Loading...
HomeMy WebLinkAbout20141169 Ver 1_DCM Consistency Package_20150306Pat McCrory Governor February 25, 2015 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: North Carolina Department of Environment and Natural Resources David Wainwright Division of Water Resources Steve Sollod or Cathy Brittingham Major Permits Processing Coordinator Donald R. van der Vaart Secretary MAC 0 6 2015 DENR.WATER RESOURCES TRANSPORTATION PERMITTING, UNIT CAMA/DREDGE & FILL Permit Application Review NCDOT- US 17 Onslow County, US 17 from SR1330 to the New Bern Bypass, crossing the White Oak River and the Trent River, in Onslow, Jones, and Craven Counties. Proposed Project: Proposes to widen US 17 from a two -lane to a four -lane road for 16 miles from SR1330 near Belgrade in Onslow County to New Bern Bypass at the Jones /Craven County line, including constructing new bridges over the White Oak and Trent Rivers. Please indicate below your agency's position or viewpoint on the proposed project and return this form by March 17, 2015. If you have any questions regarding the proposed project, please contact Stephen Lane, Permit officer at (252) 808 -2808. Ext. 208. When appropriate, in -depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. ya y wgcr sS 34211: This agency has no comment on the proposed project. T.P Ce✓fov. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED �/(/ DATE X1_74 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252- 808 -28081 FAX 252 -247 -33301 Internet: www.nccoastalmanagement.net An Equal Opportunity/ Affirmative Action Employer I®IWSION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: North Carolina Department of Transportation 2. LOCATION OF PROJECT SITE: US 17 from SR1330 in Onslow County to the New Bern Bypass, crossing the White Oak River and the Trent River, in Onslow, Jones, and Craven Counties. Photo Index - 2006: N/A 2000: N/A State Plane Coordinates - X: 2,527,452 Y: 422,866 Latitude: 34 °53'57" N Longitude: 77 °14'27" W 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Date of Site Visits —December 18, 2014 and January 29, 2015 Was Applicant Present — No 5. PROCESSING PROCEDURE: Application Received Complete: February 20, 2015 Office — Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plans — Craven and Onslow Counties Land Classifications from LUP — Mixed Use /Agriculture/Forestry /Conservation (B) AEC(s) Involved: PTA, CS (C) Water Dependent: Yes (D) Intended Use: Public (E) Wastewater Treatment: Existing — N/A Planned - N/A (F) Type of Structures: Existing — Two -lane road with bridges for public use Planned - Four -lane road with bridges for public use (G) Estimated Annual Rate of Erosion: N/A Source — N/A 7. HABITAT DESCRIPTION: [AREA] F.XCAV /FTT.T./MFCN CT PARED OTHRR (A) Open Water 25,320 sf shading Section 404 Wetlan 2,04T,222 sf 398,08 sf han c earmg 25,700 sf tem . impacts (C) High Ground 19,751,900 sf graded (D) Total Area Disturbed: 22,242,280 sq. ft. (E) Primary Nursery Area: Yes (F) Water Classification: White Oak River — C, Trent River — C; Sw, NSW Open: No, No 8. PROJECT SUMMARY: The applicant proposes to widen US 17 from a two -lane road to a four -lane road for 16 miles (partially on new location) from SR1330 near Belgrade in Onslow County to the New Bern Bypass at the Jones /Craven County line, including constructing new bridges over the White Oak and Trent rivers. FIELD INVESTIGATION REPORT: NCDOT — R25I4B, C, and D US 17 BYPASS OF MAYSVILLE AND POLLOCIKSVILLE PAGE #2 9. NARRATIVE DESCRIPTION: Project Setting US 17 runs north and south through eastern North Carolina's coastal counties and leads to Chesapeake in Virginia and Myrtle Beach in South Carolina. The highway is included in the State of North Carolina's Intrastate Highway System and Strategic Highway Corridors System, as well as being a part of the Federal Strategic Highway Corridors Network (STRAHNET). The existing roadway is an undivided highway with a 12' wide travel lane in each direction, and a center turn lane within the towns of Maysville and Pollocksville. There is currently no control of access on the highway and it is currently rated at a level of service (LOS) C or better. However, if no improvements are made, it's projected LOS drops to an E or F by 2035. Additionally the highway has a slightly higher than average rate of fatal and nighttime crashes. The current project is the second, third, and fourth phases of a four phase project to create a safe, high speed connection between Jacksonville and New Bern, two of the largest cities in eastern North Carolina. A Coastal Zone Management Act Federal Consistency concurrence letter was issued for the first phase of the project (R- 2514A) on November 24, 1999 to allow the widening of US 17 to a four -lane divided highway from SR1327 (Kellum Loop Road) north of Jacksonville to SR1330 (Deppe Loop Road) south of Belgrade. Construction was completed on the A- section of the project in October 2007 The new sections of the project are to begin at the northern terminus of the A- section, approximately 3 miles south of Maysville's town limits. Phases B, C, and D would tie into the existing four -lane highway at the intersection of US 17 and SR1330 (Deppe Loop Road) and continue northward toward New Bern for approximately 16 miles where it would tie into the New Bern Bypass. The project area is along the existing US 17 route, except within the towns of Maysville and Pollocksville, where it bypasses the towns to the west. The predominant land uses in the project area are agriculture /forestry interspersed with residential home sites along the majority of the existing road, and small businesses located adjacent to the road within the two towns. Pine/hardwood forest type vegetation exists along the high ground portions of the project, with bottomland hardwood forest type vegetation adjacent to the streams. The project crosses over several streams, including the White Oak River and the Trent River. The White Oak River is approximately 30' - 40' wide and 4' - 5' deep in the vicinity of the project. It is only navigable by small craft such as canoes and kayaks due to obstructions to navigation upstream and downstream of the project. The river is classified by the Wildlife Resources Commission (NCWRC) as Inland Waters and as a Primary Nursery Area up and downstream of the project area. The river is also classified as Class C waters by the Environmental Management Commission (EMC) and the waters are closed to shellfishing. The Trent River is approximately 140' -150' wide, 8' -10' deep, and is navigable by small boats in the vicinity of the project. The river is classified as Class C; Sw, NSW waters by the EMC. The waters are classified by the NCWRC as Inland Waters, but are not classified as a Primary Nursery Area. A portion of the Trent River is classified as an Anadromous Fish Spawning Area approximately 6 miles upstream of the project. The waters of the Trent River are closed to shellfishing. FIELD INVESTIGATION REPORT: NCDOT — R2514B, C, and D US 17. BYPASS OF MAlYSVILLE AND POLLOCKSVILLE PAGE #3 Project Proposal NCDOT proposes to improve US 17 between the cities of Jacksonville and New Bern, US 17 is currently an existing two -lane undivided highway with 28' of pavement width. The applicant plans to construct a divided four -lane highway, partially on new location and approximately 16 miles in length, with 76' of total pavement width within a Right -of -Way expanded to 245' wide. Each direction of travel would have two 12' wide travel lanes, with 4' of paved shoulder adjacent to the lane nearest the median, and 10' of paved shoulder adjacent to the outside lane. The highway has been designed with 60 to 70 mph design speeds and full to partial control of access. The project would begin at SR 1330 in Onslow County and follow along adjacent to the exiting US 17 route for approximately 0.6 miles. The proposed road would then diverge from the current US 17 route by heading in northerly direction, while the existing highway heads in a northeasterly direction. Approximately 700' of the existing US 17 route adjacent to the divergence point would be realigned to intersect with the new route at a safe angle, with approximately 200 feet of the existing road obliterated and the terminus of the road converted into a cul -de -sac. The proposed highway would cross multiple existing roads and waterbodies, while bypassing the towns of Maysville and Pollocksville. The B- section of the new highway would intersect with SR 1331 (White Oak River Road) and SR 1116 (also known as White Oak River Road), at approximately 0.7 miles and 0.6 miles west of the existing US 17, respectively. The C- section of the highway would cross SR 1114 (Lee's Chapel Road) at 0.1 miles west of existing US 17, and SR 1112 (Riggs Town Road) at 0.4 miles west of existing US 17. The D- section would cross NC 58 and SR 1337 (Goshen Road), each at 0.5 miles west of US 17. It would also cross SR 1121 (Oak Grove Road) at 0.8 miles west of SR 1336, SR 1002 (Ten Mile Fork Road) at 0.4 miles west of US 17, and SR 1330 (Simmons Loop Road) in two places, at 0.2 miles and 0.3 miles west of US 17. Flyovers would be constructed to carry traffic on SR 1331and SR 1116 over the new freeway. Four 18' wide service drives totaling 4,300 linear feet would be constructed to re -route driveways displaced by the new freeway adjacent to SR 1331. Another five service drives totaling 5,984 linear feet would be constructed in association with the crossing of SR 1116. At approximately 0.5 miles north of the Town of Maysville, the proposed road would merge with existing US 17. The existing US 17 route would be realigned and widened to three lanes for approximately 1,800 feet south of the intersection with the new road. A 400' section of the existing US 17 roadway would also be abandoned and obliterated during the realignment work. To allow unimpeded travel along US 17 during the construction of the project, a 22' wide x 1500' long temporary detour road would be required in the vicinity of the intersection. Additionally an 850' long service road would be constructed at 200' south of the Maysville town limits to allow access to the Croatan National Forest. The new roadway would parallel the existing US 17 route for approximately 3.4 miles. Multiple wildlife crossings are proposed between Sta. 85 +69 and Sta. 118 +41 of the C- section of the project. This includes dual 120' bridges at Sta. 101 +45 to Sta. 102 +65 and eight 48" diameter reinforced concrete pipes. The dual bridges would have 10' of vertical clearance under them to allow for the passage of larger animals such as bear and deer. Fencing to keep wildlife off the new road and direct wildlife to the proposed wildlife crossings would be constructed along both sides of the new road from Sta. 82 +50 to Sta. 123 +90. At Sta. 206 +50, approximately 3.9 miles north of the Town of Maysville, the new road would FIELD INVESTIGATION CATION REPORT: NCDOT — R2514B, C, and D US 17 BYPASS OF MAYSVI LILIE AND POL LOCKSVI[ILILIE ]PAGE #4 diverge from the existing US 17 route onto new location again. A 430' section of the existing road would be obliterated and a cul -de -sac constructed at the terminus of the road. The existing US 17 route would be realigned to intersect with the new road at SR 1114 where a right in/right out only intersection would be constructed. The new road would continue north and cross what is now SR 1112, SR 1112 would be obliterated in the vicinity of the new road and two cul-de-sacs created. The project would continue in a northerly direction for another 3,600 feet to the end of the C- section. The D- section would begin at the terminus of the C- section and continue northward for another 2,000 feet where it would cross NC 58 on dual 121'long bridges. An interchange would be constructed at the NC 58 crossing to allow traffic on and off the freeway. Continuing northward, dual 94' long bridges would carry traffic over SR 1337, while dual 96' long bridges would be utilized to carry traffic over SR 1121. The new highway would continue toward New Bern where it would cross over SR 1002 and SR 1330 with dual bridges, 226' long and 87' long, respectively. The road would continue northward and before entering Craven County, a 300' long portion of SR 13330 would be obliterated and re- routed.so that it no longer intersects with the new highway. The proposed highway would join with the existing four -lane New Bern Bypass project just north of the Craven/Jones County line. An interchange would be constructed around Sta. 615-00 to allow traffic to flow between the existing US 17 highway and the new highway. Several bridges and culverts would also have to be constructed over the rivers and streams within the proposed road alignment. The B- section of the project would include bridges over Higgins Branch and the White Oak River. The bridges over Higgins Branch would be dual 38' wide x 160' long concrete bridges. They would each consist of two 80' long spans, with 9' of vertical clearance under them, and would not require any bents within the stream. The bridges would be constructed from a 30' wide by 50' long work bridge with a 25' long x 110' wide platform on the end of it. The bridges over the White Oak River would be dual 38' wide x 1,160' long bridges. The two new concrete girder bridges would consist of eleven spans each, ranging in length from 100' to 110'. The south bound bridge would include a portion of one bent within the river. The new bridges are designed with 15.7' of vertical clearance above the normal water level of the river. NCDOT has committed to constructing the new bridges by building a temporary work bridge between the proposed bridges. The work bridge would be 30' wide and a total of 1,070' in length, with a 100' long gap over the river. The low cord of the work bridges would be approximately 2' above the normal water level of the White Oak River. Section D of the project also has several large bridges over jurisdictional streams. Dual bridges would be constructed over Goshen Branch. The bridges would be 38' wide x 475' long, with 23' of vertical clearance under them. The bridges would be constructed with five spans that would completely span the stream. A temporary work bridge would be built between the two bridges, and would be 30' wide and 260' long with six 40' wide by 25' long fingers platforms to access the areas next to the bents. Just downstream of the proposed bridges over Goshen Branch, a double barrel reinforced concrete box culvert with 8' x 8' boxes has been proposed to replace two existing 48" diameter reinforced concrete pipes. The applicant has also proposed to construct dual 38' wide x 1,235' long bridges over the Trent River. The bridges would each have 13 spans, with a total of six bents in the river. The bridge has been designed with 19' of vertical clearance above the river surface. The bridge would be constructed from two work bridges to be constructed between the proposed bridges. A 30' wide x FIELD INVESTIGATION REPORT: NCDOT — R2514B, C, and D US 17 BYPASS OF MAYSVI LLE AND POILILOCKSV]<L LE PAGE #a5 . 750' long work bridge with sixteen 40' wide by 25' long finger platforms on the side of it would be constructed on the south side of the Trent River, while a 30' wide x 380' long work bridge with eight similarly sized finger platforms on it would be constructed on the north side of the river. The remaining major structure to be constructed for the D- section of the project would be a 24' wide x 200' long bridge over Deep Gully in the vicinity of Sta. 625 +00. The bridge would carry a single lane of traffic off the New Bern Bypass towards existing US 17. The bridge would be comprised of two 100' spans that would completely span the waters of Deep Gully. Two work platforms, 30' wide x 75' long and 30' wide x 70' long, have been proposed on the south and north sides of the stream, respectively, to allow access to construct the permanent bridge. The bridge would have 16' of vertical clearance above the stream. The roadway would also require the construction of multiple smaller culverts, equalizer pipes, drainage ditches, and sediment control basins be constructed or reconfigured to allow for proper drainage of the road. The existing power, water, telephone, and cable utility lines along the project would be relocated to outside of the proposed road alignment. While a significant portion of the relocations would be accomplished by directionally boring under Section 404/401 Wetlands areas, some of the work would include the use of open cut trenching within Section 404/401 Wetlands. Anticipated Impacts As proposed, the construction of the US 17 Bypass of Maysville and Pollocksville would result in the excavation/filling/mechanized clearing of 2,041,222 sq. ft. of Section 404 Wetlands adjacent to the project. The applicant has also applied to temporarily fill /excavate 25,700 sq. ft. of Section 404 Wetlands and hand clear 398,138 sq. ft. of Section 404 Wetlands for the road widening and utility impacts. No temporary or permanent impacts to any Coastal Wetlands are anticipated with the project. No additional closures of shellfishing waters are expected in association with the project. The proposed bridges over the multiple jurisdictional streams would permanently shade 25,320 sq. ft. of open water. The vertical and horizontal clearances of the proposed bridges equal or exceed the vertical and horizontal clearances under the bridges downstream of the project. The project would result in 4,281 linear feet of permanent impacts to streams, including 279 linear feet for bank stabilization purposes. An.additiona1379 linear feet of temporary stream impacts are required for culvert installations and 112 linear feet of temporary stream impacts would be required for bank stabilization. A total of 299,809 sq. ft. of area within the Neuse River Basin Riparian Buffer Area would be impacted by the construction of the bridges and roadway, of which 186,803 sq. ft. is in Zone 1 and 113,006 sq. ft. is in Zone II. The project would also result in 19,751,900 sq, ft. of high ground disturbance resulting from the construction of the new highway project. One archaeological site (31JN128 * *) recommended as eligible for the National Register of Historic Places is located within the proposed highway Right -of -Way for which impacts were deemed unavoidable. The NCDOT undertook data. recovery efforts at the site between June and September 2014 in accordance with the Memorandum of Agreement (MOA) developed between the U.S. Army Corps of Engineers, the State Historic Preservation Office, and the applicant. The NCDOT has committed to an in -water work moratorium of February 15 through September 30 while building the bridge over the White Oak River to avoid impacts to the Inland Primary FIELD INVESTIGATION REPORT: NCI[DOT — R2514P, C, and D US 17 BYPASS OF MAYSVILLE AND POLLOCKSVILLE ADAGE #6 Nursery Area. The applicant has also committed to avoid any in -water work in the Trent River and its tributaries on the north side of US 17 and Mill Creek (south of US 17) from February 15 through July 15 to avoid impacts to anadromous fish spawning areas. Multiple other efforts have been integrated into the project design to minimize and avoid impacts, including but not limited to avoiding impacts to wetlands through the use of alignment shifts. where practical, vertical adjustments, a 46 -foot median width, perpendicular stream crossings, and bridging Goshen Branch, the Trent River, the White Oak River, and a tributary to the White Oak River. A localized increase in turbidity can be expected during the in -water construction portion of the bridges and culverts. The applicant has proposed to offset the proposed impacts to the wetlands and stream buffers by purchasing mitigation credit from the Ecosystem Enhancement Program (EEP). The commitments reduce potential impacts to the surrounding environment. The public is expected to benefit upon completion of the project by the increase in the efficiency and safety of the new road. Submitted by: Stephen Lane — Morehead City District — February 23, 2015 o-s,..SWFo� STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAT L. MCCRORY GovERNOR November 14, 2014 US Army Corps of Engineers Regulatory Field Office 2407 West 5th Street Washington, NC 27889 Attention: Mr. Tom Steffens NCDOT Coordinator Dear Sirs: ANTHONY J. TATA SECRETARY NC Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 Mr. Stephen Lane NCDOT Coordinator Subject: Application for USACE Individual Permit, Section 401 Water Quality Certification, Neuse Riparian Buffer Authorization and CAMA Major Development Permit for the proposed improvement of US 17 from south of Belgrade at SR 1330 /SR 1439 to the New Bern Bypass, in Onslow, Jones and Craven Counties. TIP No. R- 251413, C & D. Debit $570.00 from WBS 34442.1.3. The North Carolina Department of Transportation ( NCDOT), Division of Highways, proposes to improve US 17 from SR 1330/SR 1439 south of Belgrade to the New Bern Bypass. The purpose of this letter is to request project approval from the US Army Corps of Engineers for a CWA Section 404 Individual Permit and authorization under Section 10 of the Rivers and Harbors Act. By copy of this information, NCDOT is also requesting project approval from the N.C. Department of Environment and Natural Resources under CWA Section 401 Water Quality Certification, Neuse Riparian Buffer Authorization and Coastal Area Management Act Major Development Permit. In addition to the cover letter, this application package includes the following for R- 251413, C & D: ENG Form 4345, stormwater management plan, permit drawings, utility drawings, roadway plans, CAMA MP forms, and 4B /4C merger meeting minutes. 1.0 Purpose and Need The primary purposes for this project, as identified in the Final Environmental Impact Statement (FEIS), are to: ® Improve capability of US 17 to meet its mandated objectives as part of the Intrastate System, the North Carolina Strategic Corridors System, and the Federal Strategic Highway Corridor Network; MAILING ADDRESS: TELEPHONE: 919- 707 -6100 LOCATION: NC DEPARTMENT OF TRANSPORTATION FAX: 919- 212 -5785 CENTURY CENTER, BUILDING B PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1020 BIRCH RIDGE DRIVE 1598 MAIL SERVICE CENTER WEBSITE: WWW.NCDOT.ORG RALEIGH NC 27610 RALEIGH NC 27699 -1598 ® Improve traffic flow along the US 17 corridor in the project study area; and Relieve congestion on US 17 in Onslow and Jones Counties, thereby improving safety and reducing the number of crashes. 2.0 Project Description The NCDOT proposes to improve a 16 -mile portion of US 17 between Deppe Loop Road (SR 1330) /Springhill Road (SR 1439) south of Belgrade and the New Bern Bypass near the Jones /Craven County Line, south of New Bern. Proposed improvements include a combination of widening on the existing alignment and constructing new segments west of the existing route. The proposed facility would widen US 17 to a divided four -lane facility with bypasses of Maysville and Pollocksville on new location. 3.0 Summary of Impacts Permanent Impacts: Proposed permanent impacts for R -2514 B, C & D include fill, excavation, and mechanized clearing in 46.91 acres of wetlands, including 6.8 acres of riparian wetlands, and 40.11 acres of non - riparian wetlands. Proposed permanent impacts to jurisdictional streams are 4,281 linear feet, including 279 feet of bank stabilization. Impacts due to utility work involve minimal fill in wetlands. Temporary Impacts: There will be 379 linear feet of temporary impacts to jurisdictional streams due to culvert installations, and 112 feet of temporary impacts due to bank stabilization. Hand - Clearing: There will be 0.13 acres of hand- clearing in jurisdictional wetlands due to project construction and 2.61 acres of hand - clearing for utility relocations. Buffer Impacts R -2514C and D occur in the Neuse River basin, and are subject to Riparian Buffer Rules. R- 2514C has 10,131 sq. ft. of allowable buffer impacts (6,426 in zone 1 and 3,705 in zone 2). It also has 33,486 sq. ft. of mitigable impacts (21,305 in zone 1 and 12,181 in zone 2). R -2514D has 81,090 sq. ft. of allowable buffer impacts (52,837 in zone 1 and 28,253 in zone 2). It also has 174,583 sq. ft. of mitigable impacts (105,716 in zone 1 and 68,867 in zone 2). At these buffer impact sites, there are 82,334 sq. ft. of wetlands in zone 1 and 36,317 sq. ft.in zone 2. 4.0 Summary of Mitigation The proposed construction of R -2514 B, C &D will impact 6.8 acres of riparian wetlands and 40.11 acre of non - riparian wetlands that will require mitigation. The project will impact 4,281 linear feet of jurisdictional stream that will require mitigation. In addition, the project will have unavoidable mitigable impacts to 148,206 square feet of riparian buffers, including 86,156 sq. ft. in Zone 1 and 62,050 sq. ft. in Zone 2 in the Neuse River Basin. 5.0 Project Schedule Currently, R- 251413, C & D is scheduled to let June 16, 2015, and will be available for construction shortly thereafter. The let date, however, may advance as additional funds become available. 6.0 NEPA Document Status The NCDOT completed the Final Environmental Impact Statement (FEIS) on June 23, 2011 in compliance with the SEPA guidelines. The FEIS explains the purpose and need for the project, provides a description of the alternatives considered, and characterizes the social, economic, and environmental effects. The FEIS was approved and circulated to federal, state, and local agencies. The Record of Decision (ROD) was completed on June 25, 2012 and distributed to the agencies. Both documents are posted on the NCDOT website at https:Hconnect.nedot.g_ov/ resources / Environmental /Pages /default.aspx, under Quick Links > Environmental Documents. 6.1 Independent Utility R- 251413, C & D meets the criteria for independent utility as discussed below: The project has logical termini and independent utility and is of sufficient length to address environmental matters on a broad scope; The project is usable and a reasonable expenditure of funds, even if no additional transportation improvements are made in the area; and The project does not restrict consideration of alternatives for other reasonably foreseeable transportation improvements. 7.0 Resource Status The project is located in the White Oak River Basin (Hydrologic Unit 03020301) and the Neuse River Basin (Hydrologic Unit 03020204). This is within the Middle Atlantic Coastal Plain eco- region. The project crosses the White Oak River, the Trent River, Goshen Branch, Deep Gully, and numerous unnamed tributaries to waters of the U.S., and multiple wetlands. Wetland and surface waters within the study area were initially field delineated in 2000. The jurisdictional delineation was reviewed and approved by the USACE during site visits in May and August 2000. This analysis was described in the 2001 Natural Systems Report, which was updated in a 2003 Wetlands Report. During a March 2007 Merger Process Field Meeting, USACE observed wetlands and streams that were not shown in the August 2000 Jurisdictional Determination. During the summer of 2007, additional field work and additional documentation were completed, including a Reverification of Jurisdictional Area and Neuse River Buffer Impacts Evaluation report. The USACE issued a Notice of Approved Jurisdictional Determination in November 2009. Design changes were discussed during the Avoidance and Minimization Concurrence Meetings for the Preferred Alternative, and the Corps of Engineers recommended that these changes be incorporated into a new Jurisdictional Determination. This updated JD was approved by the Corps on March 19, 2012. 3 7.1 Wetland Delineations A wetland identification and preliminary assessment analysis for the study area was included in the FEIS. The wetlands within the study area were delineated based on the 1987 U.S. Army Corps of Engineers (USACE) Wetland Delineation Manual. 7.2 ,stream Delineations The stream channels within the project study area were identified, evaluated, and classified using the NCDWR stream identification form and the Cowardin classification system. Water quality information for the streams within the project study area was derived from available sources provided through the NCDENR. 7.3 R -2514: Characterization of Jurisdictional Sites 7.3.1 Wetlands There are four wetland types found within the project study area based on the Cowardin classification: Palustrine Forested (PFO), Palustrine scrub -shrub (PSS), and Palustrine emergent (PEM), and the Palustrine unconsolidated bottom (PUBH) More detailed information about these wetlands can be found in the 2001 Natural Systems Report and FEIS, which includes figures showing the wetlands within the project area. 7.3.2 Streams The White Oak River and its tributaries all carry best use classifications of C within the study area. The Trent River and its associated tributaries all carry best use classifications of C Sw NSW within the project area. Details for the jurisdictional streams within the project area are provided in the FEIS and Natural Systems Report. . There are no waters within the project vicinity classified as High Quality Waters (HQW). Neither Water Supplies (WS -I: undeveloped watersheds or WS -II: predominately undeveloped watersheds), nor Outstanding Resource Waters (ORW) occur within 1.0 mile of the project area. Streams within the R- 251413, C & D project area are not designated as North Carolina Natural or Scenic Rivers, or as National Wild and Scenic Rivers. Additionally, these waters are not listed on the 2014 303(d) list of impaired waters due to sedimentation or turbidity. 74 Impacts to Jurisdictional Resources Impacts to jurisdictional wetlands, surface waters and riparian buffers for R- 251413, C & D are summarized below in Tables 1, 2 and 3 respectively. 