part of the field. See Additional Regional
Sta Review Items and attached maps.
FORM: WQROSSR 04-14 Page 3 of 9
DocuSign Envelope ID: 1B51581A-23DF-46EC-9DB8-86E079E8E408
An updated site map is needed to show additional buffered areas
Updated Site Map for NC-CH-81-2
including: ditches/drainage features. See Additional Regional
Sta Review Items and attached maps.
Updated LASC form
The soils series for the fields must be updated. See Additional
Regional Sta Review Items and attached maps.
3. Recommendation: ® Hold, pending receipt and review of additional information by regional office
❑ Hold, pending review of draft permit by regional office
❑ Issue upon receipt of needed additional information
❑ Issue
❑ Deny (Please state reasons: )
4. Signature of report preparer:
Signature of regional supervisor:
Date: 7/12/2022
r'Doc_uSigned by:
S SM&
1D427000DBE94E9...
FORM: WQROSSR 04-14 Page 4 of 9
DocuSign Envelope ID: 1B51581A-23DF-46EC-9DB8-86E079E8E408
V. ADDITIONAL REGIONAL STAFF REVIEW ITEMS
Site visits were conducted on July 6, 2022. The assistance of Ryan Copeland of Synagro was helpful and
appreciated.
Fields NC-CH-73-2 and 7-9
Maps included but no LASC, no LOA, and no CPLR. It is not clear if this application is requesting the
inclusion of these fields in the permit. Note: They also do not appear in LASC tables as fields for deletion.
Field NC-CH-44-13
Mapped as Nanford-Badin and Goldston-Badin, described as Badin, and listed as Badin-Taurus in the
LASC. There are no Taurus soils mapped in the area. This series should be listed as Badin-Nanford in the
LASC with a RYE loading rate of 1261bs/ac for fescue. This loading rate will allow residuals to be applied
to the entirety of Field 13 in amounts that do not exceed agronomic rates for any mapped soil series. RYE
loading rate for fescue on Goldston-Badin complex in this area is 130-147lbs/ac (slopes 15-35% and 2-
15%). The Badin-Taurus complex has a similar loading rate to the mapped Nanford-Badin complex
(1711bs/ac and 180lbs/ac respectively). If the applicant wants to keep these higher loading rates for parts of
this field the field needs to be split and the areas mapped as Goldston-Badin need to be applied to at
agronomic rates for that series complex.
Revised maps need to be submitted to include additional setbacks for rock outcroppings, stream, and
drainage feature (See Figure 2 and Figure 3). DWR Staff requested that a 25ft buffer be applied to each rock
outcropping and ditch/waterway and that a 100ft buffer be applied to the stream.
Field NC-CH-81-1
No soils test results were provided. Tests were ordered from Waypoint, but not included in the application.
Revised maps need to be submitted to include additional setbacks for rock outcroppings, streams, and
drainage features (See Figure 5 and Figure 6). DWR Staff requested that a 25ft buffer be applied to each
rock outcropping and ditch/waterway and that a 100ft buffer be applied to the stream.
Note: The feature labeled as a ditch in the middle of the field labeled in Figure 5 as "81-1 North" could
also be deemed unsuitable for application by the applicant if they would prefer that option. In any case this
linear feature should not receive any residuals applications.
Field NC-CH-81-2
No soils test results provided. Tests were ordered from Waypoint, but not included in the application.
Revised maps need to be submitted to include additional setbacks for rock outcroppings and drainage
features (See Figure 7). DWR Staff requested that a 25ft buffer be applied to each ditch/waterway.
Big Buffalo WWTP
Listed as New (N) facility in application but was already in permit. Requested modification is for increased
DT limit.
FORM: WQROSSR 04-14 Page 5 of 9
DocuSign Envelope ID: 1B51581A-23DF-46EC-9DB8-86E079E8E408
FORM: WQROSSR 04-14 Page 6 of 9
DocuSign Envelope ID: 1B51581A-23DF-46EC-9DB8-86E079E8E408
Fi ure 3:
Field NC-CH-4413 Wes[
Stream:
Add Setback
r '
RockOutcropping. � .•���,� r-
RR1ss�
Add Setback�1 i a
FORM: WQROSSR 04-14 Page 7 of 9
DocuSign Envelope ID: 1B51581A-23DF-46EC-9DB8-86E079E8E408
FORM: WQROSSR 04-14 Page 8 of 9
DocuSign Envelope ID: 1B51581A-23DF-46EC-9DB8-86E079E8E408
FORM: WQROSSR 04-14 Page 9 of 9