0 Table 1. R -2514 B, C & D Wetland Impacts Permit Drawing Site Number Ma Label p in (2011) Type Permanent Impacts* (ac.) Temporary Impacts (ac.) Mitigation Required (2 :1) R -2514B 1 241 Non -ri arian 0.4 Yes 2 242 Non-riparian 0.19 Yes 3 32 Non-riparian <0.01 Yes 4 31 Non-riparian 0.01 Yes 5 27 Non-riparian 2.31 Yes 6 26 Riparian 1.2 Yes 7 24 Non-riparian 0.14 Yes 8 22 Non-riparian 0.07 Yes 9 245 Agricultural. ditch 0.04 No 10 44, 45, W9 Riparian 3.70 0.06 Yes 11 42 Riparian 0.19 Yes 12 W8,46 Riparian..._ 0.01 0.01 Yes 14 48 Non-riparian 0.07 Yes 15 49 Non-riparian 1.22 Yes 16 W22,250._ Riparian 0.07 Yes R -2514B Riparian: 5.17 0.07 R -2514B Non-riparian: 4.42 0.0 R -2514B Subtotal: 9.63 0.07 R -2514C 1 49 & 65 Non-riparian 4.05 <0.01 Yes 2 49 & 65 Non-riparian 0.13 Yes 3 49 Non-riparian 0.07 Yes 4 67 (west side), 65, 68 &75 (east) Non - riparian 8.25 <0.01 Yes 5 69 & 70 Non-riparian 0.25 Yes 6 71 &72 Non-riparian 0.04 <0.01 Yes 7 74 Non-riparian 0.36 Yes* 8 75 Non-riparian 0.73 Yes 9 77 west, 76 east Non - riparian 1.06 Yes 10 79 & 80 Non-riparian 1.10 Yes 11 78 Non-riparian 0.04 Yes 12 82 & 83 Non-riparian 0.50 Yes 13 West 85 & 86, east 84 Non - riparian 0.46 Yes 14 88 Non-riparian 1.93 Yes 15 89, 90, 91 Non-riparian 0.29 Yes 16 West 92, east 93 Non - riparian 0.73 Yes Permit Drawing Site Number Map Label F1 i( 2011) 1) ( Type Permanent Impacts* (ac.) Temporary Impacts (ac.) Mitigation Required (2:1) 17 94, G1 Riparian 0.03 Yes 20 100 Non-riparian 1.78 Yes 21 98 Non-riparian 0.25 Yes 23 65&63 Non-riparian 0.03 Yes R -25140 Riparian: 0.03 0.0 R -25140 Non-riparian: 22.05 <0.01 R -2514C Subtotal: 22.08 <0.01 R -2514D 2 114 Non-riparian 2.54 Yes 3 131 Riparian 0.18 <0.01 Yes 4 132 & 135 Riparian 0.74 0.06 Yes 4 141 Non-riparian 0.20 Yes 5 166 Non-riparian 0.91 Yes 6 167 Non-riparian 1.73 Yes 7 175 Non-riparian 0.02 Yes 8 177 Non-riparian 0.25 Yes 9 181 Riparian 0.60 Yes 10 182 Non-riparian 0.40 Yes 11 184 Non-riparian 1.05 Yes 12 186 Non-riparian 0.37 Yes 13 246 Riparian 0.02 Yes 14 196 Non-riparian 0.34 Yes 15 229 Non-riparian 0.05 Yes 17 201 Non-riparian 1.55 Yes 18 202 Non-riparian 0.68 Yes 19 226 Non-riparian 1.55 Yes 20 225 Non-riparian 0.36 Yes 21 211 Non-riparian 1.62 Yes 22 See note ** Non-riparian 0.02 Yes 23 D1, 217 Riparian 0.06 Yes R -2415D Riparian: 1.6 0.06 R -2514D Non-riparian: 13.64 <0.01 R -2514D Subtotal: 15.24 R -2514 B, C & D Total Riparian: 6.8 0.13 Non-riparian: 40.11 <0.01 Grand Total: 46.91 0.13 * R -2514C Site 7 includes an additional 0.06 acres of unimpacted wetlands counted as a total take. This will be mitigated at a 1:1 ratio. ** Site 22 is a non - riparian wetland site identified during construction of R -2301A (New Bern Bypass) that had not been accounted for during the permit for that project. It was decided to include this site on the permit application for R- 2514B, C & D to obtain after - the -fact authorization and provide mitigation. Table 2. R -2514 Surface Water Impacts Permit Drawing Site Number Waterbody Labeled in FEIS permanent (ft) Permanent (ac.) Temporary (ft) Temporary (ac.) USAGE Mitigation Required 2:1 R -2514B 6 W5 130 0.02 6 <0.01 Yes 6 W5 356 0.07 14 <0.01 Yes 6* W5 25 <0.01 10 <0.01 No 6* W5 25 <0.01 10 <0.01 No 13 W21 1151 0.60 60 0.04 Yes 13* W21 27 0.01 7 <0.01 No 13* W21 29 0.01 7 <0.01 No 13* W21 87 0.05 0 0 No 16 W22 120 1 0.04 25 0.01 Yes R -2514B Total: 1,949 0.81 139 0.06 R -2514C 17 G1 109 0.01 Yes 18 G1 132 0.02 Yes 18* G1 20 <0.01 No 19 G2 106 0.01 Yes 19* G2 58 <0.01 No 22 W21 32 0.02 Yes 22 W21 10 0.01 No R -2514C Total: 379 0.06 88 0.01 R -2514D 1 B5 218 0.01 31 <0.01 Yes 1* B5 16 No 3 131 5 <0.01 50 0.01 Yes 6 167 0.03 No 9 S18 196 0.05 20 <0.01 Yes 9 S18 20 <0.01 No 9* S18 18 No 13 S14 230 0.01 21 <0.01 Yes 13 S14 21 <0.01 No 13* S14 12 No 15 S9 292 0.06 27 <0.01 Yes 15 S9 27 <0.01 No 15* S9 26 No 16 S17 282 0.01 Yes 16 S17 21 <0.01 No 16* S17 14 No 21 D2 644 0.06 Yes R -2514 D Total: 1,953 0.23 170 0.02 R- 2514B, C & D Total 4,281 1.1 397 0.09 *Denotes bank stabilization; when necessary, mitigation required by the USACE exceeds the amount required by NCDWR. The table indicates 279 feet of permanent impacts and 112 feet of temporary impacts due to bank stabilization. 7 Table 3. R -2514 C &D Riparian Buffer Impacts 8.0 Protected Species The United States Fish and Wildlife Service (USFWS) list 17 federally protected species for Onslow (1/24/14 list), Jones (9/22/2014 List) and Craven (9/22/14 list) Counties (Table 4). Table 4. Federally Protected Species in ®nslow. Jones and Craven Counties Common blame Allowable Mitigable Buffer Drawing Site Number Zone 1 (sq. ft.) Zone 2 (sq. ft.) Total (sq. ft.) Zone 1 (sq. ft.) Zone 2 (sq. ft.) Total (sq. ft.) R -25140 Acipenser oxyrinchus oxyrinchus 1 E 6,426 3,705 10,131 No BGPA N/A 2 Thalictrum cooleyii No E No Effect 11,389 7,568 18,957 3 No Effect 1 Chelonia mydas No 9,916 4,613 14,529 R -2514C Subtotal 6,426 3,705 10,131 21,305 12,181 33,486 T I R -2514D Northern long-eared bat 1 Yes P Not Required [Piping lover 18,124 11,612 29,736 2 13,921 9,058 22,979 26 26 3 31,209 12,501 43,710 4 14,017 9,383 23,400 5 15,142 9,677 24,819 6 20,266 12,665 32,931 7 38,167 25,504 63,671 8 7,707 6,694 14,401 R -2514D Subtotal 52,837 28,253 81,090 105,716 68,867 174,583 R- 2514 C &D Total: 59,263 31,958 91,221 1 127,021 81,048 ' `208,069 8.0 Protected Species The United States Fish and Wildlife Service (USFWS) list 17 federally protected species for Onslow (1/24/14 list), Jones (9/22/2014 List) and Craven (9/22/14 list) Counties (Table 4). Table 4. Federally Protected Species in ®nslow. Jones and Craven Counties Common blame Scientific Name Habitat Federal Status Biological Conclusion American alligator mississi iensis Yes T (S /A) N/A -Alligator Atlantic sturgeon Acipenser oxyrinchus oxyrinchus No E No Effect Bald Eagle Haliaeetus leucoce halus No BGPA N/A Cooley's meadowrue Thalictrum cooleyii No E No Effect Golden sedge Carex lutrea No E No Effect Green sea turtle Chelonia mydas No T No Effect Leatherback sea turtle Dermochel s coriacea No E No Effect Loggerhead sea turtle Caretta caretta No T I No Effect Northern long-eared bat M otis se ' ptentrionalis Yes P Not Required [Piping lover Charadris melodus No T I No Effect Pondberry* Lindera melissifolia No E No Effect Red - cockaded woodpecker Picoides borealis Yes E No Effect Red knot Calidris canutus ru a No P Not Required Rough-leaved loosestrife L simachia as erulae olia No E No Effect Seabeach amaranth Amaranthus umilus No T No Effect Sensitive joint vetch Aesch nomene vir inica No T No Effect Shortnose sturgeon Aci enser brevirostrum No E No Effect West Indian manatee Trichechus manatus No E No Effect Notes: E Endangered T Threatened T S/A Threatened (Similarity of Appearance) P Proposed *Historic record A US Fish and Wildlife Service proposal for listing the northern long -eared bat (Myotis septentrionalis) as an Endangered species was published in the Federal Register in October 2013. The listing may become effective as soon as April 2015. This species is included in USFWS's current list of protected species for Craven and Jones Counties. NCDOT is working closely with the USFWS to understand how this proposed listing may impact NCDOT projects. Northern Long -eared Bat (NLEB) surveys were recently conducted on the west side of Croatan National Forest (CNF) in conjunction with the proposed project. The acoustic survey results (from 39 acoustic monitoring nights) were analyzed by two software programs. A total of nine calls were identified as NLEBs from both automated identification programs, BCID and EchoClass. Multiple calls were also identified as Indiana bats and gray bats by BCID and EchoClass, although neither species' range extends into central or eastern North Carolina; the results were false positives. Manual analysis was conducted to select calls with the most NLEB characteristics. This subset of calls was sent to two acoustic experts (Chris Corben, Titley Scientific, and Dr. Joy O'Keefe, Indiana State University) for further analysis. Neither expert saw conclusive evidence that NLEB were present; most of the calls were determined to be Southeastern Bats (Myotis austroriparius). According to the experts, six calls had potential to be from NLEBs. As a follow -up to the acoustic surveys, 14 nights of mist - netting were conducted for the US 17 , project, but no NLEBs were captured. In addition to the negative mist - netting results for US 175 the following negative surveys results were also obtained in and adjacent to CNF: • Six nights of mist - netting in CNF along the proposed Havelock bypass corridor in 2005 ( NCDOT); • Five nights of mist - netting adjacent to CNF at the NCDOT Croatan mitigation bank from 2007- 20 10 ( NCDOT); • One night of mist- netting in Carteret County at the southern edge of CNF in 2009 ( NCDOT); and • Acoustic driving transects conducted on CNF by USFS staff and analyzed by University of North Carolina- Greensboro staff (Matina Kalcounis - Rueppell, personal communication). Based on the negative mist - netting results obtained in and around CNF, NLEBs do not appear to be present and will not be affected by the project. NCDOT will continue to coordinate appropriately with USFWS to determine if this project will incur potential effects to the Northern long -eared bat, and how to address these potential effects, if necessary. 8.1 Bald and Golden Eagle Protection Act (BGPA) In the July 9, 2007 Federal Register (72:37346- 37372), the bald eagle was declared recovered, and removed (de- listed) from the Federal List of Threatened and Endangered wildlife. This delisting took effect August 8, 2007. After delisting, the Bald and Golden Eagle Protection Act (Eagle Act) (16 U.S.C. 668 -668d) became the primary law protecting bald eagles. Nesting and foraging habitat are not present in the project area, nor have bald eagle nests or individuals been seen within a 660 -foot radius of the project area. 8.2 Moratoria The Trent River is designated as an anadromous fish spawning area, prohibiting in- stream work in the Trent River from February 15 through July 15. Tributaries to the Trent River north of US 17) and Mill Creek (south of US 17) are also designated as anadromous fish spawning areas and are subject to the same restriction. The White Oak River is designated as an Inland Primary Nursery Area, prohibiting in- stream work in the White Oak River from February 15 through September 30. 9.0 Cultural Resources As documented in the project ROD, A Memorandum of Agreement (MOA) for historic- reso1irccs' was developed in accordance with section 106 of the National Historic Preservation Act of 1966 to address the adverse effect of the proposed project on an archaeological site in the project vicinity. NCDOT has developed and implemented an Archaelogical Data Recovery Plan for Site 31JN128 * *, a property determined eligible for listing on the National Register of Historic Places. In the Fall of 2009, an intensive archaeological investigation and site evaluation of the Area of Potential Effects (APE) was conducted for the proposed improvements to US 17 in Jones and Onslow counties from SR 1330 (Deppe Loop Road) near the City of Jacksonville north to the Jones /Craven county line outside the City of New Bern (TIP# R- 251413, C, D). This investigation was conducted by Environmental Services, Inc. (ESI) of Raleigh, North Carolina, on behalf of the North Carolina Department of Transportation ( NCDOT) to fulfill the requirements of Section 106 of the National Historic Preservation Act (NHPA 1966, as amended), and complies with the guidelines issued by the Advisory Council on Historic Preservation (ACHP) in consultation with the North Carolina Office of State Archaeology (OSA) and NCDOT. Twenty -nine (29) archaeological sites were documented as a result of these investigations (31ON1762 * *- 31ON1765 ** and 31JN122 * *- 31JN146 * *). Of the 29 archaeological sites, 26 have been recommended as not eligible for the National Register of Historic Places (NRHP). Two of the sites (31JN137 ** and 31JN143 * *) were not assessed based on their location outside 10 of the project corridor; both of these sites are early to late 20th century cemeteries and will be avoided by the proposed project. The one remaining archaeological site (31JN128 * *) was recommended as eligible for the NRHP per Criterion D. Archaeological investigations at Site 31JN128 ** documented a domestic occupation dating to the late 18th and early 19th centuries that has been recommended eligible for the NRHP per Criterion D for its potential to yield significant information pertaining to Middling Planters and Farm Sites in Jones County (and historic Craven County) during the Federal and early Antebellum periods, especially related to site structure and foodways. Spatial patterning of artifacts is present, with defined architectural, activity, and disposal areas. Research reveals that the family of Nicholas Adams and Elizabeth Wickliffe Bray, Middling Planters, lived on the property from the 1790s to the 1810s, contemporaneous with the diagnostic artifacts recovered. Avoidance of the site was recommended, but not possible. Therefore, once ROW was acquired and a temporary easement placed around Site 31JN128 * *, archaeological data recovery investigations were conducted relative to a signed 2011 Memorandum of Agreement (MOA) and Scope of Work prepared by the NCDOT. Data recovery efforts took place at the site between June and September 2014. ESI completed a preliminary management summary for the data recovery at Site 31JN128 ** in September 2014. All fieldwork is completed and it is recommended that the proposed proj ect be granted clearance to proceed without concern for impacts to significant cultural resources. 10.0 FEMA Compliance The project has been coordinated with appropriate state and local officials and the Federal Emergency Management Agency (FEMA) to assure compliance with FEMA, state, and local floodway regulations. 11.0 Mitigation Options The NCDOT is committed to incorporating all reasonable and practicable design features to avoid and minimize jurisdictional impacts, and to provide full compensatory mitigation of all remaining, unavoidable jurisdictional impacts. Avoidance measures were taken during the planning and NEPA compliance stages; minimization measures were incorporated as part of the project design. 11.1 Avoidance and Minimization All jurisdictional features were delineated, field verified and surveyed within the corridor for R- 2514B, C & D. Using these surveyed features, preliminary designs were adjusted to avoid and /or minimize impacts to jurisdictional areas. During step 4A of the Interagency Merger process, the Merger Team concurred that jurisdictional impacts have been avoided and minimized to the maximum extent practicable through the use of alignment shifts, vertical adjustments, a 46 -foot median width, perpendicular stream crossings, bridging Goshen Branch, the Trent River, the White Oak River, and a tributary to White Oak River, utilizing equalizer pipes between bisected wetland features, paralleling the existing power transmission easement in the northern portion of the project, locating service roads and turnarounds in non jurisdictional areas, utilization of existing US 17 as a service road, and elimination of proposed interchanges at the northern and southern termini. NCDOT employs many strategies to avoid and minimize impacts to jurisdictional areas in all of its designs. Many of these strategies have been incorporated into BMP documents that have been reviewed and approved by the resource agencies and which will be followed throughout construction. Construction- related impacts associated with the proposed action will be minimized by adhering to applicable rules, regulations and permit conditions and by NCDOT's Best Management Practices for the Protection of Surface Waters. All wetland areas not affected by the project will be protected from unnecessary encroachment. Individual avoidance and minimization items are as follows: • No staging of construction equipment or storage of construction supplies will be allowed in wetlands or near surface waters. • The project was designed to avoid or minimize disturbance to aquatic life movements. • NCDOT and its contractors will not excavate, fill, or perform land clearing activities within Waters of the U.S. or any areas under the jurisdiction of the USACE, except as authorized by the USACE. To ensure that all borrow and waste activities occur on high ground, except as authorized by permit, the NCDOT shall require its contractors to identify all areas to be used to borrow material, or to dispose of dredged, fill or waste material. Documentation of the location and characteristics of all borrow and disposal sites associated with the project will be available to the USACE on request. ® Grass swale treatments have been incorporated in areas where flat slopes can be maintained. • Proposed culverts will be buried 1 ft. to provide for fish passage. • Cross pipes in jurisdictional streams will be buried lft. • All wetlands will receive diffused flow. • Special Sediment Control Fence will be used were applicable. • The use of hand clearing rather than mechanized clearing where possible. • Bank stabilization at outlets of culverts will not impact the stream bed. • Considering environmental, hydraulic, and roadway perspectives, 3:1 slopes are proposed within the wetlands where most practical. 11.2 Compensation The NCDOT has avoided and minimized impacts to jurisdictional resources to the greatest extent practicable as described above. However, due to the extent of wetlands and surface waters in the study area, complete avoidance is not possible. Compensatory mitigation is recommended for all unavoidable jurisdictional impacts. The impacts for R- 2514B, C & D occur in two HUC's: 03020204 and 03020106. R -2514B is located entirely in 03020106. R -2514C is split between the two HUC's with the dividing line falling across wetland sites 14 and 15, splitting them between the HUC's. Sites 1 through 13 are in 03020106, as are Sites 22 and 23. Sites 16 through 21, and part of 14 and 15 are in 03020204. Tables 5 and 6 break down the project impacts by HUC. 12 Table 5. Wetland Impacts by HUC The stream impacts in Table 6 are summarized from those detailed in Table 2, less the bank stabilization impacts. Table 6. Stream Impacts by HUC Project Section HUC 03020106 HUC 03020204 Project Section Impact Sites Riparian Non- riparian Riparian Non- riparian R -2514 B All sites 5.17 4.42 0 0 R -2514 C Sites 1 -13, 22 & 23 0 17.07 0 347 R -2514 D Site 14 0 1.31 0 0.62 2,224 Site 15 0 0.17 0 0.12 Sites 16 - 21 0 0 0.03 2.76 R -2514 D All sites 0 0 1.6 13.64 Total impacts by HUC 5.17 22.97 1.63 17.14 The stream impacts in Table 6 are summarized from those detailed in Table 2, less the bank stabilization impacts. Table 6. Stream Impacts by HUC Project Section Impact Sites HUC 03020106 HUC 03020204 R -2514 B All sites 1,756 0 R -2514 C Sites 1 -13, 22 & 23 32 0 Site 14 0 0 Site 15 0 0 Sites 16 - 21 0 347 R -2514 D All sites 0 13867 Total impacts by HUC 1,788 2,224 In a May 9, 2014 memorandum, NCDOT proposed that the unavoidable impacts to Waters of the U.S. will be offset by compensatory mitigation provided at the Croatan Mitigation Bank for the B and C sections of the project, which are partially located in a different HUC than the mitigation bank. The Corps approved the use of Croatan Wetland Mitigation Bank "as the source for all stream, riparian wetland and non - riparian wetland credits to offset the unavoidable impacts associated with R -2514 B &C" in a letter dated May 20, 2014. NCDOT is also proposing that all impacts from R -2514D will be provided by Croatan Wetland Mitigation Bank. The stream and wetland credits generated by the CWMB are valid in HUC 03020204, where all of the R -2514D impacts occur. NCDOT has requested an acceptance letter from EEP to provide compensatory stream and wetland mitigation from the Croatan Wetland Mitigation Bank. As of the date of this application, such acceptance letter has not been issued. Buffer impacts All riparian buffer impacts occur in HUC 03020204. Table 7 accounts for the overlap of buffers and wetlands on R -2514D to determine mitigation requirements. Since Site 4 through 7 occur in wetlands, the buffer acreage must be deducted to avoid double- counting the impacts. This 13 reduces the amount of buffer impacts calculated in Table 3 for R- 2514D, resulting in a revised total of 64,851 sq. ft. of buffers Zone 1 and 49,869 sq. ft. in Zone 2, for a revised total of 114,720 sq. ft. for R- 2514D. Adding in the impacts for R- 2514C, the total mitigable project impacts are 86,156 sq. ft. in Zone 1, 62,050 in Zone 2, and 148,206 sq. ft. total. Compensatory mitigation for impacts to riparian buffers will be provided by EEP. Table 7. R -2514 D Riparian Buffers in Wetlands 12.0 Indirect and Cumulative Effects NCDOT completed an Indirect and Cumulative Effects Report on September 22, 2010 during preparation of the 2011 FEIS. As discussed in the FEIS, project construction is not expected to induce extensive development within the study area. It is expected that complementary land development, such as highway oriented businesses will develop at a small scale near the site of the proposed interchange and at the intersection of NC 58 and US 17. Based on the analysis contained within the FEIS, very little development activity has taken place or is expected to occur within the forseeable future, TIP Project R -2514 will not likely result in cumulative effects on notable features of the human and /or natural environment. 14 Mitigable Buffer Drawing Zone.l Zone 2 Total Site (sq. ft.) (sq. ft.) (sq. ft.) Number R -2514D Impacts 14,017 9,383 23,400 4 Less buffers in _12,324 -6,294 - 18,618 wetlands Subtotal 1,693 3,089 4,782 Impacts 15,142 9,677 24,819 5 Less buffers in -433 -0 -433 wetlands Subtotal 14,709 9,677 24,386 Impacts . 20,266 12,665 32,931 6 Less buffers in -0 1 432 -1,432 wetlands ' Subtotal 20,266 11,233 31,499 Impacts 38,167 25,504 63,671 7 Less buffers in - 28,108 - 11,272 - 39,380 wetlands Subtotal 10,059 14,232 24,291 Remaining buffer impact 46,727 38,231 ' 84,958 requiring mitigation 12.0 Indirect and Cumulative Effects NCDOT completed an Indirect and Cumulative Effects Report on September 22, 2010 during preparation of the 2011 FEIS. As discussed in the FEIS, project construction is not expected to induce extensive development within the study area. It is expected that complementary land development, such as highway oriented businesses will develop at a small scale near the site of the proposed interchange and at the intersection of NC 58 and US 17. Based on the analysis contained within the FEIS, very little development activity has taken place or is expected to occur within the forseeable future, TIP Project R -2514 will not likely result in cumulative effects on notable features of the human and /or natural environment. 14 13.0 Essential Fish Habitat The Trent River is listed as Essential Fish Habitat to its existing crossing of US 17, downstream of the project. The White Oak River is listed as Essential Fish Habitat to SR 1101 in Stella, also downstream of the project. Consequently, the project will not impact any essential fish habitat afforded protection under the Magnuson- Stevens Act of 1996 (16 U.S.0 1801 et seq.). 14.0 Regulatory Approvals Section 404: Application is hereby made for a USACE Individual 404 Permit as required for the above - described activities. Section 10: Application is hereby made for USACE authorization under Section 10 of the Rivers and Harbors Act as required for the above - described activities Section 401: We are requesting a Section 401 Water Quality Certification and Neuse Riparian Buffer Authorization from NCDWR. We are providing this application to the NCDWR, for their approval. N.C. Coastal Area Management Act: A CAMA Major Development Permit is also required for the section of the project in Craven County, specifically the crossing of the White Oak River due to impacts to Public Trust Area and Public Trust Shoreline Areas of Environmental Concern. Authorization to debit the $475 Permit Application Fee from WBS Element 34442.1.3 is hereby given. A copy of this permit application and its distribution list will be posted on the NCDOT website at: https:Hconnect.nedot.gov /resources /Environmental/ If you have any questions or need additional information, please contact Gordon Cashin at 919- 707 -6107 or gcashin @ncdot.gov. Sincerely, Richard W. Hancock, P.E., Manager Project Development and Environmental Analysis Unit cc: NCDOT Permit Application Standard Distribution List. 15 �4 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAT L. MCCRORY GOVERNOR February 10, 2015 US Army Corps of Engineers Regulatory Field Office 2407 West 5th Street Washington, NC 27889 Attention: Mr. Tom Steffens NCDOT Coordinator Dear Sirs: ANTHONY J. TATA SECRETARY NC Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 Mr. Stephen Lane NCDOT Coordinator Subject: Application Modification Request for USAGE Individual Permit, Section 401 Water Quality Certification9 Neuse Riparian Buffer Authorization and LAMA Major Development Permit for the proposed improvement of US 17 from south of Belgrade at SR 1330 /SR 1439 to the New Bern Bypass, in Onslow, Jones and Craven Counties. TIP No. R -2514 B, C & D. References: NCDOT permit application dated November 14, 2014 NCDWR On Hold letter dated January 27, 2015 As you are aware, the North Carolina Department of Transportation ( NCDOT), Division of Highways, proposes to improve US 17 from SR 1330 /SR 1439 south of Belgrade to the New Bern Bypass. Permit applications for this project were submitted to the regulatory agencies on November 14, 2014. The purpose of this letter is to provide additional information requested by the agencies and provide updated application materials where changes in project plans have occurred. Unless provided with this revised application, all other information included in our original application has not changed. PECDVED 1.0 Agency Comments on the Permit Application 1.1 N.C. Division of Water Resources In an e -mail dated January 5, 2015, David Wainwright of the N.C. Division of Water Resources (DWR) requested a listing of which impacted stream resources are perennial and which are R:C' -i ; ^ intermittent. _jl MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 TELEPHONE: 919- 707 -6100 FAX: 919 -212 -5785 WEBSITE. WWW.NCDOT.ORG LOCATION: CENTURY CENTER, BUILDING B 1020 BIRCH RIDGE DRIVE RALEIGH NC 27610 Stream Status R- 251413: Permit Sites 6 and 16 are perennial, Site 13 is intermittent R- 2514C: All sites are intermittent R- 251413: Only Permit Site 3 is perennial. This site is a tributary to Trent River, and is identified as stream T15 in the EIS and other documentation (mistakenly listed as 131 in the permit application's Table 2.) Most of these stream calls are identified in Table 2 from the Wetland and Stream Delineation Reevaluation and Neuse River Buffer Reassessment (ESI, Oct. 3, 2007). Sites G2 and W22 aren't specifically listed in the 2007 table; the status of these sites was confirmed with Matt Smith of Environmental Services, Inc., who conducted the fieldwork. The DWR submitted a comment letter on January 27, 2015 requesting additional information and placing the permit application on hold until the information was provided. This letter specifically mentioned six areas in which the application was deficient. These comments and their responses are listed below. Comment 1: Section B — At Site 14, it appears as if the fill impact and excavation impact numbers are reversed; please verb if the presented impacts are correct. Response: The calculations for these impact areas have been reviewed and verified. Comment 2: In the application, Table 1, R- 2514B, the stated subtotal of permanent wetland impacts (9.63 acres) do not total the sum of the impacts presented nor the impacts summary sheet (9.59 acres). Please verb. Response: NCDOT has re- checked the totals and the impact summary sheet should be 9.61 acres. The remaining difference is due to rounding, and the difference in how significant figures were handled in the summary table versus the cover letter tables. The table entries for R -2514 C have been changed to reflect impact revisions and to be consistent with the proposed impact data that was provided in the R -2514 B and D sections. Comment 3: Section C — The Stormwater Management Plan states that approximately 2 13rds of the project are in the Neuse River Basin, which is a riparian buffer basin. However, the plan does not include a swale summary table as does Section D. Please forward a summary table for this area. Response: A swale summary table for Section C is attached. Comment 4: Section C — There are two sets of impacts for power lines; one has impact sites 1 -5 and the other has impacts sites 1 -27. Please resolve this discrepancy. RECEIVED I!7? Response: The permit drawings depicting utility impacts for section C have been consolidated into a single set of drawings depicting all sites. The new drawings are attached. !� W Comments 5 and 6: Section D — At Utility Site 1 there appear to be power pole /line relocations. 2 The amount of hand clearing requested seems to be excessive for the proposed activity. Please explain why this amount of clearing is necessary. At Utility Site 2 the amount of hand clearing requested seems excessive for the proposed utility relocation. Please explain why this amount of clearing is necessary. Responses to Comments 5 & 6: Further coordination with the utility companies has reduced the clearing impacts in this area of the project. However, this review revealed an error in the permit application at these impact sites. Specifically, the summary sheet incorrectly lists the impacts at Site 1 and 2 as 0.01 and 0.60 acres respectively, and showed the total impacts as 0.61 acres in the permit application. Utility Permit Drawings Sheet 2 correctly showed that Site 1 impacted 1.259533 acres and Site 2 0.5993 acre, a total of 1.86 acres. The Utility Permit Drawing data was incorrectly transferred to the summary sheet. The revised drawings included in this submittal show a much reduced footprint; with Sites 1 and 2 impacting 0.35 and 0.40 acre due to hand clearing. This reduced the impacts from 1.86 acres to 0.75 acre. 1.2 Corps of Engineers Comments In an email dated January 22, 2015 from Tom Steffens with the US Army Corps of Engineers ( USACE) to Gordon Cashin with NCDOT, the USACE expressed concerns about a road paving "detour" project recently proposed near R -2514. This paving project will not be associated with R -2514. Furthermore, other than the onsite temporary detour described below, the NCDOT is not aware of any other elements in the works for R -2514, and believes the current permit drawings reflect the extent of the project's impacts. The revised drawings now include a temporary onsite detour associated with Section C of the project. The additional impacts for this detour are depicted in an attached set of drawings. The Site 1D shown in these drawings is an extension of Site 1 on Sheet 58 of 62 of the permit drawings. The Site 2D in the detour drawings is an extension of Site 2 shown on Sheet 7 of 62 of the permit drawings. During phase I of construction, the proposed north bound lanes will be constructed while traffic is maintained on the existing alignment. During phase Il, the temporary onsite detour will be utilized to carry traffic from the existing alignment to the newly constructed north bound lanes so the proposed southbound lanes, which follow the existing alignment, can be constructed. The additional temporary impacts are provided later in the revised impact tables. 2.0 Updates to the Permit Application 3.0 Summary of Impacts Permanent Impacts: Proposed permanent impacts for R -2514 B, C & D include fill, excavation, and mechanized clearing in 46.86 acres of wetlands, including 6.77 acres of riparian wetlands, and 40.09 acres of non - riparian wetlands. Proposed permanent impacts to jurisdictional streams are 4,281 linear feet, including 279 feet of bank stabilization. Impacts due to utility work involve minimal fill in wetlands. Temporary Impacts: Proposed temporary impacts for R -2514 B, C & D include temporary fill, temporary excavation, in 0.59 acre of wetlands, including 0.13 acre of riparian wetlands, and 0.46 acre of non - riparian wetlands. There will be 397 linear feet of temporary impacts to jurisdictional streams including 112 feet of temporary impacts due to bank stabilization. There will also be 0.01 acre of temporary fill in wetlands in the hand clearing areas for erosion control measures Hand - Clearing: There will be 6.55 acres of hand- clearing in jurisdictional wetlands due to project construction and 2.59 acres of hand - clearing for utility relocations. 4.0 Summary of Mitigation The proposed construction of R -2514 B, C &D will impact 6.77 acres of riparian wetlands and 40.15 acres of non - riparian wetlands that will require mitigation (includes 0.06 acre of wetlands counted as a total take which will be mitigated at a 1:1 ratio). The project will impact 4,002 linear feet of jurisdictional stream that will require mitigation. In addition, the project will have unavoidable mitigable impacts to 148,206 square feet of riparian buffers, including 86,156 sq. ft. in Zone 1 and 62,050 sq. ft. in Zone 2 in the Neuse River Basin. 7.4 Impacts to Jurisdictional Resources Impacts to jurisdictional wetlands, surface waters and riparian buffers for R -2514 B, C & D were summarized in Tables 1, 2 and 3 respectively in the permit application. Tables 1 and 2 have been revised below to reflect the impact revisions resulting from: minor changes in design, presenting proposed impact data for all three sections consistent, and duplicate entries. The table entries that have changed are highlighted in gray. Totals may not match the sum of individual impacts provided on the attached impact summary sheets due to rounding. 1'E' - IVc-D 4 Tfihl,,l _R_?1;14_R_C&D Wetland Imnact.v. Permit Map Label Mitigation Drawing in FEIS Type Permanent Temporary Required' Site Impacts (ac.) impacts (ac.) (2:1) (2011) Number R-2514B 1 241 Non-riparian 0.4 Yes 2 242 Non-riparian 0.19 Yes 3 32 Non-riparian <0.01 Yes 4 31 Non-ri arian 0.01 Yes 5 27 Non-riparian 2.31 Yes - 6 26 Riparian 1.2 Yes 7 24 Non-riparian 0.14 Yes 8 22 Non-riparian 0.07 Yes - 9 245 Agricultural ditch No 10 44, 45, W9 Riparian 3.70 0.06 Yes 11 42 Riparian 0.19 Yes 12 W8,46 Riparian 0.01 0.01 Yes 14 48 Non-riparian - Yes 15 49 Non-riparian 1.22 Yes 16 W22,250 Riparian Yes R-2514B Riparian: 0.07 R-2514B Non-riparian: IN 0.0 R-2514B Subtotal: 0.07 R-2514C 1 49 & 65 Non-riparian a t2 Yes Non rip arian 0.13 Yes 2 49 & 65 3 49 Non-riparian Yes 67 (west 4 side), 65, 68 Non-riparian 8.25 <0.01 Yes &75 (east) 5 69 & 70 Non-riparian 0.25 Yes - 6 71 &72 Non-riparian <0.01 Yes 7 74 Non-riparian Yes* - 8 75 Non-riparian 0.73 Yes 9 77 west, 76 Non-riparian 1.06 Yes east 10 79 & 80 Non-riparian 1.10 Yes 11 78 Non-riparian OW Yes 12 82 & 83 Non-riparian 0*50 Yes 13 west 85 & Non-riparian es 86, east 84 14 88 Non-riparian 1.93 Yes is 89,90,91 Non-riparian 0.29 IN41- 0 WON ' ;". " 0. 02. BE Yes west 92, east Non-riparian 0.73 gl� v Q Yes 93 94, GI Riparian OQ 1 Yes RE C % EIVED Table 1 continued. R -2514 B, C & D Wetland Impacts Permit Drawing Site Number Map Label in FEIS (2011) Type Permanent Impacts (ac.) Temporary Impacts (ac.) Mitigation Required ' (2:1) 20 100 Non-riparian 1.78 Yes 21 98 Non-riparian 0.25 Yes 23 65 & 63 Non-riparian 0.03 Yes R- 2514CRiparian: v 0.0 R -2514C Non-riparian: R -25140 Subtotal R -2514D 2 114 Non - riparian 2.54 Yes 3 131 Riparian 0.18 <0.01 Yes 4 132 & 135 Riparian 0.74 0.06 Yes 4 141 Non-riparian 0.20 Yes 5 166 Non-riparian 0.91 Yes 6 167 Non-riparian 1.73 Yes 7 175 Non-riparian 0.02 Yes 8 177 Non-riparian 0.25 Yes 9 181 Riparian 0.60 Yes 10 182 Non - riparian 0.40 Yes 11 184 Non-riparian 1.05 Yes 12 186 Non-riparian 0.37 Yes 13 246 Riparian 0.02 Yes 14 196 Non-riparian 0.34 Yes 15 229 Non - riparian 0.05 Yes 17 201 Non-riparian 1.55 Yes 18 202 Non-riparian 0.68 Yes 19 226 Non-riparian 1.55 Yes 20 225 Non - riparian 0.36 Yes 21 211 Non-riparian 1.62 Yes 22 See note ** Non-riparian 0.02 Yes 23 D1, 217 Riparian 0.06 Yes R -2415D Riparian: 1.6 0.06 R -2514D Non-riparian: 13.64 R -2514D Subtotal: 15.24 0.06 R -2514 B, C & D Total Riparian: _ 0.13 Non-riparian: �� 1}fl4} s: s Grand Total' R-11 - OD - * R -2514C Site 7 includes an additional 0.06 acre of un- impacted wetlands counted as a total take, not included in the table above. This will be mitigated at a 1:1 ratio. ** Site 22 is a non - riparian wetland site identified during construction of R -2301A (New Bern Bypass) that had not been accounted for during the permit for that project. It was decided to include this site on the permit application for R- 2514B, C & D to obtain after- the -fact authorization and provide mitigation. ** *For permanent impacts Table 2_ R -2514 Surface Water imnacts Permit Drawing Site Number Waterbody Labeled in FEIS. Permanent (ft) Permanent (ac.) Temporary (ft) Temporary (ac.) USACE Mitigation Re uired (2:1) R -2514B 6 W5 130- 0.02 6 <0.01 Yes 6 W5 356 0.07 14 <0.01 Yes 6* W5 25 <0.01 10 <0.01 No 6* W5 25 <0.01 10 <0.01 No 13 W21 1151 0.60 60 0.04 Yes 13* W21 27 0.01 7 <0.01 No 13* W21 29 0.01 7 <0.01 No 13* W21 87 0.05 No 16 W22 120 1 0.04 25 0.01 Yes R -2514B Total. 1,95x ' . -. 0 80 {' 139 0 OS R -2514C 17 GI 109 0.01 Yes 18 G1 132 0.02 Yes 18* G1 20 <0.01 No 19 G2 106 0.01 Yes 19* G2 58 <0.01 No 22 W21 32 0.02 Yes 22 W21 10 0.01 No R -2514C Total: 379 0.06 88 0.01 R -2514D 1 B5 218 0.01 31 <0.01 Yes 1* B5 16 No 3 131 5 <0.01 50 0.01 Yes 6 167 0.03 No 9 S18 196 0.05 20 <0.01 Yes 9* S18 18 No 13 S14 230 0.01 21 <0.01 Yes 13* S14 12 No 15 S9 292 0.06 27 <0.01 Yes 15* S9 26 No 16 S17 282 0.01 21 <0.01 Yes 16* S17 14 No 21 D2 R -2514 D Total: 644 1,953 0.06 0.23 170'0 fF4' z Yes R- 25148, C & D Total ; ,th4$2', ,_ 1.1 397 0.09 *Denotes bank stabilization; when necessary, mitigation required by the USACE exceeds the amount required by NCDWR. The table includes 279 feet of permanent impacts and 112 feet of temporary impacts due to bank stabilization. 11.2 Compensation Table 5 breaks down the proposed permanent wetland impacts by HUC. The table entries that have changed are highlighted in gray. Table 5. Wetland Impacts by HUC * R -2514C Site 7 includes an additional 0.06 acre of wetlands counted as a total take, not included in the table above. This will be mitigated at a 1:1 ratio. NCDOT has received an acceptance letter dated November 14, 2014 from EEP providing wetland and stream mitigation from the Croatan Wetland Mitigation Bank. Though impacts have been revised, it appears that this letter still adequately covers compensatory mitigation for this project and in fact, may exceed actual mitigation needs. If necessary, NCDOT will request that EEP reduce mitigation credits after permits are obtained. A copy of this revised permit application and its distribution list will be posted on the NCDOT website at: https: // connect. ncdot .gov /resources/Environmental/ If you have any questions or need additional information, please contact Gordon Cashin at 919- 707 -6107 or gcashin @ncdot.gov. Sincerely, �r Richard W. Hancock, P.E., Manager Project Development and Environmental Analysis Unit cc: NCDOT Permit.Application Standard Distribution List. HUC 03020106 HUC 03020204 Project Section Impact Sites Riparian Non - riparian Riparian Non- riparian R -2514 B All sites R -2514 C Sites 1 -13, 22 & 23If3; Site 14 1.31 0.62 Site 15 0.17 1 0.12 Sites 16 - 21 a Ft . 2.76 R- 2514 D All sites 1.6 13.64 Total impacts by HUC5 @345 X161 h 17.14 * R -2514C Site 7 includes an additional 0.06 acre of wetlands counted as a total take, not included in the table above. This will be mitigated at a 1:1 ratio. NCDOT has received an acceptance letter dated November 14, 2014 from EEP providing wetland and stream mitigation from the Croatan Wetland Mitigation Bank. Though impacts have been revised, it appears that this letter still adequately covers compensatory mitigation for this project and in fact, may exceed actual mitigation needs. If necessary, NCDOT will request that EEP reduce mitigation credits after permits are obtained. A copy of this revised permit application and its distribution list will be posted on the NCDOT website at: https: // connect. ncdot .gov /resources/Environmental/ If you have any questions or need additional information, please contact Gordon Cashin at 919- 707 -6107 or gcashin @ncdot.gov. Sincerely, �r Richard W. Hancock, P.E., Manager Project Development and Environmental Analysis Unit cc: NCDOT Permit.Application Standard Distribution List. DCM MFl APPLICATION for Major Development Permit (last revised 12127/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name North Carolina Department Of Transportation Project Name (if applicable) R -25148 Applicant 1: First Name Richard MI W. Last Name Hancock, PE Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address NCDOT -PDEA, 1548 Mail Service Center PO Box City Raleigh State NC ZIP 276991 548 ' Country Phone No. 919-707-6107 ext. FAX No. - - Street Address (if different from above) City State ZIP Email gcashin @ncdot.gov 2. Agent/Contractor Information Business Name Agent/ Contractor 1: First Name MI Last Name Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State ZIP Phone No. 1 - ext. Phone No. 2 ext. FAX No. Contractor # Street Address (if different from above) City State ZIP Email <Form continues on back> a Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Onslow Jones c. Size of individual @ot(s) US 17 Subdivision Name City State Zip Phone No. Lot No.(s) (if many, attach additional page with list) ext. N/A a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak White Oak River c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. NNatural ❑Manmade ❑Unknown White Oak River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes NNo work falls within. 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 400 300,000 c. Size of individual @ot(s) d. Approximate elevation of tract above NHW (normal high water) or N /A, I I NWL (normal water level) (If many lot sizes, please attach additional page with a list) 7' ❑NHW or ®NWL e. Vegetation on tract Forested: red maple, royal fern, cinnamon fern, lizard's tail f. Man -made features and uses now on tract N/A g. Identify and describe the existing land uses adjacent to the proposed project site. Forested h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? Onslow County: Rural agriculture; Jones County: (Attach zoning compliance certificate, if applicable) Agriculture - Residential & Rural Conservation ❑Yes []No NNA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes NNo k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. NYes ❑No ❑NA If yes, by whom? NCDOT, ESI I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes NNo ❑NA National Register listed or eligible property? <Form continues on next page> Z .,. .. t <. . i ' . ' '-� ,. •�. n 6 , 3 .? x s .s o .. 1;,v . i , .. > .. 5 -m r ... -: 3 a 2, � n �'`.. b 4� ,. Major Development Permit FAre wetlands on the site? NYes ❑No coastal wetlands on the site? ❑Yes NNo ither (i) or (ii) above, has a delineation been conducted? NYes []No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. N/A o. Describe existing drinking water supply source. N/A p. Describe existing storm water management or treatment systems. N/A 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial NPublic/Government ❑ Private /Community b. Give a brief description of purpose, use, and daily operations of the project when complete. To maintain and improve public transportation. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Heavy highway construction equipment. d. List all development activities you propose. Land clearing, grading & filling, road & bridge construction e. Are the proposed activities maintenance of an existing project, new work, or both? New Work f. What is the approximate total disturbed land area resulting from the proposed project? 120 ❑3q.Ft or NAcres g. Will the proposed project encroach on any public easement, public accessway or other area ®Yes ❑No ❑NA that the public has established use of? h. Describe location and type of existing. and proposed discharges to waters of the state. See attached permit drawings I. Will wastewater or stormwater be discharged into a wetland? ®Yes ❑No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? :,;:: ❑Yes. ❑No ❑NA j. Is there any mitigation proposed ?. ®Yes ❑No ❑NA If yes, attach a mitigation proposal. <Form continues on back> Major Development Permit 6. Additional Information In addition to this completed application form, (MP -9) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) - (t) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name See attached landowner letters Phone No. Address Name Phone No. Address Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. N/A h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. I I 3 1 -10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date � 3 2-o/Lf PrintName RIC -RAP-fl �• 9NNC -0CK Signat _- Please indicate application attachments pertaining.-to. your proposed project. ®DCM MP -2 Excavation and Fill Information. ®DCM MP -5 Bridges and Culverts ❑DCM MP -3 Upland Development ❑DCM MP -4 Structures Information l 1 Eel Z 1111 . •' (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and /or fill activities. All values should be given in feet. 1. EXCAVATION ®This section not applicable a. Amount of material •to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (i) Does the area to be excavated include coastal wetlands /marsh d. High - ground excavation in cubic yards. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. r__ - 12. a. C. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of the excavation in these areas: DISPOSAL. OF EXCAVATED MATERIAL Location of disposal area. (i) Do you claim title to disposal area? ❑Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner e. (i) Does the disposal area include any coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None (ii) ®This section not applicable b. Dimensions of disposal area. d. (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA (ii) If yes, where? f. (i) Does the disposal include any area in the water? ❑Yes ❑No ❑NA If yes, how much water area is affected? Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NWL) stabilization Length Width Avg. Existing NA NA Depth Final Project NA NA Depth 1. EXCAVATION ®This section not applicable a. Amount of material •to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (i) Does the area to be excavated include coastal wetlands /marsh d. High - ground excavation in cubic yards. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. r__ - 12. a. C. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of the excavation in these areas: DISPOSAL. OF EXCAVATED MATERIAL Location of disposal area. (i) Do you claim title to disposal area? ❑Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner e. (i) Does the disposal area include any coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None (ii) ®This section not applicable b. Dimensions of disposal area. d. (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA (ii) If yes, where? f. (i) Does the disposal include any area in the water? ❑Yes ❑No ❑NA If yes, how much water area is affected? 3. SHORELINE STABILIZATION ❑This section not applicable (If development is a wood groin, use MP -4 — Structures) a. Type of shoreline stabilization: o• ❑Bulkhead NRiprap ❑Breakwater /Sill ❑Other: c. Average distance waterward of NHW or NWL: 2 ft. d. e. Type of %bilization material Class ( Rip Rap g. Number of square feet of fill to be placed below water level. Bulkhead backfill Riprap q 7`1 r Breakwater /Sill Other i. Source of fill material. To be determined by contractor Lengtn: i i a n. Width: g-4 Maximum distance waterward of NHW or NWL: �f f. (i) Has there been shoreline erosion during preceding 12 months? ❑Yes ❑No [DNA (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. 4. OTHER FILL. ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a tit Will fill material ha hrouaht to the site? ❑Yes ❑No ❑NA b. (i) Will fill material be placed in coastal wetlands /marsh (CW), If yes, (ii) Amount of material to be placed in the water (iii) Dimensions of fill area (iv) Purpose of fill submerged aquatic vegetation tsHV /, sneu ooaom took, ut other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAN ❑SB ❑WL ❑None (ii) Describe the purpose of the fill in these areas: 15, GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragllne, controlled? backhoe, or hydraulic dredge)? c. (i) Will navigational aids be required as a result of the project? ❑Yes ❑No ❑NA (ii) If yes, explain what type and how they will be implemented. d. (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes ❑No ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. �. r R%C-V A P w. 14�co CK Applicant Name Date ((�� Applicant Signature Project Name S Form 8CM MP-5 BRIDGES and CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. BRIDGES ❑This section not applicable a. Is the proposed bridge: []Commercial ®Public /Government ❑Private /Community c. Type of bridge (construction material): Prestressed Concrete Girders e. (i) Will proposed bridge replace an existing bridge? ❑Yes ®No If yes, (ii) Length of existing bridge: (iii) Width of existing bridge: (iv) Navigation clearance underneath existing bridge: (v) Will all, or a part of, the existing bridge be removed? (Explain) 9. Length of proposed bridge: 1160 ft. and 160 ft. b. Water body to be crossed by bridge: White Oak River (1160 ft.) and Higgins Branch (160 ft.) d. Water depth at the proposed crossing at NLW or NWL: 4.1 ft. (White Oak River) - 1.5 ft. (Higgins Branch) f. (i) Will proposed bridge replace an existing culvert? ❑Yes ®No If yes, (ii) Length of existing culvert: (iii) Width of existing culvert: (iv) Height of the top of the existing culvert above the NHW or NWL: (v) Will all, or a part of, the existing culvert be removed? (Explain) h. Width of proposed bridge: 2@38 ft. i. Will the proposed bridge affect existing water flow? ®Yes ❑No j. Will the proposed bridge affect navigation by reducing or If yes, explain: As water surface rises with large storm increasing the existing navigable opening? ❑Yes ®No events, bents will be in the water. Approximately 1850' of If yes, explain: fill is in the 100 year f!oodplain. k. Navigation clearance underneath proposed bridge: 15.7 ft. m. Will the proposed bridge cross wetlands containing no navigable waters? ®Yes ❑No If yes, explain: The Higgins Branch bridge (160 ft.) does not cross navigable waters. I. Have you contacted the U.S. Coast Guard concerning their approval? [--]Yes ®No If yes, explain: n. Height of proposed bridge above wetlands: 13.7 ft. 2. CULVERTS ®This section not applicable a• Number of culverts proposed: b. Water body in which the culvert is to be placed: 252- 888 -2808 ;- 'I- 888- 4RCOAST -- www.nccoastaimanaqement.net revised. 10/26/06 0 N Form, Ct PAP-5 (Bridges and CvN -arts, Page 2 of tip) < Form continues on back> c. Type of culvert (construction material): d. (i) Will proposed culvert replace an existing bridge? e. (i) Will proposed culvert replace an existing culvert? ❑Yes ❑No ❑Yes ❑No If yes, (ii) Length of existing bridge: (iii) Width of existing bridge: (iv) Navigation clearance underneath existing bridge: _ (v) Will all, or a part of, the existing bridge be removed? (Explain) f• Length of proposed culvert: h. Height of the top of the proposed culvert above the NHW or NWL. j. Will the proposed culvert affect navigation by reducing or increasing the existing navigable opening? ❑Yes ❑No If yes, explain: If yes, (ii) Length of existing culvert(s): (iii) Width of existing culvert(s): (iv) Height of the top of the existing culvert above the NHW or NWL: (v) Will all, or a part of, the existing culvert be removed? (Explain) 9. Width of proposed culvert: I. Depth of culvert to be buried below existing bottom contour. k. Will the proposed culvert affect existing water flow? []Yes []No If yes, explain: 3. EXCAVATION and FILL []This section not applicable a. (i) Will the placement of the proposed bridge or culvert require any excavation below the NHW or NWL? ❑Yes ®No If yes, (ii) Avg. length of area to be excavated: (iii) Avg. width of area to be excavated: (iv) Avg. depth of area to be excavated: (v) Amount of material to be excavated in cubic yards: c. (i) Will the placement of the proposed bridge or culvert require any high- ground excavation? ®Yes ❑No If yes, (ii) Avg. length of area to be excavated: 25 ft (iii) Avg. width of area to be excavated: 80 ft. (iv) Avg. depth of area to be excavated: 2 ft. (v) Amount of material to be excavated in cubic yards: 150 Cy b. (i) Will the placement of the proposed bridge or culvert require any excavation within coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of the excavation in these areas: prnokklt revised: 10/2610 Form DCM P-5 �Brjdges and Culivert ,, Page- 3 n14) d. If the placement of the bridge or culvert involves any excavation, please complete the following: (i) Location of the spoil disposal area: e. 7 (ii) Dimensions of the spoil disposal area: (iii) Do you claim title to the disposal area? []Yes ❑No (If no, attach a letter granting permission from the owner.) (iv) Will the disposal area be available for future maintenance? ❑Yes ❑No (v) Does the disposal area include any coastal wetlands /marsh (CW), submerged aquatic vegetation (SAVs), other wetlands (WL), or shell bottom (SB)? ❑CW ❑SAV OWL ❑SB ❑None If any boxes are checked, give dimensions if different from (ii) above. (vi) Does the disposal area include any area below the NHW or NWL? ? []Yes [-]No If yes, give dimensions if different from (ii) above. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed below NHW or NWL? ❑Yes ❑No If yes, (ii) Avg. length of area to be filled: (iii) Avg. width of area to be filled: (iv) Purpose of fill: (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed on high - ground? ®Yes ❑No If yes, (ii) Avg. length of area to be filled: 1850 ft. (iii) Avg. width of area to be filled: 180 ft. (iv) Purpose of fill: Proposed Roadway 4. GENERAL a. Will the proposed project require the relocation of any existing utility lines? ®Yes ❑No If yes, explain: If this portion of the proposed project has already received approval from local authorities, please attach a copy of the approval or certification. f. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed within coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of the excavation in these areas: b. Will the proposed project require the construction of any temporary detour structures? ❑Yes ®No If yes, explain: Form continues on back> 252-808-2808 :: 11=$38= 'f r ,,_ r_ 10126/06 r3 c. Will the proposed project require any work channels? ❑Yes ®No If yes, complete Form DCM -MP -2, e. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Heavy highway construction equipment. g. Will the placement of the proposed bridge or culvert require any shoreline stabilization? ❑Yes ®No If yes, complete form MP -2, Section 3 for Shoreline Stabilization only. Date Project Name �— 2-5 t Applicant Name =�pr R�� W, RAN W C- < Applicant Signature C/ d. How will excavated or fill material be kept on site and erosion controlled? Use of Standard NCDOT Best Management Practices and erosion control measures. f. Will wetlands be crossed in transporting equipment to project site? ®Yes ❑No If yes, explain steps that will be taken to avoid or minimize environmental impacts. Temporary work bridges. Month Carolina Department of Transportation ! \ fL�l xlyft Plighway Stormwater Program . STORM4YATER IIANAGEIVIENT PLAN . (Version 1.2; Released September 2011) FOR LINEAR ROADWAY PROJECTS ' Project /TIP No.: R -2514B Coun ies : Jones Onslow Page 1 of 1 General Pfoject Information Project No.: R- 25146 Project Type: New Location Date: 1/23/2014 NCDOT Contact: Paul Atkinson, PE Contractor/ Desi ner: Address: 1020 Birch Ridge Rd. Address: Raleigh, NC 27610 Phone: 919- 707 -6707 Phone: Email: patkinson@ncdot.gov Email:, - Ci /Town: Maysville Coun ies : Jones Onslow River Basin(s): White Oak CAMA County? No Yes Primary Receiving Water: White Oak River NCDWQ Stream Index No.: 20-(1) NCDWQ Surface Water Classification for Primary Receiving Water Primary: Class -C Supplemental: Other Stream Classification: 303(d) Impairments: Buffer Rules in Effect N/A t ? , ?; PRa ect €DescTi tion Project Length lin. Miles or feet): 4.156 Miles Surrounding and Use: J 9 ( ) ,. g Farmland Pro . edPro ect Ezlstin 'Site`i Project Built -Upon Area (ac.) ac. ac. Typical Cross Section Description: Four Lane Divided Highway with 38' grassed median. 4' interior paved shoulder, two 12` Two Lane Highway with two 12' travel lanes and T paved shoulders. travel lanes, and 10' exterior paved shoulder. Average Daily Traffic (veh /hr /day): Design/Future: 15,900 2035 Existing: 6800 2015 General Project Narrative: R -25146 is the planned new US 17 bypass of Maysville. Two major structures are planned at the crossing of the L Line (US 17 Bypass) with Higgins Branch and the White Oak River. The structure over.Higgins Branch is 2@80'45" Girders for a total length of 160', while the structure over White Oak River is 2 @100', 7 @110', 1 @100', andl @90' 63" MBT for a total length of 1160'. Grass lined ditches are utilized throughout where possible. Any ditches draining to wetlands were daylighted 10' before entering the wetlands to prevent concentrated flow from entering and additional impacts to the wetlands. Rip Rap toe protection was used in areas where this was not possible to maintain non - erosive velocities through the wetlands. 36" RCP -IV Equalizer Pipes were used in areas where the proposed roadway is splitting wetlands: STA. 72 +04 -L -, 75 +50 -L -, 151 +92.61 -L -, 157 +27.35 -L- to allow for water to pass freely from one side of the highway to the other allowing for wetlands to remain viable. Storm drain outfalls have been located outside of wetlands where possible. " R @ferenceS ;s 31 North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN (version 1.2; Released September 2019.) '- FOR LINEAR ROADWAY PROJECTS Pro'ect1TIP No.: R -25148 Coun ies : Jones Onslow Page 2 of 2 Project Environmental Summary Surface'1Nater lm `acts Sheet Station Feature Water / Wetland 1 Receiving Surface NRTR Map NCDWQ Stream NCDWQ Surface 303(d) Type of Existing Proposed No. From / To Impacted BufferType Water Name ID Index Water Classification Impairments Im act SCM SCM 10 Y2A- 31 +03 Stream Perennial Cotman's Branch W5 N/A N/A None Culvert N/A 31 +50 10 -L- 99 +27 Stream Perennial Cotman's Branch W5 N/A N/A None Culvert N/A 100 +97 18 -Y3A- 23 +40 Stream Intermittent N/A W21 N/A NIA None Culvert N/A 23 +74 18 -L- 207 +00 Stream Intermittent N/A W21 NIA NIA None Stabilization N/A 208 +34 18 - Y3E -11 +39 Stream Intermittent N/A W21 N/A N/A None Stabilization N/A 12 +10 19 -L- 213 +85 Stream Intermittent 1 - N/A W21 N/A N/A None Fill N/A 222 +00 20 -L- 222 +00 Stream Intermittent N/A - W21 NIA N/A None Fill N/A 223 +71 22 -Y2- 30 +83 Stream Mitchell's Branch N/A N/A N/A None Stabilization NIA 32 +00 List all stream and surface water impact locations regardless of jurisdiction or size. Equalizer Pipes to be noted as a minimization of impacts. All proposed SCMs listed must also be listed under Swales, Preformed Sour Holes and other Energy Dissipators, or Other Stormwater Control Measures. L. . . . . . . . . . . =7777,7, 'R _SR 51� V"I.- '1 1 11-1.1"I"N" 11111�1 1i .+ 0" ",1 SP, NO; g . . . . . . . ProjectITIP No 34442.1.5 Coun!Zies): Jones Craven Pane 1 of 3 poet, Pro ject No.: 34442.1 .5 Pro*ect : New Location 3/712014 NCDOT Contact: Randy Henegar, P.E. Contractor I Desi ner: Address: 1020 Birch Ridge Dr. Address: Raleigh, N.C. 27610 Phone: 919-707-6700 Phone: Email: rhenegaE2ncdot.gov Email: City/Town: Pollocksville Countyfles): Jones Craven River Basin(s): Neuse CAMA County? No Yes Primary Receiving Water: Trent River NCDWQ Stream Index No.: 27-101-(l) NCDWQ Surface Water Classification for Primary Receiving Water Primary: Class C Supplemental: Swamp Waters (Sw) Nutrient sensitive, waters (NSW) Other Stream Classification: 303(d) Impairments: Buffer Rules in Effect Neuse 7!rrr 7777 Project Length (lin. Miles or feet): 6.383 Miles Surroundins Land Use: Farmland P. Project Built-Upon Area (ac.) 58.80 Typical Cross Section Description. ac. The roadwaytypical section is. of .a foUr-lane roadway divided by a 46-foot median with N/A ac. NIA 12-foot lanes'and paved shoulders. Average Daily Traffic (veh/hriday)- Design/Future: 20,800 (2035) 1 Existinq: 12,606 2000), General Project Narrative: NCDOT proposes to improve a 16-mile portion of US 17 between Deppe Loop. Road (SRI 330) Springhill Road, (SR 1439) south. of Belgrade and the New Bern Bypass near the Jones/Crav6n. County line South of New Bern. Proposed improvements include . abombination of widening on the existing alignment a , nd constructing new segments I west of the existing route. The proposed facility would widen, US, 17 to a divided four-lane facility, with bypasses of,Maysville,and Pbllocksville on new:location. R-2514D is the planned new US 17 bypass of.Pollocksville. Two major Structures are planned at I the crossing of the -L- Line (US 17 Bypass) with Goshen Branch: and the Trent River. The structure over Goshen Branch is dual bridges with 5@95' 54" Girders for a total length of 475', while the structure over the Trent River is dual bridges.with 13@9.5'54" Girders for a total length of 1235'. Another major structure is planned at the crossing of the -DRV3- Line and Goshen Branch, which is a 2@ 8'X8' Reinforced Concrete Box Culvert with a total length of 40'. One last major structure is planned at the crossing of the -Y1 ORPA- Line and Deep Gully, and is a bridge with 2@100'63" Modified Bulb Tee for a total length of 260'. Grassed swales have been utilized where possible to treat drainage going into buffered zones. The.cumulative length of grass swale ditches on the project total 12853 ft. The recommended treatment length for the entire project totals to 11329 ft. 7777777 References. .., � f �•a..:e a i1- .w, I r ..:,,,,<r,. -Y.a A F A r A �1, J g�, m t v � '+ J ,�.. x., \MrAKnSj 4� { � I \.. \ i 1 f i�lV y,T �... ty � 1 \t� � 1 ,,., Sy Y 1:.. �n�.�Ia A p, . �t�,� �yy •, . f (iW�. a .!JkD hl: '�',.1�w4 � Y1.,v �rK W 1{' .'F. ' $ fA l J... y: 11, "t. l j�y M:•:, ��',. :' 4 l .ye611 7 \ J I 1 ; v ;. ,i � (9'�W �}1 i 4 1 ✓-. �.. �. :,:w+ C' �: n {'.,5L�' "' \4, ,t....., ✓:.vr :w '••.' ."i F t A.: ,:..,. . 1 I I.:r,a... ..uwr •, '.. :'< d�'�,. 1 A'k,t };':• h lh Nl.. a "51 , \, Y V ��.. �C. � } s:,.,t� 5, C4.4 '.: +.' < .. ,..��- 'f�- '.,.,. t,:tu.•7r. 1N �._ ..;.,., It ,•, &5 {y'�, ro .r K }1h CL{ /�I ; .,.t Yf �' :.tl k ;Q .:.rL r.fl 1.. . +1'' c ad ' ' i i, de t. ,, A': ' Y,'d"" r 1'" FOFI+,r4` S r •r .P ,, , . ,t ti"PROJEC`r5, .. Pro ectMP No 34442 1 5 r t \ Coun ies Jones Craven - •: \ t,. r „,`''.rr ;mli,s",.,Ifrr� ,\ ; , V f Page 2 Of 3 . ., ...,ar4a:,Ya «.,,t.l,,.�:,�r 1 ,,.. z.A,„ • s+ },�Yl:.; Stream Drainage Recommended Actual Longitudinal Sheet Station Crossing Base Width Front Slope Back Slope Area Rock Treatment Length Length No. From / To Station ft Slope Q2 V2 Q10 V10 Checks H: H :V ac ft ft) 300 +00 { °� °) {cfs ff s cfs (fps) Used 4 - NA 4.0 3:1 3:1 6.12 612 � p 301 +50 LT -L- 0.30% 11.0 1.6 14.0 300 +15 to 1.7 No . 4 &5 NA 00 6:1 6:1 0.47 47 426 304 +00 HIED -t- 0.30% 1.2 0.8 1.6 0:9 No 9 364 +06 NA D -L- 370 +37 MED 0.0 10 :1 10:1 0.68 68 631 1.70% 1.5 1.4 2.0 1.6 No 9 370 +50 to 372 +30 RT 372 +30 RT L- 3.0 3:1 3:1 4.78 476 rL- ,: 0.45% 13.5 2.0 17.5 2.1 No 9 17 +00 to . NA 2.0 3:1 3:1 0.15 18 +00. - DRV3 - 15 100 2.11% 0.4' 1.3 0.5 1.4 No 9 18 +28 to 20 +16 - DRV3 - NA 2.0 3:1 3:1 0.14 14 188 1.20% 0.4 1.0 0.5 1.1 No 9 375 +40 t0 NA 0.0 6:1 6:1 0.58 510 0.60% 1.5 1.1 2.0 380 +50 MED -L- 1.2 No 58 9 &10 380 +5010 NA 0.0 6:1 6:1 0.30 280 0 0.8 0.7 1.0 0.8 383 +30. -L- . 30 .30% No 11 399 +70 to NA 0.0 4:1 3:1 0.20 125 0.30% 0.6 0.8 0.8 0.8 No 400 +95 LT -L- 20 11 400 +95 to. NA 0.0 4:1 3:1 5.80 580 0.30 %' 8.0 1.4 10.0 1.5 No 406 +50''LT -L- 11 404 +50 to NA 0.0 4:1 3:1 1.70 400 0.40% 3.1 1.2 4:0 1.3 No 408 +50. RT -L- 170 11 395 +78 to NA 0.0 10:1 10:1 0.28 272 0.34% 0.8 0.7 1.0 0.7 No 398 +50 MED -L- 28 11 398 +50 to NA 0.0 6:1 6:1 0.62 580 0.30% 1.6 0.9 2.1, 0.9 No 404 +30 MED -L- 62 11 1 404 +30So, NA 0,0 6:1 6:1 0.64 605 0.38% 1.7 0.8 2.2 0.8 No 410 +35 MED -L- 84 16 465 +50 to NA 0.0 6:1 6 :1 0.90 720 0.30% 2.7 1.0 3.5 1.1 No 472 +70 MED -L- 90 16 &17 472 +70 to NA 0.0 6:1 6:1 0.37 330 0.30% 1.0 0.8 1.2 0.8 No 476 +00 MED -L- 37 17 476+0016 NA 0.0 6:1 6:1 0.80 736 0.30% 2.1 0.9 2.7 1.0 No 483 +36 MED =L- 80 21 +16 M 30. 539 +16 MED: -G- NA 0.0 6:1 6:1 1.07 107 1066 0.30% 2.8 1.0 3.7 1.1 No 0 0 E] YES p No Have minimum design criteria, as presented in the NCDOT Best Management Practices Toolbox, Version 1 (March 2008), been met and verified? If No, provide further explanantion of why design criteria was not met. On roadway heet 4, buffer `= 'AdditionalComments y ffer site 1 the swale from station 300 +00 to 301 +50 Lt. ,. . L- has 5.4 ac, of offsite drainage coming to it from project R 2514C. The 5.4 ac. is composed' of 4.8 ac. of grass and 0.6 as of pavement. i i�'+�" I }� � -, f:�Y '� id \% , } h 1 .r�, ��' 1f : � YY 4 f � f ti.H�., "iuh:'�` A •:t 1r ,k J ;:� \ �_ '. n r .:.:fie :t•,�.;f 3 .. i�N�4 ..o.Vr'� 1 7' i >i. 5�... �'. W 1. '•� :.�; - .:.. .,•1` ,. ,. ,. k ..y }. �. t, lF. yn 1• "A'4.�.•'N iqv •. A. Q.� .. 'r' °l. %,c.,n yl h. 11 } :.tip M1,,. ,:.:: .. 1. T n;v„ .,. .., ::: C ft.. Pro ectITIP No Coun 34442 1 5 t= b►At?VVY EGIS yes Jones Craven " 1 t r Page of 3 3.. Mule Stream Drainage Recommended Actual Longitudinal Rock Sheet Station Crossing Base Width Front Slope Back Slope Area Treatment Length Length Slope Q2 V2 Q10 V10 Checks No. From / To Station ft ii:V hl: ac ft ft % cfs (fps) cfs (fps) Used 21 539 +16 to NA 0.0 6:1 6:1 0.53 516 0.'s0% i.4 0.8 1:8 0.9 Used 544+32 MED -L- 53 25 &26 593 +67 to NA 0.0 6:1 6:1 99 750 0. 0.30% 3.1 1.0 4.0 1.1 No 601 +17 MED -L- 99 26 598 +45 RT -L- NA 6.0 4:1 31 35.20 0 t0 16 +00 FT 3520 F 0.30 o 31.0 1.9 42.0 2.0 No YIORPC- 0 26 16 +00 to 17 +00 NA 4.0 3:1 3:1 4.60 1 "e:i:' 1.00% 7.0 2.0 9:0 2.1 No RT- Y10RPC- 460 26 - 605 +15 to _ NA 6.0 3:1 31 29.70 508 +85. LT -L- 2970 dsr" . . 0.30% 41.0 1.7 55.0 2.4 No 26 0+00 L to ` NA 2A 3:1 3:1 2.70 0.30% 5.0 1.3 6.0 1.4 No 610 +00 LT -L, 270 26 56 +50 to NA 0.0 4:1 3:1 0.29 150 0.30% 1.0 0.9 1.3 0:9 No 58 +31 LT -Y8A- 29 26 $01 +17 t0: NA 0.0 6:1 6:1 0.82 767 0.30% 2.1 0.9 2.8 1.0 No 608 +85 MED -L- 82 26 608 +85 to NA 0.0, 6:1 6:1 613 +34 MED -G 0.50 50 450 0.30% 1.3 0.8 1.7 0.9 No 26 613+3440 D NA 0.0 6:1 6:1 0:62 606 2.20% 1.6 1.8. 2.1 1.9 No 619+40 MED -L- 62 27 to 4 627 7+50 .0 3:1 3:1 2.60 260 0.90% 7.0 2.0 9.0 2.2 No +50 R T -L- 27 15 +25 to RPA- ' NA 399 RT = Y10RPA- 2.0 3:1 3:1 3.99 0.30% 8.0 1.4; 10.0 1.5 No 0 0 0 0 0 ne: 0 1� •mil P`:tl -1i "k. �1i'i! FV 0 [] YES p No Have minimum design criteria, as presented in the NCDOT Best Management Practices Toolbox, Version 1 (March 2008), been met and verified? If No, provide further explanantion of why design criteria was not met. Additional: Comments` On roadway sheet 26, buffer site 7, there are three instances of offsite drainage draining to'swales. From station 598 +45 Rt. -L- to station 16 +00 Rt: -Y10RP From station 605 +15 to 608 +85, the swale has 25.2 ac, of offsite drainage. From station 608 +85 to 610 +00 Lt. -L -, the swale has 1.5 ac of offsite drainage.. On roadway sheet 27, buffers offsite 8, the a are two instances of offsite drainage draining to swales. From station 627 +15 to 627 +50 Rt. -L -, the swale has 0.82 ac. of offsite drainage. From station 15 +25 to 18 +05 Rt. - Y10RPA -, the swale has 2.95 ac. of offsite drainage. Project No.: NCDOT Contact: Address: Phone: Email: City/Town: R -2514C Paul Atkinson, PE Hydraulics Unit, 1020 Birch ridge Dr., Raleigh, NC 27610 i oA,NVO: is Project Type: Roadway Wii Contractor / Designer: Address: Phone: Email: Coun ies : JONES , :•; :...:� .. ening Date: 6/3/2013 Brook Anderson, PE. Hydraulics Unit, 1020 Birch ridge Dr., Raleigh, NC 27610 Fbasting.Site 919-707-6707 919-707-6706 patkinsonQn cdot. ov From North of Maysville to South of Pollocksville beanderson ncdot. ov River Basin(s): Neuse JWhite Oak CAMA County? 1 No 28' + / -. (Typ.) Average Daily Traffic (veh /hr /day): Primary Receiving Water: White Oak River, Mill Creek, & Goshen' Branch NCDWQ Stream Index No.: White Oak R. 20-(l.); Mill Cr. 27- 1.01 -26; Goshen Br. 27- 101 -25 NCDWQ Surface Water Classification for Primary Receiving Water Other Stream Classification: Primary- White Oak River: Class C There are, no named jurisidictional streams impacted by this project. The primary downstream receiving waters are White Oak River in the White Oak River. Basin and. Supplemental: Mill Creek & Goshen Branch: Class C, Sw, NSW 303(d) Impairments: use of rip rap was minimized and limited to those areas that needed additional protection from erosion. Although not required, an equalizer pipe is used on the project. Buffer Rules in Effect Neuse Buffer Rules apply.to the he portion of the project. (app roximately the northern 2/3's of the project) Project Length (lin. Miles or feet): 5.492 miles Surrounding Land Use: PnmaAy agricultural and forested with some rural residential development along roadways. Pro osed Proect Fbasting.Site Project Built-Upon Area ac. ac. ac. Typical Cross Section Description: 2 -12' travel lanes in each direction with a 12' outside shoulder, 6' inside shoulder; and 2 -12' travel lanes with a 2' paved shoulder on each side fora'total pavement width of 38' grassed median. Total pavement width is 76'. 28' + / -. (Typ.) Average Daily Traffic (veh /hr /day): Design/Future: 17700 (ADT 2035 Existing: (ADT 2015 ; General Project Narrative: .12000 The proposed project will upgrade US 17 to expressway standards. The proposed typical for US 17 consist of 2 -12' travel.lanes in each direction with 10' outside paved shoulder widths:and 4' inside paved shoulder widths. An additional-2' wide grassed shoulder is provided on both the inside and outside'shoulders with a38' wide (from shoulder point to shoulder point): grassed median. Awildlife crossing consisting of dual bridges, 4 @ 72" rep, and 4 @ 48 ". rcp will also be constructed as,part of this project. There are, no named jurisidictional streams impacted by this project. The primary downstream receiving waters are White Oak River in the White Oak River. Basin and. Goshen Branch and Mill Creek in the Neuse River Basin. Wetland and stream impacts throughout the project minimized.to the maximum extent practical by keeping fill slopes as steep as possible and existing drainage patterns were maintained to the maximum extent practical. Pipes and culverts will be constricted with buried inverts as required. Where possible runoff is maintained as sheetflow and treated by grassy surfaces. Where ditches are required grass -lined ditches are used whenever possible. The use of rip rap was minimized and limited to those areas that needed additional protection from erosion. Although not required, an equalizer pipe is used on the project. ( References 7 1-fighway North Carolina Department of Transportation st-01-111watt. Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 1.2; Released July 2012) FOR LINEAR ROADWAY PROJECTS ProjecttTIP No.: R-2 514C County(ies): JONES Page 2 of 2 I Swales Sheet No. Station Stream Crossing Station Base Width (ft) Front Slope (H:V) Back Slope (H:V) Drainage Area ac It Recommended Treatment Length 1-1 Actual Length (ft) Longitudinal Slope N Q2 (cfs) V2 (fps) Q10 (cfs) V10 (fps ) Rock Checks Used 16 164+50 to 172+54 RT -L- 173+08 -L- 0.0 3:1 3:1 3.40 340 820 0.31% 7.1 1.6 9.3 1.7 No 17 195+45 to 200+00 RT -L- 195+05 -L- 3.0 3.1 3.1 1.70 170 456 0.30% 6.5 1.5 8.4 1.6 No 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q YES No Have minimum design criteria, as presented in the NCDOT Best Management Practices Toolbox, Version 1 (March 2008), been met and verified? If No, provide further explanantion of why design criteria was not met. �,Qddltloiat Gorrimen, ts- z Z *CD 0 * *eq �6.9� �0% v1 *a >- *(r V* 0) vri *w * *V) r �dsd? Lo 0 0 0 See Sheet t -A For Index of Sheets See Sheet 1 -8 For CenventlonGl Symbols STATE OF NORTH CAROLINA PENT DRAWING DIVISION OF HIGHWAYS I SHEET 1 OF 62 ONSLOW LOCATION. US 17 FROM SOUTH OF BELGRADE AT SR 13301SR 1439 TO FORTH OF MAYSVILLE WETLAND AND SURFACE WATER. IMPACTS, PERMIT 'ATB 6rA'I8 PROIeCi' X&FSUNM N0. '•Hq' R -25148 81'ATe rAOl.N0. 1.1PEDI.N0. DB8CRMOK 34442.1.3 PE 34442.2.53 I RIGHT 0" C 1 rr! 'I A *DESIGN EXCEPTION REQUIRED FOR SAG VERTICAL CURVE K FACTORS AND STOPPING SIGHT DISTANCE ( —Y2— & —Y3 —) Prepored in ft Office Orr DIVISION OF HIGHWAY'S 1000 Birch Ridge Dr., Raleigh NC, 27610 2012 STANDARD SPECLFIC477ONS RIGHT OF WAY DATE: I JAMES A. SPEER, PE DECEMBER 17, 2013 PROJECT ENGINEER LETTING DATE. I JOHN LANSFORD, PE JUNE 16, 2015 PROJECT DESIGN ENGINEER HYDRAULICS ENGINEER ROADWAY DESIGN ENGINEER 16J MR PRELIMINARY PLANS DO NOT USE POR CONMUMON Or MORpq ap4� P��O 4 `S s OP PRAIA THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. THIS IS A FULL CONTROLLED— ACCESS PROJECT WITH ACCESS AS SHOWN ON PLANS. ® ® CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. GRAPHIC SCALES DESIGN DATA PROJECT LENGTH ADT 2015 = 6800 vpd 50 25 0 50 100 ADT 2035 = 15900 vpd LENGTH ROADWAY OF TIP PROJECT R -25146 = 3.906 MILES PLANS DHV = 7 % D = 65 % LENGTH STRUCTURE OF TIP PROJECT R -2514B = 0.250 MILES 50 25 0 50 100 T = 7 % ° V = 70 MPH TOTAL LENGTH OF TIP PROJECT R -2514B = 4.156 MILES PROFILE (HORIZONTAL) ° TTST =4% DUAL =3% 10 5 0 10 20 FUNC CLASS = FREEWAY STATEWIDE TIER P2r1F11 r- IVFRTICA1 l Prepored in ft Office Orr DIVISION OF HIGHWAY'S 1000 Birch Ridge Dr., Raleigh NC, 27610 2012 STANDARD SPECLFIC477ONS RIGHT OF WAY DATE: I JAMES A. SPEER, PE DECEMBER 17, 2013 PROJECT ENGINEER LETTING DATE. I JOHN LANSFORD, PE JUNE 16, 2015 PROJECT DESIGN ENGINEER HYDRAULICS ENGINEER ROADWAY DESIGN ENGINEER 16J MR PRELIMINARY PLANS DO NOT USE POR CONMUMON Or MORpq ap4� P��O 4 `S s OP PRAIA O OL' n eR w 4fl d r ,N Ln U C 4 1 ° * b DENOTES MECHANIZED CLEARING F/F7/7- /Vj DENOTES FILL IN WETLAND " \ o I � N US n Zr'BSr \ p--XX X 98' LRLk IX �I y I I �� 6 �'1❑ I III � I SHEET NO. fc� WEYERHAEUSER CO. % p TIE I S P SPECIAL LATERAL "DfT TIE 70 TOP Oi PIPE EX. — SEE DETAIL A TO DITCH T E INNERDUCT E / 48' WW ISB KISTWG R/W CN F F F F INNERDUCT �=C C� �— _ _ _ — —T f0_ _ _ — _ _ _ _ _ FO— _ _ _ — —T f0_ _ _ _ _ _ _ — — — _ —T f0— —I FO_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ �p -- --- - - ---- - - - -- --- �__ —__ VI ___ __ ____ _______ _ __ MEDIAN N` DITCH SEE DETAIL AA Lo IL �- ____ RIP \ \ _J REMOVE RAP 1 _ l P y�� _ -- N50. .dam n -- ----- - - - -- -' 11COLLAR i eCOLLAR F.• �— �_ F __F_ F F F p _- F F F F A <� , 1 O it r ts C C C .. ., 48' CN EKi ,wG fl/W E TWG H/M HL E E ' R/W TO PK " ® REBAR i TIE SLOPE TO I LATERAL DITCH I Q' Q TOP OF PIP " E I SEE DETAIL IL B 1 1 Q .1,� I I JONATHAN MORTON 1 �1 tvEYomaUSER co TIE TO EX. TIE TO E%.I I O 1 ivl 1 DITCH DITCH LmNOWN T I 111 36' LONL� 36' Co. 1 1 1 Q Y ISBKD ISBKD 1 1 1 oEcK 1 1 3 ` ROA. L. ADAMS 100' O' 100' I' =100' 0 Z 0 Lo 0 DENOTES MECHANIZED CLEARING F/F DENOTES FILL IN WETLAND SITE I YO PROTECT REFERENCE -N-o - --71�—sHEET NO. 1 RW SHEET NO. ENGINEER PRELIMINARY PLANb I w NOT usg P06 00NETRUMON PERMIT DRAWING SHEET 3 OF 62 o_n C) ANn"USER CO. T TO , OF PIPE T SCOPE EXJ S SPECIAL LATE -w CtITCH SEE -b TIE DIT + T -I. 11 F F F---- INNEROUCT C V) — -- --- — — — — — — — — — — — — — — — — — mEDm TDITCH SEE DETAIL AA US17 2rBS7- to RIP RAP Lu • U�--RETAIN\ LU V) F F 7il LLI ZLL—�- �=j- -7 GTD)� 47 V X 48'CHL)C x C X ✓ A8• �Kl- R/w To 041 Ll .-AR ESTMG E f-E SLOPE TO SEE OFTAIL 0 u X UJ," Y'- 01 91 ll�E ?F ?!�E LMMUSE ( ) 2 II II x x 4 IJ TI -.Ex /DITTO -EX. H E TO DITCH �x I.Imm" Co. PK fill, 4, 3 ROMA L. ADAMS 00 z 100, 100, z 0 H � rn �3 v � r _ \ L Efj U REFERENCE NO. DENOTES FILL IN R SHEEiNO. ROADWAY WETLAND ENGINEER DE S IGN ENGINEER 11 SEE SHEET 24 FOR -L- PROFILE SEE SHEET 2 -A FOR MEDIAN TURN DETAIL CONCRETE ISLAND J KYERQHUSER CO. JREE FARM j 111 'TREE YARg STANDARD X;DITC,H 4 ' BASE DITCH SEE DETAIL P BE- !�ETY� D 14 TREE FARM TIE TO EX. DITCH i nlTC� PUE PUE ru PQE PUE PUE PYE< PUE PUE rut: PUE + 0 LQ&17 TO P, PUE PUE PUE CV) z CN ELW x 40 '.F F -F- W 0 �1:p — — — — — — — -- — — _ - - -- — — — — — — 94- -10 LU 39' LLI - — - - - — - - - - - - - - - - - - - - - - - - - - - - - ABANDO)F& RR BED CSX r ? LU F- A K7 Ral m�_ LL, # # ## # *F* * * * �tF* WF* *F* Qj= 7 23 CFS V, -1.2 FPS 48- WW l�PW —x- INEYEMAEUSER CO. U 2? v C, ITCH LATERAL 3' BASE Il SEE DEFAJL E TREE FARM TREE FARM, TREE FARM,_ to o"'ITE I 100, ol 100, z VW%N% ['=[DO' wy SEE SHEET 24 FOR -L- PROFILE cn SEE SHEET 2-A FOR MEDIAN TURN DETAIL CONCRETE ISLAND Lo 0 ■■■■■■■■■■■■■■■■■■■ ROOM ■■■■■■ ■ ■■■■■■■■■■■■■■■■■ ■ ■ ■ ■ ■ ■_■■■■■ :■ CLLL�: Elm i■■■■■■■■■■■■■■■■■■■■■ ■■■■�■■m■o■■om■o■o■ ■E■M■■■■■ ■■■ ■■ WO■■ ■■ ■MME■■■■■■■■■��■■o■om■om-■■■■■ AMEN■■ t■■■ SEEM ■■ ��■■■■ om■■■■■ mmorm ■■m■■mm■■m■ommom■■mm■■■■ ■■ENNEN ■■IMER ff ■■■■■m■■■■■momom■o■ ■O■■■■ ■■■■�■■ ■ t■■■■■■ t■■■■■■■■ t■■ ME 0 ■■ ■ ■■■■ ■■00000 ■■■ ■■■ ■■ ■■■ ■■ ■■ ■■�■��■ ■■■ ■■ ■�■■�■�■�■�■■■m ���■■■■■■■■■■ ��■■ ������� ■��■�■■o■■o■m■■�■■■�ME■■■■■ No W MENNEN NONE MEMO m o��r■■■■ ��■■■■■■■1 1�!��■■■ ■■■M��■■■O■■�■■ ■�■ SOMEONE m,mmmmmm,mmmommoom diw ■■■■■■■■■■■■■■■■■■� o■■■ mmo■ ■��m■■ommm■■■■■■■m■■■■■■o■■■■ :. Long MENOMONEE a��■■■ ■■ ■�■■■� ■■■■■■ am ■.■m ■mom MO1 ■■ ommomm MINNEEM���� ■ ■■■■■■■■■■■■■■■■ ■�■ ■�■■ ■■ ■ ■ ■ ■�■■��■� ■ ■ ■ ■ ■� ■�■a �Jr�� ■ ■ ■■ ■ mom ■■ ■■ ■; ■ !■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■ ■ ■■■■■■■■■■■■■■ul ■�■� ■ ■ ■ ■ ■t■■o■■o■m■■ ■t NOME ■M�t: ■■■■■■■■■■■■■■ ■■ ■ ■■■■■■■■■■■■■■■■■■■■■■■ ■ : ■ ■ �■�■ ■ ■ ■ mom ■ ■ ■■ ■ ■ ■ ■■ look■■■■■ m■■ ■■m■nommm■■■■■M■M■E■■■■■■ ■ mom ■■ �No■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■I� SCI ■ ■■ ■����_�ar� =�'�� .EM- NEE■■■■■■■■ NONE ■mom ■■■■ . NO "ME ■■ MEMO oimi■osimems■■■■■■■■■ Bpi ■■■ ■■■ ■■■ME B...Pas ■ MEMO ■M� ■ ■ ■■ NE■■■■ m■ ■■■■■■■o■■■■■■■■■ �MR�ME■RMEN v MEMO ■■ om■■ ■ ■■■■■■oommorme■moo■■��� ® ■■��� Mom 'mom MEMO MEMO■M mom - WI■■■■ NOMINEE ■■���■ ® ®M■ ■t■■■■■■m - nommys = ■= ��! �__■_� ■■■■■■■■■■■■ME MINE■■ ERNE ■ ■ ■ mom ■■■ IN ■■ .1101M■■■■■■UM ■0 ■ ■ ■ ■ ■ ■ ■mmM 0 i ■■ ■■ ���■ ■���■ ■ ■�� �� �■ ■ ■�� ■���M ■ ■ ■■■■ ■M mom E. No ERNE ■MORE WZUMIMMIMMMMIIMMM mom ME SIEDMIENCEMD E V m ■■ ■momm■m■ ■m ■o ■om■ ■o 111WitA Ulm � ■■NONE■■■■■■■■■■ ■ E■■■■■■■■■ ■ �■ SA M EME ■E ■ ■ ■ ■ ■ ■N ■� ■o ■mm ■�� ■� ■o ■0 � ■� AN lomm"Ems REVERSE � � � �Q) L0 L) ° ^ ERS Omm CO. � TREE FARM ' ° '' � ' WEYERHAEUSER CO. TREE FARM cu � ° w � " -aLwQ& ASSOCIATES. INC. PARKl A/ R,W SHEET NO. DENOTES FILL IN ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER SITE 5 —WETLAND DEN �ED ow ��»w"`— CLEARING ` ` PERMIT DRAWING i m ` 100, « m* n CO. ' ° ^ ERS Omm CO. � TREE FARM ' ° '' � ' WEYERHAEUSER CO. TREE FARM cu � ° w � " -aLwQ& ASSOCIATES. INC. PARKl A/ RW SHEET NO. ROADWAY DESIGN HYDRAULICS DENOTES FILL IN ENGINEER ENGINEER WETLAND SITE 5 S 2o07 DENOTES MECHANIZED PRELIMINARY PLANS CLEARING w ?4� USB Ml MNMUCTION PERMIT DRAWING SHEET 12 OF 62 ol 100, lool *EYl to 0 Lo + (V) + �o z IF F 0 F F F ------------- rptl' L F: F 0% Lu LU n n n fl Lu Lu ,F Vz/f V) Lu uj '77� F r -'Q;!3' -1 CFS- fj F F F F F IF IF F v;'1.6 FPS F F IR W y ERS iER CO. TREE FARM de 0 ol WEYERHAEUSER CO. _j —X�X- 4FWW --7 N 7— TREE FARM < HTR T z L A- // + D GAC' + /8- r J + -43 & AS 01ES.K. Lo Q g, hi 0 U3 � 3 r _ Ln U DENOTES FILL IN y WETLAND \ DENOTES IMPACTS IN W SURFACE WATER DENOTES TEMPORARY Lu + DENOTES MECHANIZED u � Eli G ength =24 FT. M Lu LARRY R10GS. ET UX DO 19156 PO 89 D =2.5 FT z DUSTIN J. CANESTORP. ET UX SLIM 0.271 TOE PROTECTION O (A' `�9 ROBERT LEROY 8 JOYCE R I ®I z N uJ LuL T� + Z� VV) I N a. 10 q P U3 � 3 r _ Ln U LAMY WAS. ET UX D8 166 PO " w 90 PO 69 SLOE O'2Ti DETAIL I +n TOE PROTECTION cn i Na �o S., � a �S c.o:,ee 6 P a TO ' e w a y 6 55FT. Gco'cddc o T. of liner= CL a RIP kA? re -L- STA. 99 =33 TO 103 =00 LT. y -L- -STA. 33 0 TO 100 34 0 IT -Y2A- STA. 33 =00 TO 34 +04 P.T. -Y2A- STA. 34 e.2 TO 3120 RT. e -Y2A- STA 34 +03 TO 34 +25 LT. -TOE PROTECTION SEE DETAIL I DENOTES FILL IN DETAIL 1 WETLAND \ DENOTES IMPACTS IN 6A�'A SiA61L1U.T10N SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES MECHANIZED u � CLEARING G ength =24 FT. ip LARRY R10GS. ET UX DO 19156 PO 89 D =2.5 FT RA 30 PC 63 DUSTIN J. CANESTORP. ET UX SLIM 0.271 TOE PROTECTION LAMY WAS. ET UX D8 166 PO " w 90 PO 69 SLOE O'2Ti DETAIL I +n TOE PROTECTION cn i Na �o S., � a �S c.o:,ee 6 P a TO ' e w a y 6 55FT. Gco'cddc o T. of liner= CL a RIP kA? re -L- STA. 99 =33 TO 103 =00 LT. y -L- -STA. 33 0 TO 100 34 0 IT -Y2A- STA. 33 =00 TO 34 +04 P.T. -Y2A- STA. 34 e.2 TO 3120 RT. e -Y2A- STA 34 +03 TO 34 +25 LT. -TOE PROTECTION SEE DETAIL I DUSTIN J. CAMTORP. ET UX RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DO NOT Use Pot CONSTRUCTION 100' 0' DETAIL 1 \ 6A�'A SiA61L1U.T10N SRS g�U7 u � NAp 8y ength =24 FT. D =2.5 FT DUSTIN J. CANESTORP. ET UX L- STA. 700 i -97 R7. Y2A- STA. 3i; -4D LT. \ 13 is `�9 ROBERT LEROY 8 JOYCE R I DUSTIN J. CAMTORP. ET UX RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DO NOT Use Pot CONSTRUCTION 100' 0' 100' 00' �'- BO Lu UJ to i J LLU z, i ro a e a® aLn P+ to M 0 N T Luji Lu N LLJ .J DETAIL J HYDRAULICS- NOINIER SITE 6 TOE PROTECTION DUSTIN L CANESTORP. ® DRAWING SHEET 15 OF 62 SEE ENLAR, -MENT 'SHEET 16 PD Lu -7 POE j. �✓'"/ ice_. \VI __ - - - -.- _ ` -' �'41. ►� � !I� cW�iYiBltrNlu' .w......�M�ARW1� H -. _� ... FZ-7— DENOTES FILL IN TOE PROTECTION +� WETLAND c,.e .. b n ®DENOTES IMPACTS IN SURFACE WATER SE I BANK STABjC N � - DENOTES TEMPORARY L SEE'6EraIA•J -L- STA.100 -72 TO 100490 RT. nnn } IMPACTS IN SURFACE WATER _,(2A- STA. 34 -12 TO 35 RT. -Y2A -- STA 34 -03 TO 34 +25 LT. r •U) inn DENOTES MECHANIZED F as 1 P.; • .; is CLEARING 11 o LARRY RWS. ET UX 12 + as 156 PC " we SO PC 89 tH SLICE C-271 TOE PROl_ ®` ® -- :Yi LIJ C `c` HEM, 4+ ' �N i _ -\ u N F F F F F F F F F T Luji Lu N LLJ .J DETAIL J HYDRAULICS- NOINIER SITE 6 TOE PROTECTION DUSTIN L CANESTORP. ® DRAWING SHEET 15 OF 62 SEE ENLAR, -MENT 'SHEET 16 PD Lu -7 POE j. �✓'"/ ice_. \VI __ - - - -.- _ ` -' �'41. ►� � !I� cW�iYiBltrNlu' .w......�M�ARW1� H -. _� ... . \ � � � _ ^- —'"' •-1 T\. J �� _ V -1.9 FPS TOE PROTECTION +� E C E \ \_� ` TIC. 4 c,.e .. b n d SE I BANK STABjC N � - Type of Uner:. CL B RIP R.+.' -L- STA. 99 33 TO 103; 00 LT. L SEE'6EraIA•J -L- STA.100 -72 TO 100490 RT. nnn } wn g� _,(2A- STA. 34 -12 TO 35 RT. -Y2A -- STA 34 -03 TO 34 +25 LT. r •U) inn 1' =100' F as 1 P.; • .; is LLA U �a . \ � � � _ ^- —'"' •-1 T\. J �� _ V -1.9 FPS TOE PROTECTION +� E C E \ \_� ` TIC. 4 c,.e .. b n d SE I BANK STABjC N � - Type of Uner:. CL B RIP R.+.' -L- STA. 99 33 TO 103; 00 LT. L SEE'6EraIA•J -L- STA.100 -72 TO 100490 RT. nnn } wn g� _,(2A- STA. 34 -12 TO 35 RT. -Y2A -- STA 34 -03 TO 34 +25 LT. rn vn r •U) inn 1' =100' LLA U �a o LawRV ET UX 12 + .- Mg yC PC 89 DUSTIN 1 TORK ET UX SLOE 0.2TI DETAIL 1 �-- TOE PROTECTION c,.e .. b n d o =s Fr. c-, � z �o Type of Uner:. CL B RIP R.+.' -L- STA. 99 33 TO 103; 00 LT. n� -L- STA.100 -72 TO 100490 RT. nnn -Y2A- STA. 33 +00 TO 34 -04 RT. 100' 0' 100' 400 wn g� _,(2A- STA. 34 -12 TO 35 RT. -Y2A -- STA 34 -03 TO 34 +25 LT. rn vn r •U) inn 1' =100' LLA U �a TOE PROTEFTION SEE DETAE� PLAN VIEW I 't E 6 BURY V TOE PROTECTION EE DETAIL L '�q� -15 CFS DENOTES FILL IN WETLAND DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY g °� ® * a DENOTES MECHANIZED CLEARING IMPACTS IN SURFACE WATER PL VIA 50' o' 50' HORIZONTAL z)l I t 6 — BANK STA SEE DETAIL' TOE PROTECTION SEE DETAIL I 3GI F-M R0 7.2 CFS F V,o 0.9 FPS IZATION 5/14/14 SHEET 17 ®IF 62 crlewis 30.00" 20.00" lb NWS = - 75' PROP. INV. 25.6' 50' 25' AM\,/ TB RT. 30.00' 1� TB LT. „ rr \r�7�rT�i 25.00® EX. STREAM BED L PROP. INV. 25.1' 20.001 � 25' 50' 75' 100' m- m 0 � STA. 100 +09.93 -L- 72" RCP-IV i ij ELEV.= 32.35' 4,0� SKEW =46° 6:1 (NORMAL) 0 TB LT. TB RT. NWS= 26.1t'- EX. STREAM BED 2 0' PROP. INV. = 0.00061 FT/FT PROP. IN dV. 20 — 23.55' 23.40' — 200' 150' 1(0,1 5' LT. RE 5' 100' 150' 200' PROFILE NCDOT ®® EX DIVISION OF HIGHWAYS ONSLOW COUNTY ® HORIZONTAL 101 of 10, VERTICAL N Z 0 h r Lo Lo U P L� r LU L.'Up� .eL m I LU z J V r PL® c r C LLd c LU I q�A P Lu Zr I r I 0 4s Ey ) SETH 0. MILLS I \ SLEEPY CREEK FARMS. INC. 1111111 DENOTES EXCAVATION IN WETLAND F� %1) DENOTES FILL IN WETLAND DENOTES MECHANIZED CLEARING SITE 7 SITE SLEEPY CREEK FARMS. M EJECT REFERENCE NO. SHEET R -25146 12 PAY SHEET NO. MWAY DESIGN HYDRAULIC ENGINEER ENGINEER PRELIMINA RY PLANS DO NOT USH MI CONSTRUCTION 100' _ 0' 100' I' =100' Z 0 "T 'n Lo 0 Lo 0 C C LuC uj LLJ z C F- uj C c LU 3: 4 Lu z 3: U DENOTES EXCAVATION IN WETLAND DENOTES FILL IN WETLAND < % SLEEPY CREIK FARU&Iftc., Agvllb� momaw DENOTES MECHANIZED CLC/AKII'0J lool of 100, — M09 '=100, SLEEPY CREEK FARUSW. RN/ ENGINEER PRELIMINARY PLANS I W NOT U$9 Mi CONSTRUCTION I DENOTES EXCAVATION "� °, °' DENOTES MECHANIZED IN WETLAND - CLEARING DENOTES FILL IN WETLAND ... ■ ,: ■. HORIZONTAL REMOVE PLAN VIEW I T E 7 6 F SITE z + Q cv) CV) V) N r - PROJECT REFERENCE NO. D H DENOTES FILL IN ROADWAY ENGINEER SIGN ENGINEERS WETLAND DENOTES MECHANIZED SRS zoos PRELIMINA —RYFIP—LAN-S� CLEARING 1 mr r7 f% W NO USE M: MNMUC71ON ""LAL CUT DI' SEE DETAIL N [7-- RETAIN NPR AV SLEEPY CREEK FARKOC. Z 0 K. Lf) C-) 9 LU LU PROJECT r NO. RN/ SHEE ROADWAY DESIGN HYNDRAULICS DENOTES FILL IN ENGINEER EGI NEER WETLAND DENOTES MECHANIZED C PRELIMINA RY PLANS CLEARING ivy. - W NOT U96 Pol mNnRucTJoN \A a V. UARTHA 0. BYNW A Is g I)EhM W.SALILTER ? W > k6, SLEEPY CREEK FARMS. CC. 0 Z 0 aC 4 DENOTES EXCAVATION IN WETLAND DENOTES FILL IN WETLAND DENOTES HAND CLEARING DENOTES MECHANIZED CLEARING DENOTES TEMPORARY FILL IN WETLAND ? 1061 c- TEMPORARY WORK BRIDGE SLEEPY CREEK FAMM W-; AT BRIDj3E ABUTMENTS FOR CLARITY. SLEEPY CREEK F > PROJECT REFERENCE NO. I RW SHEET NO. -1 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS I W NOT USR PO CONSTRUCTION I PERMIT DRAWING SHEET 30 OF 62 N Z O N_ OC Lo U V - r SHEET NO. RAY SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN4RY PLANS DO NOT USE PO CONSTRUCTION PERMIT DRAWING SHEET 29 OF 62 4 DENOTES EXCAVATION IN WETLAND DENOTES FILL IN WETLAND DENOTES HAND CLEARING * * * * DENOTES MECHANIZED CLEARING DENOTES TEMPORARY FILL IN WETLAND IWO- -■ ■ ■- a a i ® DENOTES EXCAVATION IN WETLAND CD®T DIVISION OF HIGHWAYS DENOTES HAND CLEARING ONSLOW COUNTY DENOTES FILL IN WETLAND ° °� DENOTES MECHANIZED CLEARING DENOTES TEMPORARY FILL IN WETLAND TEMPORARY WORK BRIDGE -DLG- F-- )ENNIS/ W. SAULT I 18 S -BL2- I f \K 7 C Ili t) s / r ERA _F A 2GI 2GI 0 O , ca L . w PLAN VIEW CD®T DIVISION OF HIGHWAYS ONSLOW COUNTY ITE 10 PROJECT: 34442.1.3 (R- 251413) iIS 17 RDnM SOIJTI3 OF IME1 n-DADE • Ol 50' ■■ :'6;m ■ ' ■ �' ;ice ��. ; >■ ■. HORIZONTAL AT SILL 1330/SR 1439 TO NORTH OF MAYS`7ILLE 5/14/14 SHEET 31 OF 62 criewis 15 SLEEPY CREEK FAFW& W- �3 \ L Lo U y / F F F F F F 2ir 41 C CFS 1 -1.5 FPS I ' SPECIAL LATERAL 'V' DITCH SEE DETAIL A f ;r r L1 L_L� DENOTES FILL IN WETLAND DENOTES HAND CLEARING * ® DENOTES MECHANIZED CLEARING `1 1G1 m 3 F F F F F 15 SLEEPY CREEK FARPAS.INC. RIP RAP HATCHING NOT SHOWN AT BRIDGE ABUTMENT FOR CLARITY. II RIP RAP SITE 11 1 Y / � K s/` l e Iz RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN4RY PLANS DO NOT usK FO CON"RUMON IMC PRGPERTES LLC PERMIT DRAWING SHEET 33 OF 62 !"i"ITE 12 j" s O-r TEMPORARY WORK BRIDGE 21 .,.., _ ALENE V.WETIEFINGTON TEMPORARY WORK BRIDG 22 DIM R. WETtERMTON IN ■: ■ 10 Me- t Z 0 10 -j LU LLJ 1: ton I MHC PROPERTIES LLC PROJECT REFERENCE NO. SHEET NO. &W SHEET NO. HYDRAULICS ROADWAY DESIGN ENGINEER ENGINEER I PRELIMINARY PLANS I 0 NOT USE Poi CONSTRUCTION I 15 SLEEPY CREEK FARES. IK- SLEEPY - FARIAS. W- F F F F F -4 T LA ;s 11 iIxp 'p j 15' RCP -IVl Z.Zr 7A I Irl 9Q 2GI oo V� c —c C gom wfzffl'/j' or" DENOTES FILL IN F;F7 WETLAND DENOTES HAND CLEARING DENOTES MECHANIZED CLEARING TEMPORARY WORK BRIDGE ALENE ff. WETNE, TON A �aM.A� �U RMAI --TE)WORAkY WORK BRIDGE RETHERKTON REBAR m REBAR L DENOTES FILL IN P WETLAND DENOTES HAND CLEARING 20 24 UK PROPERTIES LLC TOM OF MAYSVILLE ®DENOTES TEMPORARY FILL IN WETLAND NO. ENGINEER SRS 2001 �Ap g3/ PRELIMIN RY PLANS DO NOT USE PO CONSTRUCTION DORA R. NETHEPAWiTON ,111 . 111 . ■• � � 1 r � U \ \E\ \F\ \ E Z ESS. EGJ EYEE� E- MpY5V1lLE CITY REBAR RW SHEET NO. ROADWAY DESIGN HYDRAULICS F/F7/7 ENGINEER ENGINEER DENOTES FILL IN WETLAND DENOTES HAND CLEARING tkw RY PLANS[ UK PROPERTIES LLC TOWN OF MAYSVILLE DENOTES TEMPORARY FILL IN WETLAND PERMIT DRAWING SHEET 38 OF 62 _ TEMPORARY WORK BRIDGE MIX PROPERTIES. L).0 V. if In /SEE DETAIL L 00 71 7 to Lu LATERAL 3' BASE D! AT BRIDGF_ABUTMENT FOR CLARnr TEMPORARY WORK BRIDGE _ co Lo TEMPORARY WORK BRIDGE WIN WIN IVA ��' r - X11 1 1 1 i MANOR 4� I • ■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ MEN ■ ■■ ■NOMINEE ■■■■■■■ ■■■.■ ■■����■ ■ ■ ■■l�E� �E�I�E� � �■■■ �■■■■�■MEN �■■■■■E E■■■ N ■■■■■■■■■■■! ■■■ ■ ■■ ■ ■ ■ ■ ■M■■■■E■■■ ■ ■ ■ al■ ■fv Run M R, ■ E■NEE■■E■■ ' ■■■■■■■ ■■�■■M ■■ ■■� ■■■ ■ ■ �■■N■■ ■ ■■■ a ���■ �■ ti ��r�■ ■■■■■■■■■ ■■■■■■ ■■' ■E■ ■■� ■■■■■■■■�■■■l■�■■■■�■�M■■■■'■■■ ■■■■■■■E■e■M■■■E■■■M■■■E■■■NiS■■■E ■M � ■ ■■■ ■■■■■MESS■■■■ E■■■■■■■ ■ ■■■■E■■■E■■ ■E■■■■■■ SI MM E■ M■ S■■■■ ■■ ■NE■ ■■ ■■■■S■■ME ■■ ■ ■E ■■NEEE ■ ■i ���■■■■■■■■ ��■■■■t! �i:■:: ��E■■■ ■ ■L�...... ■■ ■ ■ ■■ ■ ■ ■ NONSENSE ■■off ■��, ■■■■■ ■■ ■■■■■■■■■■■M■ ■■■EEE■ M■■■ ■■ ■■■■■■■■■■■■■ ■■■■■■■■■■ ■■�■■■■■■ ■■■■■■ mom �■■ ■■ ■■ ■■N MEN ■ E■ ■ ■ ■■■■■■ MONSOON ■■ ■■■■■■■■■■M ■oE ■■■■■■■■■■■■■■■■■■■■■■■■ ■■■ ■SOME■N■E■■■■■■ ■■■■■■ ■■■■■■■■ ■■ ■■■■■■■ ■■■■■ OMENS MM■■■ ■ ■ ■� IMMENSENESS C ■MEMO EEMEMME©Ilmall O=T mom ■ ■■■■■ lEi ■■■■■■■ ME■ iiM�iOSiSiiEE���C�����:■_■■■■ ■ ■ ■ ■ ■ ■ ■�� ■ ESii■ ■s■ ■ ■ ■Eff, ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■3�� ■ ■� ■ESE ■ ■ ■ ■EM ■ ■ ■ ■■■E■ ■ ■ ■ ■ ■ ■ ■■ !!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ mom ■ ■ ■ ■!!■ ��■■■■ ��■■■■■■■■■■■■■ E■ E■■■■■■■ E■ ■EMM■ ■ ■ ■ ■E ■ ■ ■ ■ ■■■ ■ ■ ■■■E■■■ ■ mom ■ 11010 ■ ■ ■ ■■ 0 ■ M ■ ■ ■■ ■■■■ ME E■E! MEMEEME■ ■ ■■■ ME mom ■ ■■■SEMEN■■■■■■■■ ■MEME ■■ N■ EEEEM■■■■■■■■■ ■ ■ ■N■■ ■O■■E ■■■E■■ ■USESIS E ■ ■ ■ ■ ■N■■■ ■E ■EN ■E■■ ■E■■M■■ ■ESN■Sgo M■ MONSOON ■mom ■■ ■ ■E■ ■ ONE ■ME■■■■ ■ ■E ■E ■M■ ■E ■ ■N ■E■ ■■■■ M■■■ E■■■■■■■ E■■■■■■■ E■ EE■■ E ■■ ■ ■EM mom �M■ ■ ■ ■ ■ ■ ■ ■E■M ■M ■ ■ ■ ■ ■s■ 11; ENONE MEQN= EEM TO? ENE■■■■■■■■■■■■■■■■■■■ T= SO�iTE== CS SESECEdz■■■ ES■■===■ =��T=EDSM =T ■�■�iO�iiiiSE ■ ■ ■�I!� it' N ■ ■N ■ ■S ■E ■■ ■ ■E■■E■E ■■E■■ ■M ■ ■■ ■M ■ EMEMNONE ■ EM■ SE■■■■ MSMMM■ MEMESE ■ ■E ■E ■ ■M ■ ■E ■ ■MM ■ESM ■ ■ ■ ■ ■ ■ ■ ■M!■ M■■ E■■■■ E■■■■ N■ lwMMM=■.■■■■■.■■■■■■ ■■■.■■■.■■■■■■�� ■ ■M ■ ■EME mom ■ ■ ■■ ■WEEME■■■�■■ ■ ■ME�E■E■■■ ■� ■■..UES■ EMS■ n ■_ ■_EMN - , SEE ESol EMEN EM ■NONE■N ■E ■■ ■1 ■ ■■■■■ ■■■ ■ ■E ■E■ MME ■�!�Em ■ ■■MM -mE- ■■MM EIS■■ ■■■ ■.■ ■■■ ■■ ■■EM■■MM■MMM��EMMME■■ EE■ ■ ■ ONE ME■ ■ E■■■■ ■E■EE1■■■ME 11■■■■■ ■� ��� EME■■EM ■■iE■M■M■MMMMMEE■ ■■■■■EMMM■ EE■■ E■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■M ■ ■ ■ ■ ■ ■EI ■ ■ ■ ■ ■ ■ ■ ■ME ■ ■ ■■M M� MEMNON ,�MM■MMMMNEMME■1■■M■M■M on mom So ■E■■■■■ MME■■ ■■■M■■■E■E■M■E ■1l■■ ■■■■■MM ■■■EM mom M mom mom MEMO IN MEEMEMSESEEMON' BURNS E■■ _ ■MS_ EE■ M■ =MM E■■ ■�■ 11■■ ss= MEMO MO■= oss= ■ ■MMSSSS■ ■ ■s ■as ■ =MO ■.e ■e ■ ■M =E ■_ .a� E■■ ■ ■ ■ ■■■ ■■E■■■■■ -■■■ FMEE ECM■■ M■ MS■ EM■■■ M ■MMEM ■E■ME■E■M■■ ■■M ■tM■■E■i���� ■MM■ ■■■■■M■M■■ ■ ■M■■■ ■E■■ ■■■■■N IMME■■■■■ SEMEN sM■■■■■■■■■■■■■■■E■■■■■iE� IE 7�L ■■■ MEN on MENEM NES E., MEMEMEMEME _T_l_JT4uA DETAIL AC BANK $TABIUW10,N ue D=VAR. CL I RIP RAP m _YlP_ STA 11 An TO 11 -A3 P.T. DETAIL Q CHANNEL RELOCATION Not fog S I I PIDPoSCd r au .Z jell. rfl. Mi.. D-3 FT M­ d=3 FT. rEcam- RE 8 =8 F- . T b=10 FT STA. 207 a25 TO 208 `IT LT,, DDE = 336 CY S Ull JAWES E. 0 _r�oo, 'O' 1111SS- 'CIS' EASCIINT. A 7 rAwD_8YSRS 200 0 J. C. LAROOLIE HEIRS PROJECT REFERENCE NO. I SHEEP NO. DETAIL AB BANK. VABIUZA1104 RW SHEET NO. I 5—w HYDRAULICS ENGINEER CL I RIP RAP EST­ 20 TONS /F GEOTEXTILE EST­ 40 SY W.gth=24 FT. D = VAR. u -Y3A- STA. 23 +74 RT. .L t- L _T_l_JT4uA DETAIL AC BANK $TABIUW10,N ue D=VAR. CL I RIP RAP m _YlP_ STA 11 An TO 11 -A3 P.T. DETAIL Q CHANNEL RELOCATION Not fog S I I PIDPoSCd r au .Z jell. rfl. Mi.. D-3 FT M­ d=3 FT. rEcam- RE 8 =8 F- . T b=10 FT STA. 207 a25 TO 208 `IT LT,, DDE = 336 CY S Ull JAWES E. 0 _r�oo, 'O' 1111SS- 'CIS' EASCIINT. A 7 rAwD_8YSRS 200 0 J. C. LAROOLIE HEIRS PROJECT REFERENCE NO. I SHEEP NO. R -2514B 18 RW SHEET NO. I ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER PRELIMINitRY PLANS I w Nr US3 Folk CONSTRUCTION I SPECIAL LATERAL 'V` DITCH SEE DETAIL A PLIE Pu PLIE PUE C) LLJ to `------------------- - - - - -- Lu + IAL LATERAL V DITCH 30'MRESS.EGRESS WNW Lu ETAIL z < F C V) L) F \o 29 pmt C y 0 DECK . ❑ 'P'CIAL CUT DITCH A \ \\ 11DEC SEE DETAIL H DEC Ki -,C 0 N C) C) SPECIAL CUT DITCH • SEE DETAIL H Ov Lo Lm N C Z LLI E 'A? 0 + E� SPECIAL CUT DITCH CUT DITCH SEE CIE 41_�. E SEE DETAIL H fV E— U) Q) Lf) 0 Zuj F- \_ C_ z ZF BURY 11 BANK STABILIZATION SEE DEWL AC V) /F u --TIE TO EXISTING r-ANWEL SEECHANNEL D I L Q RELOCATION P® 25 TIE 10 EXISTING C11111�ELF I F IF F F F — 25 01� 0 LAT RAT. 4' BI DI _F IF EIACKFILI EX CHANNEL — — — — — — —LUC Lu 6 —SEE DETAIL AF UJI C) Lu + L 4k CN L U -7. C14 CN E z :j- F- m u V) u ji F F F F F F F F HW F F F F _F�__ IF F IF F F F F LATERAL 'Y' DITCH SEE DETAIL L f KA 0- LATERAL 2' BASE DITCH7 SEE DETAIL R DAJ&t&LVV AM DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY - — - - - - - --- - - -- IMPACTS IN SURFACE WATER — — — — — — — — — — — -- — -- — — — — — 100• o• 100, 48' 4SEW DAVO KLSW JOH105M Slt�E 13 PERMIT DRAWING SHEET 42 OF 62 DETAIL A BANK SlA! I*N ­7 Ott iO -TO E fl I GEOTEXTILt, .E�.­40 SY �.-Z;14 L..gth=24 FT_ Y3A -STA. 23 -74 RT._ J. C;J.M �A PROJECT REFERENCE NO. L-_2514B MV SHEET NO. HYDRAULICS ENGINEER NAD 831SRS 2007 ROADWAY DESIGN ENGINEER ENGINEER JAMES E. rPRELIMIN A RY PLANS DO NOT USE PO l CONSTRUCTION X� J. C. LAROGLIE HEIRS KiL V I L SPECIAL LATERAL DITCH CHANNEL RELOCATION i I PGJ - SEE - DETAIL A PUE. PUE - o' Pte. pu Lu Lo pue ui -3 Ft. I 'E - - - zil - - - Min. D 1 �" + M.X.d=3 FT. B =8 Fl. 1_ j -�EESS. C&US EASN�r I -10 Ff Lu 77" • -L- STA. 207-25 TO/2013<11 LT., DDE 336 CY V) X u 29 SPECIAL* CUT DITgH k T C cy) Y C DEC It SP C T' UffeH S - EE D H IA IL DECK F —E N 0 r SPECIAL CU 2 -T D SEE DETAIL Lo A� uj N AL CUT DITCH Z 0 + SPECIAL qUT DITCH, DETAIL ETAIL H E C Lu QA STABIL 4� BURY _j u v T -CHANNEL RELOCATION (y) '7 �.-f/-TIE TO- ISTING TIE TO Z2 5) 25 EXISTING F 0 F F' F F F EASE DI BA&FIIL EX. CHANNEL 4' F JIM LATERAL S DETAIL AF Lu 6 Lu Lo + + C'4 UJ Q �z CN4 R 3G (N ED 1. U 7 U F F IF F F F F F F F F F ` LATERAL 'V"PITCH $Ell DETAIL 0 'LATERAI 2' BASE DITCH SEE DETAIL R DAAk%LVr AM sm DENOTES IMPACTS IN z SURFACE WATER DENOTES TEMPORARY — - - — — — IMPACTS IN SURFACE WATER 100• ol 100, t t C2 %Nw C2 1'=100' I JOHWAN sl 1 PERMIT DRAWING SHEET 43 OF 62 L N9 Lo 0 NN 40 STA. 23 + 51.43 -Y3A- 40" 84" RCP -IV � ELEV. =36.82' SKEW =62.50 3 51 TB LT. 35' 0 3 1 ----- --- - --- - - -- --- -- -- ----- ----- - - - --------------- 0 ------- 30 NWS=28.13' V TB RT. 2 5 ^4 37 7=!n 25* ;r EX. STREAM BED PROP. INV. PROP. INV. 25.00' 20" 25.17' 20" 050, 5r LT. RT " 51 501 75' It 0', . PROFILE -Y3A- 84 rlpr%E 1 ' t a w 'CP' to r r L0 U DENOTES EXCAVATION WETLAND IN 8 O ao va3 DENOTES WETLAND L IN boo' CS3 ®DENOTES IMPACTS IN SURFACE WATER 6 • • DENOTES MECHANIZED F + F� CLEARING c \ \ \ DENOTES TEMPORARY 5EE AIL \ \ ® D F \ \ —BURY t' /! L IMPACTS IN SURFACE WATER \ u =0.4 \ \ \ F \ V,,=1.4 p =1.4 FPS 34 SP'cCIAL CUT DITCH F = J. G L . OCR$ SEED I H \AG \ \ F •,y - SEECDETAIL HDITCH \ G —� SEE ENLAR�Lff MEET 49 Fib a NA I 1 1 �ALTO" ODELL HUDGINS , ET UK = �kCHAEL A. I I 1 SPE LA7RAL N' DITCH I EC 7ERAL N' 1 CN 5EE ETAIL �� E L A I C c 15' RCP `\ r F RETAIN R � CP - - - - -- ---- - - - - -- ----- _ IS' fl 15' RCP --- - - - - -- — BEM2N�_ RENcOV SR /ll6 WR/!E OAK RNER RO ZO'BST �\ 4Y IS' RCP .: h t ���` •�rfiWr►V4 J a r+►.,,r; , �, LATERAL N'DITCH �N LUHIL 7 E ® \ \ \ \ 4 C.LAROOI$ HERS \ MYRTLE N.HANSLEY AND LIRA' IKFFMAN tl \ AS TRUSTEES OF INTE OAK T TY BAPTIST CHLOtCH SPECIAL LATERAL 'Y' DITCH \ A SEE DETAIL A \ L p \ Ozo 0 SALLY µ NORTply \ d� mac'' © \ \ 9d�d7 -v) p \ \ Z� nG \\ ' 29 © \ \ \\ \ pp \ 0pp c� A NK TAIL 17AT10 ��� 5 DETAIL DETAIL S CHANNEL RELOCATION DETAIL V (Not to Scnle) ,may cro��a CHANNEL RELOCATION I Nat to Scale) x _511 P, ..� ' Groin +p .� t ".•Ft. � PmPO'od NN4t r _Elrsm,o c:_�a � _ �����. BOBBY EE HANSLEY JL — 1e.cr� - FT. Ff. B8 FT 8 =8 . Min. D =3 b =10 Ff. 8 =8 FT. - L- STA218e78 TO 221 +50 LT.,DDE =2597 CY -L- .2i4 +06 TO 216 +41 LT., DOE 1775 CY - NK TAIL 17AT10 ��� 5 DETAIL DENOTES EXCAVATION IN WETLAND DENOTES FILL IN WETLAND S ITE 14 DENOTES IMPACTS IN SURFACE WATER L X DENOTES MECHANIZED CLEARING DENOTES TEMPORARY El!�ATLI IMPACTS IN SURFACE WATE4 FA� L A F PS PS C - �EU SEE DIKE CUT 41L H IT H E, `b SPECAL CUT DITCH FZC1,41- CU SEE DETAIL H ttE f DETAIL H HEET 4 cv 0 SEE EPM&A c PD It c A""' 0DELL'R)00AIS.ET Uxj c I C- 0) cv) uj '-4 M COW" L K PECIAL CUT DFTtH SEE DETAIL H uj Lu C) + C14 25 LAN DITCH zi'm GI wj F -Ij /SEE L VDITCHI c IS' RETAIN At WBST Q-vL c Uhu REMOVI SR 1116 WHffE OAK RAIEhl `Rc Jv- CONC It b TL 11E LEE x?MSLEY LATERAL CA OR LATERAL DIT IN DETAIL ' T \ \ 32 , \ \ \ Q C3 r puik C.LAROOUE HEIRS MYRTLE M.HANSLEY AND LOW' HUFFMAN AS TRUSTEES OF WNTE OAK T TY BAPTIST CHURCH SPECIAL LATERAL 'V' DITCH SEE DETAIL A A C) QETAI�A c� Vk 29 SALLY K MM,or, 00 CL I RIP RAP EST— t 00 GF GIOTIXTI11=11T,111 0 SY -L- STA- 214 +23 TO 215-44 L7 DETAIL C NNEL RELOCATION DETAIL V (Not to Scale) CHANNEL RELOCATION I Me, to &.1.) N —d z P­—d Fill '—d N ql* N fu . 48TM1 Y EE "in. D =3 FT. HAWAEY �t 'et S=8 FT. Min. D=3 U) b=10 FT. 8=8 FT, 6 -L- STA. 218 78 TO 221+50 LT., DDE -2597 CY\ -L- 214 06 TO 216 +41 LT., DDE 1775 CY LO L) \F NK S TIO SE DETAIL R-2514B 19 &W SHEET NO. T 'SHIP 'SHIP ROADWAY DESIGN HYDRAULICS ENGINE E R ENGINEER PLANS W NOT U96 PO CONSTRUCTION PERMIT DRAWING C, SHEET 48 OF 62 SPECIAL CUT DITCH"' S EFEF�� EE H O SPECk Ck SEE,'DET�11- fbi 1 34 IRS C - �EU SEE DIKE CUT 41L H IT H E, `b SPECAL CUT DITCH FZC1,41- CU SEE DETAIL H ttE f DETAIL H HEET 4 cv 0 SEE EPM&A c PD It c A""' 0DELL'R)00AIS.ET Uxj c I C- 0) cv) uj '-4 M COW" L K PECIAL CUT DFTtH SEE DETAIL H uj Lu C) + C14 25 LAN DITCH zi'm GI wj F -Ij /SEE L VDITCHI c IS' RETAIN At WBST Q-vL c Uhu REMOVI SR 1116 WHffE OAK RAIEhl `Rc Jv- CONC It b TL 11E LEE x?MSLEY LATERAL CA OR LATERAL DIT IN DETAIL ' T \ \ 32 , \ \ \ Q C3 r puik C.LAROOUE HEIRS MYRTLE M.HANSLEY AND LOW' HUFFMAN AS TRUSTEES OF WNTE OAK T TY BAPTIST CHURCH SPECIAL LATERAL 'V' DITCH SEE DETAIL A A C) QETAI�A c� Vk 29 SALLY K MM,or, 00 CL I RIP RAP EST— t 00 GF GIOTIXTI11=11T,111 0 SY -L- STA- 214 +23 TO 215-44 L7 DETAIL C NNEL RELOCATION DETAIL V (Not to Scale) CHANNEL RELOCATION I Me, to &.1.) N —d z P­—d Fill '—d N ql* N fu . 48TM1 Y EE "in. D =3 FT. HAWAEY �t 'et S=8 FT. Min. D=3 U) b=10 FT. 8=8 FT, 6 -L- STA. 218 78 TO 221+50 LT., DDE -2597 CY\ -L- 214 06 TO 216 +41 LT., DDE 1775 CY LO L) \F NK S TIO SE DETAIL DENOTES EXCAVATION IN WETLAND DENOTES FILL IN WETLAND ®DENOTES IMPACTS IN SURFACE WATER * * * DENOTES MECHANIZED • * ** * ° * CLEARING SITE 13 BURY 1' • ol 5 • L ■ HORIZONTAL ■ "- i , \F 65' 65' STA. 16 -i -52.34 -Y3- 1114" RCP -IV ELEV. = 60.31' SKEW = 64" 55' 45' 614 45' CD®T PROFILE DIVISI ®N OF HIGHWAYS ®® JONES COUNTY -TJ ® PROJECT - 34442.1.3 (R- 2514B) US 17 FROM SOUTH OF BELGRADE AT SR 1330 /SR 1439 TO NORTH OF MAYSVIL.L,E 5/14/14 SHEET 50 OF 62 crlewis NATURAL GROUND ALONG PIPE NWS= 31.96' PROPOSED DITCH / GRADE PROP, INV. PROP. INV. 25.85' 26.41' 25' S =0.0023 f-T ?-T 25' 150' 100' S0' LT. RT. 50' 100' 150' CD®T PROFILE DIVISI ®N OF HIGHWAYS ®® JONES COUNTY -TJ ® PROJECT - 34442.1.3 (R- 2514B) US 17 FROM SOUTH OF BELGRADE AT SR 1330 /SR 1439 TO NORTH OF MAYSVIL.L,E 5/14/14 SHEET 50 OF 62 crlewis 50' q STA. 222 - 21.63 -L- 1 84" RCP -IV f ELEV- 37.34' SKEW =48.5° 50' ■ ■- ■ ■, HORIIONTAI 1 VERTICAL ..I NATURAL GROUND 40' _ ALONG PIPE (NORMAL) 40_ ' TB RT To LT. o __ -- PROPOSED DITCH ` -_ — - _y--- - - -- -- - --------------- - GRADE -- — \ NWS = 31.96' 30' \ - 30' \ ` 5= 0.0013 FTiFf PROP. INV. PROP. INV. 27.00' 26.66' EX. STREAM BED ALONG PIPE C 20' 20' 200' 150' 100' 50' LT. RT. 50' 100' 150' 200' P R 0 IFILEE NCDOT L- or llbff 8`4 �® DIVISION OF HIGHWAYS JONES COUNTY ■ ■- ■ ■, HORIIONTAI 1 VERTICAL ..I VVETLAM P CMG° PUMT NPACT SUMV MARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 22 +67 TO 28+77 -L- RT. 0.27 0.13 _ 2 24 +60 TO 27 +00 -L- 0.19 3 56 +35 TO 57 +13 -L- RT. < 0.01 4 16 +26 TO 17 +40 -Y1- LT. 0.01 5 71+09 TO 77 +39 -L- 2.06 0.25 6 27 +46 TO 32 +33 -Y2A- 60" PIPE 0.22 0.09 0.02 < 0.01 130 6 6 98 +20 TO 101 +64 -L- 72" PIPE 0.80 0.09 0.07 < 0.01 356 14 6 33 +61 LT. -Y2A- BANK STABILIZATION < 0.01 < 0.01 25 10 6 100 +97 RT. -L- BANK STABILIZATION < 0.01 < 0.01 25 10 7 128 +50 TO 129 +44 -L- RT. 0.08 0.04 0.02 8 131+13 TO 132 +38 -L- RT. 0.05 0.02 9 139 +81 TO 140 +61 -L- 48" PIPE 0.03 < 0.01 10 140 +57 TO 162 +27 -L- 160' BRIDGE 3.32 0.06 0.38 0.43 11 162 +83 TO 164 +07 -L- RT. 0.17 0.02 12 168 +10 TO 179 +18 -L- 1160' BRIDGE i 0.01 0.01 4.02 13 206 +10 TO 223 +71 -L- 84" PIPE 0.60 0.04 1151 60 13 23 +74 RT. -Y3A- BANK STABILIZATION 0.01 < 0.01 27 7 13 11 +50 RT. -Y3E- BANK STABILIZATION 0.01 < 0.01 29 7 13 214 +74 LT. -L- BANK STABILIZATION 0.05 87 14 13 +65 TO 14 +27 -Y3D- 18" PIPE 0.02 0.04 < 0.01 15 228 +39 TO 231+42 -L- 1.08 0.14 16 29 +23 TO 32 +00 -Y2- RT. < 0.01 0.03 0.03 0.04 0.01 120 25 TOTALS *: 8.29 0.07 0.11 1.21 4.45 0.81 0.06 1949 139 0 *Rounded totals are sum of actual impacts s� ;u °t1. 'jI- NOTES: Site 10: Permanent Impacts due to bents in wetlands: <0.01 Acres - -These impacts are not included in the total impacts above. DC -M/ Site 10: Temporary Impacts due to Temporary Work Bridge bents in wetlands: <0.01 Acres - -These impacts are not included in the total impacts above. Site 12: Permanent Impacts due to bents in wetlands: 0.01 Acres - -These impacts are not included in the total impacts above. Site 12: Temporary Impacts due to Temporary Work Bridge bents in wetlands: 0.03 Acres - -These impacts are not included in the total impacts above. Site 13: 386 LF of Permanent Stream Impacts due to Relocation. sed 2013 10 24 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ONSLOW AND JONES COUNTY WBS - 34442.1.3 (R- 2514B) SHEET 62 OF 62 5/14/14 crlewis N Z Q r _ \ L L0 0 W N I fV F- LLI uj DETAIL Z CHANNEL RELOCATION (No+fo Scole) 12C4L FII Slopo ��_ r 'p � -6.r.. Channol Min. D =4 FT. Max. d =5 FT. 6 =6 FT. CL i RIP RAP =EST. 46 TONS; GEOTEXTILE =EST. 65 SY 'ill TOE PROTECTION SEE DETAIL I 44 —W1lTE PUE LATERAI�'V' DITCH SEE DETAIL L � 12 F° DUSTIN J. CAI rSYDRP, ET UK -Y2- STA. 31 i 00 TO 31+ 96 RT., DOE =246 CY 15 SLEEPY CREEK FARN9 W-1 14 , 4AK RIVE& RD. INVEST) PROJECT RN SHEET NO, ROADWAY DESIGN HYDRAULICS O ENGINEER ENGINEER cp f �cP PRELIMIN RY PLANS UO NOT U96 FO CON9TRUC710N kol PERMIT DRAWING SHEET 58 OF 6 03BOA 14 Spy W� i �- RDDER .I. BDYD. ET UK IMA 43 S. SAWYER. E T VIR CHANNEL RELOC47fON ' SEE DETAIL Z /' F/F7// I .c 5 \/ DENOTES EXCAVATION IN WETLAND DENOTES FILL IN WETLAND ARHOLD D. 4 EREDITH. ET UK DENOTES IMPACTS IN SURFACE WATER a DENOTES MECHANIZED O ° CLEARING DENOTES TEMPORARY IMPACTS IN SURFACE WATER IOD' o' loo' i I' =100' z 0 L0 DETAIL CHANNEL RELOCATION -2, and D r Mi.. D =4 Fl. - ceorlxnlE M.K. d =5 FT. B= FT. CL 'RIP W=EST, 46 TONS; GEOTEXTILE=EST. 65 SY NO. RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER e.% 110 NOT 096 FO OON9TRULTION PERMIT DRAWING - Y2 -STA. 31 (10 TO 31 +96 RT., DDE =246 Cy SHEET 59 OF 62 --AEEPY CREEK TARMS. PROTECTION ON SV DETAIL Lo \ I . SIAN + REMALDER L & BARBARA co kN T SHEJL�T,, 4 RoaR J. BOYD 04 ET Ux 44 E DA6 RKAL 0. WEST ;S t fn, :Z7 IS& El VSA 06 MA . �S. SAWYER. ET VIR Lu LATE t,WbITCH 7 Q43:. SEE IL i u �,a. ,SEE DETAIL _.? I- Ns 4"NESTORP.ET UX f DENOTES EXCAVATION IN WETLAND F7 17 % DENOTES FILL IN J WETLAND DENISE PHLLV-.. EY VIP ARNOLD 0. MEREDITH. ET LIX DENOTES IMPACTS IN SURFACE WATER DENOTES MECHANIZED CLEARING DENOTES TEMPORARY Z IMPACTS IN SURFACE WATER 100, ol 100, I T 16 V=100• DENOTS EXCAVA DENTES IMPAC DENTES TEMPORARY IN E WETLAND TION SURFACE O WATER TS IN FFN IMPAOCTS IN SURFACE WATER DENOTES FILL IN ' ° DENOTES MECHANIZED WETLAND CLEARING ': 4 4 ': _W- HIT- -E -ACYAK- RIVER—M. fNVESTWff WTs PUE PtJE 50' 0, 50' Mm� m HORIZONTAL PLAN VIEW FV No ON INN 0 mmmmmm Ill ■■�■e■■��■ ■■■■■■■■■■■■ E■■■■■■■■■■■■■ ■■E■ ■ ■ ■■■■ ■■■■ ■ ■ ■ ■ ■ ■ ■ ■MEN ■■ ■■ ONw■■■■■■■■■■■■■■■■■■■■■■■ ■■� ■■■■■■■■■■■�■�■■■■O■■■E■�■■l ■■ ua■■■■■■■■■■■■ E■■■■■ M■■■ ■■ ■■ aaraaaararrMEN ■ t■ t■■■■ MEMO ■■E�■���■��■■■�■���■�■■■�■� ■�■ ■■■■■■■■■ -an ME■■■ ■t■MEM■■■■ ■ NONE ■M ■■�■■ "I NUM■E ■■■MEENEE Monamoni 9 ■ENEM .11 MMM= ■■■ ■ 0� ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■aar"G■■■■■■ ■t■■ ■t■ ■t ■■■ ■ ■ ■ ■■ a!■■E■ ■ ■■■ ■■■ ■0 ■■■■■■■■ 0 '■■■■■ ME■E■■■I■E■■■■■E■ ■■ ■ IR ■■■■■■■■■■ t■ MEN t■■■■■■ EME■ t N■■M■■■■■r ONE ENE immoss moolmilmommommoom OEM !! ���■ ���■■ ■■■E■■■■ ■E �■■■■�ilai rid ■ ■�■■■�■■■■�■��� ■■■■■�■� ■t ■■ I's ■■■■■■■■■■■■ S ONE ■■ t■■■■■■ t■■■■ t■ E ■■oo ■t■ ■t■ ■t■■■■■■■m ■ ■t NONE ■ ■■ MEMO SO■ EO■ t■ MO■■■ N ■ t■■■ ON■■ M ■ ONE aM■aM■■M■■■ ■t■ ■t ■a�aaaa�: ■�O■E■ MO■■■■E■ ■■ ■ ■■■NNEN EM _s MIENEM■■■■M■■EMEM■■M■■■■ ■ ■� ■■ { �. ■■■ ■ ■■ ■_== a= CMS =ownsTio MEN a \■MENaeEaaEaa■■ ■t■■■aE■ o f■■■ ■■■■■ ■■■■■■■ ■ ■■■ ■■■■■■■■■■ ■affs ■■■■■ Ea■■■■ ■t ■t■M■■■■■■■■ ■■■t■ 0 ■■■ EMS■■ONE ■ 1 ■■■ ■ONE ■■■ ■o EMEN■■■■■■■■■ 0 ■ON■ , OMEN MEN ■■■■■■■■■■ ■■■■■■■■ t ■ ONE ■■■■■■■■■ ■t ■t■■M ■t ■ MEN ■ ■ ■■ l■■■■ t■ N■■■■■■■■■■■■■■■■■■■■ ��� ■■■ ■t ■t ■t ■t ■�� ■ ■■ ■ MEN ■ ONE a��!�$ ■ ■ ■ ■ ■ ■ ■ ■■ ■M■E■■M ■� ■aMME■ MEN!'- MM UMEN ■ ■■ ■■ ■ ■ ■ ■ ■ ■ ■ ■ ■� ■��� ■�� ■ ■ ■�■ EM■EME EM■E=oo ■U=IMMEMSE NI■■ a ■a os ■es ■es ■■s= ■�■��■No■�■�■ ■■■MEMO ■■■■■■■■■ ■ ■■■■■■■■ ■OMEN '`'r■■E■N■■ ■■■■ i■■■■N■�■■ !!■MEN■ ■ ■■■N■M■ ■■ ■M ■■■ MEN■■ No 0 MEN ■0���■����a����a, f■ E■■■■■■■■■■■ M■■ E■■■ ■■■■■■■E■ ■■■ ■■MMO ■t ■EM ■M ONE M■■■ ■ MEMO ■ONE MMO� E ■EMENEMEMMEME. ■. ■■.■ ■.. ■..■_■ ■MENEM ■ MEN ■ ■.. ■ ■ ■ ■...■MEMEM No ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■EM ■M ■ ■ ■M ■ ■ ■ ■� ME ---- _. _ UARA --• - - - ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ��ii�W� ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■�ON ■ NONE ■ ■■ MEN ■■EMO■■EMMM� ■ MNE ME ■ ■ ■EM■MME■ ■ ■ ■MMEMSEEM ■ME ■ ■ ■■ N■o ■® ® �. ■�M� � ■■MEMEME■ -0 MMENE■■ ENE■ ■ME■OEES M0-0 ■OM ■0 ■ � � ®� ■��� N■o!!� �,� ■� ■ ■ ■ ■ ■� ■� ■���Et ■ ■�� ■■ MM�ON MM_" M ■MNO ■��� ■E ■ ■ ■ ■ ■� ■�EM■ EM No MENEMENEEMEE ENE MENNEN Opp a MMMM■ MEMO MO�E■ M■ M■ M■ M■WE MOMEE` ME EMENN ■EM -�S■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ MMEMOMME■E is ME ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■EMSO•EN ■M E■■ ■OM M MMMMM■MEMME■■■■MEMEMM MEN ME MMM■ ■ ■ ■��LUM �R ■■■N ■■■■ ME■■■■ ME■ EE■■■■ EM■ MMaaaa■■ MEM�J ■ ■ ■ ■� ■ ■ ■ ■ ■ ■ ■ ■ ■� ■ ■ MEN ■ ■ ■ ■ ■ ■M■NS ., RoM�[��M�� . � �MMMl ��' �ll ���!',•l ��E'. �a�fl ��aa�aaa�a 'r!!',la',!!'la''�ta■E�■����■! �■ �yop S� W E3 N = i it15 1116 W SITE 22 MAYSVILLE ,, 111 �� CROATAN ' 1112 1% � FOREST 1114 58 1108 �— / Chadwick ills 1116 r 58 N Illg / CROATAN `I ' NATIONAL EST JECT 1116 \ I I f y §ui VICINITY MAP SITE 1 \.10 +00.00 —L— GIN TIP PROJECT R -2514C SITE 3 BEGIN BP / r® SITE 5 �. �L ^STA. 1 ...r 1 SITE 7 SITE 6 ---x SITE 23 STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS JONES CO UNTY RATS RATS PRaBR SR6PWOZ NG N4, INB4A GLI •C• R -25140 1 RA1H PBOIMU P.A�SOAM6 g0.WR1eN 34442.1.4 PE WETLAND AND SURFACE WATER IMPACTS PERMIT WILDLIFE I-- SITE 1® SITE 4 SITE 9 SITE 3 ONLY. SITE 15 SITE 11 SITE 16 SITE 12 r° SITE 17 L-- L SITE 19 -SITE 14 SITE 1S SITE 13 END CONSTRUC _Y_ tte as+An s`O�° 1 4``1 SITE 21 - i`'CI� y�3� ice_ n SITE 2® STA. 300 +00.00 —L— END TIP PROJECT LENGTH Prepared In me Office aT DIVISION OF HIGHWAYS 1000 Birch Ridge Dr., Raleigh NC, 27610 LENGTH ROADWAY TIP PROJECT R -2514C = 5.469 MILES 2012 STANDARD SPECIPICAITONS LENGTH STRUCTURE OF TIP PROJECT R -2514C = 0.023 MILES RIGHT OF WAY DATE: JAMES A. SPEER, PE TOTAL LENGTH OF TIP PROJECT R -2514C = 5.492 MILES JUNE 21, 2013 PROJECT ENGINEER LETTING DATE: DANIEL W. GARDNER, JR., PE JUNE 16, 2015 PROJECT DESIGN ENGINEER HYDRAULICS ENGINEER ROADWAY DESIGN ENGINEER fo " rMi', i -% )D 01 V —2514C INCOMPLETE PLANS W NOT USE FOR R/W ACQUISITION PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION 4 p GOR p Oq ♦A O 9 `s o, Cp TA ?b THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. ®® THS IS A PARTIAL CONTROLLED - ACCESS PROJECT WITH ACCESS BEING A CLEARING ON THIS PROJECT SHALL BE PERFORMED TO LIMITS ESTABLISF GRAPHIC SCALES DESIGN DAITAI ADT 2015 = 12,000 50 25 0 50 1I ADT 2035 = 17,700 di DHV = 12 % PLANS 50 25 0 50 100 T = q Q/Q w V = 60 MPH 1 +�a PROFILE (HORIZONTAL) * TTST =5 % DUAL =4 % 10 5 0 10 20 FUNC CLASS= EXPRESSWAY STATEWIDE TIER PROFILE (VERTICAL) STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS JONES CO UNTY RATS RATS PRaBR SR6PWOZ NG N4, INB4A GLI •C• R -25140 1 RA1H PBOIMU P.A�SOAM6 g0.WR1eN 34442.1.4 PE WETLAND AND SURFACE WATER IMPACTS PERMIT WILDLIFE I-- SITE 1® SITE 4 SITE 9 SITE 3 ONLY. SITE 15 SITE 11 SITE 16 SITE 12 r° SITE 17 L-- L SITE 19 -SITE 14 SITE 1S SITE 13 END CONSTRUC _Y_ tte as+An s`O�° 1 4``1 SITE 21 - i`'CI� y�3� ice_ n SITE 2® STA. 300 +00.00 —L— END TIP PROJECT LENGTH Prepared In me Office aT DIVISION OF HIGHWAYS 1000 Birch Ridge Dr., Raleigh NC, 27610 LENGTH ROADWAY TIP PROJECT R -2514C = 5.469 MILES 2012 STANDARD SPECIPICAITONS LENGTH STRUCTURE OF TIP PROJECT R -2514C = 0.023 MILES RIGHT OF WAY DATE: JAMES A. SPEER, PE TOTAL LENGTH OF TIP PROJECT R -2514C = 5.492 MILES JUNE 21, 2013 PROJECT ENGINEER LETTING DATE: DANIEL W. GARDNER, JR., PE JUNE 16, 2015 PROJECT DESIGN ENGINEER HYDRAULICS ENGINEER ROADWAY DESIGN ENGINEER fo " rMi', i -% )D 01 V —2514C INCOMPLETE PLANS W NOT USE FOR R/W ACQUISITION PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION 4 p GOR p Oq ♦A O 9 `s o, Cp TA ?b H DETAIL A DETAIL DETAIL AP DETAIL L R -25140 4 LATERAL USE DITCH FALSE SUMP SPECIAL LATERAL BASE DITCH STAN D WE OrtCH (Notro Smlel iNais wa1 Irae �d P/W SHEET NO. ,w, ROADWAY DESIGN HTDRAUUCS �kw D ENGINEER ENGIN®I Aen.D- 7.5 k. B- 9A FE w Ghats �°n1— "'+'�— 20'- -M GI 7Nn. D— h= S Min.O- ].0 R. VAR. g 6A k. - S -om Slope gt hop..d Dikh -{8US- ST AI ro STA-13+00 IT 100' 0' 100' -IBUS- STA. 11+22 ro STA, 12+14 LT DDE=1B1 D' G. d. L Dikih Dade L -��- STA. 13+70 TO STA.19 +M (61 �.- STA. 17 +50 b STA. 19 +15 RT DDE =S69 CY 0.0% To 2.014 d Oran 4.0% To 6. 4d Z�7 PRELIM FY PLANS r e . 8d O�sr 6.0% 50' GRAPHIC SCALE t i sw '� \-°� WETLAND AWSURFACE 'WATER IMPACTS PERMIT Y d , Fly IN WETLAND " �7 PERMIT DRAWING FRW JEWM KM * SHEET 2 OF 62 03 *PC 4W ENLARGEMENT / ;' .'�� If REVISED 2/3/15 k , — f ° (3)Q �' /' " J ,'-� MECHANIZED CLEARING / { _ Q " FILL IN WETLAN�V't ° a F �♦� fgo ° I 09 PC Im I+ I 610 -1.9 !�t%t R �. a �Q RCP p� R •� • •. i f fQ : i / � 3 =1 .. !.. I \ I t • ' & VI0.7 RNEV.. em F1 7 a ! 1• ♦ ! f - tF _ , b new roe of 6N FRW JE ID PC 04 ' SITE 1 1 2 m HW / C /, \ tE Tr ,�, -'' � NG DITCH - / tt" r' ` TO DW. DITCH +� ♦ t t ,'/ / vP @/ 69\ ®,6' SPECIAL LATERAL 31 RASE pDCH �7 ' / 1 / �. T .••,,,fthiii�� /// 1 R / Nt , •+ SEE DETAR. AP IIyl /// iI R /' �! HAND(/ � '€ ♦`\ /' K �vte — —� k / // `. _ TO It %t RINC9\ 'j .• f' STANDARD RASE DROYR tyi �¢ f / ♦ t / ` / \\ I SEE DETAIL L C .Ay�,y ' , ♦ 10G O� RAP /! e �`C' i �,p FEiAWx ,�Rt1tBdS EIEIRS / ! i*MV $ 0® spa 04 �_ _ _ —/ Y � 0 0 /L7 � \ \ LJIATED STATES DEPARTNEWT LF A tO YLM L WETLA e �� NLARI;EMENT ,� DENOTES FILL IN �• c3 WETLAND SITE I °R DETAIL D LATE iM RUE DITCH _— -- / ° ® DENOTES MECHANIZED X� \ W _ ,m• \ ` " _ — — — — / b a >0. ® LATERAL S' EASE DITCH W to RR CLEARING a SEE DETAIL D R qi O- H. W � R N' DENOTES HAND 4'�o h- s.R H. CLEARING �� OO to srA 19+40 IV' wo CLEARING � ow a% oo NW Y 'C r' E �aQ �£~ "+„ ~3(@ 14 1 i �'•, 1 \ •! �. `` f r� �t c,� \ . ti `,, . \ 'gy_ ,} \ m\ ; l \�"\.4 . Q'- 9 ^c'",.\ St r•;--° $ . 1 %`£ � . 1,r _ "`'(�'1 ' I 7 r 6C ; v 90FY, �c- % I =..✓•/ .r E �• T J / t - . l t-om1^ ,E � ,n. `` qi A'la o��. -1` t \ � " t f �8` ; ` DETAILWJ � �\ 1 . PECLAL LATERAL EASE DITCH. i" -7 to I 4tkol-, I— ' '• >nr \ g I 7t � � ; i � ` . j ? ( J � �, `\ i v.j�a�' • l' - f I ✓ ^*�� .. s /ti : � - 7•ti.. o�f+.� �' �''°�' m / �. D_ ! _'. '�. °E1 m • '` ! f !` ��,,,,,`� `� '� �•- r'" f' l e- EI. 59°£/ B- 3,RAa {{B+3Ff. 3 : 1\a s /l6 ft Ditch 1 r AAUS +70 ro / .-+ "•� 5r ✓ A.,iit77 A^73+ 4. -16}. ST 13 +70 5TAA +.u•'W +°• i D' -Gm e GoJa L roV `^• `1 � i w r �•=. l Sja�°sr�i9'yli�- �E =sb9'.er .o>b r z I zos To e. so• ! `•., t_ r.,. \ _.K°} )�.:..,., 0 1 - W `q'c+�, /�,�•./,j �r •y .� 1 , 0-16. 0% so' i ,\!' N --•g•, ,,,'• . . i r7 t GRAPHIC ISCALE ; t `�: — - , - -- � - �:; ' a �E L N® �► ASURF,ArE �A�eX IMPACTS RE I REFERENCE NO. DO "r on mg owwmucrmx 1, i I t PERMIT DRAWING ia�s x�a' } f \ + SHEET 3 OF 62 �\ __ ♦ €� ij�j� % (.— �" It I a� '° �. 1t �. �� e REVISED 2/3/15 ~. \j ENLARGEMENT . / 3 I \! (3 , �,3� r f7 t /� �''� -- �AECHAP(IZED CLEARii g� Nt FILL IN ' KEAA '- ''���'.� -'i'" -=.£.. ••r' �� t ## # , •/ ,.. f M l .\ l.J� ' PiSE i 1 ~• 4 -' f 6F 0 vr '"-- ..•.. -P°' "�_- �•....- °.�-'- �c' � ! ° a � � 1 � i LI- /�/� ,A � K % P• ! *I J ` : V ' f' . ^•°•,� "'3B.?s� - i E is It � vV f' !y •t all O%' F o /At Yl LE I t p� •,-. ., ; i }� t , � �'14I� ` 1 i i\ A. PC M Ilk / _ S � � / � . /�G7 r Q _ / . � f. �- 31+k'S.•• --t ...-.^ 1t � ® � / i �\ R• I , . I - � ' \ 9S '� t 1 - % t 6 �vi ! _ t� // / � ~ ; t i ! T ! J.... ' .. -- - ''" / - - . - _ , L ^ j 7 •® �v3 :� �r,is } / �~ _ _ ; • / i � i f? ✓ I.AlTL . / )DITC s 3 H s W , R37 Fd TIE ro E1MIG ofTi �C 1 a � % ENT t kAREM { I f DENJ �F LL IM '^.! a•« \ \ •off J � �'u � � --- -� � �- � W Vt ,._ 1/ ! l � tt �;" }! \� � ..>� .. .. - 1 �y,��•" •.�,/ ,- � �•.. � ,� s � � � DENOTES MECH / 8 c `r- I `f'/ 1' \ \ - •__ -�.. �./ i ~' !3 EB° �� t8 t1 LE FUN ir. L �• poi,- ,t i t .D E�A ES'Hll H f t k`15.0 ULroITCH ! t\ D Fi fr t Acs o- i.s�, e It ; 5 6BA H. ) 0w, A19 +f10L PROJ. REFERENCE NO. SHEET NO. M N — 1 ^� m 1 0 110 1 0 l 0 1 0 110 50 0 D D D A D 0 D 1 1 20 30 AD E D M D E 0 so 11 0 1 0 1 0 l 0 1,0 1 0 WE ND AND SURFACE,WA TER I PACTS PERM PE IT DR) WING SHE' T 4 OF 62 0.060 460;1 6 0.060 0. 58 sin g ;1 AQ SO 0.060 5 460:1 6 0.060 o 3 :1 31 - In - -- - - -- -- -- - -- -- - -- - - 14•+ 4.62 - -- -- - - - -- - -- - -- - - -- - LEARING CLEARING LIMITS Ll MITS m 0.060 0• 4.778.1 .1 0.060 o.o 3;1 3• 1 c v� — -- — — — — — - -- -- — -- W. 41_99 - - - V v 14+ 6.00 - -- - - -- -- - -- - N G O 0 gn N e 0.060 0.060 :1 6261.1 0.060 0.0 3:7 0 m— — — — — — — — — — — — — — — -- — — D.P. dn W -- — — — — 13+ 4.62 S_F a W a i 8 0 m � 0.060 0.053 4:1 6,0721 0.060 m a, g;1 g;1 31 0 oC 0 — -- — — — -- -- -- - -- --- — -- -- — D.P. 42.2 13+ 4.04• { D v 1 ip „ w K 0.060 0.050 4 02 ?:1 6:1 0.060 dn �o — -- — -- - - -- — -- - - -- — _ _ D.P_42. 6 - - -- —° — -- -- — — ��« 12 + .80 N1AZ rrntr N1AW IA t9N (9M7 (9 (9(A �� 10 10 10 10 10 10 1 _ 1 10 10 10 10 10 10 m 10 PRO1. REFERENCE NO. SHEET NO. R-2514 X- N 10 10 1: 0 10 10 10 1 1 10 10 1: 0 10 10 10 WE ND AND SURFACE WATER I PACTS PERM T 0.060 0.010 4.24:7 5:1 0.060 PERMIT DRA ING 3.05.7 SHE T 5 O 62 3 — -- — — — — - - -- -- — -- — -- — ---' .3620 - - -- \ :7 EL. =33 72 sin 0.060 0.010 4:l 4 41:1 0.060 0.0 3.7 @a EL. =3 3.67 FCF�ff-Z IV. VV gn 0.060 0.010 4: 7 6 26 :1 0.060 0.0 3.79. 4p 1 n p LA 11 c 3706 FT rn J I EL.= 3.66 ;' CLEAR114G LIMITS LB v v 0 0 sin 3 c 0.060 0.010 3.8j:7 q:1 0.060 0.0 5 0 3'• E — — — — — — — — — — — -- — — — — — 3976 c EL. =33.6 W I lSy-• AIV.VV 3 W d 0 0.060 0.010 3.39:7 p;l 0.060 033 3 :1 m= a� ;1 m� — -- — -- ° — -- — — — — — — -- — — — — — — -- — — — .7— — — — —° — — — — — 3707 EL. = 33.5 an xin 0.060 0. 0 3:7 A:1 0.060 0.030 3:7 n 0 Tn yn NlAZ Tl9� N AW NN�N ��� l! 0 10 1: 0 10 10 10 i 1 10 10 10 1: 0 10 10 0 5 0 PROJ. REFERENCE NO. SHEET NO. N 6 0 i R- 2514C X -111 SI t 0 110 1 0 l 0 1 0 1 0 0 E 0 70 0 E D 40 D 2 D 1 1 10 10 10 1 40 70 11 5 a 110 To 1 0 130 110 1 0 WE LAND AND SURFACE WATER IMPACTS' PERM PE IT DRAWING SHE T 6 Of 62 0 3: 4n 3f7 dn Fn 60 WLB CLEAR NG LIMI S 01 0 3r1 c m An X T x Uf oag N� K g:1 ° 3:l — — — — _ m _ _ o' c m E c 0 c W yl SH a W d U O a� m oc (9 4n g;1 3:7 1 f r c, s;` OW 4n WSW°" - -- — — -- -- __ - -° — __.. - - - - -- — - - -- - - -- — -- — — 3 O*Z O *W -LB 'JS Z* 1 0 ��w 110 110 I'M 10 1 0 1 1 1 0 10 1110 1 0 1 0 1 0 Z Q W W CI 9� N a Q: W h In .� Z_ O � W 4 W R I uj W ti O y Otu y �tn I T c� ti M �a OW h C3 ,i f� —'� 1 6 PAY SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DO NOT USB PO` GONSTRUMION PERMIT DRAWING SHEET 7 OF 62 SITE �AE 1 I X TARAIDIPM I L E �OIXEY E£BSN O 9* I ET UK SfD K LAT M 31 RUE DITCH IF N, SITE Ew SEE DETAIL D X If. B I ROSA LE SMITH — _ _ _ _ / / © HAND 1 O " � IE ,'� � _ I � CLEARIN X � EB' MECHANIZED 6 LATERAL BASE, 6ITCH ' 11 12 TEL IRA I I I I UARn(ATA H&L SEE DET L C/ \ TEL I L B P RAP N• CLEARING `SEPTIC LITL c '11 I TONS 14 D CAN ( \,\ G W W , [ ICI / EST. 0 SY GEOTEIG�L / LLI 1 Ie ,,e "" \ B RIP I I ISfD I &Rl a I I IF \ / W .1u GAO UE lil I 1 °.im WARD.HEIRS " 5 � B RW ne— PUE P I I E E- -I-- -- PUE PUE (� 14p.3.. PU I ISfgU YTL i I L I \ PUE _ _ /\ EST. 'ST. 10 SY GEO ILE _ © _ _ 24' 1_ �r4 Sr za us IT i \ F � F R REMOVE IE / 24' RCP 1!- - -- SITE 2 It LATERAL X BASE DITCH MAINTAIN EJ(ISTING DITCH SEE DETAIL A I� K• � Pis Slo 21¢5781 ® = 27e 14'570 (LT) ®s - 4'l' 325° D - 3e29 37P � L = 77997' LT = 160A4' T = 3975r Ft R = 1,640AY 1E b _ b _ k \ I SEP� II \O I FI I � I I I I IE I / Ir � MEDIAN N' DITCH N. If SEE DETAIL B / — zz RAP H H _ fE H 1f la N THE LN7ED STATES OF A4EMCA � � O -L- PL Slo 16 +95.31 Pis Slo 21¢5781 ® = 27e 14'570 (LT) ®s - 4'l' 325° D - 3e29 37P Ls = 24OW L = 77997' LT = 160A4' T = 3975r ST = 80A4' R = 1,640AY b b _ b _ RO = 240' w 3I� 1° lAl. ( VS n YAIN ST zrw DETAIL A DETAIL D DETAIL C DETAIL B LATERAL BASE DITCH LATERAL BASE DITCH LATERAL BASE DITCH MEDIAN V DITCH (N.1 S 14) (N.. Smle) (Ne1b Smb) INelb Smle) b b _ b _ slwWd.r 3 � der w 3I� 1° lAl. ( D 3 \ liH. 51 en ° D 3� °dl_ l:fl. SFi, D i r slI sl° E B Min. D= 2S H. B - Min. O= 1.5 H. B Min. D= 2.0 Ft. 8= 3.0 H . B= 3.0 H. B= 3.0 Ft. b- 5.0 H. b= 5.0 Ft. b- 5.0 R. -L- STA.20 +15 TO STA. 24 +00 MED -L- bM II +bU t0 bM IY +Ib KI - L- "dY+�Y O t� "I -- al T +. ­ DDE =564 CY DDE =2610 CY DDE =2251 CY MECHANIZED CLEARING N FILL IN WETLAND w lE N- H DENOTES EXCAVATION IN WETLAND DENOTES FILL IN ;ir_ A ��►— IpI.i... DENOTES MECHANIZED %w DENOTES HAND L4A.;� CLEARING �Pv MECHANIZED CLEARING N FILL IN WETLAND w lE N- H DENOTES EXCAVATION IN WETLAND DENOTES FILL IN WETLAND • • • DENOTES MECHANIZED CLEARING DENOTES HAND CLEARING i W m o� g N J Q ti W H O_ 'y W it a O a IL W ti H C I t� ti ra I LL. \W �2 oW '3 It � 100' 0' 100' ETU N��; / 36, � $8 -e. l / / `tt•; �\ w � � ♦��` _ -- - 368 �•� � / `� i ,,�• c�� w! °ice �it�r/�r.� 10'a '�pT� .� \- 36.0` / - l- \,�� R YroN.� r� © Lu _z j / ;5 TEIW.T BASE DITCH �M -AN EXIV(JT DITCH /° A 7 - \7 `"� -��"' •ems � � r� 16�e <b0G' /// //` 'g•0� y� / O //�� -_% I I ( LA7DET Am ` ♦ D / i a //�.0 09 /' -0 J rE_' ` t// l/ J( 3.O H./ & p. i 0'6 // / /� \ cv / ✓ 1 \I / --°L- STA.Q7 +50 to ST 19 +1j qT ` -C- STA +5i v BODE =564 1 1 / DES /4 ��jT�/ �ye" � \ Q°r 38.0, �• 1 /` \ /gym / % / � � � 1 / l � C IV \ DMA DB AS TO I STA. 2a +01(1 MED PROJECT REFERENCE NO. SHEET NO. R -25/40 5 WW SHEET NO. _ ,OADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS DO NOT USR M CONSTRUCTION j PERMIT DRAWING _ SHEET 8 OF 62 9 tit, w In mo h, _0L\ MNIZED �, \ 9Ei�dO�SN i4i`4"D r�9R / 10 ii PROJ. REFERENCE NO. SHEET NO. N R-2514C X- m 1 0 110 1 0 1 0 10 110 1 M 1 1 0 10 1 0 1 0 1 0 150 [:W:I.TLANE, Air! SURF CE ATER PAC S PERJ 4 0.025 4.43: F 4A3fl 0.013 0.013 PERt4T SHE DRAWING T 9 0 - 62 4 A8 7 EL. 43.79 In E..= _ .22 pin 0.025 0.0 4. :l 4.3A: 0.017 0.017 4.35 3: 7 EL =43.96 da �421 L. 0.030 0 D30 44 Al 0.029 0.029 i 4'51. EL. =44. — _ 3=7 _ E . = 4.17 v an CLEARING V r LB LIMITS 0 m a 0.038 0.022 3•TS:I •75'� 0.038 0.038 4.63 3:7 o An EL. =4 .95 — — -- dn CIE 3 -- — — \ ✓ 7 ` _ f �— — — — — — — o— c W = 4.14 21 6,00 yl sHg oZ W d N 0 0.042 0.018 3 ?:7 .72 0.042 0.042 ` m a 4.47 3;7 ma aEL i . = 4 .92 — — -- — — L.�413 21 +50.00 a 0.054 0.010 3 6: 3 6.1 0.054 0.054 g.0 4 3:7 EL. = 4.82 — — — 3 I -- �� - - -- -- — -- — ��� — — — 21 + ®.®o �f tll (AN (9 W� dMW �«« Md1 H 10 10 10 10 10 10 1 1. 1 10 10 10 10 10 10 N 1 PROD. REFERENCE NO. SHEET NO. R— 2514C X —8 1 0 110 L 0 10 1 0 DID 5 3 ED e 3 D 40 a 20 1 1 D 30 A 0 0 3 70 E D so 11 0 1 0 V 0 1 0 1.0 1:10 WE ND AND SURFACE WArER IN PACTS PERM PERMIT DRAWING SHE T 10 CF 62 0. 25 0.025 0.010 0.025 b:1 EL. = 4.41 — — — — 0.025 0.025 6 :1 61 OX 10 13 0.025 3.1 29 - _� — D.P. 4.34 3;1 - —-) —3: — — — -- 4050 EL. .37 CLEA UNG LI ITS WLB WLB CL LI RING WITS 025 0.025 5.44 :1 5 4b:1 0.010 0.025 v -'1 3 — — EL.= 4.19_ 3.1 X 1 � dn 1133- ul El . v a v c 0 m 3 rn c 0.02 i 0.025 4.8;1 4.a:1 0.008 0.008 1 o _ EL. 44.04 3:) c W EL.= .29 1 N F$- d W d 2 1 0.025 4.65: b.65:1 0.000 0.000 o " 5:1 1025 ao = � EL. 43.95 3:I EL. .27 0.025 4.62; A.62:1 0.002 0.002 k'v 5.291 EL. 43_92 EL. .26 wi *Z 'en¢ ntnw 123+ 0_00 w iA� »ww ��� 10 10 10 10 10 10 1 1 2 4D 7 10 10 10 10 10 10 a J z W W W a J k N Z O O � WI W W W O W T �T Vti W� �tz W � W I 3� �yIQ Yg o� L�1 O k WLV I 'c �0 11 • 7�3 i VETLAN ARI ® /,BURFOA!CE WATER IL M -B Ll 5) J '/ � 1\ E�CAV I IN WETLA�d L��� I �0�— -EXCAVATION IN WETLAND , 1% —//I / ♦ / w 1� ' II \GRAPH {A6E .e J \ / 37 0 L -&I WETLAND ) ) 1 � / l IM, FACTS St aoo�,� M AN1ZEQ_ �s J� ) j� 0o n \ I ANIZED / ° /� \� U \ 3eaZ / -c RIN6 L�RING ( \ \ 1 1 .� -- I `/� / Via. — i : j / / / \ -� •.�� _ \_ �\ Illi ,/ / I J / --Y0 _ NDRM ao \ to / / r —\ / � �. >_.� _' `r � �- d / / £ -- •/' / i�0'B£ 0 F. LASSjiEfl. EY U% <\ / T. �•• 9!� ` .06' aDi� ( I L�� J }W� /1 1 I�1 0 �q �• / / / ` �sf/ W la a , 0. \ `. •3g9` J Alf* AOCHELLE AMT HiOLT 0 _ y��,•,�: W / -k PUE 1 rU c�IPUE _ E.°. I lJ — �— — MEDIAN Y D =H SEE DETAIL B RAL 3' D I \ SE DF AIL D X. ISM 1 / E PUE PU „ PUE 1 Im z — / x � I I>, II Ie��1 1YE PERMIT DRAWING I SHEET 12 OF 62 L 9 � LLI I � T�E LISTED STATE$ OF AIIEWK '360 £- H6 "\ a �! i vo It i0 /THE L"T� STATE OF K, f / \ t-- .� I ✓/ 0g�/ x-38.0 �' '` IE ,E ) •/ ✓ (°' �•`£ "'� �� \� ` SIT -�: = � �\ —LATE 5 ITCfi/ /1 I / 1, / , ► f \, — �IEC/IH/�PYLpIZ /D� — m 5- ,m0 \ . 14 0�J° \ I CLEARING •�./ 374 U 1 1�. \ 1 \ \0 \ \ / !aW ^ \ B / / 3� 'I.5 /�61eps v I I! V\ °�/��y /7L /�q�w� // �)BAc�M. 5.� \ 1 IMF 1/ I•--�\ \ ( /> 1\" �A�A AM/ '9" 9 ` .0 �/ \ � -L- 3U36_ STA. 52+�0'LT / J I I ��I�I, dVLANb �W \ \ �— -0'6� / m / �0 /CY /// _ �\ ^ I f _ � X08 ° \> > rte( /° �tilnrl i ✓ / / \ , k- / / poi I6 / 1066 la A MMA I I6 — _ ✓ / LL IN WETLAND µ \CHANIZED �CLEARING "o,/ / \ / J �0�� C ale \ \ /'A ° �-- 0�` DEAL DITCH ( fee \ I I I \ DCNO�ES FILL \�N� i � �` ✓ / \ 7". 6�w, ( ' ` / — \ ( -- - WETLANND 'k- A '� -5.1 TO'STA.4f!00.f Lr\ FAR�� `a 38.0_ 1\ \�� ✓ a ` \° I� ? , DENOT EXCAVATION L 1 1 \ \I ` I ✓n \ It* WET ND1- IL s F' PROJECT REFERENCE NO. 1 SHEET ND. PE " fT R -25W 6 , ; _ WW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER P RY PLAINS Xv- NOT U6N DO N07 U6B PO W CONSTRUCTION \ n1 r J 1 Im z — / x � I I>, II Ie��1 1YE PERMIT DRAWING I SHEET 12 OF 62 L 9 � LLI I � T�E LISTED STATE$ OF AIIEWK '360 £- H6 "\ a �! i vo It i0 /THE L"T� STATE OF K, f / \ t-- .� I ✓/ 0g�/ x-38.0 �' '` IE ,E ) •/ ✓ (°' �•`£ "'� �� \� ` SIT -�: = � �\ —LATE 5 ITCfi/ /1 I / 1, / , ► f \, — �IEC/IH/�PYLpIZ /D� — m 5- ,m0 \ . 14 0�J° \ I CLEARING •�./ 374 U 1 1�. \ 1 \ \0 \ \ / !aW ^ \ B / / 3� 'I.5 /�61eps v I I! V\ °�/��y /7L /�q�w� // �)BAc�M. 5.� \ 1 IMF 1/ I•--�\ \ ( /> 1\" �A�A AM/ '9" 9 ` .0 �/ \ � -L- 3U36_ STA. 52+�0'LT / J I I ��I�I, dVLANb �W \ \ �— -0'6� / m / �0 /CY /// _ �\ ^ I f _ � X08 ° \> > rte( /° �tilnrl i ✓ / / \ , k- / / poi I6 / 1066 la A MMA I I6 — _ ✓ / LL IN WETLAND µ \CHANIZED �CLEARING "o,/ / \ / J �0�� C ale \ \ /'A ° �-- 0�` DEAL DITCH ( fee \ I I I \ DCNO�ES FILL \�N� i � �` ✓ / \ 7". 6�w, ( ' ` / — \ ( -- - WETLANND 'k- A '� -5.1 TO'STA.4f!00.f Lr\ FAR�� `a 38.0_ 1\ \�� ✓ a ` \° I� ? , DENOT EXCAVATION L 1 1 \ \I ` I ✓n \ It* WET ND1- IL s F' -- PRO1. REFERENCE NO. HEET O. N R-12514C I K -1 1 0 11 0 1 0 1 0 1 0 110 1 1 20 2 D AO 0 e 3 0 f 0 5 D 110 10 E 0 1 0 110 1 0 WE LAND AND SURFACE wArER IMPACTS PERMIT PE IT DRAWING SHE T 13 C F 62 0.025 6:1 6 0.025 3� :I 4n 1 3.0 — EL._ 36+00.00 0.025 6;1 6 t 0.025 3•. 7 3.0 — dn vn EL.= s 35 +50.00 Ta 0.025 6 :1 6 2.025 rn a I 4n 3.0 — — — — -- — -- — —:1 :1 �� -- - - -- -- — -- — -- -- -- — -- — N. v EL.= 2 35+00.00 To ZLEARIls G CLEA ING o LIMIT WLB WLB LIM TS v m 0.025 6;1 6 0.0 5 Q 3.0 1 W EAl. 8 34 +50.001 NI SH a W d rin t� m`v 0.025 6 :1 61 0.025 � and 3.0 — _ — 3 dn Tn El. = 14 R 34+00.00 F * 0.025 6;1 6 0.025 3.0 3 — -- — . 7 Z o � �� EL.= .10 33 + 0.00 a >.Uj M *� *1 *1� l 0 1 0 110 110 1.0 1 0 1 1 140 1.0 140 1 0 1,0 1 0 Z 0 N C v N a- a rA rA a a M fA • is 0 :�£ /I \ / q�'� �m w u _ \ ° ✓ \mil m'9i/ ' -I�� WETCAND AND SURFACEIWAM 1>\ lt1 Al a- _°/ p �•6£.>_ -�.�o ,_„ ✓ mm /`C , - 0.6£x` .� !r •6 , _ L/ _ l _�. 66���- M :0 �€ _ ^�I I \ = "�`�l� - b � � , 7 m J �1 y --ROOY . RmD. ET U% CEO HILL, EIT UX I' I q / 100 0' 0 100' I� 6£• 120 I I x /. 1 I, / I m / FREOP6CK_,.KMET U%� W GREEa 0 LAaITJLL{C x e�� L'9J _ _ , x�xIi \- = f ! m < _' f r X 2.4 / GRAPHIC SCA \ `� - II • \� s� p 00 - / 6 .I FRED ' uX: Wi I m/ (j \ a J / 6 �- J I \ � \ � /.• ' �� /� � / / � � � •� � I 24 l � \ px + x4e•eLECxJi �� �, � - 9 6 5 I `�o tIEDRICK E. x •0Y l �+, Q � „ I `I `•e :E�i s/ J: / �� S 1 6. II ``- ET U% \ I� `°" 1 �� i 1 I paFns L. IILL \ ) 22 2.2 e -� Q \ \ III 2••4 \ 25 ❑ / % - 1 ` I L`1#.L II \uT€RAL BASE- -DITCH / >/ m �5 ,J° �Fy DK I I� Ip( 9� _+ flLOER G. /sYSPT 1Y 5 E U \ I SE �� \ WD DK /vA IEFp r1 I ^ Ir / ' \SEPTIC SYSTEM ✓ ' I I CL B RIP RAP x� �� \ s �40.m h�h,, - m • / HTR I ) I 11 i W I \ j \ H /I I ` I�' I- 4 S TONS l SYS7 IISM EWiI 6 _ fI 9 I I (/I \U5 -006 �F�y1 yI�� ✓ / I 14 Y GEOTEXTILE a x. ` /- 11 .. I I m I t ISFD ISFD RO�L KMIG ET .III 5T. I 20(fILE I � C�NC M EP f 1I Y5 M LT) ` Vo `I� `I / �I �� 23 ' V �I I \ O 1��j • d _ �I P ) % L ET - OIIOI.EY, I u nAT 3' BASE DR PL1E� 9.0 40.0- UE' PUE A E I s, �P . //ate PUE PU DEFAIL E ( I ' IP 1 ( L _ PUE � J ER \ 1 _ _ _ _ _ _ /- MEDUN�'DITCH _ -/ SEE DETAIL B -- I - - - - -- -- �F- - -s - -- 837 SRS 200 \ \ PERMIT DRAWG SHEET 15 Of 2 .QpWY A. LORERS.ET U% PROJECT REFERENCE NO. SHEET NO. R -95 7 RAY SHEET NO. ENGINEER DO NOT USE POd CONSTRUCTION �TNACr 2 i 1b•� 7 d0 I / ""� fll�A .T'" z'� •Fay■ `� mo Ste[ - OWN- in rr�Jrli•7� �T7L.l�f"���. iJ. G i 3'�- -`.mot iN�I>iir's� �•y .L i I- I I \ THE LOOTED STATES OF AMERICA / 16 % It I TIE 18MTE0 STATES OF AiEMCA / / It H- z 16 - MECHANIZED 1 e 6 ,� CLEARING - µ 10. IZ JY \ ,F 39'� _38.0- FILLS, �9[ 38.0 ^38.0.. \ _ _ _ J µ •i �` I f i \ Ir - -/ // -� \�\ / - ^8e -' \µ @3�. \' ��� -���� - -38.0 -- •__.__38.0 J -SITE __ / �; �� i _ I-- - - - - -- \ �38.0� / / -� \ \ / i-- V / I � - -38.m- -•' 7// �� \� �� `� i \� -- _------- - /�� // F 37 DENOTES FILL IW, 4. �e ,me \ f WETLAND I W _ DETAIL B DETAIL D DETAIL E ` - - / MEDTA ro DITCH LATERAL BASE DITCH 37. E_WCH 1 Na ro sml.l b r (Ne ro smbl b Yuinl 3. _ _ DENOTES MECHANIZED D 9' tlI _ 6 9 D 3• d � SbV. I '!9� �° 15R. ` Sl�epe � 1 , /`37.� % \� '�I. LZA�R) G 0 k. M_N 3.O .5 B- 3.0 F. Ft. J ff , -L- STA. 46 +90 TO STA 48 +00 MED ` / b' 5.0 H• 6= 5.0 F. / 1' D -L- STA.30 +5 I. STA. 52+00 LT -L- STA. 52 +00 1. STA. 61 +00 LT OD / (I DDF =2610 CY "-E =765 CY �37.m -1 37.0 v, -Iwi„ I<n Icn X \ U8 RAI)WO C. "WS. A ®s%ul�; jr 00 m k0 I ,we uj 1 fF P -k -' -.--'r -PUE £8� ""� fll�A .T'" z'� •Fay■ `� mo Ste[ - OWN- in rr�Jrli•7� �T7L.l�f"���. iJ. G i 3'�- -`.mot iN�I>iir's� �•y .L i I- I I \ THE LOOTED STATES OF AMERICA / 16 % It I TIE 18MTE0 STATES OF AiEMCA / / It H- z 16 - MECHANIZED 1 e 6 ,� CLEARING - µ 10. IZ JY \ ,F 39'� _38.0- FILLS, �9[ 38.0 ^38.0.. \ _ _ _ J µ •i �` I f i \ Ir - -/ // -� \�\ / - ^8e -' \µ @3�. \' ��� -���� - -38.0 -- •__.__38.0 J -SITE __ / �; �� i _ I-- - - - - -- \ �38.0� / / -� \ \ / i-- V / I � - -38.m- -•' 7// �� \� �� `� i \� -- _------- - /�� // F 37 DENOTES FILL IW, 4. �e ,me \ f WETLAND I W _ DETAIL B DETAIL D DETAIL E ` - - / MEDTA ro DITCH LATERAL BASE DITCH 37. E_WCH 1 Na ro sml.l b r (Ne ro smbl b Yuinl 3. _ _ DENOTES MECHANIZED D 9' tlI _ 6 9 D 3• d � SbV. I '!9� �° 15R. ` Sl�epe � 1 , /`37.� % \� '�I. LZA�R) G 0 k. M_N 3.O .5 B- 3.0 F. Ft. J ff , -L- STA. 46 +90 TO STA 48 +00 MED ` / b' 5.0 H• 6= 5.0 F. / 1' D -L- STA.30 +5 I. STA. 52+00 LT -L- STA. 52 +00 1. STA. 61 +00 LT OD / (I DDF =2610 CY "-E =765 CY �37.m -1 37.0 v, -Iwi„ I<n Icn X \ PROD. REFERENCE NO. SHEET NO. R- 2514C I X-1 7 1 0 1 0 1: 0 1: 0 1 0 110 5D Eo ?D W D 40 W 2D 7 1 2D 30 40 !D eD ?o E 3 SD 11:0 110 1 0 1: 0 1 0 1 iO WE -AND - AND ND SURFA --- E wA - I-ER IN - PACTS -- PERM ] I j PERMIT 1 DRAWING SHE [ C T 16 F 62 0.025 6.1 6• 1 0.025 0 469 7 n P Al 7) 1 1 1 1 1 EL. 51+00.00 rin 5.07 0.025 6-1 611 3.0 ---4iL- — n P A? RA 40 EL. .47 In 50 + 0.00 4.95 0.025 6.1 6• 0.025 - 3.0 L A298 dn t.43 .43. .3837 50+ 0.00 .5 A.-/3..l 0.025 -7 6 1 _2.025 3.0 n P A3_aZ_ 4Q E EL �13 ? 36 i8 r An 49 ;2 LB B CL E kRING U AITS 5D 2 0 D25 0.025 6-1 6 0.025 A K 0 1: a< 3.0 nP 4n EL 3 .35 49+ 0. "or 432-1 0.1 25 0.025 6 1 0.025 .0 n P A1,2n S. EL. .31 48 it 02� + 0.00 env z awm 1.10 1 0 110 110 110 100 9 D 80 70 6D 5D 40 1 1 0 5D 6 D 7 D E D 90 100 10 1 0 In 0 0 Z 0 I- it CL< 0 o& 0- LATERAL BAS 13 SEE DErAJL E . -JIUL, T� RAYMOND C. BADS, JLET UX YARVaa L, GOlOSO" I. " DITCH 9 D AND SURFACE WATER 1IMPACTS PERMIT PROJECT REFERENCE NO. SHEET NO' R -25/90 b 8 RIP/ SHEET NO. ROADWAY DESIGN ENGINEER ENGINEER k. ju RACHEL M. EUMW DETAIL E LATERAL BASE DITCH DETAIL F Fe A LATERAL ASE DITCH I IN.,ro �)b DETAIL G LATERAL VDITCH RiI b F, m b I H. :0 D .01 gmDENOTES EXCAVATION B filf.b- IN WETLAND D= VAR. -.dd b= 5.0 Ft. 3. Ff. ww. . 1.011. ddh dWh 6= 5.0 H. ED A- Mn. D= 1.0 H. amend e, iweded -I— SIX 52 +00 to SM 61 +00 IT DDE=765 CY b_ —_ TA+o STA. —L— SM 66+90 to 31A lb+dU Ll DDE=439 CY MLIMINARY PLANS I DO NOT US9 FO . CONSTRUCTION _ _j PERMIT DRAWING SHEET 17 OF 62 y 01 DENOTES MECHANIZED CLEARING F, m DENOTES FILL IN / WETLAND gmDENOTES EXCAVATION IN WETLAND DENOTES HAND G y 01 N Z O N_ R' V w w a a w w rA LLI to Lu suj V I w. 40; w I IN 40 / l l ` N yam. 39.0 // .� \\ 39.0 \' ✓�!/ ?'e NQ,S m N E WATER/IMPACTS P -- -- -ate„ ��✓ /' m v �/ �MBt�.6�E•1' UXC �.,-1 gb r f f hr m / % 4 4 t (Nab w.) b 3/4 `�� L D 3��� l:fl.• 51 /� \ / \ O / 1j B 0-3. B= 3.0 N. / b- 5.0 H. .r Flle6ew ®.n °v Min. D= VAR / rppvvvdnnd. Tmdm r 10.0 1 SEE DETAIL/G m B= 3.0 H. 41 / 1. .$d dwh 6= 5.0 — IATEWAl' BASE DRt�` \\ 4 .0 = SEE DETAIL E J / " �•o J `J,9'� \ m ^ /I / I 0 � ✓I \.I pl '8 �39.0- / \ \390 -�3q0 / -,/ / SITE-A,—/ 3$�/ `x.90• \ ` � _DETAIL E LATERAL BASE DDITCA \\ DETAIL Fa \ LJ11AL BASE DITC� sf °PO 38 D TAIL G Qv LATERAL '"ITCH rdI (Nab w.) b 3/4 IN.. Swl °) b Gd.h "v Grvv / O (NWro Rv) Sbp. b D 3��� l:fl.• 51 D o,. '0/ / 0.8 —_ 6wn�. M GwM / B 0-3. B= 3.0 N. / b- 5.0 H. .r Flle6ew ®.n °v Min. D= VAR / rppvvvdnnd. Tmdm I D a / \ AFa / m B= 3.0 H. 41 / 1. .$d dwh 6= 5.0 ob°n mo.kp Min. D= 7.0 b= 5.0 H. i.oii.amA -L- STA. 52 00 to STA. 61 +00 LT w FDE =765 CY -d� _ -L- 6l +00 to STA.66 +00 LT 1 \� / \\ \D` n�G_ r / -L­ \ 6DDE=4 5T�78 +30 LT SR �n07 � Al, 39.0 e R O / �9.0- — PROJECT REFERENCE NO. Snttl R -25/40 8 PAY SHEET NO. _ LOADWAY DESIGN HYDRAULIC. ENGINEER ENGINEER PRELIMIN RY PLANS DO NOT USE P0j CONSTRUCTION PERMIT DRAWING / , SHEET 18 /OF 62 h 47.01 J 71 \ CLEARING DENOTES-RILL IN / WETLAND— , j DENOTES EXCAVATION IN WETLAND DENOTES HAND €9 ! -LNG 0y i pi 5 1 PROD. REFERENCE N R 2514C X-22 t0 110 1: 0 1� 0 10 10 so ED ?D eo !D AD 30 20 1) 1) 20 OD AD M W 70 ED 90 110 I'D 110 130 110 1! MO, WE ND - AND -'E SURFAI- WA rER [IV PACTS PERMIE -T PER T DRAWING SHEIT 19 C F62 0.025 6:1 6: 1 4n 3.0 3.A D.P. 43.07 dn i 66+ 46H .00 00 In sit) 6:7 61 0.025 3.0 40 ,rn EL. 37.68 n P J1 10.00 Al OR .76— . 00 +65+. in C.EARINC W WLB CLEAR114G LIMIT 50 LIMI 0.025 6:1 6-1 0-)25 3.0 D.P. 43.12 4n EL. 64 3 90.00 0.00 :rn n sin 0.025 6:1 6! 1 0.025 3.0 D.P. A3.20 dn E > EL T60 ja 64 + P 01 .00 in tN 0.025 6:1 61 _0.025 3.0 3 dn n P Al 1? in in EL. a 64 +Ub.00' ' In 0.025 6:1 6 0.025 1.0 P A-1 AA Af) -7 = 7527 N 63 + Ob ) .00 W** 1 D (I 'HD 3JT 120 110 1 10, 110 0 70 60 50 A 0 3 D 20 1 D 1p 20 1 A D 50 60 Ito 110 0 1 0 110 1 0 —...1 D' PROIECf WHENCE NO. SMEEi NO. R -25(4C �P� 9 +. • I .`� �^. ._ 0 I ' r' _ ` t ems~ - 9 &W SHEETNO. m �f�b>f \ � � .' � � •��__� — ....�, �i� >, t \ . m"' � ,.� r�- V1��TLAP�€3 .�T�f�. 6Afi �'TS - i ._. -. 0 7 i w-• !."` `",,.� . _ -. _ ,� ` 1- lu.•xe_,��- __- y.' _L._ -j .. / - ROADWAY DESIGN HYDRAWCS FILL IN [�Q� __ —. ,. , l l ENGINEER ENGAN� 1 4... ^^'$S5fi ^' _ e .i I f - �A r 5 RIN 1 - •,�,.f -7' f t ^• , -_ C%Y'AT4ON ,} t f� i ✓� s� 1 � i WETLAND �NL GEA NT r \ 88 f . 2 FILL IN- WET ANO (3X) " PRELiAiiN R% PLAN ' \ ;� / t - > f iaR'74�+ � ; - :n i ) '� DO KM IA6 O�i61RVCfiW1 -.� tea.,, E`i'\ e•Hb, l I .._'_•� 1 x^ , DfTCH Lrr D I „w �`eq°a.'� ••I • ., � % ^•, .'`�• ,,,.. � �,. �'" -¢ � SEE �NL KRCH . -•••y. ��IOiY' 0• , , -100• %,a, -• • ...w .••t "• •� �°' �` •' r 1 r . ^-• ' t` .._ v ti _..,.. • e PERMIT QRAWIPIG LARCaEAA N A \�� ®� j a. / - if SPECVU+CUYDI I.SI�EEIe I OF 62 DUCH SEE DEPIL AF - f j _�` •SEE NLARGEMEENT!, c seE Vy. .✓ - ,� }� k %% ( j *- �aa:� REVISED 2/3/15 td1E�HkN1�ED l , j 1 b t '' _ HEETt22jti /� ' CLEARING / ( �_ . I �� f �� 'r - -'�v' IjE ! f, �' ', r p®9 �3- _a' 7 t >' , EXCAVATION t I �4i /f } \ !.� a7 A fk1 ••"' y ' I / \ /!.ABBY L EL , "`3 °•:t J X06"• —IN - - p - -- � 44' .9� � � / J i ^-? ✓ \ 3� �� _.1 LATE tiL D \ 1� ®! A co 0 m l ` 7 1 I � -i s , ` .\ � 1 \ r � . � . \ NA RAL GRO13ND I r � _ lf,. I .. - .. ' •` �..... -. ,_ TES H I� LLJ r LATE �r elrea! 2 k `e. 3 rl q, SEE oErtiL LLi LL,S 4i'(: •,� - �` se�>DEr G I' LI ;` �`\ \ Y�i ; �� 1 +�� , ' /1JACS 6Alm.. i (- I�' LLJ > j 1 p Pg'E Lij PUE PUE`' —� , • E - ]` ----"� P �• E� G EXiR E S E ' ^� o_ f ? T E DETAIL LLJ # K.� , I _'•� EST. ESi.3GTO�NS D. sLU - ® c _ r•1 lb• .sisp rd e __ ~_ — - _ — r— -- — -- -- -- 0 -�• — — — — _- _ _ — - - - - — - .— _ _ — — HE SPECIAL DETAIL 2t-9 = _ OF V oor C `\ l uj — r LLA 0 IF u a Ej j It H, S �rmi •,mac.^` ^� ! 1 i t `� $9.. �� t I! / Bf ! Tj3 , .AiJ� -/ e� FILL IN WE°I'L�1@ f UNTEb(Sra�T P�A�a T.o�' T � # � � H \* � t -- - ( ( � i I� e re 1 ..•.• '�•'_••� ---- � r... -• -- -ti<"- "" m � � ` '- fit\ � /' MECHANIZED j ' -" ` . 'E -" ' ,i a . �- - CLEARINGS `_--- _ {y '^ u,� ` "� / .,•' 1 s —' / 1 ` H"" "r 3 °••2... ..•� ✓ ,`"i L ,� _'•- ,yam•°- .` �y ^. ,I - Y f �, r•'•^ -^'� r^- - �" r,Q• � \ I � `• �. S� �- a •--- d. ENI�R MENT ?'3.r, -- f ''r �� \ '4•'79, ". / (3X) N, 1 ^/ r t a ~ ,\ �,~ yaw j T f� SU `' e DE EsS FILL IN WEiNQ 1 f J MECHANIZED ERING ty , w FILL IN WETLAND V D_ AIL r ETAIL I ; DETAIL K 1 DETAI ` \ MAIL 1 DETRIL AF DENQTES�6,E�XC ♦AVATION w rERAL M DITCH °, S uL CUr DrtCH SPECIAL cirr DDCH u �bIfCH , -,JAIML 'r DITCH q, SPECIAL LITERAL •w DITCH I N WETLAND w rldro resiq r by [Neab read Nxb smtq w I n.�. fNaro tmH e+.m IHw�e rey naM ; t �° DENOTES MECHANIZED AUn. D =1A ` Alin. D -lA R. �+ / 9 h =3A k. .,,1 D_ vul / i +A e Is m CLEARING z �, °Ieswe came- DRV1A- 1f1 +2570 STA 11 +I0 RT ! - ORYLSTA 9 +35 TO SrAli +19 / Hl�eaw =-j r l wo Ati o= 7.0 R. yrovd e. nsded -L- $TA.. 83 +50 TO Sr0. 86 +50 LT Mdyn- a5 R. ? h"I SA R. "'E'b1en' j DDE -219 CY h= 6n H. aw. =++"w -0 A- Sf0.10 +SO TO Sf0.11 +25 (LTl l r ;:lc;_`,:_I�,_•�._,., 66 +00 b STA 78+90 LT DDE -499 CY -4- RA 86 +30 fo STA.89 +00 LT 81 +50 TO STA. B9 +50 LT DDE =49 CY ! t f \ DDE =90 qY a® 1191 a nib, n 16 A 7r-M-1 A A& 9 w-& ff" fff WE F 11 'Iff F T-: ra v E;: a REFERENCE NO. SHEET NO. R -2 14C X-28 °\° e 1 0 1 0 1 0 1 0 1 0 1 0 1 1 100 10 1: 0 1 0 10 10 WE _ND AND SURFACE WArER lJVPACTS J7ERMlT PERMIT DRAWING SHEqr 23 C F 62 cla in W z J 0.025 6: 156'1 0.025 0.025 T-L — P. 49.13 ` — — -- — '— — — — -- -- -- -- __� Bey 82 + 5.00 aa 0.025 :1 5.678 0. 25 0.025 gn m D.P. 4E.40 Xi 81 +A U. 00 v to LEARIN LEARI LIMITS WLB WL LIMITS m 0.025 6;7 6 0.025 3 i c 3 :.N JD.P.47.78 3:7 3 o _ E 81 +3j �.00 c 0 c W F 0.025 6;7 6f 0.025 •; g:1 3:7 0 o -o D.P. 47.61 'D= °•� — _ _ �� I 4n 3 3 -� — — — — ®+ ® .®® 0.025 6:1 6f 0.025 3:1 3:7 NO — -- — — D.P. 47.44 n J w 80 l3b.00 wyw a yv, Tn �f irn i*z �wz vriww 1 1 10 10 10 70 70 1! 0 «�« 10 awv 10 10 1: 0 10 10 10 1 PROJ. REFERENCE NO. SHEET NO. C m K— 9 1 X-30 10 10 1: 0 1: 0 10 10 5 a ED D e D D A D 00 2D 7 1 2 D 30 AD D e D 7 D ED so 70 10 10 10 10 10 FA 0.0 5 0.025 0.025 WE ND AND 3URFACE WATER I PACTS PERM PER4T DRAWING SHE 24 OF 62 - yn 87+ &00 0. 25 0.025 0.010 0.025 3 � •I 86 + b.00 r N ILB CLEA ING LUY ITS X 'D x 0.025 0.025 6:1 b. 0.01 0-03 0.025 a c a 3:1 D.P. 9 : ) 3 \ EL. 8.30 —i - 7672 E O i 0 `c m E 0 c Pin W An N� F- a 0. 25 0.025 6:1 5.1621 0.010 0.025 '0 3' D.P. 51.10 : ) dn + Jb. — 86 00 w 0.025 0.025 6:1 5• '241: 0.010 0.025 E:= i4 {. t , H3:1 D.P. 50.85 a UIN ��� 85 + 0.00 — An NHrN � M dl7 (qMm �ww� 10 10 10 10 10 10 1 1 10 10 10 10 10 10 z 0 o�z T_ DETAIL J DETAIL H LATERAL V DITCH RR LATERAL V DITCH (Nel le SmM) Slop IN"Iro 5m M) b '-- slop D l 'p�� Min. D =1.0 H. b =5.0 H. RU ehd dNine Min. D= o.s F. mma <. —I.a .{_ STA 89 +00 TO STA. 94 +00 LT 6= 5.0 k. 1. °1pi''d""' """ °'" DDE =451 CY 1.ON. ddd+de h -L.— STA. 86 +50 to STA. 89 +00 LT DDE =30 CY DENOTES FILL IN WETLAND eR DENOTES MECHANIZED CLEARING •• i I THE UNITEO STATES OF O SITE i PROJECT REFERENCE NO. SHEET NO. R -25/90 /D WETLAND AND SURFACE WATER IMPACTS PERMIT PAY SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER GLI FRELIMINA, RY PLANS DO NOT USB PO CONSTRUCTION fool 0' I00' Bill m PERMIT DRAWING GRAPHIC SCALE SHEET 25 OF 62 NAD 8� SRS ?007 IIEYERRAEUSER COMPANY 34 KYERK EUSER COMPANY 34 SITE 9 P MECHANIZED CLEARING ul 1 k• � I M � ,\ 18' CARP W/ 2 ELBOWS Jt W \ J,c M � 6i3 PUE F c @, IR,RAP IE PUE — PU PUE —"'�� PUE — — — — _ _' F �yA —' F - ' F .. .. • • i� . EpiNO . — EST. 10 59"OEOlEXTILE � ���iii \ \ \ \ \ \ \ \\ T MINME + V" flCP 15' cmp=i=== =4= / /`\ \�� \ �' �• 'ice - BURY 1.0' US I6Yi O /RC 5B f4 BST ACCESS STILUCNRE — 1191 n'IF4frR OSSING_✓ .I 0.4 •• i I THE UNITEO STATES OF O SITE i PROJECT REFERENCE NO. SHEET NO. R -25/90 /D WETLAND AND SURFACE WATER IMPACTS PERMIT PAY SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER GLI FRELIMINA, RY PLANS DO NOT USB PO CONSTRUCTION fool 0' I00' Bill m PERMIT DRAWING GRAPHIC SCALE SHEET 25 OF 62 NAD 8� SRS ?007 IIEYERRAEUSER COMPANY 34 KYERK EUSER COMPANY 34 F k 4 � M M M S ITE 9 MECHANIZED M CLEARING M FILL IN* WETLAND — Iy O SITE 9 P MECHANIZED CLEARING ul 1 k• � I M � ,\ 18' CARP W/ 2 ELBOWS Jt W \ J,c M � 6i3 PUE F c @, IR,RAP IE PUE — PU PUE —"'�� PUE — — — — _ _' F �yA —' F - ' F .. .. • • i� . EpiNO . — EST. 10 59"OEOlEXTILE .-r! .. .. T + V" flCP 15' cmp=i=== =4= F5 BURY 1.0' US I6Yi O /RC 5B f4 BST ACCESS STILUCNRE — 1191 n'IF4frR OSSING_✓ .I 0.4 F k 4 � M M M S ITE 9 MECHANIZED M CLEARING M FILL IN* WETLAND — Iy O SHEET NO. / \ I t(-z514U Fu / AfLJ DETAI Ii / WETLAND AND SURFACE WATER IMPACTS PERMIT RAY SHEET NO. gIAIERN -'V' DITZ{ A ` �TERAL N' DITCH l ---- -- ROADWAY DESIGN HYDRAULICS ��"I NORd• � S4 �I.) \ \ \ ENGINEER ENGINEER b \ PRELIMIN RY PLANS / H ^ \ ^ DO NOT USR PO CONSTRUCTION ben. 5. \0.5 1. a a. STA 8%ODD TO SEA 94 +00 LT l� \ b= 5.0 F. u0. dtm. ®���n� � I DDE =451 C1' \ v � \ /-L- STA. BbDDE =130 �y 89 +00 LT I I \ ' `\ \ \ 100' 0' 100' ION \ PERMIT DRAWING GRAPHIC SCALE \ SHEET 26 OF 62 DE-4.. 016 r-tIFILN IN _\ 0•bf-- �.,,_. _ // / / / /' \ \ I'll j D_ a \ " _ ' AN m6E �— NAD \ / / • • • DENOT.dAECIZED� _ _ \ / \ ,RS 20p7 48.0 -CLEAKNG l \ ^m'?� a,0 m _ _ -� ° -8 mn_ _— ' \ 8� =LI!✓ \/ /` \/_ i `/✓ — 6= �\ - B•6E•r. �. L —, m J. / /' > mS \ ,� l _ �\v n ` \ / Or �` _„°e /qe ,�/ / o .39.0 h ✓ //A jy °\ J �/ / IKYP.AHAEUSER /CONPI \ -•41. am ry \\ V \Q ^ / \ `ate 1 -' a LL�7 /� , l \ \ — / \ (� 41.8 _ ✓ / r e m� MWUS6, COMPANY( ! � / \ /i it �� (__`j a� ��� \_ej� 34) tr J � (° m N\ J `— \/o I } f re; /�( Az�� 1 1 L MDIfCH 0•Ib ( 9% �°. •�' l 0b \ s /��y� ^ / J/ / / s / l \ `- \ "� _ ` _ (41.0` /' 1 V I 9�m I` . / `� e ` r W ---� • ' . l b W LATERAL 'V'.BRCH^� - \\ -� -IE \ 1 Q' ` > -w'-1L -SEE DE�q� \ / J/ / J p; I \ / \ ✓� /E•_, 0,1V 6d' m zL'TIROv7v) y\ / /� e `/ \ \ / a \ /,• " \ j \ (_ 6/8 _ y r JACK P LA�-� Via, \ f t Z i� 1 \ / ,b 7 r i m ` \ IJJ lie ­c� B� \ % /i , aaP wi `��x f , �� 1 \ A��� \ l \ \ . ` ELeows 1 0 n /« 1 / I�✓ " 6!J v P --� \1 / 41.0 a O .Ib .. J \ •� .� . \ \ \ \�i x'42.0 .7,. ` o / )�� U 0 i` ��� / SS, _ _� _ t \ 1��_ Pub _ - •3 -� \-' �. _9 _F L- �_ __ _ \` ' s I ...5 W��f \ \� E �� .3'i I i�CL'i4.E'.L� 0•£ a W 0 :�_� i- 1. �_ r v- 1 a�n w LLJ a v! / � � a � q•� --- - rte- - - - - - -- -- =� _ �' b 1�, `T o � \ \•0^ ./ ^\ '� _ � ', \`420 ,A20 � •y= - F Ate_ /- / a� .�• F � 02 "/ I\ / \ CL Q RIP yr HW\ X \\ 40.0` ra / \ lb �9 1 1 ��T�E/�IMITEO STATE OF r / / \ yew G , if �JL'D, I / \.• \ \ It / / \ , / / /� �/ /\ / 18' CRAP W/ 11 l,g� A.\ = �` ,4 / `� 39 94'^ / \e �, \ N z ELBOWS k UtATEO TAiE 0 RICA H� I \i_ l`� a dF -I.\ q0 .. �� %9 / /0 \ / y�- / 1 A` c^ - - �J 11 -1 /'1 ✓ \ `` i- =a- _�, \sue �a.. .� _� fi v/ }�A 1 E/ / MECRAM NN �+ {( ,e - /0.& � CLEARING 1I`J I --FILL iN* VVV Tb4NQ \ a ww 1 m - 10 PRO1. REFERENCE NO. SHEET NO. ni R— 14C X— 4 m 10 10 10 t0 10 10 5 D 80 70 60 50 AO 20 20 1 1 20 30 40 0 e 70 E 90 10 to l0 10 10 10 0.050 5.264.1 6.1 0.050 WE ND AND URFA E WATER IMPACTS PERM PERMIT DRAWING — SHEET 27 OF 62 _ dn 97 3557 .00 in Tn LEARIN LEARIN WLB LIMITS LIMITS LB sin 0.050 5.447;1 6:1 0.050 _ — -- 96+ 0.00 — — -- - -- -- J a ;, 0.050 879.1 6.1 0.050 x V v C _ �\ dn- 40.00 96+ 0 0 / In 0 0 v 1: r 0 "'i 50 5642.1 6' 0.050 W ==00== rin d 8 D.P. 52.55 �o m -o da 95 + .00 VEpE q 0.050 5642-1 6. 0.050 D.P. 52.38 z 95+ .00 ��� 1 0 1 0 1 0 1 0 10 1 0 1 1 1 0 10 1 0 1 0 10 110 0 it c °C v WEYERNAEUSER COMPANY 34 REMOVE EXISTING ROADWAY UNDER PROPOSED BRIDGE AND GRADE TO DRAIN F F W../ F F ® CONC HM Tr As THE LIMITED STATES OF AMERICA AR Al O 4 A� A FILL IN WETLAND MECHANIZED CLEARING I 1 . I i 1 I I 1 ' 1 I I I: I ! . I I . 1 1: I 1 I 1 I 'I I I 1 I I I 1 1 I I 7 1 1 . I I I I I I ' PUE BURY WETLAND AND SURFACE WATER IMPACTS PERMIT " GLI I�f loo' o' loo' GRAPHIC SCALE Nqo a �SRS�00 � LWPUE VATION ETLAND SITE -11 MECHANIZED CLEARING A 18• CRAP W/ 2 ELBOWS EST. 3�TON5 LATERAL 3' RASE DITCH --**��`` PUH! !� PUE EST. 10 SY GEOTPEU%E \ PUE SEE DETPUEE N PUE US rAW n /AC 58 zI BSF ®� r BURY 1.0' L —FS �[� `I eeeCcec F F F F F F F F L18' CAAP W/ CL B RIP RAP N� 2 ELBOWS ESf.2 TONS M \ EST. 7' SY GEOTEML.E / Ae / I I I I 4 DETAIL E LATERAL BASE DITCH I N.I. S 1.) b �YDL�I �"p1j"O J�j�o D A) e� 1iH• Aa 4 p B Min. D= 1.0 Ff. 0- 30 H. b- 5.0 H. -L- STA. 104 +50 to STA. 142 +00 LT TIDE =4025 CY DETAIL H LATERAL N' DITCH ( Nol b Smle) Min. D =1.0 ff. -L- STA 114 +87 TO STA. 115 +10 RT DDE =5 CY CL B RIP RAP EST 3 TONS ONE �' u W .4 .4 J. kaA► _ cy MO EN �W,1mmlw -- • 'A4, POW�I /i��il MAE I REMOVE EXISTING ROADWAY UNDER PROPOSED BRIDGE AND GRADE TO DRAIN F F W../ F F ® CONC HM Tr As THE LIMITED STATES OF AMERICA AR Al O 4 A� A FILL IN WETLAND MECHANIZED CLEARING I 1 . I i 1 I I 1 ' 1 I I I: I ! . I I . 1 1: I 1 I 1 I 'I I I 1 I I I 1 1 I I 7 1 1 . I I I I I I ' PUE BURY WETLAND AND SURFACE WATER IMPACTS PERMIT " GLI I�f loo' o' loo' GRAPHIC SCALE Nqo a �SRS�00 � LWPUE VATION ETLAND SITE -11 MECHANIZED CLEARING A 18• CRAP W/ 2 ELBOWS EST. 3�TON5 LATERAL 3' RASE DITCH --**��`` PUH! !� PUE EST. 10 SY GEOTPEU%E \ PUE SEE DETPUEE N PUE US rAW n /AC 58 zI BSF ®� r BURY 1.0' L —FS �[� `I eeeCcec F F F F F F F F L18' CAAP W/ CL B RIP RAP N� 2 ELBOWS ESf.2 TONS M \ EST. 7' SY GEOTEML.E / Ae / I I I I 4 DETAIL E LATERAL BASE DITCH I N.I. S 1.) b �YDL�I �"p1j"O J�j�o D A) e� 1iH• Aa 4 p B Min. D= 1.0 Ff. 0- 30 H. b- 5.0 H. -L- STA. 104 +50 to STA. 142 +00 LT TIDE =4025 CY DETAIL H LATERAL N' DITCH ( Nol b Smle) Min. D =1.0 ff. -L- STA 114 +87 TO STA. 115 +10 RT DDE =5 CY RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEE0. ENGINEER (PRELIMINARY PLANSI DO NOT USE FO CONSTRUCTION PERMIT DRAWING SHEET 28 OF 62 34 WEYERHAEUSER COMPANY —18' CAAP W/ 2 ELBOWS PUE PUE PUE F ..— — � — F = F — F IF �EST.7 SY GEOTE)MLE /THE UNITED STATES OF AMERICA oLATERAL 'V` DITCH SEE DETAIL H 18• CAAP 1 2 ELBOWS WECENIED Ll� /L_L 1J DENOTES FILL IN WETLAND DENOTES EXCAVATION !�r IN WETLAND ** ** * * * DENOTES MECHANIZED * * * * CLEARING IYrA - mid rl CL B RIP RAP EST 3 TONS ONE �' u W .4 .4 J. kaA► RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEE0. ENGINEER (PRELIMINARY PLANSI DO NOT USE FO CONSTRUCTION PERMIT DRAWING SHEET 28 OF 62 34 WEYERHAEUSER COMPANY —18' CAAP W/ 2 ELBOWS PUE PUE PUE F ..— — � — F = F — F IF �EST.7 SY GEOTE)MLE /THE UNITED STATES OF AMERICA oLATERAL 'V` DITCH SEE DETAIL H 18• CAAP 1 2 ELBOWS WECENIED Ll� /L_L 1J DENOTES FILL IN WETLAND DENOTES EXCAVATION !�r IN WETLAND ** ** * * * DENOTES MECHANIZED * * * * CLEARING IYrA - mid rl PROL REFERENCE NO. SHINO . m R- 94 1 0 l 0 t o l 0 1 0 1 0 1 1 l 0 1 0 1 0 1 0 1 0 0.050 5.264:1 6:1 0.050 WE ND AND SURFACE W. ER I PACTS PERM sin PERMIT DRAWING — SHEET 27 OF 62 In 97+ 0.00 LEARIN LEARING WLg LIMITS LIMITS LB 0.050 5.447:1 6:1 0.050 J CL X �, 0.050 579:1 6:1 0.050 v v sin tn e 4.00 96+ 0 0 0 v E c 0 e w� 0.050 1 5 642:1 6' 0.050 w u. D.P. 52.55 ` a — m= i 95 + .00 0.050 S642-1 6• 0.050 D_ D.P. 52.38 a z ° 95 + .00 in -V �-d.a i vNnz WWN ��� w nw 1 0 110 1 0 1 0 10 1 0 1 1 1 0 10 1 0 1 0 1 0 1 0 WEYERHAEUSER COMPANY F 3� REMOVE EXISTING ROADWAY UNDER PROPOSED BRIDGE AND GRADE TO DRAIN J �`� U THE UNITED STATES OF AMERICA FILL IN WETLAND MECHANIIED CLEARING t SITE 10 WETLAND AND SURFACE WATER IMPACTS PERMIT GLI 100, O' 100' GRAPHIC SCALE Hq0 9 I i 200 t I I I I I I I I: I I I . I ' I I I I . I EXCAVATION I IN WETLAND I � , SITE -11 \ I I MECHANIZED / CLEARING CAAP W/ \ 2 ELBOWS 161. ST. 3�TON5 LATERAL X BASE DITCH 1 PUE PU@ PUE _ PUE EST. 10 SY GEOTPEXXTILE \ PUE SEE DErAJL E PUE BURY L5 MPP O /AC 56 "BSf —FS F F H F F F "",71F F - - -_ _ F / 18- CAAP W/ CL B RIP RAP r.we— 2 ELBOWS EST.2 TONS EST.7 SY GEOTEXTILE I I I 1 4 1 DETAIL E LATERAL BASE DITCH ( Nate Sao) j b ...JO D 4 �O� B Min. D= 1.0 F. B= 3.0 H. -L- STA. 104 +50 to STA. 142 +00 LT DDE =4025 CY DETAIL H LATERAL M DITCH INetb Smt°) 6 =5.0 FI. -L- STA. 114 +87 TO STA. 115 +10 RT DDE =5 CY PROJECT REFERENCE NO. btlEt7 NO. R -25140 /I RW SHEET NO. ROADWAY DESIGN HYLIRAULICS ENGINEER ENGINEER DO NOT USE Po( CONSTRVCTION PERMIT DRAWING SHEET 28 OF 62 m WEYERHAEUSER COMPANY CL B RIP RAP ,EST. 3 TONS 18' CAAP W 2 ELBOWS P1 19 immmaim.&M ° 11th THE L"TEC STATES OF AMERICA OLATERAL 'Y DITCH SEE DETAIL H 18- CAAP ' 2 ELBOWS zath pAt ■ ��I RECENED DENOTES FILL IN WETLAND DENOTE WETLAND XVATION ** ** * * * DENOTES MECHANIZED * * * * CLEARING N O C � v PROJECT REFERENCE NO. SHEET NO. ",-a ikmOl J � ✓ (� t' <� �mmn`J ! I WI LA�ND� ,i�H_� Sl '�W �EI�.�T�PACT PER�I� R —W SHE gb ✓ a J / r 6 \ ' !__._.___,_a '- ROADWAY DESIGN HYDRAULICS / / // \ J \ / ENGINEER ENGINEE0. ob•J /r ° wb"�i� /� s \ HORD - Jm \ V �1S PR°ENIMIN) RYsraPucLr1ANS J(( \k,l 9 \� / %A90 —J/ \`� / 0,1 \�,/1 —"� �y/ q4\ _ \ / 100 ( D DD, m p. -4 < ` / �m� } @�\> J. J� ¢/� o I— / vii —\ I\ \ as ,'/ e r¢( ✓� / I' n 1m\ / / ' / 1 ` \ �_ a GRAPHIC ALE / 6 , PERMIT DRAWING Jai% _1�—�� n� 1 ! J) 9.04_ = SFiEET��29 OF 62 \� m \ N/ r �l \ _7 tid 41. \ C1 016 '• J I 42.0 l /i l / @�'/ / % J 2b \ / I O @ ` /� ✓ '� a l y �/ �6 I \, \ \ ( a �/\ /�/ 1 /lni \ �\ m'7 ((I- 2b ( f l `^•- \ J to - / � m / @ � 1 I � ^ . T- `' /J I � 1 L REYERRAEUSER CC ANY @ ` �a \ �k� ° ` r / 02� ! �� `�/ Zn! j r / • e� /A ( \ i j\ /@a Aj /'1 EM NDEkl�itOSED fLBOR�DGY 1/ec ' 1 fr �/ t f JA \\ `0` g� /% 1 J / /'% ✓/� I \ \ ✓�\ \ k� I / /AND GRAD TO DRAIN 22 I /�� /7 \�'Y @ / �1 N �a N� m'� V .�ti�) c �j (� _ @ / z —1 J(� _ -/ e/ /11,`� o JI �p�1'_ ;—' •�,, % l 42.0` 1. N , I I 1(. J X11 'i �•� `�..� �, L �( �16� 34 _ / 1 �• � / \ / \` ' � J \ � \- '"\/` , V { If I aM;� �� �4�'� •_._ o � � f /EYE AEUSER C4APJY ® / I %j e r / J /^ (� I� (I I ( %� V� MECHANIZED \ \� \ J ^ ` a EES s •, J �4t.9 \ \ / r i / s2.0/ II \ (� / -026 c r CLEARINGS e A 18' \�/ < 2• / %L�� 18• W /EL RIP RAP EIBOWS� / 2 ELBO d �' \ 41. W ✓ _ ( ` l I ,y, — X BAS MY [ ,� t . �\ a / @ - \ i \ I Zb / 1 I <\ 1 J / 'k S �.� TONS �"'+' / �.. 61 40.9 , / l `` E 0 SY GEOTE%TILE \ / %S E DETAIL E U� , N •�k2� 0 -PU 8�E •`°-�'PU @E P PU , JPUE �� PUE { PU /_, a_ P. \C ' n PUE l / „ L\ v N ' 4 \ / \ \ by uj .� / _ -� r — .� ty-- �- = MW N CCC — aai ` ..l i •g h-- b /'_1• _ _ ti _. =r-_ .� / @_mil 7'r "_` `�1��_� *•-- ��._`.0 _`/~`�1J� __ 'YY�0�." %^ ��'!'.0- -r ,✓.'�, 0....i \ '/� -4 4� ® ISM ""_ _ ® 0'£b —. — — 0.E6_ _-.t�^ - InleE aosulm - -- ~ `LlSJ4avJfIAC E4!857— — `.� ---- 04z.9'-� — — — — — ® 7 `•� BST 43. —• —" X3.0— = 43.0 — —BURY 1.0' -43.0 6URY 1.0' _4ZHq — = ®_ _ -- _— — = — .ice- _ - — = _ = - _ _ _ - _ =_'g _ _ In 1 2G1 2G _ _ _ I —� - -- —�-- — — - -� —/ \ LLJ Mill F F F� p HW F F F F A UL B 1S' CAAP W/ EST .2 TONS / ` ` j EST. 2 TONS IR z#— \ d9 # 4ee• t,µB r "' 2 ELB01S El.7 SY $EOTE)�LE � � 1 ST. 7� SY GEOTE)MLE � 1• I m• / \ T IF! 0 STATE" AMERICA I \ # I o \, Hg e �J �q. o \ ro� \ > \' \ THE WE0 STATES OF AB.ffRICA 4 F- \\ 1 / # / \ .?ee \ \ \ y \ Ac I / / I \ o SEE DETAIL Lj7- II I \ t �I / \ / �,� F6�LL IN WETLAD\ r 38.0 MECHANIlE[b m l 1, I �m / l J I o / c— 1 18* � W �A✓� '� m_ CLE R G V DETAIL DETAIL H •� LITERAL SASS-DITCH ✓ � � '�"�RAL "'�`" DENOT FILL IN Smla) I � ,� s E s' —A %� / WE D T 0.0- / \ \ LEV. 6.9� \ ---- _ FII / � I " ° ' �•` W �DENO� ES EAVATIO�N\ i SITE, 10 / 1 B= 3.0F Mn. D =1.0 N. p 6= 5.0 H, n�q� l 6 =5.0 F. / \ Q .yt1if —t Fr;y.vl =' -.rn.J } � m_ � , IN WE STA.104 +50 to STA. 142+ LT - L_.5Sm 114 *S7 7O 115 +10 T 1 DDE =4025 CY / pDE 3 \ ( \ \DENOTES MECHANIZ \ `/ / / \W / �/ I 1 • . �� ,d CLEARING P P N PROD. REFERENCE NO. SHEET NO. m 1111mm, R- 2514C X- 9 10 10 1: 0 1: 0 10 11 O 1 1 20 a D A 0 D D 7 0 E 3 so 10 10 1: 0 1: 0 10 10 0.025 6;1 6:1 0.025 r WE ND_ AND SURFACE wArER IN PACTS PERM 3.0 PERMIT DRAWING _ _ -- SHEET 30 OF 62 - — -- -- — -- -- -- E_ .98 4 — -- In 106+30.0( 0.025 6: 6:1 0.025 A D.P. 55.00 3.0 — — — — — — E = 10 4 — — — — — — yn 105+50.00 WLB CLEARI G LIMI c m 0.025 6: :1 0.025 v a x+ TA D.P. 55.37 vT _+ 3.0 --3: — — �— E = 23 — — - - -- -- 0 05+ 0 ® d i N C O D r E c r 0.025 10:1 9 98:1 0.025 0 W T-A D.P. 155.17 --<1 t2 H 3.0 o `mv 1 E= 35 04+ — — -- - - -- - - -- -- -- — Aa 'm .0c, = c� m� Fn 0.025 10:1 9 61:1 0.025 e w g'1 D.P. 55.27 z v yew rwa ,*X YMP VIWW (9WN f9m� MN(9 a»� ��� 1 0 1 0 1 0 l O 10 1 0 1 It 10 10 10 10 l0 10 G v N O ,D C m N Z Q V N O � c .G r F_ t11 p�LU av ui W ci L I f° Pte' I� 6P1 \ L f 'F- F k �- F F #F # F _ - F F a# 15 TON$1 F F IF F F \ F F F f EEXXfTII L B RIP RAP 1dJ1 sY GEOT L ` ` ��_ ` �/ 2 TONS \ \ / am EL B RIP RAP �/ / I �4Q'� -� 1 \ /E 7 SY GEOib(TILE \ m/r EST.2 TONS 40.0 - � _ -- 1 49# / / ` I \ �r 1 EST. 7 SY GEOTEMLE 1 Bye e : TIi UMTEO STATES OF \ / TIC UOTEO ST'AT� Oi 4:9CA 40.0- - - J l I _-9.e rF - 40.0 - T 1 STANDARD 3' BASEE DRCH = r4[) # �_r__ 16 c EST. DE C.Y.LDDE \ Bte / / \ ` \\ _ / / C l � / 39.0- -� \ € / FII- FibTLANf 7 *m 0 \ \ \ M�/I L age i/ % —r 7 ��G B " rA0.0- TIE TO IXISTING DITCH MECHANIZED �9.e \ 400 CLEARING C 6£ §7 • r'- 390 +11.TERAL IV'OITCH om/ i l SEE DETAIL H / � 7 41.0�� / cp• �~ -_ J —/� B. \ / —41. "- / I_� TLAI�AND S�l ACS WATER IMPACTS R i�MIT- � \ � rfe- � \ /� � ✓ /�� ^ � � �.\ � -� \ \ / /, / d r - _ J I � � � X41.0` \ � ,� \ s/� ✓, '- .a— 1 ~eya 1 `era \ � � / /(� � _ ` \ d �� � � � � � /' — I 'a — �' f �. e.e- --� f �`-ae.e- ' % 9 \ .—' \ / A0• C �d� ` i � // �\ � >q� I % ge / ) Al -��._J J - J \ J 41.0 / / / �� �/ (tea p° ✓/ ° 1`� - / ` '� I! / ` \pm' Q� f�yd 39�o- L 0-e=s \ x°7" 6' - \ ` e` G _ - �4 / m( �/ / \ /r° l \\ \ % / �0' a /� / 1 m Ao° / 1�� �a1 o C4� po > l ^ J °� 0 A \ \ i� / P oll \l. �\ �0•eb IC SC jLE \ ` �r L l ���' r / . q SHEET NO. RW SHEET NO. _ ROADWAY DESIGN - HYDRAULICS ENGINEER ENGINEER DO NOT U66 Fog CONSTRUCTION \ ( o� ,y e0 � I I \ \ J-° \ V. (I 1� f` '' �% a J \ \\ j �A ti �01V �1 \ J �/ ,�� ~� r / \� // l M H�?Llf11ZD c,. e.� CAgTTNNG / ( . f b\ 01b —, \�\ I (�J iq0° /V �/ \ J el ^ \ J ate\ <' 41.0 / 1 `i �! 004` \ 4— + ,- 41.e -� �% /v 3 , /Ja / / ✓ 1 I���a�� r / I r < J ` — (� J < ✓ /�'I EXC/ 41.0 J ` .` � 1.0 1 vESAELisE0.S�CANT e� r J 1' S 2 EL WS Al• 0'Ib \ ry 0 eb( • 3 % "� a RPt ALLEN G f .BBC s s1E / . ST.3 p °0 7 \ iT / —J �'^ EGH IZED EST.0 SY GEOTXTILE J \n \ ' \ m o / /IATE�S3')BASE DTi CCH ` LS7 PUE PUEz — PUE -`- ,,,y ` '� .0 r�EEDE4iUt�E J .� \ ISFO 41.0 PUE ---B PUE � . s pU i b __ _ —�_ � PUE PUE PUE PUE P '0b US M /r /AC M 24'BST :'39� ^-- "f<"'�:�'�_ - i9.R -= � � — 3Y.0 -• -.v ����_ = "i9'Or�- •.m�=- �'x��� -:Ya ^-_ X400- -= \\ 1, I I 4- / PERMIT DRAWING " ECT,,32 OF 62 0�1 L.JACKSOK ET LOT Lie •t'r•r f 7,.1i ';Bill 728ECAAP W/ I I II1 �� _ 38.0 / / < I . 't6.w DETAIL E / LATERALRASE gRCH / UU xy`sl D -L- STA. 104 +5D'to /STA. 142 +00,LT / W DDY -4025 CY 66 L F r iTLAND NE� FIIjL -1 # 4 DENOTES" MEC 13ED 1 \ \ w i / (\ � \/ DfiNOT�! EX %AMN 1 S Nbb 3q 0 � ,D J \ 38.0 1 �" \ I / \ A\ \ 1— 0 10 PRO1. REFERENCE NO. SHEET NO. N R- 2514C X -46 •� 1 0 1,0 1 0 1 0 1 0 110 5 D a 0 70 0 5 D 40 a 2 D 1 1 20 30 4 D D 0 70 E D 50 11 0 10 110 1 0 110 1 0 PERM WE � ND AND 3URFACE WArER I PACTS PE IT DRAWING SHEET 33 OF 62 0.025 6:1 6 0.025 3.33 ' 3.I 3. — — — D.P. 47.71 — — — — — — — — — — — — — — — EL= .46 7+39 2 0.0 Tn WLB CLEARING LIMIT 0.025 6:1 1 6-1 0.025 3 2p' 3 :7 3A D.P. 47.87 dn EL= .39 396 24+ 0.0 0.025 6:1 6 0.025 3 .1011 �� 3J v 3. D.P. 48.03 L 4n EL= 29 t3 o� 123+90.0d N /O C 0.025 6:1 6 0.025 e 3 p1:1 3 :7 0 3A D.P. 48.19 E EL= 20 _ 3 23 + 0 .0 0 W NI H 0.025 6 :7 6 0.025 319•, 3.) 0 °i 3.0 D.P. 48.35 a= dn 9 EL= .1 22 + 0.0 w 0.025 6:1 6• 0.025 3.097 3 :) '• j +r +' 3.0 D.P. 48.51 22 + 0.0 91 �f F* JNN2 - N HW W dl(n (q d17 �«« M (9Y 1! 0 10 10 10 10 11 0 1 _ 1 10 10 10 10 10 10 REFERENCE NO. I SHEET No. R-2514C I X-48 10 11 0 10 1� 0 10 110 50 f D D e D a AD 0 1 D 1 1 D 20 A D D e D D 110 110 1: 0 1; �O 110 0 1 0 1 An WE qPEW -AND D SURFA E wA rER I)V,PACTS PERM PE RN IT DM VING SHEET 34 OF 62 —im M95 rin D.P. 45.80 -4 3 90.0( -------- 0:1 0 3.1 D.P. 45.96 5 L E -7, ;r53 - 3 9 130 + 0.0c M 3A J, — 45 D.P. 46.12 EC� -44 3S7-8 129+50.00 NN O 3.0 3:7 M D.P. 46.28 E EL= 129 40 Yo.00 7n Tn Cl EARING AMITS WLB WLB CL EARING In LIMITS 3.0 T 46.44 egg ►D.P. EL—='7Y9r 15 128+'9o.oc n mg n nw; 4T- 3.0 3' D.P. 46.60 3-1 Ma �*z I *CMC RM M M 1.10 1,0 1: 0 110 110, 110 50 4 D a D 2) 1 1 2 D 4 D 5 D 6 D 7 D 6 D 9 D 10 110 10 10 140 110 wl Z 0 c� w w YnWtC I REFERENCE NO. �11tt1 NO. /�l PHEP�SIRpStT. T Ux � � R -25/90 /3 l g� p��� WW SHEET NO. YVC1 I�D/AI�D tlpFjLCEY.�c� j \�J PIYC/Y1IT I ROADWAY DESIGN HYDRAULICS \ l f\ PA I ENGINEER ENGINEER \ / a {e I \ - L i —.. 4y - /1 / Th 7 m I / — �- -i—v1 ...___...III loo' - -- o Io— // I NAb 8—� -- e / //: nl /�jCy1 1 \ I S,Q� ?0 — 1 E� \. PRELIMIN RY PLANS GRAPHIC SCALE \ *. OLMEi JO£sET Uk �) J oo Nor use eo rnNSrnvcrloN S . m I � l i \ � I // ` ✓ y �' Jae�s PERMIT DRAWING SHffT. 36 OF 62 39 m II /eel \ l % ✓g A.sii R ET AL /A •0 i D AILBASE DITCH 3s 4 � \ J / l ✓�/ � *)Sco ANIZE L ING � E7# I (ABAN01 ` x'42, \ I / .\ � / .k /' > � C \ O ISFD ID (// /— _41% D PUE r \ C ' e> \ PUE / PIIF PUE P I — \ 0\ / 51iYw,ET L/ LLI .� . "' — _ /.. ✓ e __ _ — — � �'�` _ n ELI ® f 4 - y0 '—W3:0= _.US MiY- lIlNC- SB -24.� —43. •- - -.o:.- ' —•• xi e" ._ -_ ` _'9'3.6" ` ' ` - -c,• ®! — _— ECM 6os F •G \F P PR # -VT0 =1.8 = F i A\ P F C� L * / / R # i CL B ,RAP J 1 ` ` _ * "•A EST. 11 ss TMLE \ % # AAECI-IAINIZ D `40.0'9 ✓ i _ �� Lu \ - - - \ I \ \\ CLEARI INCA �� \ j�//W,9 ` m H $7$0RI& PROPERTY Z _-7 / \ \ I \ 3$0� �I ) * ELIGIBLE FOR NRHP� / I I \ I A I _' J. "MY FDSCUE. JR. ✓ 1 t� lz aT6Pr IIMYED STATES adE1�A — \) \ \FILL N /Wk�rIkN� e / I * '� - -a0.0� -40. / / ` .!E / 41.0 ¢ r _ 0 \a / e I' /41.0 — \ �� F L INS * `%I..O m / �' -4 ** * * ** /�✓ ee 9 I I II \� EAU FAY / �',� / \ \ ✓ `^ ✓ 11 A DETAIL CJLa n G 41. + \/� / \40e\ �' %* # * #+ ** #* £\ / •\� II I I I A,` / �TE/R1ALHBroA. �® .�.:.•',, a I l '° 0.0• /� ✓ '9 / �Z I AVn. D = /1.0 ry. L I 777��• I _ / e J r-40 0 I J 408L- "�L idCf / > I\ _ ( (D�:d" / e-. _ \ I I F DENOTES FILL IN b 0 f / / / //� 1 1.`UDE=4025 CYH2 +D0 LT 0 {04� n WETLAND TIION/ IN /WETLAN[� -7 /�' 1 ��i / m' ti a0 e 1 \ s a I/ � • e g DENOTES MECHANIZED I m I I / / \ �4\" J ��e f C i e 1. . a -1 � �� � � a CLEARING °�- / / I— 1 /-F \ /'=-a1.0 � _ ✓Am•m- 1`}\ /- 4r�.0� i _I 1mm / � a (� V V / DENOTES EXCAVATION ,b?�i / IN WETLAND _ �✓ / it / � A00 i /� �'�. n //� , '' --- — ✓, � ~ i � \mom / J o — . 4 PROD. REFERENCE NO. SHEET N — 14 1(INO. 1 0 1 0 1 0 1 0 1 0 1 0 1 1 1 0 1 0 1 0 1 0 1 0 1 WE ND AND SURFACE WATER IN PACTS :PERM ^� PE IT DRAW ING SHE 37 F 62 3.92 6:1 5'k60' 0.060 3. 3:7 — — -- D.P. 44.28 EL= 00 139+00.00 3.99 6:7 5 .4601 0.060 3 3:7 D.P. 44.20 _ — — — — — — — L 4n EL= .95 38 + 7 50.00 sin 3 86 6:1 5 60:1 0.060 m 3 3:7 — _ _. _ D.P. 44.15 o EL= 90 — 38+ 4 00.00 — — U h v c a 3 e 3 9. � 6:1 5 60:1 0.060 0 30 3'I D.P. 44.12 o E EL= 85 137+50.00 0 0 > L III to- - WLB C RING t W LIMITS L 0 3 59' 6:1 5 60:1 0.0 m v` .0 3:7 m = —' — --- -- _ D.P. 44.12 — EL 80 37+ 9 0.0 irr -- if 3 62: 6:1 5 60:1 0 �0.060 D.P. 44.13 — — — — — — z EL= 9165 36 + 50.00 _ _ N AW NIAN (A W� �w 10 10 10 10 10 10 1 1 10 10 10 10 10 1 0 O a ' I ANNIE R. PAIGE 1 C/O OL Or 6 fT � � I uJt D1.LNNm _x- -x— I 1 x I I I VERONICA M TAKE I 1 � � SHERRY % 51 52 / I 4MaSST�SEbYC S sEPrtc SM DENOTES FILL IN WETLAND ffi DENOTES MECHANIZED CLEARING DENOTES EXCAVATION IN WETLAND I I9 I OII EXCAVATION IN WETLAND 55 MARY SWAM- ISLER. AL SURFACE WATER IMPj la- NAD 83i SRS 2007 L — �til I ISF0 I I I I JAMES V. BENDER, pt M. l 1, O LATERAL 3' BASE DITCH SEE DETAIL C pNCll I ..I \ PVC PUE J ' ; F`UE PUE.o�o K- J. MANLY FOSCuE. pt FILL IN WETLAND 43 K. " If It Ft - TIE IDUSTING DITCH It IF TO PROPOSED DITCH MECHANIZED LATERAL'y' DITCH it CLEARING Ir SEE DETAff ry R R R .. 14 --- EXCAVATION IN WETLAND FILL IN WETLAND ENLARGEMENT (4X) DETAIL E DETAIL C DETAIL H LATERAL BASE DITCH LATERAL BASE DITCH LATERAL V DITCH (Not I. Sm6) (NO1b Sml.) (N.tb Swlsl b b 1 °n 3.7o D 3 \ °� lift. Fill 07° D 3 \�d l:Fi. FJI r---- Fp B Min.D= 1.0 k. Slepe B Min. D= 2.0 H. Slips u D l:fl. Sl.p. B= 3.0 Ft. e= 3.0 Ft. MI .Ds1.0 H. b= 5.0 Ft. b= 5.0 rt. b =5.0 H. —L— STA. 104 +50 to STA 142 +00 LT DDE =4025 CY —L— STA 151 +50 to ST& 181+00 LT —L_ STA 151 +3V TO STA 156 +50 RT —L— STA 147 +00 to STA. 151 +50 LT DDE =264 CY DDE =6255 CY DDE =261 CY NDPE PERMIT PROJECF REFERENCE NO. SHEEP R -25/40 /4 PAY SHEET NO. C/O OLIVER J. COLLINS HYDRAULIC ENGINEER ENGINEER DECEIVED I PRELIMIN s+ PLANS DO NOT USE F01 CONSTRUCTION \- LAIERAL XL, DITCH Ly - 1111, P .�r.��r: 11 DENOTES FILL IN WETLAND ffi DENOTES MECHANIZED CLEARING DENOTES EXCAVATION IN WETLAND I I9 I OII EXCAVATION IN WETLAND 55 MARY SWAM- ISLER. AL SURFACE WATER IMPj la- NAD 83i SRS 2007 L — �til I ISF0 I I I I JAMES V. BENDER, pt M. l 1, O LATERAL 3' BASE DITCH SEE DETAIL C pNCll I ..I \ PVC PUE J ' ; F`UE PUE.o�o K- J. MANLY FOSCuE. pt FILL IN WETLAND 43 K. " If It Ft - TIE IDUSTING DITCH It IF TO PROPOSED DITCH MECHANIZED LATERAL'y' DITCH it CLEARING Ir SEE DETAff ry R R R .. 14 --- EXCAVATION IN WETLAND FILL IN WETLAND ENLARGEMENT (4X) DETAIL E DETAIL C DETAIL H LATERAL BASE DITCH LATERAL BASE DITCH LATERAL V DITCH (Not I. Sm6) (NO1b Sml.) (N.tb Swlsl b b 1 °n 3.7o D 3 \ °� lift. Fill 07° D 3 \�d l:Fi. FJI r---- Fp B Min.D= 1.0 k. Slepe B Min. D= 2.0 H. Slips u D l:fl. Sl.p. B= 3.0 Ft. e= 3.0 Ft. MI .Ds1.0 H. b= 5.0 Ft. b= 5.0 rt. b =5.0 H. —L— STA. 104 +50 to STA 142 +00 LT DDE =4025 CY —L— STA 151 +50 to ST& 181+00 LT —L_ STA 151 +3V TO STA 156 +50 RT —L— STA 147 +00 to STA. 151 +50 LT DDE =264 CY DDE =6255 CY DDE =261 CY NDPE PERMIT PROJECF REFERENCE NO. SHEEP R -25/40 /4 PAY SHEET NO. OADWAY DESIGN HYDRAULIC ENGINEER ENGINEER DECEIVED I PRELIMIN RY PLANS DO NOT USE F01 CONSTRUCTION 61 L--� YAL4AGE DOCRE" ET 6 59 AL DARN M. PAGAM. ♦ � ' ET VIR ♦\ • 11 0 b01ATRE L.SPENCER: I I s II II II SEPTIC I ISM SYSTEyIUP RAP I I CCE�LSi663 TONS ES 10 SY En IlLE i ISFD I IB' I IE� Buff ROCK STpIkTIHiES,I6I:, I� DECEIVED I 72'CHL 6 3ser, X X \- DETAIL F Np LATERAL BASE DITCH Shp. (N" Smle) b Gmu "'— end D Min. D= VAIL Rohn ,d.Knp dmn dd B= 3.0 Ft. i. pmtid. minM�im b= 5.0 H. I."A" dpffi I C a ; 1 -� DRAWING 38 OF 62 i O s a 1 \✓ ? V � %PW44 ism / ❑d i !lvfl --7A M.PA 11 i, wo P '} ✓• QGL 1! /� �MRAPHIC,1ftALE),- ' S 'j/ I \ I 6 / —: \ v `a XCQ.Lptl$�m 'I �0`l ,` -40.0 m Q0 11 v / /m/ /I(p� I I W \ //. EXCAVATI07� .�•��� \ ICI YVETLAND I IWO 5 Y % YSLE AL SS"S � 0' � / i I m '• e � � c i �01 1 1 J ca I i E�'aD1T�7� ' G IS RD \ SEE DETAIL E p / [[ / JI I/ LATERAL 3' BASE DI r / / / _°40.0- 411,,,ETAI ¢0 SEE DE TAIL F 3' E DIP PUE ` PUE sr - 46 PUy 0PU ' r _PUE I -- O 0� ` P P `PU . .I I AIP i -JSU FA E✓ �'t IMPAd1t-P` ERMIT�- \ 3 3/ 1 '1 NAD `8/ SRS 2\0 L j J 1 59 .I _e JAMS Y. MPPER, JR. 1 - ❑5 \ ` '0. I i — - -�\5-7 I 1rr 4 LATERALE DITCH 4J SEE DETAI _�IS B[D L PUE .— �R pUE E I ,1 — -L — --I- 41r.0— RAV SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DO NOT D5E PO( CONSTRUCTION DRAWING 39 OF 62 AL' THE L.SPEMCER }I�Z 40•0• -_ •7 �0� ,0� \ \' \ / � / R kC -06£ ��✓ R' � � 1 � U-1 _—J.VIWY F�Y,E.JR. L _ -J IE / I ( I I \ 0� \ m ( �. u, \ r I �/ FILL IN WETLAND 4 U J 4.3 / \ r ° / �9e F e�be� I rm fE r �. / \ R- SRN DITCH 0l � / 43 R R TO ROPUSED DITCH '�•- K a IF It / 1 / _ MECHANIZED / LATERAL •.y'DITCH ` ' / / I CLEARING I* SEE DEfAIEH I BLUE RM iTRW S. 1 � \ 0•pY` / / � ' ' I III 1 � � 00 ( " \ — � / yeb£` 1. -( v s.0,\ \ T6N� 111 �� . �i` 'W / U X39 �/ / — f \ x x �\ i F/F i//EXCAVATION IN WETLY�ID � n tN6fa FILL IN - -- (— 9 / a 06£� \ _ \ i f j / �, a I ^ �9.9 n / �(; P \\ \ \ m� \ WETL ", \ FILL ITV W)TLAND ' 1 ,� C IIG�.. �'s� 1,� \\ (1 ` �G NI1 4JNT'ILI�Y�•b£ 1 4- L I / '/ I,� J �' (4X1 •s °� • * �€NDTCS MRINGANIZED v�� e . . — _ f / / `DE L _ I DETAk / �p E / DET L H ETAI F LATQ B/�$m ITCH \ LATERAL BASTiW H ILATERAL ' ORC� Y`I/1TERAL E DITC ) N. Scolel l T,� \ / 39.0 (Negro Swb)b J 1�� \ DENOTES EX{C6���OL� ♦\+'J}� }1�1 "ON �_ _ l / —39.0` J t nom• \ IJ - — 1 �1 l� I WEI L7i�r / ` \ I W X+ 3.. liH. FII I 7o D'! \�sl 1:N. J 'Sbp. 1',H.� D ht. /f9 L ^ m� ^ b� 1.0 N.� �- l ro B I�= F.0 H.� °h D FI� 9 g' /\✓ 7 �( /•� ae 0 Fb 9 r) / 5.0 N. .8 `�' V 6 =510 F. / Min. D= VAR ` F 'D0 l B= 3.0 H. �i 1 �• e 3$'I 1 .-� �. 61- 50 T 5YA 142 +00 LTD E- 025 -L- 1 +50 1 1 1 OD LT / / \ 1 ) \ J i� \' 1 A.yj�1 _ \, " -L- STA. 151+f3'93b ETA 156 A R� b= 5.0 40,0 / J�� '� C jC "'9 - L- SJ�.`i £j ✓ "� M�DE •8E /' DDE= 261'CY 8£ -L -ST 142 +00 io STA 147+ IT / 0 6 ` C 0 9 ! +DO tQ STA,R¢i +50 LT DE -264 CY ,K 0p ' 6 I \ W / •/ /_ DD�E =202 CY_ \ P_ \ /,0-b£ ~ /f� "� ). \ I )/ �M \III (mi ` ✓ i 38.0%'% � /, j`�@?�% /, �� 1 � `— ,'.b r �. YI Mk �ralla .1l1♦1� N WIN�� 40•0• -_ •7 �0� ,0� \ \' \ / � / R kC -06£ ��✓ R' � � 1 � U-1 _—J.VIWY F�Y,E.JR. L _ -J IE / I ( I I \ 0� \ m ( �. u, \ r I �/ FILL IN WETLAND 4 U J 4.3 / \ r ° / �9e F e�be� I rm fE r �. / \ R- SRN DITCH 0l � / 43 R R TO ROPUSED DITCH '�•- K a IF It / 1 / _ MECHANIZED / LATERAL •.y'DITCH ` ' / / I CLEARING I* SEE DEfAIEH I BLUE RM iTRW S. 1 � \ 0•pY` / / � ' ' I III 1 � � 00 ( " \ — � / yeb£` 1. -( v s.0,\ \ T6N� 111 �� . �i` 'W / U X39 �/ / — f \ x x �\ i F/F i//EXCAVATION IN WETLY�ID � n tN6fa FILL IN - -- (— 9 / a 06£� \ _ \ i f j / �, a I ^ �9.9 n / �(; P \\ \ \ m� \ WETL ", \ FILL ITV W)TLAND ' 1 ,� C IIG�.. �'s� 1,� \\ (1 ` �G NI1 4JNT'ILI�Y�•b£ 1 4- L I / '/ I,� J �' (4X1 •s °� • * �€NDTCS MRINGANIZED v�� e . . — _ f / / `DE L _ I DETAk / �p E / DET L H ETAI F LATQ B/�$m ITCH \ LATERAL BASTiW H ILATERAL ' ORC� Y`I/1TERAL E DITC ) N. Scolel l T,� \ / 39.0 (Negro Swb)b J 1�� \ DENOTES EX{C6���OL� ♦\+'J}� }1�1 "ON �_ _ l / —39.0` J t nom• \ IJ - — 1 �1 l� I WEI L7i�r / ` \ I W X+ 3.. liH. FII I 7o D'! \�sl 1:N. J 'Sbp. 1',H.� D ht. /f9 L ^ m� ^ b� 1.0 N.� �- l ro B I�= F.0 H.� °h D FI� 9 g' /\✓ 7 �( /•� ae 0 Fb 9 r) / 5.0 N. .8 `�' V 6 =510 F. / Min. D= VAR ` F 'D0 l B= 3.0 H. �i 1 �• e 3$'I 1 .-� �. 61- 50 T 5YA 142 +00 LTD E- 025 -L- 1 +50 1 1 1 OD LT / / \ 1 ) \ J i� \' 1 A.yj�1 _ \, " -L- STA. 151+f3'93b ETA 156 A R� b= 5.0 40,0 / J�� '� C jC "'9 - L- SJ�.`i £j ✓ "� M�DE •8E /' DDE= 261'CY 8£ -L -ST 142 +00 io STA 147+ IT / 0 6 ` C 0 9 ! +DO tQ STA,R¢i +50 LT DE -264 CY ,K 0p ' 6 I \ W / •/ /_ DD�E =202 CY_ \ P_ \ /,0-b£ ~ /f� "� ). \ I )/ �M \III (mi ` ✓ i 38.0%'% � /, j`�@?�% /, �� 1 � `— ,'.b r N PROD. REFERENCE NO. I SHEET NO. 1 0 110 t 0 1 0 1 0 110 5 3 D A D 1 1 20 AD - 14C 1 X- E 5 D 110 1 0 1 0 t:0 110 1 0 WE �ND AND SURFA E WA rER 1 PACTS PERM CLEAR I G LB WLB CL RING PE T DRAWING LIMI S WLB LI ITS SHE 40 F 62 6 :) 6 rin 3.0 �) — — — — -- --- D.P. 45.30 L= 94 �3� 5 — — an 44+ 0.® 6:) 5 3A 3.0 ) D.P. 45.29 L= t2 -- 5 -- -- dn ° Ta 44 + DO.0 Tn c 3:1 6:) 5 e 3.0 :) X D.P. 45.23 — II� a E _ .30 4 -- — — — _, 43 + 0.0 U C h i C O m N 3�p;1 6 :1 5 0.050 � 0 3.0 D.P. 45.15 .) E EL 48 - - din -- 0 G in + 0.0 W F4- a W d `.0 3p6;1 6:) 5 0.060 m= .0 3I D.P. 45.07 EL .62 42 + 61.4 �3 Iv :D sn k3 3pq:1 6:1 5 0.060 .0 3 �� -- D.P. 45.06 _ z �o EL .66 42 + 0. — -- Tn ra¢ N�Z �nww ��w 10 10 10 10 10 10 1 1 10 10 10 10 10 10 . P P I WILBER STRATHOR, I I I ET UK DORIS C /OHIA IPHIREY 1 -• I • I WILLIAM YOUNG I CEO JERVENS YOUNG �--- — �{� FORRESTER a 1 HTR lA0AIR11 64 I I ET t�L. JRL. w f Z O N_ v 0 W W LJ.I LU v S H r� vJ I ui M ILO TALMAGE NCKERY. ET AL 61 a UU 9 LFI CP V _!- IB' RCP US OIAC 58. 24' BST W Y �/$1 D J 3 iN �.r EEE1111 �o III HTR i I i p I ISFD RCP / IRALD I LATERAL 'V' DITCH SEE DETAIL H BsT LATERAL -MDITC SEE DET /,1 Q N zsBKeus 1. N 58 BLUE ROCK STRUCTURES. W- 72* CHL 6 3SBW —x— �—x— x —xx —x= \ / 68 1 I I LINWOOD WILLIAMS EEIRSI\ LATERAL 3'RASE DITCH \ ,'CHARLES HARGETT SEE DETAIL C ARV- - 67 70 \\ K- MARY L. WF6TE CLASS B RIP RAP \ EST. B TONS PUE EST. 21 SYUGEOTFXTILE n PUE P4 RCP ISBLKD IGLI WETIM0 W J 100' 0' 100' E -- e SITE 1 l , EXCAVATION , IN WETLAND y IF N K, I JANES Y. BENDER.JRj i MATTOOKS.ET UX %7 i N � PUE N PUE — I PUE; Us Mri O /AC 58 24,B5T _L- J CONC ACE WATOR IMPACTS PERMIT NA— p gyrtSRS 7 s. 158KD p 86 WJ�J N 84 VAN S. SMITH ALEXANDER SMITH. N - - \ w o II I CLASS B RIP RAP I � EST. TONS \ �✓ /I IO I ISBKO ST. 10 SY GGOTE (TILE X WD I, PUE — — E 1 PUE \ \1PUE S ; / �/ / / / / N ' y H/� X'r It �! , ISBKO � ---" �W �I 3 4 � �LATERAL 'V' DITCH H / ! �u �T M SEE DETAIL N / WILLIAM F.OIALEY 5 TERAL 'V' DITCH 7�y+ t {v W N. \ ❑ ♦ 66 E IDETAILH y / ` 1F N MA13EL SL'WEAVER ' of '' b 78 I N. IF / / JOSE RYANT, N �? 69 6 � IF 76 � �9 83 � 75 81 /g/ 4 0 ILL 14 ME AN D MATTHEW W TLAN CL RIN / SIT 16 ` F DENOTES FILL IN WETLAND r DETAIL C DETAIL H DETAIL M DETAIL N DENOTES MECH IZED LATERAL MSE DITCH LATERAL M DITCH LATERAL Y DITCH LATERAL Y DITCH CLEARING b (NO bSmM) (N.Ibkab) (N.IbSmle) . 3�,, ,d ;',ft. F� I 1 --- Fdl I 1. HI I 1 D 3' sI yep, lift. Step. lif5. Sbp . 15F1. yero R Min. D= 2.0 H. °j D Alin. D =1.0 F. D D Min.O =2.0 F. R= 3.0 F. DENOTES EXCA AT10N b- 5.0 F. b =5.0 F. b =5.0 H, b =5.0 Ff. IN WETLA D / I- STA. 151 +501. STA181 +00 IT DDE -6255 CY -L- STA 151+39 TO STA 156 +50 RT DDE =261 CY -L- STA 156 +50 TO STA 158 +25 RT -L- STA 164 +50 1. STA 173 +17 RT DDE =964 CY -L- STA 158 +25 TO STA. 158 +90 RT DDE =22 CY DDE -147 CY :T REFERENCE NO. I SHEET NO. 4 -25/40 I l5 WIN SHEET NO. AY DESIGN HYDRAULICS SINEER ENGINEER LELIMIN Ard 0 / / %L��i►�II0 DO NOT USB . CONSTRUCTION S ; / �/ / / / / N ' y H/� X'r It �! , ISBKO � ---" �W �I 3 4 � �LATERAL 'V' DITCH H / ! �u �T M SEE DETAIL N / WILLIAM F.OIALEY 5 TERAL 'V' DITCH 7�y+ t {v W N. \ ❑ ♦ 66 E IDETAILH y / ` 1F N MA13EL SL'WEAVER ' of '' b 78 I N. IF / / JOSE RYANT, N �? 69 6 � IF 76 � �9 83 � 75 81 /g/ 4 0 ILL 14 ME AN D MATTHEW W TLAN CL RIN / SIT 16 ` F DENOTES FILL IN WETLAND r DETAIL C DETAIL H DETAIL M DETAIL N DENOTES MECH IZED LATERAL MSE DITCH LATERAL M DITCH LATERAL Y DITCH LATERAL Y DITCH CLEARING b (NO bSmM) (N.Ibkab) (N.IbSmle) . 3�,, ,d ;',ft. F� I 1 --- Fdl I 1. HI I 1 D 3' sI yep, lift. Step. lif5. Sbp . 15F1. yero R Min. D= 2.0 H. °j D Alin. D =1.0 F. D D Min.O =2.0 F. R= 3.0 F. DENOTES EXCA AT10N b- 5.0 F. b =5.0 F. b =5.0 H, b =5.0 Ff. IN WETLA D / I- STA. 151 +501. STA181 +00 IT DDE -6255 CY -L- STA 151+39 TO STA 156 +50 RT DDE =261 CY -L- STA 156 +50 TO STA 158 +25 RT -L- STA 164 +50 1. STA 173 +17 RT DDE =964 CY -L- STA 158 +25 TO STA. 158 +90 RT DDE =22 CY DDE -147 CY :T REFERENCE NO. I SHEET NO. 4 -25/40 I l5 WIN SHEET NO. AY DESIGN HYDRAULICS SINEER ENGINEER LELIMIN RY PLANS DO NOT USB . CONSTRUCTION PERMIT DRAWING SHEET 41 OF 62 � 91 i ISM ELL FOYE, // x IL T HORRY EV JRe. ET W / ,k /I I/ EI r 0 O I JKBER @g�SYR HOPI �7 ( 1 " 1 7 l 1 \ \` %V Ali/ n ^ / f /i`\ ^ e8 W%�LAAI�I ,'t�1D �_ FACE WET _(' ( _ i R- 2514C �5 SC,�/0�"�^, ' a/ 1_'J !I �ry �� v 0 ° J M, / �\ �\l •G /��/MPb t FE -NT I PhY SHEET NO. t- fr ^R)x -'""� fy �/ \-° 0 1 / \L _ �� m � 4 8,p�• / J I%�'�T\ ROADWAY DESIGN HYDRAULICS /�� I I 9/ M' /� 8.0� ,� ��•--I % J v y -0.6£ ` _ l 'T 9� J)/ �iV I r / �! ENGINEER ENGINEER ,J 039.0- a V — 'BE_ -� `� ) s ' l 0'B AD gy g S 200 1 I I \ I /� \7 ) `L 'wad•- I 39.0 ^ 390_ J / 100' I 0' 100' ® PRELIMIN RY PLANS DO Al" US9 PO CONSTRUCTION '--GRAI'HI"C*L% b£ ) P'l � X39.0 tt ) \ / PERMIT DRAWING 3 ITE 1 3 c� �) X00: \ II �NS / �. /// moo` mJ m I J � � � ~ 9e` (� s `.�/, �1 I I '' H T 42 OF 62 / Q I A o,m v 65 \ / \ �� (�o / ✓ �ge01 '' \ 3 \,` Q w I I I > / �' l� BRYAN . ET YR� FYE 8.0P 64 �� �. ISB HLL,JR. % m ¢4 ux 1 1 \ / I - — EVCAVATI�O WpyL�AND 82 `0--I �3� •3 � r m '�'•L It �' VV, .0 I LBVW — LIAMS- IREECtS'f� 0 — -1E '� n °— L 5 8.6 YALp1AGE I I /, `.kF -' [�- ,J — — V. BENIDER; }- ❑ & x � DocKERV.EY � .I( '" � // -' .ae. // ��� ,/ /)) � � � \� \ ,•\\ ( 1 tea\\ �` / .j . / � 7 �_) 8�4 VAN s.ula�H IATERAL'3' BASE DIT�,{ ES HAMMMTT MAY TOCKS. E) Ux / 7-7 ( //. `y' m \ Ex R SA9YH,■ I 3� �� SEE AIL C 06 X0'8 l / Lij : ' 'l.0' /V I _\ _ 1 /ZC!_ ' 7,t I'1 IE \ H `men 1^ yt\ (OW _ .III (/, i-- I \ : IJI HT A A 1 ✓ 0' �/ J 40��"s : ✓ Imo/ ` \ / �/ C .�\ .0�" / p _ CIA�S B-RIP AAP -- A' c++, \ /{I - /tj'x — I.I.I ?. ' ISFD L.(RHITE CLASS BLIP RAP �' e. \ / \ \ 0 1 �f I� EST.3 TONS J a\ 4Y' 1 m �' �O HTR ( \ W.. R TONS - 6 \ ,i `b' I �SBKB \ 10 SY G O7E,(11LE \ 1 ,� ISFp «i PU E F 11\ 06 ESt 21 sy EOTFXTILE: PUE P PUE PU UE P l.• PUE P PUE UE PU E� PU —�- UE �= , Lu W Lu aa3b �— _ _ b U3�i /Ai: se EI Li ST — — — — — — — — --- — 0 — — — — — _ — -�-- __ __ REMOVE SYSTEM _ = — r — = _$ 3 oo ff e� m®I �` __ _ ✓ \ ,T II . J I \\ III I ' ISBLKD F r * * F * C 0 / D LLI I S P / -4/ W I 65✓ 0 _ I 4RNL 6,w SSXD TERAL 'V'DfTC1� R' 1 'i /ate' hh !� '� �.. I 3 `` I 1• S 1 / / SELAE DETAIL H � °� 0b ~ �SE`EE 1DF�CH = \ /• / / $ �' !u �3Q7 / / ' , ! / �! EE DETAIL IN ds / 0 10�. ` e❑5 A4LIAMM 3q!S�EY 'TERL'V'DITCH � � v ! r � J .R I t / / \\ r'i E /�� H I lE � R v *40.0 vi/ 1 ¢ 7 (" • . [[ K. �Lrr s Z t D z;BKeu� / , e „11 :IT I MABEL StKAVEIj �\ ..� f r L W — pyoyr w \ \_(` — ` ET L FOYE./ 1\ I 11 I 69 Si [ 0 \ IA 939 Y -tt H C JDSE EY MANY ��\1 Y — / 5'8 I — \ 1 I R 8 f 1/ ll E ROCK SYWffl R>ES,gic� ' \ 0 . / f �� 91 4 4 1 < /i� 0I I 8 Y �k \ / Evv r1 E.EY ux ` I II II / / 4�1�� \ ✓ /P� SIP / A� / 85 ®\ �I i I _ 1 I J A -- X - -X—T X i 8 3X—' -X :I / I ✓ /� I / / 0'Zb- ` / 9 �/ A \�1 I /n�O%' �/ / \ ` e6 \ f I I 47 \ e I ?/ ILL ' \20 rrTL i `� \90 I �` '\ J \>\ MAYiIa . �F�Y J l IT 1 _ -SIT, DOTES FILL I! WETLAND /l I r �m ✓� ( // /� v'/ �r 1 \ 1 \I 1 `� a ` ,L /\ � % 1 � � ��''� I .0�. I ► /) 3 � I 1 I a I \ <�� / //a � \ \ // .�� � � � e \ I / ( �� � . � . /,.a.�l 0 e c \ AI 'DETAIL M 38• 'DETAIL N 1\ \-7)$ *� • DENOT S MECIi IZ fD1cH �' ORAL- v.DlrcH / i {Aff wu olrcH / `� uT KR \ 6,0 0B NW IO— ' _ ° B \ e B mb — R1• L AGn. 10 k. / ...�0'6 D nu s n D �° n6 .]� _,`{. 3 EN E C \ W TlA D � \/\ "'A 39.01 ` m \ 151 +3Q SU. 56, 50 KT DDE =261 STA. 1,56 +50 TO ST.(t. 75flt2 =STAN +56'(o STA. 173 +1� RT DE 961 CY 0""' i°'� ^ — —31.,E 1 = �58+�'f6 STA 15B +A0 RT DD`E =22 ` v t DDE =147 yCSIS I \ ° / °•� l l / �7�� / f 0 10 PROD. REFERENCE NO. SHEET NO. N R- 2514C X-59 1 0 110 1 0 1 0 1 0 1 0 1 1 110 1 0 1 0 1 0 110 1 0 WETLAND AND URFA E WAFER I PACTS PERM �� PERMIT DRAWING SHEET 43 OF 62 rin- b' 0.025 6:1 6 0.025 3.1 3.0 EL .40 49 rn 16:1 6:1 0.025 61 .025 3: ) 0 EL= .44 62 + 00.00 rn 0.025 6:1 6 0.025 i 4n 3.0 dn s � EL= .4 161+ 9 50.oq t To ZLEARIN G LEARIN LIMITS WLB WLB LIMITS 3 rin 0 0.025 6 :7 b 0.025 3.0 E e � 6 .; EL= 52 161 + Do.oq W Nl _H W d o v 0.025 6;1 6f 0.025 m = a< 3.0 5: 3•) a ne EL= 56 $ 160+90.00 gn 0.025 6;1 61 0.025 y 3.0 dn w L= .60 Mr. 60 711,04 ®.0 wf in �ma lA dim q�« 10 WMN 10 10 10 10 10 1 1 40 50 6 D 70 60 9 D 10 10 10 10 10 10 Z O 0�: gm .i W i :1 11 1 11 11 ' . 1S1 IIA II BENJAMIN BROWN, ET I I I : 1�►I 93 I :1 92 1�1 11 CYNT I VW� 1 IN EMA WAis �41L nll 40120-0- M1 >o- � / I / _ N z MAT HE* MOO11E, JIB., ET qX _I 3: ��k 90 11 35• k III / I `� II J / LAIV'DRCH /V SEE.FITJIIL N / I ISFD Hp I 1 X om I I X SHEET NO. R -2514C 16 RW SHEET NO. DENOTES MECHANIZED IOADWAY DESIGN HYDRAULICS ENGINEER � ►1 I 11 PRELIMIN —X�x 1 1 00 NOT VBB PO CONBTRVGTION SEE DETAIL R 11 REMOVE 11 it SEE ETAIL E DETAIL C LATERAL BASE DITCH I F.. LATERAL 3'BASE DITCH INetb a°le) . J)or D3� lAl. Fitl flops - --- a a. ate. a��uv Min. D= 2.0 k. B B= 3.0 Ft. b= 5.0 F. -L- STA. 151 +50 to STSTA. 181 +00 LT DDE =6255 CY M I i an 17 (SEE LARGEMENT S EET 46) 103 OUE L. BRYANT. ET UX 95 9$ W4.LE L. BRYANT, ET UIX WILLIE L.004 T. ET EOgAR -t,8RYANT,ET UX JAMES HENRY BRYANT /04 �\ o` 1 SEPTIC y _ SYSTEM G SYSTEY K. MEC ANIZED CLEAR[ G ILL IN WETLAN SBRD i 15BRD ' CAVATION RAL 3' BASE DR H\ \ 1'1 F3 ii ��- 5 DETAIL C H \.� I WETLAND 1 T I�UE P PU PU - J'• —'PUE PUE CLL RR LIES Hw raBBwl 0 1q-1—;1 • ' MUM Am � T UXNARRQELLt 1 / coJ c 1 94 11� 1: "IMP CTS IN r / SUFAC WATER O. ,. 0 " S SEPTIC 96 SYSTEM •• .. ELEANOR LJACK ET VIR 97 SIT 17 (SEE EN RGEMENT / SHEET 46) /J r N", DETAIL P CHANNEL CHANGE (Not to Scale) Proposed Ground d rZe ounT D —FIIJ, ope 1JTt \ Geotmdile B Min. D= 2.5 Ft7— Ust. Channel Mox. d= 2.5 Ft. Min. B= 5.0 Ft. Type of Liner= Cie. 8 Rip Rap Min. b= 10.0 Ft. Maw AI�.m - zr� 1, - * M-1 - mM-- I is, 01 111111111 111111111111 1 PROJECT REFERENCE NO. SHEET NO. R -2514C 16 RW SHEET NO. DENOTES MECHANIZED IOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS 00 NOT VBB PO CONBTRVGTION 1 0 m m 0 m I PERMIT DRAWING 1 GRAPHIC SCALE SHEET 44 OF 62 7F DENOTES FILL IN DENOTES IMPACTS IN WETLAND SURFACE WATER ®DENOTES EXCAVATION DENOTES TEMPORARY IN WETLAND IMPACTS IN SURFACE WATER F F F F F F F F 99 Paz RONAL If // ELLA s� ry CHANNEL GE VU qq B21 � lS�.�_ -JS s eti SEE CLASS P .. JS . .. .. • • 1 STANDARD 2' BASE CH EYELYN .p141E. EY YW W/C1AS5 B RIF RAP BZ 1 BZ T E ENLARGEMENT EST. 4D TAIL DDE SHEET 47) EST. 10 TONS RIP RAP 10 812 BZ 2 IMPACTS IN EST. 15 S.Y. F.G. SUE BMW, FOSCUE SURFACE WATER RRE- EiVCD 105 TEMP. IMPACTS IN HISTORIC PROPERTY SURFACE WATER ' / ELIGIBLE FOR NRHP DETAIL O DETAIL E DETAIL Q DETAIL N DETAIL R ' SPECIAL CUT DITCH LATERAL BASE DITCH STANDARD BASE DITCH INwb Sw1.) INelb sme) (Nara s w) LATERAL N' DITCH MEDIAN V DITCH / b (NWb Sml.) INelb Seale) �Id ^� Sh.uldx / Groun /oiM y, Peiie , 1 e fioN 'OV" `?•Jo D 1 l:ft. fill D I 1 Gn 3.Ja 3' Dill 4 SI°P° l:fi. Slope �{db °� i r D SbP B MJn. D- 1.0 H. OMddo B Min. D= 1.0 H. r D �� B- 3.0 It. Moc d= 1.0 R ° Min. D =2.0 H. Min. D= VAR b= 5.0 H. B= 2.0 F. b =5.0 H. -L- STA 181 +00 to STA 185 +50 LT -L- STA 187 +80 TO STA 186 +00 MED -L- STA 174 +50 TO STA 175 +50 (RT) DDE =744 CY T d linty= Cho B R; - STA 164 +50 to STA 173 +17 RT DDE =964 CY -L- STA 180 +76 RT 9 E"- uj uj uj w I) 40 4 • 144 DENOTES MECHANIZED SEE DETAIL R REMOVE FOOT SEE ETAIL E BRIDGE I F.. LATERAL 3'BASE DITCH . �. r -- -- - --- a a. ate. a��uv F F F F F F F F 99 Paz RONAL If // ELLA s� ry CHANNEL GE VU qq B21 � lS�.�_ -JS s eti SEE CLASS P .. JS . .. .. • • 1 STANDARD 2' BASE CH EYELYN .p141E. EY YW W/C1AS5 B RIF RAP BZ 1 BZ T E ENLARGEMENT EST. 4D TAIL DDE SHEET 47) EST. 10 TONS RIP RAP 10 812 BZ 2 IMPACTS IN EST. 15 S.Y. F.G. SUE BMW, FOSCUE SURFACE WATER RRE- EiVCD 105 TEMP. IMPACTS IN HISTORIC PROPERTY SURFACE WATER ' / ELIGIBLE FOR NRHP DETAIL O DETAIL E DETAIL Q DETAIL N DETAIL R ' SPECIAL CUT DITCH LATERAL BASE DITCH STANDARD BASE DITCH INwb Sw1.) INelb sme) (Nara s w) LATERAL N' DITCH MEDIAN V DITCH / b (NWb Sml.) INelb Seale) �Id ^� Sh.uldx / Groun /oiM y, Peiie , 1 e fioN 'OV" `?•Jo D 1 l:ft. fill D I 1 Gn 3.Ja 3' Dill 4 SI°P° l:fi. Slope �{db °� i r D SbP B MJn. D- 1.0 H. OMddo B Min. D= 1.0 H. r D �� B- 3.0 It. Moc d= 1.0 R ° Min. D =2.0 H. Min. D= VAR b= 5.0 H. B= 2.0 F. b =5.0 H. -L- STA 181 +00 to STA 185 +50 LT -L- STA 187 +80 TO STA 186 +00 MED -L- STA 174 +50 TO STA 175 +50 (RT) DDE =744 CY T d linty= Cho B R; - STA 164 +50 to STA 173 +17 RT DDE =964 CY -L- STA 180 +76 RT 9 E"- uj uj uj w I) 40 4 • 144 z O `+ a � m •O N= NO. w ` I r / w rr \ �� \ \ �\ •��� \ — � W TLAND`)No__S A VTER IMPACTS PE RW SHEET NO. I ROADWAY DESIGN HYDRAULICS \�L� V J� / •`91' % ` / 0a� g0i 1/ \ �. / I �i \ / ENGINEER ENGINEER / JIgaO I / 8.0— \ -w ( I \ e \ NA /�\ \ I J/ 2007 / / , /� ` 1 s / \ 3a y SRS // \ ` PRELIMINARY PLANS U \ \�� 1 \ ` / / / > �� / / r \ L -- - 0 be DO NOT USE PO CONSTRUCHON Lo. T1_s EE e- 0 a£ / /roV > 0 100' jl a \ .e` �(� LARGE / / �� \ / PERMIT DRAWING w S E V,4 Sj, r \ L �// \ ` 1 / / IR / \ \ \ �� e �1 — GRAPHIC ALA a ` L &�c/ /gee ✓ ✓ / • 6 £- — S5 OF 62 0 = L. PANT. ET (ux 1 / m -cJ -3 ! 0 j \ 9 x \ ` X w / 37.0 I I % \ / ; e ( , ` m �1 0 �/ m 1 e _�F3 -N III�WdAbW BR01N,ET ux 1 / m� �, �� ! \) t a ^ , JDENOTE FILL IN / s 7 ( ^' 1 1 , J / / .. \ -� YFJ fWETLND 1 �'�16ifiL ATER \ •M` 93 _ J � � m ` �� / w � \ 'o`� � ,e � 1 � -39 \ w [� yq a£, \ \� — l \ vn- e n\ ,\ ` e \ �� 0.m �� ) �PEN&Eb ETLANDTION j ��fNOTq TI PORAR 1 92 // \ \ ' j � oil)( 98 � a9/E E �1'�e°iT �L�IIE L. 0y .ET I �e hP�,C� S IN sURFACE'WATER `y 9, w EOp FRYANT. Ei x- I Y BRYAN 0' / /'\m l' / • W L.� / \ 0\ , .b£� .� '-'. am•• 1 \ cYWQUNG I \ — m� \ r 3 10 ®1 f'• DEVOTES MECHANIZED VIR \ :/� 'r ��•�` \�� I 00 > 1� r CLEARING/ '/ — - s. 1 I® 91 \ �F� I 0t II. ( o 0 x s REYE ` USER COWAWY 3 �B�tAN �rDlrcH r° FLORETTA- S \\ ,a ` \ \ `0 £�It : / \ R \ ��BYSTEM i \ \ ` / ` -39.0 0 6£, SEE D�IL R £` ! °b _ 0�'� / .g 38.0 \fir -0'6£- L E ANT. ET \\ \ . -� /' MEC ANIZED CLEAR# . G / 6 EE, 1' 9 • • SEPTIC �• �+C -- / / O — W £� C SYSTEM .�' `w � �?�\ i f� �: �' IS D �. / / ♦ ���_v / // / / — ERAL 3` 14SE�RCH LU SEPTI 9 T 1 ILL IN W,ETLLA 1([II�Yt F001' ( C J L H, DETAILE m J 390 Ij.(] SYSTEM 6.01 / / 7• /��,� \ / -7 1 r 1 ` 3 i. 1i T e� ^ ,. 2S BRIDGE V) ISBKD 1 .. .. ` ` / aeµ E�R \ �� w I WETLAND \ �' / qj SEE DET 3' BASE DRCH •�99� / 1 v I L q W P PUE UE U� P PP P� PUE PUG / e E - PU -�6 - PUE - PUE -�- p e L1J W ` -� i w ` m r LU V) J — — — t� =use _ —_— — — — Mpg __� _ —= -- — _ ® — — — — — — — — — _ — — — — — —� .- - -fit — - ::JAC3a - 2¢BS'� — — — — — — — — — — — - - -- O —� 39 + 1 so a Ha 1 HR Qa£- - me 1 e - m — _ J -37.0 TREK' ,0 /�T' f6CMARD L. NAB L CON v E GEONTE7(TI ,� \ ♦ X38. / / '/ C •j�0_ ET Ux / g\ 9YE UTDgCH �" \ • 1 1 L 5 � K EE 1110 � 6' 0 T 6 .� .lo. 36• `� $ / B "IMP CTS IN em \. \ 3je -� \ \ ti„ / { / �`' // mtij /l e• \ is /-- � (1 AC WATER . TEL . ' e _ . \ BZ z I j� j // / • / % / \ `£� o. \ — I�) "p° / Est \ / (� / / {// J L rtCYL ` EEv �L H m -• i 79 1r �ro �ROAL / , / x 6F0 Hn I � � �\ C/ ♦/ / / � \ S / � — —e— � / � i0a gt16 E N� E = � -09£I / /SIC3 96 82,) e� - -P — \e l i �0�� m o I t \ / O\ / - / 1 `. \ ` \ �£ / ST�DARD 2' BASE ' 1 I(;I I I w e _,\ E ETA --m J EvEtYNL ' F� "� �� b \ / e i 0'e£ EN RGEAAE�IS�r I ( WVSS B RIP RAP/ b I I J\ , .9n 1 / 0 SEE ETAIL Q 0 � \ > w '�,_1 �--�- . EST. C.Y. DDE // I� £ / / it 1 m ��\ �� �� / \ '' H T 47 1 \ / /^ 1 \EST. 10 ONS RIP RAP /� \ / I / / 1 — iZ\ Z 2/ / L w \ ESf. 15.Y. F.G. 'I; IMP' SN \ ':�_1,,� =) \ %,— / sa°1tr�oos \ SURFACiPTE'R��� l �) \ \ \ x 3R.0 r � TEMP. IMPACTS III' SE _EN RGE NT I `� � �• I / _ m / /, \ \ �\ 1 Wr5#Q�RIC PIC�PF$Il STFAItSE \WAfiER, 46) I ) n gae v _ J e ELIGI R,tv �/ -'/ �ti �/ / / / \� a / / / / �� , �+ j/ �la'9I' ) / I) w 1' 36.0 -A �i , — w \ i-- m £ �0'9( II II /� J �\ mom\ I % (, �l I — , _ l f a \ ° �// r J. IL E E DETAIL P ETAW O'" Fe I DETAIL c� AIL W, II N CHANGE E CUT R IE E D H ^ ARD E TCH ✓1 TE N' C MEDIAN Y DI C / ••'� Sn 1 Y ��..4,�� —(Aa emb]�( T _ Sw �V�/ < Ndk aj D /C,�38.0 / /�� tab .l v \ L y,r` ' �l w r I / C� \� 5 �£ l N m Rg 0 r7 41,,1 I / � ,y,,.�• / r--- -- fla5 Grnjl� Slope 'r=" "' u\ �`� T /1� } �, ` D= 2.0 Fr. d D �3bja8 0 n L ' g t„i•'Q Ft. B 'n De 1.0 k. / °� A I e ! f 1 ✓ � / 3.0 Ft. ( I _ \ 5.0 Ft. I Geoledile B / .�� Mi14.a =1 2.5 Tt�RDst. Channel / r > l^ / ®H; \ n> 1.I= IA Fr / b y --F4.O H. r0 a 1.0 ✓ �� 0 III w 0! f\ Mmc el =� 2.5 AG11��8, Art.. J �' \ '� ' \ 39 e� / 6 ��i 0 F! m • L£- l..- -j / -1- STAd8i +80 TO STA W+00 ME fo i1 -L -9. 1 +98 LT / , Min. 5.,0\ F)!y \,/ �,, 1 -L- 1 0 0 185 +5p LT I .� /�% m Ep m Min. b- / -L- ST& 174 +60 TO ST 175 50 p j j �m ` � q , CY I f m 1 N o`6 CI. �,eD +76 - ST'"„ \ 0 topST� 73+17 RT DD� =964 CY \ / �' \ l m eoflner= lauBRpRapi �� fL F, , M."C"mf "e- iii SURFACE WATER DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER 20' ot 20' me, w ■ ■ ■ ol m m 0 m ["NAlmull P p- N PROI: REFERENCE NO. SHEET NO. m - 1 - 1 0 110 t 0 1 0 1 0 110 30 1 1 1 0 1 0 1 0 1 0 1 0 1 0 rin CWE ND AND URFA _E W ER I PACTS PERM PERM T DRAWING 0.025 6:7 b• 1 0.025 SHEE 48 F 62 3.0 -- - -- — 31 j�j ✓ D.P. .1?. 7-5 — — -- - -- —�. 3. — — - - -- -- - -- E_ 39 2 E= 3.91 in WLB V ILB da 0.025 6:1 611 0.025 da D.P. 7— — —_. •-- — _ -- —;� 3 - - -- — — -- ._ 5 E _ .54 EL=-S4—.06 0.025 6:1 6• 1 0.025 — -- —° -- — — _ 3.0 :i 3774 ° �i a X, E _ .69 D.P. 37.82 EL= 4 22 D V h C O 0.025 1 6 :1 6-f 0.025 c — .0 dn — — — — — DP / 0 EL .84 EL= 4.38 m E c m c W H� s_~ a W At) 1 0.025 0.02 i g:1 61 0.025 — — —_ 3.0 � - -° -- L— — �. D.P. - - -- - - -- — ° -- — -136 68 mm 99 L= 4.53 PH - . , i�3 t: f rr. .1 0.025 0.025 1 4 6f 0.025 — — — jq t6 EL= .1 EL= 4.69 z wc� TV ay�vn vxnz rum nww Mwtn rnw� uww �� 10 10 10 10 10 10 1 1 10 10 10 10 10 10 Z O H 0 Q 0 V ti W K i� I 41 O j ox y O �N! W - PROJECT REFERENCE NO _V. (<w/ Ir I Ili M \� % > C 11 �lr V�ETI;�t 6£�.t�iD\ S�IRFACE�V�F�hIER— /���yY/I �4CTS\PE IT` R- 2514C n P�{'/ \ ROADWAY DESIGN HYDRAULICS \ ^ 6 -� 00 / r / �� _ (/� I I \ m ' / / 6 t / ENGINEER ENGINEER amp \ / \ �- � q'ab/' £ — ✓3a0� /, /mb� �1� //� /�� b1j ✓�R900� JI % — '3 •e / � — 3a.0 � / / PRELIMINA RY PLANS t -" -' 1 w r \ \ 1//' I 1 J m'� •\ .'t, ` .� / i \\ \ \ / ,500 / a£, Do NOT USE Po rnxsraucrloN e >� = �.� .F CNADW�ILJSR. J /6 j �° \ �1 �I ,✓ -� �r ` ' \ / \ IDD• �\ \ •e0�' ✓ 1 R SOD' /- ww ^ J .�a \ ee£- PERMIT DRAWING ( > 11 "•?9 L \ C6 •. /,^\\ '6 %RAPHIC SCALE / ' ,mr,' \ / %' .,0• / m ( o-' SMEEI✓ 50� F 62 S EVEFI LBiS� JA r _ � \ ` \ / ' \ / \ '39• — — — % 1 w I 1 9 I r' GE ARBOR •� / ' I (� I 2 fSBKO I \ \ i ` lD I �• ` .0-' ••� \. % / \� 11 6-9.0 I 1 / I ✓ Q I� J 1 / I \ �09E.. ^• I I I \1 ..� _ — /' / 7 _ i 1 ✓ / J ^,7 , \ LIJI ��/ / p,TgPp I/ �QO ©O� 10;$\ ^ 9.0 •- �HTB I, L l J I IV JC71D1 f lY- 44CDAt EI.. � UR�X =1 SET" LOU W. Ela \ 1I w-L� -�7z•- 'CHLHLL & X 'EOwhA\ I °� G LEE I�LSOk =! e'6£- �► )m J/\ I I r S — 1 11 \ �/ . \ .A ILATI:BAI. 3' BASE prrdi II / 1 1 y.� I I S % v // / •f�I �I DITCH B�DETNLE r j �@' �•�i 3� 7 �w ``• J) II \ \ I i -^.�� ` — `��. �h`,..p Lam' ✓L R. k 111.4 \ _' 3'+ All R ^ clY I 1 `�" GRAPE a W (�\-' 1 (� pyq �® J ^ •/ � � 4i. I 1` �L ARBOR J IL.+ \ tlbJ 39 �Lp�.11r \YS E YSTENV� I \e 3\ \ \ \ / SITE 1 uj \P 1 •1 SE r)J IC 1 i/ w I I i w —S.,,4- p I _ 10 \ \ \ (S E ENLARGEMENT i / f \ W _ — bs. I FO �i mil +� I ✓ / I I / ° II �� \ \ \ — _ ' S� IEET /51) / \ W ��q —06E7 SEpTIIC j��y, `` 1 ISFO ( I wce- l 1 _ I ° 1 ISBKD I ISBLK ` \ / \ / qry 6 SY57EM 1�� l I I I 1 / / 0 A GRAPE �P I f 1 \8 , I i ' 1 I PU P CON, S I II L f l I' r 1 r .� I I I 0 \\ o\ \��e �- -- J I •\_ter PUE • e'er_ PUE / w{E+ \ 1 Q� --� .\ 3 . l) $PUE E qUE .� PU UE ` PUE1 -f--c— PUFF ---�•- PU \ ' 3 LJ • I .. LLJ VIJ =6 �+ ® = Z —y8_�_ _ m.�— �"ccr-= _ ` 1 Im 1 1 r�_ �,�1 _�� % — 3e�-- )`J - _ ✓ • - \ E- .` ► �. J/5 JMY O /AC 58 24'w _ _ — 7 �� 11 -- — — — - _ — = =�/0 0 C Ei-7 _ – – – – – – , 0 w / a I n./ �I� �- —/ _ 1390 / ``�� J���I —��` ^� z �,.� � /� _ 1J I��/ �? \ �0 F 38.0- �- r•mF —_ _ c\ _'e F — F a— �— F / F F •'\ ®1 LLI - 1 3� \ _ �' C =37.0- C C C C C _ G '37.0✓ S \� ' `1 e` CL B RIP C C dL E=. I GEOTF.7(T L� l $ \ 360` \ \ \ \ /� I / / e— _ % ` — / ✓ �37�0 \ \ t% r \` \\ T ® .r 36:® % J TD \. 5� :\ � % // // //� �\ \ / / J(' ._., lam— '--� f � w � �� \ `� . ?� ✓ / °1, b e w � /h� / \i t 1 ' f ( SUE 80RLOeG�fOSC1 \\ II h &' C %= 1 r ` — T►P91hoolft J / RETAIN m \� tIp 0g£ SREE D A IAQTION D AIL A 1 \ — / — -A a/ T 1 L� „t one uunor� 1 �' 3g�eJ �a°I-' 110 .� / -•• s£ °E�oN�• `'I I _ _ /w �.. _ 37.0 I�p—g1 E1ElAIL R / DET L E 1 (7/7A \� �s r f6 I �G \ PIS w J NahnlJ N+ 1 . 50 MEDC4♦a LE/ LATERAL BASE DITCH / N lam/ ' // �/.{7.� eei p / uw�a I ca r �-1 sbeda.r tNdro swll .'/ ` L� PdM / /��"��,��/ T4 w�`Irroia \ B 3�1 xHelror l I I -I . Ae 1 Gmu l J.J 3,. ` 1Ff. Sb� B / \ `0.5E I l 70 Ipgy \` _ r F' �ORARY44PACTS IN � /0 / I I 8 -3.0 k. ' 8 \ J h- t�"l / / r B 8 n 30 IR / / •�/ LD C �- i -,•t 1 F 1t A 194 +94 OOJW TO 130' RjI \ 11-•_ -I- STA 181 +80 TO A 186 +00 MED "+'S i / / L ,r pAAN K YTABILIZATION I �=.`�• �' "� X0'8 L _ L- STA.181 +00 io STA185 +50 LT DDE =744 CY eq l e \ \�uL uTAIL 5 _ \ tm l� "DETAIL D We\WC� J ' I ` D� TC — pECAIL , DETAIL U J — 1 I 11) \ — m [I�{ SPECIAL DITCH D —BABE DITCH 0 SEECIA� LATERAL BASE DITCq f INO�sml.l —_ �I \ (Naro �l V /. \ J ( IN.. 1'Haw swkl �. �5'�' >(NoHO Sm •�-i= X310 .— i' — 36'0 < ~ _/ Il / / `� ✓ _ � / .t'� \\ �. \.. � � � 1,� , � D/ � r� V � � _ / 3.\•� . \,�oo� � Fill \. � / ` i / 1 6. Y \ Mn.D =\ : m 40 / SIw4 0L�° _y oon H -\ O�PS —� l —Y� / 350 IMPACTS IN SURFACE - WATER i L l \. 0£�` P �•• 5� c� /q \ I RfwD�].5 J3.-. -..�g� / W B Ayn. D - "fi. ) ) % —36.0- / \• \c^ V \ \' \m VA / I 11 BAY k._ ._ �' / lj, ( / �1 f 0'g ^ �. -0 £ c-9 \� \ ll\ I Itin. D- 1S k./ '�jr� e u < a.a• JAin Ba 3,p Fr. W - W X36.0 -• / B= 3 £� w /) ( ✓ / ( / m _ -I- STA. 19Y+i9�(RT( /' z L �<^ 7 d cA.r= CL455 I tuARAP �: ✓ BTA 194+ T STA 199 +50 / J l - / 5\F,50 O Si 191 +8'Y R A 5 zl O�TA 9 +35 (LT) Sr 19�07Ji w 4 \ I. � {y v ^ / J f3 \ r w //c �ER$QTES IMPACTS IN I J / pp Z L STA. 194 +94 (BO' T TO 100' RT) j / J // /� \7\ A 195 19 n ?� \ —✓ — — -i J ✓3b.0= �36� -\ ✓i 3Ge .0-, / m ¢�� �/ b _ / a S.UkPAC�WAT�R— — — n, 37.0v It Aj/ m \ � 1 J /` / \ / / / ( �� ' f ✓ l ) � i e NAD 834S-�SO020007 W-4=ww 611 OU I I d 1101 A N Mal SITE 19 ENLARGEMENT I 100 , /Eml 1, 1 114 7-1101 MIMS Vq 30' ol 30' m 0 0 0 m I mm" GRAPHIC SCALE 7i G IV 0 c (JW¢TLAND AND., RFAC� WAT � I �►C .$ PT I R -25140 22 1 PAY SHEET NO. _ / ` �0 g£- _ �' % /3 i - ya' / /iE ( ROADWAY DESIGN HYDRAULICS / ` GLI _ / / / j / ` ENGINEER ENGINEER yti�- _ -36.0 V / r✓�� p it JHEL'CA FOY MEiTS API IP . -0'g£� -\ "0•g£ _"'G I DALTON L E -EtSOX (oo O/ .62.E f \ e^ E _ PRELIMIN RY PLANS IoD' J / / �' DO NO'f VBB PO CONBTRVGTION GRAPHIC SCALE— l4lpF0R0.�R. I- > PERMIT 136 _� ��—, ��� /���� ) \� \�� = =���J � / / / /// :�' // `�Q+`>tl'� eyi � � '• %� SHEET D�OFI62 ABLE ROBERT -0'9E— / Ap 8y 5 '/ N w -0'g£_ d �°• -0 g£..� - \ -� < / 'G' ° ' o`�g �. ✓ '° % // /� / /,� / % / lam. \ .% I. SHIRLEY HOWARD RODS. ET 1/6H- L- — / / I ap // / / /// 1 T E � I 9 EY HOWARD R"1h ET / W //LEN YAYALAS£Y / --32.0 LU TOE PROTECTION r f / 1 J -32.0 / SPECIAL LATERAL' DITCH M / by J \ / m SEE DETAIL AC SEE DETAIL W ' / / �f J / / /`�' / \ It ` ` / /' i SEE DETAIL AD BASE H 7 uj LLJ C C C C C c c c g3E� c / /'yam / } 32.0- —C� C L '� / z6'0- Hw so ' � ® 04 _ J BYPASS / tm I<— LU to e 2GI CN r ' / LU / I % � . J / � -•I -` 0/ � / ''�I —j 0 LE.. -^ � 5• � TO C B T u W C C C m C - S CL B P RAP /ryti m / , / L .3 TO S 3 TO 3. EST.1 S" LE -0 7• G -0'g /- O��T.7 SY GEOTEXTILE GEO (TILE y ey- )- 1 �E r LATER4'V DI H� 6• m iF E ETAIL H% / }� I / / t ` K. N' DITCTI 1 b m� .l / E5LOT.2 = 0OD ERE WALTER PELLETIER, II, ET lyO4V-- DB 264 PG 391 / -0'9E— i / rFA�RI R � FEL b YAY�L Y Y ���q/ — RFA1 FROADWAY TO r SH:j- aDYBR�sOD .FIT vat G E (DRAIN IN%, g6, �/ 0 3y�° / / /ilif -W T�AND 1 ` I1` ('•— 0� C �.� �� �. r �// % J 4s \ /�m'� // N It: / \ \ =• J ^ 9 \ \ /, ... d SPECIAL LA°ITCH p tDENOTES FkL IN _ WETLAND F ) _ i r i i — ea£` �/ // �/ I I J — J \' i ' I /pEINOTES MECHANIZED / _ FIiLiN WE CLEARIN�,6 °' l \ ` -JA / 0 - f�= � 3 = "4,/ " _ % °gym / per1� - ^- •\ / l J ✓ 2.J 01 J E ETNa 1 �AL��CV i� S D��C�H G � > 34.r /!r +� r DETAIL 'y i- �0P / ETrU AD DETAIL AC _ ANDARD ' DITCH J SP CIAL D H / mm SA AL CUT DITCH( SPECIAL {ATEwaE DITCH �. TOE PROTECTION /,R'• \ �mi (NNNSmI.J / IN. �1� �� eh 1nt— Fi r / tiw I�sel. )1 FILL IN "ViUlM e '. ,1 1 1/1 �� A 3' >e� ��. N-11 r J . ��^a `fin ENLARGE ENyT r +l D �O 3.Jur D m 1 / d, D Q / ///— �• 1 /`_ \ ' G, °�"d r M �2.5A �� Q�M1•� \�` I I A .� �'� / / m 1 N W� M n D J4 H. B Min. D =0.5 k. t�/ d i ��7 .6i I , ,0`�£ Mire. D= 1.5 . P' V 1 _ Ba3. H. d= �7. F. �''I 3 �� / a � `�.0 Ft. G.olwile V \ /'•� � G /' ) � ST�T8 +""To" +50 (R / ( " " "' _ 'D �''/ �Y21STA. 19 +5 i0�J 2Q 53 RT) m /� ✓ / L '`• '+� / / 1 / {{�� / J iiY2- $$TA. 19 +50 Ty 0 +21 ((Ln -L- -A. 261 00 T STA. 264+IQ. (LT) ` type of unar= cloys B Ri p / 6m w -L- S 240+ 12 T TA 257 +9. ((LT) �--'m I 1Y2 5hp.J9�ir58• IL117 19+50-( RT( -1 J _-7 �m -L- STA. W +BN 0 A.261 00 (L7) ✓ / 7 ilm /�/ i / / I J \ / / / \✓ / / / �r d "l! //, r- �a� >. N PROD. REFERENCE NO. SHEEJINO. — 14C X -1 0 1 0 1 0 1 0 1 0 1 0 1 1 1 0 1 0 1 0 1 0 1 0 1 0 WE ND AND UREA E W ER I PACTS PERM PERMIT DRAWING 0.025 6:1 6• 0.025 SHE 54 F 62 3.25:1 D.P. 38.58 :I 61 + 0.0 0.025 6:7 6 0.025 3� dn D.P. 38.73 '7 60 + 0.0 0.025 6:7 6 0.025 v J D.P. 38.88 60 + 0.0 L, 0 0.025 6:7 6 0.025 IL N c 3A dn o D.P. 39.03 ' 7 0 m E 59 + 0.0 TV c 0 c w y' CLEAR114G CLEARING LIMIT; LIMITS 0.025 67 6 0.025 8 E A R. D.P. 39.18 '7 m= a! — - 0 -- - -- - - 59+ 0.0 N dn 0.025 6:1 6f 0.025 3' � *s 7tt D.P. 39.33 :7 _ _ _., 58 + 50.0 in Af pn ��� l0 l0 10 10 10 10 1 1 10 10 10 10 10 10 s ;, � ��, �d N Z O M to a w H b \ / a f _ F_ all.g � REG48AL0 blIG.ET UX r r WETLAND AND- SURFACE,WATER (IMPACTS PERMIT s _ -7 / / t „ /-- (��- /� \-- /3j$_� SRS X07 / 31.5 / � •”" �I � / / rl 1 /�• �. .i �v —{._s J —/ s.� L• /J- / ; 100' 3 \ 100;/ 31.5x 31.5 .9i£ • —, -- J \�< // �(/ ••. X30.5 s - )GRAPHIC SQL ;�,. a I ^� 31y� . / •" v ✓ / '-•" / /315 / /31.5— .ERE WALTER 7ELLETIERAET UX PAY SHEET NO. _ ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DO NOT USE PO( CONSTRUCTION PERMIT DRAWING SHEET 56. OF 62 X. \.- HELEN ZAVALNEY r // ` I ` l ✓. / J ' / SPECIAL LATERAL'V'DITCJ ui ' �7pNp 5 pl �a TERAL v�Q1TCHS� I v\ / c •• •p- / SEE DETAIL W e 1 / ^rJ r Ie�`7 3E t1'AI� Y DRCH I // / //� 1� tJ,L \,aWK / !F / 31. '• _ ( \ ` % i d L J J Y--- E E \ SLOPE = 0.002737 / ,L � /�- EST. S eY DDE - � 1_ e '°/J w . 1 _ / r I / J .i Lj f SPECIAL CJ�N DrrcH I S6Y` / •ut�% w 1 : ,.,1 t - \..�` °I 31.5 _ / , _ —3p.5 ui ui PECIAL IATERAL 3' RASE DITcAL /I / SEE D`N[1RE EE AIL AD — " ✓ / .Z£J —32,y 5•I£ l// .i/ / / iS / --� i •\ -\ \ J� RAP ® % --s r •.� .`'— '\ I "` ` < °i / EST.2 TONS �M `� / EST. 7 SY GEOTEX CL 8 RIP Lu C - / C •..0 ° C . C �• J" . / > \ CL 04A1d� RAP 1 - �• \/ C C / C --c- C C C C Lu t ST ® C L° ✓ C ES7. 7 E , T EOTP NS C�DLE C S. / 9 5 r a \/ / -7 _ / / / y —29.5� � / N r �� I /� / /°. / ^r 1 G/ ��/ //` OS O BYPASS \- \ r / l l • / /r' s w % y. P \\270 2%5 Fs + -L- 1® CN / v ✓ CL I RIP RAP ,r 32.57 7 N - � � � A i � •� EST. 15 TONS 7E � �_ _ EST. 30�G�TDITI i Alllu�EKSE DITCH FF��jjj������ /t�/�' `a! l r –{•� '�j '� /-Y (_' ��j�+ �I? e �fI- -y/ t• 1 \� 5'pe, / ANDARD 3'.erySE DITCH' t' I FI F.�1 -� / F9g, /F/ b J T F 0'��,F w !��-� \ / �\ / _ _� r ,n� SEE DETAIL AB `\ C •-W •� 'S� A 'B ` cq \' �- I F - -� �F ♦' F F F F F F °1 SLOPE = 005426 1 \ /� r -� \ / , 5 / y \ ) / jFD // @w .0 ISHNG/ROAD 13g / 5 ' /2�. - - - U 'S[. •b` 3(• "�i > LdJ ML G_ D, F NG hr �2q• 1 i '� S• \ e \ S" �\ �3 - \ / _ V N \� &�RAP'NE,rO N HQ \a qy' ,` \ z STANDARD 4 F DH _ �` / _ 1, `\ X lN.._ t]./ ,fit _ \�SSSLLEppE-DE #T0.0058977.,��,, e / � ✓ � I/ �_ � LJ �� ,` �! � � ESP,15� CY DDB.:f� -� ti / FItkAf4- WET_kAND S6 - X30.5— ��___, I cy,� — — /30.5' -�-�� T HELEN ZAVALNEY DB 266 PG 997 DB 327 PG 32 PB R PG 96 39 L / � v ` � /1E 'b ) m� / DVE L90 �TIq\.�G-2A P r \• ° i / -�2 / N / y / L_ C> / 4m u� \ 4) qFj • 5� 55�EEFAN ,v DiT 4 I ? ( — ✓ (� [Mj�ECCA`HA,I�.�NIZ CJ' /RE((r�TE� f LET R.®. �+T<UK� I 1 %� / / ^\ \J �� /I �OPEE =0\429 �\ I //) \� L'- �R /`IG /1 / / sr 2 cY oD �' I 1 r� /ryl v SP \ s ET IL L L b_ W DqAILX\ \ STANPARD°'v DIT9N W SPECb ILATEE34VDITCH / �STANDARD4�E DITCH ) J �/ ` / D / _ l W. D= 2.0 k. 7 Min. D= 1.5/RA v t \ ✓ B Y0. k. ('L' =.1 .-� ( / �/ / Y2 STA 1,( +90 TO 15 +85 Rn iy _ Ln= Y2- 5 18 +62 (RT) ✓ \2- A Y8 +63'T0 19 +50 IRn/ -I S A 26 50 i0• SNC 8 28 L J I 5'gZ 28 / ' N / ✓ I / / . , N- L 5 DEMOTE FIL IN AIL AF / SPEC LATERAL v' DITCH (NNb Smle) D ILA ST�NP DITCH ` s62 INe�ly SPECIAL I CH / s / EiA�IL SPECY RAL CH/ SaSl.y / i GmunA `!' D �n, mu 3.� 2�:,— ` ^HxN NI� \ SIOPI U�1� �� •` �/ VAR \S6 / % D \ �? \ O S• e�H,\ Min. D= 1.0 Ft./ B B130�F.5 �\ Min.D� VAR. / �' 27.5. _ . 17+ -Y2- S7Ik 93 TO +59 (RT) Y2 or T STA 20 5 V l /1�LLYJ( \WETLAND / V • < CLEAMNG -L- S7A 276+ TO -STA. 280+00 ) / / / � - A 14 +50 ,TO `STA 1 0lj (1111 - STA. 2 1 +00 T STA 2 +50 (lIl ^ ( STA 19 +50 TO A +210( 7{k Q ` q - L -�SFA 264 +50 O 8TA 267 i.8R ( w I y L l r- ` S'LZ ' \'L ' 9Z' I ` N /! lbi4 +90 1( T) 1 L \ sa£� s 1 s6z� / n / _ ^ II J r� Jam/ J J 7 1� .°- . d: -, � � � / � I 1\ \ mti � \ 6e-- i \ \ �. � � /n. '� v / ✓ /� � / � � 15� ) °\ \2Y'yY ^ � JA / I 0 10 PROD. REFERENCE NO. SHEET NO. N R- 2514C X -1 co 1 0 110 E 0 E 0 1 0 110 5 3 Ea D e a 4 D a 0 2 3 1 1 2 D so 4 D 0 e D D E 0 5 D 110 1 0 l 0 L 110 1 0 — W E ND AND 3URFA, X W ER IN PACTS PERM PE T DRA ING SHE 57 F 62 — — —7 .— _ D.P. — 35.88 _ .___ 1=29.37 3 J7 70 + 00.0 3 — -- D.P. 36.03 L =29.55 — 3052 - 69 + 50.0 WLB. CLEARI I 4G LIMIT r 3 3:7 v 36.18 x, � L =29.74 3 69 +00.0 4 — -- — — -- -- °- U v c 0 3 H 4a 4n 0 4:1 3:7 D.P. 36.33 m EL =29.2 N 68+50.00 7Y '"' — -- -- — -- — 0 c Rn W N� F$- d W d V c b.60 my 3;l 7t- D.P. 36.48 EL 30.10 68 + 00.0 — -- - - -- 025 dn 4.33 3.7 — — — — — — 3.7 D.P. 36.63 z EL =30. 267+50.00 _ Tn — W,Ld M,� �aQ on to 10 10 10 10 10 90 8D 7D 60 5D V 30 20 1 13 2D 30 4D 9D 10 10 1; 0 1: 0 10 1! 0 N Z K 0 a rA to a 144 REMOVE 24- CMP HARRETT BARBER HEIRS \1 aeJL O N I 1 � �� 3 I._ V Qd 143 _ NARY ELLEN EAOY I Na le Sml.l SPE LATERAL LATERAL 3'BASE DITCH SEE' ET y ')� tom' v D A� RFw:I 144 REMOVE 24- CMP HARRETT BARBER HEIRS \1 aeJL O N I 1 � �� 3 I._ DETAIL Al A SPECIAL CUT DITCH SPECIAL CUT BASE DITCH I Na le Sml.l I /Y�I �E LATERAL 3' BASE DITCH SEE DETAIL D SITE 1 I� MECHANIZED �E "OVE 24' CMP CLEARING* 1 � 1 I I ) 1 � 1 1 � 1 1 ( 1 t REMOVE 36' CMP \ DETAIL AP DETAIL AK DETAIL Al A SPECIAL CUT DITCH SPECIAL CUT BASE DITCH I Na le Sml.l (Na ra sml•) From ( Notts -4) ryo DRn N�vi°t 4'�X.°t 9ev. y ')� tom' v D A� RFw:I B Min.D= 2.0 H. Min. D= 2.0 H. � MIn. D= 1 H. -DRVI- STA. 12 +06 TO STA. 17 +00 (RT) QO .� 2 SITE 1 I� MECHANIZED �E "OVE 24' CMP CLEARING* 1 � 1 I I ) 1 � 1 1 � 1 1 ( 1 t REMOVE 36' CMP \ DETAIL AP DETAIL AK DETAIL Al SPECIAL LATERAL BASE DITCH SPECIAL CUT DITCH SPECIAL CUT BASE DITCH I Na le Sml.l (Na ra sml•) From ( Notts -4) DRn N�vi°t 4'�X.°t 9ev. D F \6H °f Skew ')� tom' v D A� RFw:I B Min.D= 2.0 H. Min. D= 2.0 H. � MIn. D= 1 H. -DRVI- STA. 12 +06 TO STA. 17 +00 (RT) .. ...... ...... ....... ... e.... .a r�� 1nq -uRVh SIA. 11*45 TO —IC+UU lu) t 1 DETAIL AL \ DETAIL SPECIAL CUT DITCH Y \ (Naro smi.l STANDARD -DITCH _ IN sm Otro bl \ \. tbNnl K\ • D� Non, F) D. Fa¢`O Gou \OP Gov D 9' Min. D= 1.0 H. Min. D= 1.5 H. -DRVI- STA 11 +45 TO STA 12 +06 (RT) -DRVI- STA. 17 +00 (RT) PAY SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DO NOT U96 FU` CONSTRDCTION PERMIT DRAWING SHEET 58 OF 62 DETAIL Al STANDARD roBASE DITCH INa Smle) i rt v D rev c.ei•Na• B Min. D= 3.0 H. M- d= 2.0 H. B= 3.0 H. DETAIL D DETAIL AO DETAIL AN LATERAL BASE DITCH SPECIAL LATERAL V DITCH ST AR THE LIMITED STATES OF AMERICA ( (Nara secb)b I INaro Smbl A AND D ' -9r rwP RAP = I -1 , —' �� MECHANIZED — o�= SST. 38 SY GEOT� P \ K \ I — )S�_... , — REMDYE 24' CMP , \ \ ).�— CLEARING —15 "' ,S ¢I 1 ` I I. STAND RIP SEE DITCH \\ � �� 1\ ENLAR2GXEMENT 7 fl EMP. IMPACTS IN s SEE DETAIL A, y� \ EST. SURFACE WATER EST. 25 C.Y. DDE 21 TONS RIP RAP REMOVE 30' RCP g EST. 47 S.Y. E -- �r ) :ESTATE OF FRAW •EWMIS 1E TO I ; I I SPECIAL ry' DITCH E%IST. SWALE I SEE DETAIL AO 1 / Y MAYSVLLE DEVELOPMENT CORIERATLON / \ 1 O1 IMPACTS IN SURFACE WATER I: I EXCNATION IN WETLAND *. ARD 22 DITCH i i I SEE SPECIAL CL T ELASE DITCH SEE ff I . REMOVE 15' CMP i I a Tr E: It di :d��•�.I •; . RETAIN 1r< y �� F of I i I i ES . RIP \ i / I \ EST. 1 5 3 EOTE)MLE i' E - LBUS- POI S ►o. 22¢59Q0- E E -owl- POP S/0.10¢OOAO =� �/ --'f—' _ - -- m - -E Y ---- ---- - - -- — ---C— E�f Qa� f ', SITE / C c E =� / k __ r C SPECIAL LATERAL Y DITCH � -- � _ PDE SEE DETAIL AO F P C — ._ C C �E' E `�,A, I� -E E REMOVE 15' CMP �'- SPECIAL CUT DITCH /k (•'•� II I QESEE DETAIL AL - A i STANDARD ry' DITCH 46 i Ii SEE DETAIL Y SLOPE = 0.01868 SIAYSYLLE DEVELOPRENT CORPERATLON SPECIAL CUT DITCH EST. 14 CY DDE w.s.PRmcEN ESTATE SEE DETAIL AK DENOTES EXCAVATION IN WETLAND DENOTES MECHANIZED TCHLINE -LBUS- STA. 24 + 00.00 SEE SHEET 27 * * ** * * * CLEARING EmDENOTES TEMPORARY ® DENOTES IMPACTS IN IMPACTS IN SURFACE WATER SURFACE WATER z Z w to to a w a WETLAND AND SURFACE WATER IMPACTS PERMIT MATCHLINE —LBUS— STA. 15 +00.00 SEE SHEET 4 I I � P E FIN SURFACE ATIIER / \ ' MARt4d N EADY `. \ SPEi SEE I I I I `• 1 � l ' p ,3g6 I R=Yf 18' MARY ELLE P E FIN SURFACE ATIIER / \ REMOVE 3D' RC K .IEW W To s uE �38. sr. I I I /u IY s R.1 f` / J J I \ rT � 3' BASE DITCH � J �n 0 144 \ REM0 CMP HARRIETT BARB\ER�,,,I66 ms.,, O k �� l � `'9 `f\ :ESi�,YE OF 4 ,REMOVE 15 CMS r / Kid. i / �a�OS= rOT 50 22¢59D0 \J / -DWI- POT S/o. ro _ /, b fi, �i f �� 380eI I m I i 4 r 8 a 4°I6 . // j I m .n o�Lj� ^�\ eF m0• 1 /\ °la Iii ,�\ �_� I r✓3s.0 _ef_ J �� 370` \ l f ✓ 38.0 \ I GRAPHIC SEALE v y .37.0 -� ` /- — j ) - 38.0 — �4 -3B.0 -1 ^ v LATE 'BASE DITCH — SEE DETaL D\. .A 3,a \� ✓ I 1 � )/ I� �� �g6 BSI r /1� IIII E \ DETAIL 'P 7CIAL LATERAL BASE bg. H `,m ETAIL A _ �� SI PECIAL Cif DIiGi.���_.. MP. IMPA TS f N FIN SURFACE ATIIER / \ REMOVE 3D' RC K .IEW W To s uE n. 3 =H 2.0 Ft. sr. I I I II s R.1 f` �URFA E �/ATER J I \ rT �� L.pITCH SEE aL = _ /, b fi, �i f �� 380eI I m I i 4 r 8 a 4°I6 . // j I m .n o�Lj� ^�\ eF m0• 1 /\ °la Iii ,�\ �_� I r✓3s.0 _ef_ J �� 370` \ l f ✓ 38.0 \ I GRAPHIC SEALE v y .37.0 -� ` /- — j ) - 38.0 — �4 -3B.0 -1 ^ v LATE 'BASE DITCH — SEE DETaL D\. .A 3,a \� ✓ I 1 � )/ I� �� �g6 BSI r /1� IIII E \ DETAIL 'P 7CIAL LATERAL BASE bg. H `,m ETAIL A _ �� SI PECIAL Cif DIiGi.���_.. q ETA(L Al SYECIU�DITCH FIN p /// SInW to.D9 n. 3 =H 2.0 Ft. A`4'n. D= 2.0 k. r B e n. H, s R.1 f` -0RVI 5T 6070 SFA17 +00 9 T REFERENCE NO. SHEET ND: 4 -25140 26 PN/ SHEET NO. _ AY DESIGN HYDRAULICS 'fNEER ENGINEER LELIMINA RY PLANS DO NOT USE PO CONSTRUCTION PERMIT DRAWING SHEET 59 OF 62 1 ..� ' W J i �3� -LBL� ST 3+7 TO STa 19 +q4 AT) I / 9 '! j -DRVI- STA.11 +45 TO STA. 7 +0 (l ``o. '� \ /oCECbii41�I ED �e \ (\ / \ y QLEARIjJ / RE?AOVE 2 cA1P 1 I �` \ \ 1 I ^ X26 \ \ I / J / L A DET DETAIL Al \ f .r �,C C )DITCH STANDARD BASE DITCH I ° I(a1 bl \STANDARgN NiDRCH INam s.d.) 1 V � J N0W x l -V / / ` I o I / 0 D D , GwNxrib B Min. D= 3.0 H. —Ors / ` 1 \/ /V r / W I I 1 < I In I I/ ^ i. �� O ' n.D= 1.OIH '8i /� Min. D= 1.5 H. B= mm 2.0 H. 3.0 ) -DRYI- STA 11445 TlQg`STA 12 +pt % T ) IN�a + s0m0 b ) (R I) " ?RMOVE 36,. P 4/_W / %V DETAIL-DI / DETAIL AO ) SPECIAL LATERAL M D RCH Loma- u_jn rf6CA r-.PB b w r Min. D= 1.S H. / °. D V I \ 61' 5. H. 7 � Min.D= 1.0 H. 1 \ mA L `` \1 +R' V / ` �) 1 I I \ -LB j +00 to STA,.1R +//4 -,BUS- STA. 19 +40 TO Li] SuS-S�T sra 2s +oo Rn 4 REMGVE24"CA1P c i// '��0'a �% .� 1 +` \ 1 STANDARD 3'BASE DITCH l ✓ / \\ d i I � — - J13F!0 J / ,e EMENT _ LASS B RIP RAP/ 0.8F� I (I / `�`, _�'•�/ \ 0 1� -^ `\.1E I X DETAIL A1� I 21 ND ;P,LLP�3e. \y��/� V ` ������\I \`�\ 1"'f I / Eydi- 5.J%s. (L4 /J� �LE� I sPECIAL3d V DIT I� / / \o V SEE DET L010. MAY6YIY E-DEYECOPMENTt�ATl8�1 \\ \ \ ✓� \ \C/`37.01z f��`° I I \ \\ �/� :3s� I XYATION � \ o ` y1I WETLAND SPEL7(�LL CUT BASE DITCH I I • ��O. LE \ 3&.0 v ' \0 \ SEE DDEraLa - 1 t0' �8£ _ � I - 39.0 -- /. `39.0.. "--�'°. ?__ 8£I Y...II /'V V�� ice` /i ET l� \� EST I V ✓ — _ . \ .0 _ _ _ - _.. ._ ��r.. � � ._.- cam- - -• � � _ _ r I / r 6` 4°7.- SPE IAI�LATERAL V DITCH ' f i 0 SEE DETAIL O C = — ✓ )� l 3q•0 / I / Bz, E f , r CMP I� III ( u�io E ET-cm DRC /( / J I ✓ / 1 .� STANDARD V DITCH SEE DETAIL Y //� \ / SSLOP4 CYIDDE \ 09� 46 I ` ` I I I I MAYM& DEVEL NT8(;O�ERATON o s SPEcIU cur D�pl \ I Is. N ESTATE II � � / f I 1 � SEE DET�LAR I. I\ ���J < J � \ IIII � 4 f ' I 0,0` J / 3s.e � mil e / � I I ©•b� l i/ / I MATCHLINE —LBUS— STA. 24 +00.00 SEE SHEET 27 DENOTES TEMPORARY IMPACTS IN SURFACE WATER i -LBUS- STA. 19 +77 (LT) DETAIL AN STANDARD V DITCH INA. Smb) 1 I. D0. G•o° D �� M n. O= VAR ,w&. 7z DD TAAECHANIZED CLEARING * * e� e' -: ;1 v Fir) i1 SITE DENOTES EXCAVATION IN WETLAND DENOTES MECHANIZED CLEARING DENOTES IMPACTS IN SURFACE WATER PROJ. REFERENCE NO. I SHEET NO. F 0 7 0 1 0 1 0 1 0 110 7 1 � � 14 X-132 1 0 1 0 1 0 1 0 1 0 1 0 Rn CWE ND AND SURFACE W ER I~ PACTS PERM X 78 7T 19+01.27 PE SHE IT DRA 60 ING F 62 61 0.020 0.020 5;1 ' 18+ 6.72 0.020 0.020 18 + 60.00 CLI ARING L MITS WLB 0.020 0.020 4.1 z`- o. x, 18 + 30.46 v U Rn V 0.020 1 0.020 4;) 3595 —� - -- -- — °- -- m 18+00.00 3 G O 0 dn 0 0.020 0.020 4:1 c w, E.=35.58 + 1 x.65 w S_r a w ` p m � N = a� F=7= m 0.020 3 E.=35.46 17 + ®.®® EL 35.5 5 v, ZREM N - J 14`' Z 0.020 0.020 __ An W,w E =35.33 16 + EL =35. 0 Ev- 10 10 10 10 10 10 1 70 10 10 10 10 10 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type CAMA Permanent Fill In Wetlands (ac) 404 Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -L- STA 10 +00 TO ROADWAY 3.65 0.42 <0.01 -L- STA 19 +49 2 -L- STA 21 +50 RT ROADWAY 0.09 0.04 3. -L- STA 24 +00 LT 18" RCP <0.01 0.04 0.02 4 -L- STA 22 +95 RT TO ROADWAY 6.82 1.43 -L- STA 84 +82 RT 4 -L- STA 30 +11 LT ROADWAY <0.01 5 -L- STA 24 +30 LT ROADWAY 0.03 0.11 0.11 6 -L- STA 62 +27 LT TO ROADWAY <0.01 0.03 <0.01 -L- STA 84 +82 LT *7 -L- STA 76 +79 LT TO ROADWAY 0.26 0.01 0.08 -L- STA 82 +96 RT 8 -L- STA 87 +00 RT ROADWAY 0.64 0.09 9 -L- STA 90 +56 TO ROADWAY 0.89 0.17 -L- STA 97 +96 10 -L- STA 99 +50 RT TO BRIDGE 0.95 0.15 -L- STA 105 +79 RT 11 -L- STA 106 +50 LT ROADWAY <0.01 0.03 12 -L- STA 118 +16 RT TO ROADWAY 0.45 0.05 -L- STA 124 +70 RT * *SUBTOTALS THIS SHEET: 0.00 13.78 0.00 0.17 2.60 <0.01 0.00 0.00 0 0 0 NOTES: *Site 7 has an additional 0.06ac of unimpacted wetlands that are considered part of a total take but are not included in the impact summary table quantities above. ** Totals may not match sum of individual impacts due to rounding. N.C.D.O.T. DIVISION OF HIGHWAYS JONES COUNTY PROJECT: 34442.1.4 (R- 2514C) US 17 FROM NORTH OF MAYSVILLE TO SOUTH OF NC 58 NEAR POLLOCKSVILLE se V 9 I W d O O L O O C = 0 � LLL ` 1004 aa✓ 3 110 1115 I 3 111 N 7113♦ NATIONAL @ I 1112 17 I 111 FOREST • I 1 ` � 3112 END PROJECT I 1110 1 1114 58 1108 1115 I I Chadwick t Ills 1116 1 0NEs 0Ns • 1116 17 Lo�cOU� v sB 1118 / CROATAN - NATIONAL FOREST BEGIN PROJECT 1116 f ysui VICINITY MAP STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS. LOCATION. US 17 FROM NORTH OF MAYSVILLE TO SOUTH OF NC 58 NEAR POLLOCKSVILLE TYPE OF WORK GRADING, DRAINAGE, PAVING, I STRUCTURES [BUFFER RAIL RAiY rPWKT ■iICpYHR NO NOR ll�iea'viD •C• R 25140 1 rrwn rxotNa r.A.raolRU oacal ^�°�+ 34442.1.4 ADT 2015 = 12,000 PE 50 25 0 50 100 ADT 2035 = 17,700 DHV = 12 % z PLANS D = 60 % 50 25 0 50 100 T = 9 % r w�11J V = 60 MPH 169 a PROFILE (HORIZONTAL) * TTST =5 % DUAL =4 % F/I ,, 8 NSRS 2007 BUFFER DRAWING SHEET 7 OF 4 us ®e THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. THS IS A PARTIAL CONTROLLED - ACCESS PROJECT WITH ACCESS BEING i CLEARING ON THIS PROJECT SHALL BE PERFORMED TO LIMITS ESTABLISF {� GRAPHIC SCAMS DESIGN DATA ADT 2015 = 12,000 50 25 0 50 100 ADT 2035 = 17,700 DHV = 12 % z PLANS D = 60 % 50 25 0 50 100 T = 9 % r w�11J V = 60 MPH 169 a PROFILE (HORIZONTAL) * TTST =5 % DUAL =4 % V)*w 10 5 0 10 20 FUNC CLASS= EXPRESSWAY STATEWIDE TIER PRnFII F NFRTIr.AI I ONLY. PROJECT LENGTH LENGTH ROADWAY TIP PROJECT R -2514C = 5.469 MILES LENGTH STRUCTURE OF TIP PROJECT R -2514C = 0.023 MILES TOTAL LENGTH OF TIP PROJECT R -2514C = 5.492 MILES Prepored in the Grace or. DIVISION OF HIGHWAYS 1000 Birch Ridge Dr., Raleigh NC, 27610 2012 STANDARD SPECLFICA21ONS RIGHT OF WAY DATE. I JAMES A. SPEER, PE JUNE 21, 2013 PROJECT ENGINEER LETTING DATE. DANIEL W. GARDNER, JR.. PE JUNE 16, 2015 PROJECT DESIGN ENGINEER HYDRAULICS ENGINEER ROADWAY DESIGN ENGINEER P.E. PRELIMINARY PLANS W NOT USE FOR CONnRUCrION °p N011 e r °p tse11 W a I N 0 AAI w f //15�/�a����►;.� /,Air" -: m m. WAS. b s� '1 ME.'D- 20 H. B- 3.0 R. b- 715 ft l ALLOWABLE IMPACTS ZONE 2 DETAIL LATERAL DITCH MED H IHNb W4 INNb fd-0 � f6wtla pdm D 1 Sup. min. 0-2.0 R. b -5.0 ft. k STA. 181 +80 TO STA. 186 +00 MED MITIGABLE IMPACTS ZONE 1 SITE 1 aw ZONE 2 ;•;.iATw��w;r�t� ALLOWABLE +42.00 -L- g 4 4 , , , i BROKET Lot -� /� - :,.�. � '•.�.�.� ZONE 1 ir g3 ALLOWABLE D* ), &li w ReP a<e+ Etiling D I 0.009iM aldaf,'Y', n -0.095 X•© D2 FS QI 9.8 CFS • EOi4l4F1fw ET JAQ$$ 1EP@ti' MIT _= = 716 F FPS T Gia- -1. -1.2' 8. LT, I 8 r4 - SEPTIC 5 �' 1 - rAKO '- + -lr �135.00�� 1 1 140.00' ¢T.) DITCH aLC - t PUE- PUE .- ME �ff/m � Ilv"': � AV11,21, VaL r �ro 124.00' d USTI . (�) •• •, ELEANN SOK � 9'7 d t DETAIL P CHANNEL CHANGE I Notb SmM) Ira Naluml 1m0T d p . �f1� cImp. Ground �„ GeotmdNe B Min, D= 2.5 H7 Bdot. Ch—1 M. d= 2, H 5 , Min. B= S.0 Ft. Type efUnor- Cibse a Rlp Rep Min, b= 10,0 F,. 4- STA 179 +92 TO STA.181 +0e RT o } I &LE L. WYAMT. ET UK Wm Y.BRYlBiT oa PUE 1 ll p. 8 TAO N T Ef� yi I �D Pbf PUE- RAY SHEET NO. BUFFER IMPACTS P IT ROADWAY DESIGN NYDRAUDCS ENGINEER ENGINEER NAD 83/ SRS 200, PltI31.lA4YN liY P1,AN8 m xoT Des ODHe1RDCISe21 loo• 0• loo• LI GRAPHIC SCALE BUFFER DRAWING SHEET 2 OF 4 ALLOWABLE IMPACTS ZONE 1 REVISED 2/3/15 \ \ \ \ \\ ALLOWABLE IMPACTS ZONE 2 DETAIL LATERAL DITCH MED H IHNb W4 INNb fd-0 � f6wtla pdm D 1 Sup. min. 0-2.0 R. b -5.0 ft. k STA. 181 +80 TO STA. 186 +00 MED MITIGABLE IMPACTS ZONE 1 STA 164 tS0 b STA173 +17 RT DDE =964 CY - -... aw ;•;.iATw��w;r�t� +42.00 -L- g 4 4 , , , n 1;.�, -� /� - :,.�. � '•.�.�.� �` 'lam ir • 121 D* ), &li w ReP a<e+ Etiling D I 0.009iM aldaf,'Y', n -0.095 X•© D2 FS QI 9.8 CFS 7110 -9.9 N0�7.q, d10 -1.9' 7.1rie ,d2 1 ll p. 8 TAO N T Ef� yi I �D Pbf PUE- RAY SHEET NO. BUFFER IMPACTS P IT ROADWAY DESIGN NYDRAUDCS ENGINEER ENGINEER NAD 83/ SRS 200, PltI31.lA4YN liY P1,AN8 m xoT Des ODHe1RDCISe21 loo• 0• loo• LI GRAPHIC SCALE BUFFER DRAWING SHEET 2 OF 4 ALLOWABLE IMPACTS ZONE 1 REVISED 2/3/15 \ \ \ \ \\ ALLOWABLE IMPACTS ZONE 2 DETAIL LATERAL DITCH MED H IHNb W4 INNb fd-0 � f6wtla pdm D 1 Sup. min. 0-2.0 R. b -5.0 ft. k STA. 181 +80 TO STA. 186 +00 MED MITIGABLE IMPACTS ZONE 1 STA 164 tS0 b STA173 +17 RT DDE =964 CY - -... aw MITIGABLE IMPACTS ZONE 2 �D�aIL RDImH +42.00 -L- g 4 4 , , , r- REMOVE �T BRIDGE +35.00 -L- +150.00 -1- LA7T8JJ. 3' BASE DITCH 7 5. 1 ,' T..) SEE OETML E E /� DITCH � -PUE �f1E .=L GPUE H PUP DETAIL O SPECIAL CUT DITCH (tbfa 5.14 fmut nti D oe,n min.D- VAl -L- STA. 174 +50 TCl 511 115 +50 AM T DITCH O BZ BXI- -ez J.MAM.ET FOWX MRS '4.3 HISTORIC PROPERTY ELIGIBLE FOR NRHP ZONE 1 MITIGABLE ZONE 2 MITIGABLE Isla I STANDARD 2• BASE A WO ASS B RV RAP SEE DETAIL Q BST. 4 C.Y. DOE EST. 10 TONS RIP RAP BT. 15 S.Y. F.G. — SITE I ns Rap xa 6�11n0 0 1 41,'Y',n.o.D35 �1.7Tp�dlo�ta' 1 1 DETAIL E LITERAL BASE DITCH IHra amW 11f,. b= 615 R DETAIL Q STANDARD BASE OH'CH IN.. 3-01 1 Ny,,,el D G.dmaPe B MIn,O= lA R, M- d- 1.0 Ft. B- 2.0 Pf. i oil;,sr- clew Ri DETAIL LATERAL DITCH MED H IHNb W4 INNb fd-0 � f6wtla pdm D 1 Sup. min. 0-2.0 R. b -5.0 ft. k STA. 181 +80 TO STA. 186 +00 MED -Ir STA. 181 +00 to STA 785 +SO IT STA 164 tS0 b STA173 +17 RT DDE =964 CY - -... 340 L' It .= e2 • 121 D* ), &li w ReP a<e+ Etiling D I 0.009iM aldaf,'Y', n -0.095 D2 FS QI 9.8 CFS 7110 -9.9 N0�7.q, d10 -1.9' 7.1rie ,d2 _= = 716 F FPS T Gia- -1. -1.2' STA- 1 +60 TO 172 +54 ITT r4 - 1 DETAIL O SPECIAL CUT DITCH (tbfa 5.14 fmut nti D oe,n min.D- VAl -L- STA. 174 +50 TCl 511 115 +50 AM T DITCH O BZ BXI- -ez J.MAM.ET FOWX MRS '4.3 HISTORIC PROPERTY ELIGIBLE FOR NRHP ZONE 1 MITIGABLE ZONE 2 MITIGABLE Isla I STANDARD 2• BASE A WO ASS B RV RAP SEE DETAIL Q BST. 4 C.Y. DOE EST. 10 TONS RIP RAP BT. 15 S.Y. F.G. — SITE I ns Rap xa 6�11n0 0 1 41,'Y',n.o.D35 �1.7Tp�dlo�ta' 1 1 DETAIL E LITERAL BASE DITCH IHra amW 11f,. b= 615 R DETAIL Q STANDARD BASE OH'CH IN.. 3-01 1 Ny,,,el D G.dmaPe B MIn,O= lA R, M- d- 1.0 Ft. B- 2.0 Pf. i oil;,sr- clew Ri DETAIL LATERAL DITCH MED H IHNb W4 INNb fd-0 � f6wtla pdm D 1 Sup. min. 0-2.0 R. b -5.0 ft. k STA. 181 +80 TO STA. 186 +00 MED -Ir STA. 181 +00 to STA 785 +SO IT STA 164 tS0 b STA173 +17 RT DDE =964 CY - -... r / t / 1 i 1 1 1 1f 1 11 e 10 LO fat NNN w W4 rE b I,►L i J[ J J h rr r I I EYEM C(LLso LLLC 111401JAN _ a If t O000'i .Ra31ld RAY mil. ET UR X'�7xxxx�� Q r4 j I'M e r CE I 1 .. -. uTEtlAL a� euE Drrdt i I � 711 I I RED w'DIrc1I EEE DETAA e l i !ag TUtI R • Qt i I {„ t.��"'""" STSTEY A',, C, 1 1 I I SE,E, D Ns. �� '� �s 1 I �• I �.1 t f Oro t �i 1 srD I i t i t r 1500 +seu o i t F Syr. ] i i7J J 1 MAK AAW t ! � Ii it _ t -BL- 13 PINC 179 ZONE 2 MITIGABLE �A >E K00 FOS" ZONE 1 MITIGMLE 6" '( L W KY iowx. JL fe s TE HISTORIC PROPERTY ELIGIBLE FOR NRHP SPELUL LAN'DITCH iI ImFd eq + AKP- 1.5 R. -I-c-5 AA ,1885a50 Q 5""199 -01 L -L- ETA. 190 +10 TO STA. 195+19 1) �Ml Nfi4ft"° l.rvllv t>o�.ok..� 114 aBad b.bH ridl 6M+o'J4 l,l xf WMt Ab.dR7A fA 1 4 AWA ► -15 P. D L . SEAN BASE DRCk (3kAb $deI owaE. E rem.0- VAR. W—d- VAS. Alin 1- 3.0 VT. S►ECUL LATERAL 'Y' D11T7S SEE MAX S m BUFFER IMPACIIIS PERMIT W -25+ SHEET N _.. _.�A $._ ... __........_ _.. EO)MHr DETIGN . . - - .... EHGE1E6l S02007 AgGLKS eas[.tr�t� DO h'OT' WG Ipo. 0, 100' WOW SCALE E MITIGABLE IMPACTS ZONE 1 Buffer Drawing Sheet L-oUi ;L'l AWAT. ri MITIGABLE IMPACTS ZONE Z GC�dI1£!� I % BETTY LOU E.LgB LEE W.TIELSM r r SKCW IATT -1 V DR04 SHE MAIL 1 _ .. . -81-- 14 PINC I88+75.57 u. pUE PUE t Ue up-4 hW ! BuRY D.r Kr vs7rE•aiet58 xtasr I ITT LIMAIRMY 170 TO .&W&. 9+�tAr N.ss. Ase A.l 'RA -l- STA 151 +80 TO STA. 1SE +00 *m STANOARD T BATE WCWK t SY# DETAL T 9LOp¢=0.067l07 is !w'l DDf CL IRIP BM WALK EST. 19 TOM BT 59 SY GEOTom ROAR6t E,Ia� 114 D�r�L E MIlAI 10.1E DRCH 1 4 )Nn.bu IA R ,a 6. d:o a Zi .LSA- 1E1i00 i. STA18Sk30 LT ODE -7ta C1' MIT[ D AIL $PE,rN DQCH twa- �•�w4DIT04 :PECIAk.(Naf to Df(CH D Slop° W D H M& ,-D- o» to R. �8 I Mtn. 3 t H. e. t P.. a- a Tr. Aan. Dr LO 11. �_nt 101i6o lim T a-Lrh- ' ..1,. STA 195 +21 TQ STA- 199 +35 Rq CA -L- 3TA. 194 E PA TV dlA i"T" l�'1 1*1 RAP Dm LT riles' wr: �t (I1. 412-4 11"01-,10 E 4 RAP da Sy TC I ABLE MITI ABLE ZONE 2 MITIGABLE DA- (.700 -_- SLOPE- 0.00 '� ,I R�o.= U �• _. QQ 0 79 Fl cm Y16" Tm D1a- D.9 ET xTA 19E +45 To xaa +DO RT -4 - _ I - '. -1 D .,rr, z V- KA, Rev. May 2006 N Z 0 N W 100' 0' 100' GRAPHIC SCALE GLI O N m 2SFO A8AN0 Sr T9 BST - - -_ - -___— 15' Ke T� 19 I II II I; m m A OV 8 I gi S N Q m O� N W RCP DET3 DETOUR S HEET 8� SR s NOTE: USE FOR CONSTRUCTION OF DETOUR ONLY -------- i WET `� N ND SURFACE WATER 7Mf�AC PERMIT ` .k NOTE: ONLY ADDITIONAL I P S DUE TO TEMPORARY DETOUR ARE SHO 0 SEE PROPOSED FINAL PROJ :C RMIT DRAWINGS FOR THER IMPACTS. 15' CMP . T� T NO REC cdrP FD I �� I It 1 , I rri I i I I 1 ( I I I m 1 ( )+00.00 I I I I I I mm I I <N II I 2 L 1 rp II t .I l I 1 1 1 I II I t t� m t TI I. I t I \ I I I• w/L : 0 �\ 10 O I W Qm WILT � WILT \ \\ DECK O I ❑S )y jT1 L ~ 1 1 DECK isvD iSFD s 1 � rsFD I Ip IsFD I A< A ISBLKO ` 1 (D �I10 9 cn- a d ana yna 11� ova i.LTI SFD ` ABANB I v ' i \ I NIT \ \ , \ '♦WILT ElOSTHG . . • I I I ; 24' RC 2A' RCP � ®18`A8P 1 IB' RCP ........... O US !! YNN Sr ZB BST 6A0 �... ... ,.......,c s 317 - V I GRPARKING , 1 1 _.-1. eus Ta F � � I I IS \ v ®DENOTES HAND \\ CLEARING R -2514C 26A RAV SHEET NO. _ ROADWAY DESIGN HYDRAUUCS ENGINEER ENGINEER A = 8'06' OOB (RT) D = 8°48 53D' ' .. .. .. .. .. 1. .. .. .. L = 13322' L = 307.44' CL T = 6685' T = 15426' � v ElBSixG RA Ac LIS = 45 n7ph _ � ' 'k E e= D4 a =.03 A� RO = 92' (R , D I I CLEARING I I � N � A ^� BEGIN CN RUCTION -DET3- O SRtU 16+00D0= i -L6US- Sto. 19+00.00 ODO RT. A< � a, ~ - &tTE 1 D - BEGIN DETOUR \\ -DET3- PXr Sta. I7 +2693 � _\ m O m IA 1 � �WW � O 1 \ N b � � I I IS \ v ®DENOTES HAND \\ CLEARING PROJECT REFERENCE NO. SHEET NO. R -2514C 26A RAV SHEET NO. _ ROADWAY DESIGN HYDRAUUCS ENGINEER ENGINEER A = 8'06' OOB (RT) D = 8°48 53D' D = 3' 49' Il.0' D = 201 41.4' L = 13322' L = 307.44' CL T = 6685' T = 15426' A< R = 650.W E Ac LIS = 45 n7ph DS = 45 niph DS = 45 no E e= D4 a =.03 A� RO = 92' (R D A< � Ac 1 � �WW � O 1 A[ PROJECT REFERENCE NO. SHEET NO. R -2514C 26A RAV SHEET NO. _ ROADWAY DESIGN HYDRAUUCS ENGINEER ENGINEER DO NOT u B PO CONBTRVCI'ION I ADDED 2/3/15 DETOUR PERMIT DRAWING T SHEET 1 OF 6 L eOP RAPS 6A0 B>e— — � — �f ST 2 TONS .k Fo ST 7 SY GEOTMLE ff EMOVE WHEN qJ, ETOUR REMOVEDY HA 14D CLEARING Q SITENID k C - -= O O cn CN H- ByF I I2 iT � I yf W q eG ` -DET3- B PI Sto 16+6685 PI Sto 18 +87.46 PI Sto 23 +24.44 A = 1i44' 35x4 (RT) A = 1f 44' 35.4° (LT) A = 8'06' OOB (RT) D = 8°48 53D' D = 3' 49' Il.0' D = 201 41.4' L = 13322' L = 307.44' L = 399.39' T = 6685' T = 15426' A< R = 650.W R 14WDV Ac LIS = 45 n7ph DS = 45 niph DS = 45 no e= D4 a =.03 RO = 92' � ` -DET3- B PI Sto 16+6685 PI Sto 18 +87.46 PI Sto 23 +24.44 A = 1i44' 35x4 (RT) A = 1f 44' 35.4° (LT) A = 8'06' OOB (RT) D = 8°48 53D' D = 3' 49' Il.0' D = 201 41.4' L = 13322' L = 307.44' L = 399.39' T = 6685' T = 15426' T = 200.03' R = 650.W R 14WDV R = 2+82500' LIS = 45 n7ph DS = 45 niph DS = 45 no e= D4 a =.03 RO = 92' RO = 69' SEE SHEET 44 FOR —DET3— PROFILE N N a N DET,5 DETOUR SHEET SRS NOTE: USE FOR CONSTRUCTION OF DETOUR ONLY �O lNEi ' i6,1 41E,,WATER AC PEI IT NOTE: ONLY ADDITIONAL P UE 'T® TEMPORARY DETOUR ARE H® .._, -Pk T - - kXW NGS, THE *RACT SEE PROPOSED FINAL ° i J i e 1 \ / ISF0 ASAND - __ —=-_ -- - - - - -- — Sr 29BST F 3Eld A s U N ''alll 1p /II m -DET3- POT Ste.10+00A0 a 1 IF,;j• j ' ' l!I� j m>` .` 1. y LJ -A DECK .t ;P �i/ I Z ISFD` \ - I I� I xY ISBLRD . \ ISFD �w�/LT u 0 ` I` � �l � - -q' - - -J= ` 5 E� R �.1 .. .. \— — 70�s31 - �t \)j i . r r �'.. ...4, "IN BEGIN CON RUCTION / C -DET3- 1 Sto. 16+OOM- // y -LBUS- Sto.19+OOA0 0.00 RT. / / a us rr uNw ST 2& asr I I - SITE 1 BEGIN DETOUR � `' � -DET3- POC Sto.17+2693 \ - o sm \ \M PI Sto 16+66.85 PI Sto 18 +87.48 0 = If 44' 35.4° (RT) A = Ir 44' 35.4° fLTt D = 8'48' 53A' D = 3'49' 11.0' L = 13322' L = 307.44' m\ R = 650.00' R = L500W DS = 45 mph DS = 45 mph DENOTES HAND\ e = .04 CLEARING RO = 92' F J .k M M SITE" i D Q. � o PI Sto 23 +24.44 A = 8' 06' 00Z (RT) D = 2'Or 41.4' L = 399.39' T = 200D3' R = 2,825.00' DS = 45 mph e = A3 RO = 69' M O 1 sr Or NO. RNY SHEET NO. DWAY DESIGN HYDRAULIC ENGINEER I ENGINEER DO NOT USE I m Ru`n N ADDE 2/3/15 DETOUR PERMIT DRAWING c SHEET 2 OF 6 .. Inn � V / CN �.� W / V) < „r Lad Lad -\' CN B N t Lad /.` r� I W „ r� D SEE SHEET 44 FOR -DET3- PROFILE - Psi , -r O NRr S P EST 7 SY GE O TE(TILdE (REMOVE AND1 HC OUR RFMOVED)'r EA ING { \ i > ,y -- - " -' -- — H, k CI I I - SITE 1 BEGIN DETOUR � `' � -DET3- POC Sto.17+2693 \ - o sm \ \M PI Sto 16+66.85 PI Sto 18 +87.48 0 = If 44' 35.4° (RT) A = Ir 44' 35.4° fLTt D = 8'48' 53A' D = 3'49' 11.0' L = 13322' L = 307.44' m\ R = 650.00' R = L500W DS = 45 mph DS = 45 mph DENOTES HAND\ e = .04 CLEARING RO = 92' F J .k M M SITE" i D Q. � o PI Sto 23 +24.44 A = 8' 06' 00Z (RT) D = 2'Or 41.4' L = 399.39' T = 200D3' R = 2,825.00' DS = 45 mph e = A3 RO = 69' M O 1 sr Or NO. RNY SHEET NO. DWAY DESIGN HYDRAULIC ENGINEER I ENGINEER DO NOT USE I m Ru`n N ADDE 2/3/15 DETOUR PERMIT DRAWING c SHEET 2 OF 6 .. Inn � V / CN �.� W / V) < „r Lad Lad -\' CN B N t Lad /.` r� I W „ r� D SEE SHEET 44 FOR -DET3- PROFILE X , 0 5 10 i PROJ. REFERENCE NO. I- SHEET NO. R-2514C -1 X- TOUR SHEET PERMIT 3 OF DRAWING 6 37 es 0.017 0.017 in [3f 2 1 + 01 i0-00 gn 0.005 0.005 4n 2 14 0.00 3E 31 gn 0.040 0.04 0.040 0.040 CIE L,jfNG 4n 71 7 in l9r4lb.00 110 110 110 1: 0 110 1JO 9D 80 70 50 40 30 2 N PROJECT REFERENCE NO. SHEEF NO. J/ //1���� SHEET R -2514C D E T 3 T O \ /U/ R NAb 8ENGINE SHEET NO ENGINEER [�� V/ /'3600• ROADWAY DESIGN HYDRAULICS � Jf SRS 90° NOTE: USE FOR CONSTRUCTION OF DETOUR ONLY ' �� `� 16 """"""""`°"_....`�..�""`_`"'.. '• � " °` °° _ lt: � i PRELIMIN RY PLAN5 \Put WETLAND AND SURFACE WATER IMPACTS PERMIT If \ � ... �,. Ad- �__- .- .,_..._...- ..- ..- ..,,_....... ._..._.. -.>- .._..«..e.......a._...,._ -_/M1_ � � '_ BO NOT US6 PO CONSTRVCTION +23, ADDED 2/3/15 IR pUIF "Vol. t EIP Ij1P EW 145, �- I " SCAEE \ DETOUR PERMIT DRAWING SMTp \\ LE tam lg�" \\ SHEET 4 OF 6 M /*_AI ® f Ir �1' ®4 um O �' / / "- / ` —O 91p \ EIP ur / / INORACE VERA LE • " O PIIE Ir - � \ /F PUE ae O �.\ � / ' . +25.00 � 7 ♦ NJ D\ I O (1 PU \ II "�.•...,, /— D\ ��we— PUE PUE ^��sTEM /I• O 1 i °j w/L 1 \ / uE ICI / T c caN / c I 7-7 N NTTR ;'L T EMETER CIN7 0 O / \ g ISFO MTL I / E \ I I CAN ( - L'> PUI I \ \ C E10 t \ I SEPTIC SYSTEM' P ` ( b' / 5 ..I .: \ � � 29'CONC 1�1 I �ne�� / \ I ISFD S c Inl �/ MP. FILL IN WET S ( I D •-'� SYSTE I J a I I I +0. a EI E(d �- IRI N /LT I 145.1 .. .. .. .. .. .. .. 4S R _ MTL I I + ISBLA �_ �- � 4)24' CU A�, IB ® Rip O 48. P A M RIP RAP ON �q•RCP RCP ` N I WHEN DETOUR REMOVED) _L - 18'RCP �j —g•RCP �� � MAIN ST 29 BST - - - -- _�_-_rr— GRADE to DRAIN ___— __._______�_ ®' 690 -•--�� I 2' PS -°- I NABLE OTO SOI.LECT,- rr RD �� \ GRADE to ID N 1 22' ��� =ODE TO PS -__ _ _ _ - - _ - ro I ® 1°= • • '� CL 41 RIP RAP dB0 E9I 5 TONS .EST 14 SYfEOTEXn E A, I I,•. A ..� (REMOVE WHEN DETOUR OVED) IE � R A co SITE 162 ® d IF I4 IEO SIAIES DEPA"W"I 0F' AObcLt ruRE � Jr Z >F m HAND CLEARING Jf ® DENOTES HAND CLEARING DENOTES TEMPORARY FILL IN WETLAND -DET3- PI Sid 23 +24.44 PI Sla 28 +7774 A = 8'06' OOB (Rr) A = lr 29 492 (Rr) D = 2Or41.4• D = 229 28Z L = 39939' L = 702.37' T = 2WDY T - 35394' R = 2.825A0' R = 2JOODO' DS = 45 mph DS = 45 mph e= A3 e= A3 RO - 69' RO - 69' 1001 0• loo' GLI GRAPHIC SCALE RECEIVRD SEE SHEET 44 FOR -DEF3- PROFILE PROJECT REFERENCE NO. SHEET NO R -25/4C 26B n - RA'/ SHEET NO. x, SHEET NAD 8� S DETOUR / � ROADWAY DESIGN HYDRAULICS D D / ENGINEER ENGINEER RS� NOTE: USE FOR CONSTRUCTION OF DETOUR ONLY PRW N" USE RroY�PANS pUF )'r - -W E -TLAND AND SURFACE WATER IMPACTS PERMIT +23. - ADDED 2/3/15 ��� l \ �.. Ew k- 145. 1T. _Alp ) ' DETOUR PERMIT DRAWING "SALEE ,i„ HEIRS J LEA(�pM SHEET 5 OF b P E ` — % I I r 4 NtL. E � 1 "� 7 / — , \ --- " �/ /y r- Dom, ►1Eps,� 8 tf It 'f.� / \- // ' ',�� �'', ��\ \I I { ET�`U1f C�,u r /� 1 ` I �) ,'� w / I /j s N -' ` ,a •=� �� f9 �� pU ae- _ PUE - PUE I�,��...` Ii r _ n j• / '' \ � -_. � � ` � ' I t j - � • � � l � � IsFp \ I ✓ fHTa ) a / ) p / + `weir �p� / 1 a I 1 �•• •- s � \ \� •I � ISFD � ✓ ) I METER � }� L 1 / - ,-_ � � Put': �• ~ \� \ {r W C � °V •SYSTEM SAN \ 1 ` / i ` P J c 1 0 J ��If / '` \ t' e•) ! / 4'CONC'A 1'to-5 \ SE �- `__` !� !, \ I( ISFp )�r+�I CIA P. FILL IN WE7T + 1 - I / n I M I �I ,/ t;r ✓ 1 — V� I !: � � — 1! ; / Y� l .r srsTE \ I� �S. y.- i\�_./ i I �Iffl�l wlLr /1" N I I (; ' .- Y� 40 A SQCIATED O \EI 1 p - •- -�� E� — X11 Il Ij J- IE- V� .. / 5 ./ /' �n /1 - — 1 / < / ,,� I � .. . � T�eArP ^ • � .��_.... - -_ � -_ � -- — �__� -� hI,F�_ _ =l rrcRL Z / 2 04 J �� _' -- — ,.. —` *"-`- —_ _ -- _ _ _ -- .- --�.._. •._.� '�'-%� �_'-UN LAC D AS PE �r r' -T^ �,J ��,r'� 680 .mm.• _ _ _ _ - �. _ xi. _ �_ }_:, zte = ==� -- - •w --mom A>a'E -i�COELFCi'�ppE RECDIiJ? ���?�1•= ,(rt "°'.F . - .-.:.• J"�� - . --_°.� _ a- _- — _ '°�- ,e�,ec_, - c�$_.1= _ -mom -._� 70-FENCE OC ® J�� % ` .N �� —._ .� _ _ - i �- �• ' rN- p& _- __ O N �•*- t�i��'= = ,s`_ -.6 a. �L =��. -� ' = = ' �• y _— _•t P -_ ® gU- M =' Rirl✓nP t r 6[I ESf ¢¢ TONS f r� N r r - fmtTA4 SY EOTEE�TILE/ ) / A y y !� OVE EN/bE7 UR O D) I I t 1F2 D, L_ . SiAiESpT / y: • �� ..� i -, ; t-• ' / J - - -_ 'E V ®� a " 1` V 4IFNTJ9F i k. k. HAND V CLEARING lE ® DENOTES HAND CLEARING DENOTES TEMPORARY FILL IN WETLAND -DET3- P1 Sta 23¢24.44 PI Sto 28+7774 6 = 8`06'009(RT) A = 17'29 49Z(RT) D = 20r 41.4' D = 22928.a L = 39939' L - 702.37' T = 20ODY T = 353.94' R = 2,82500' R = 2,300,W DS = 45 nph DS - 45 nph A69' A69' RO RO 100• 0' 100' (ELI GRAPHIC SCALE ' SEE SHEET 44 FOR -DET3- PROFILE 0 5 10 PROJ. REFERENCE NO. Ir S8EET NO. R-2514C----1F--x-1T9— 110 1� 0 130 11.0 150 5D 50 1 0 110 1: 0 1: 0 1 0 1110 50 Eo 7 W M 40 20 2D 1) 1) 1) 2D -'o 40 E D 6D 70 Eo 9 1110 0.030 WETLkND AND SURFAC -E WATER IMPACTS PERMIT 4a 50* 0.030 4a 3904 79+50.00 [DETOUR PERMIT DRAWING SHEI:T 6 0: 6 in gn ADDI D 2/3/15 4n 0.030 0.030 le3fl 27 21�+ bo.001 4a 1 "501 0.030 0.030 4n ZZ7 X7 28-+50.00 27 0030 0.030 4n Is' 00 --N +V0.00 X;n gn 0.030 0.030 40 2 7 +1 220.0 01 4n 1 WLB CLEARIN LIMITS 4Q 0.030 4030 1 4n — -[L�= — -so' 37 27+00.00 75 -- —Z- AO 0 03 0 0.030 38 80 _f26 +50.00 Ta .030 _.I_ 0.030 W) .0 3 31 26+00.00 Xn i--.z �.z 1 0 1 0 1: 0 110 1 o 1 0 9D 80 3D 40 110 jo 140 140 ljo 110 UAW `i e® See Sheet 1 -B For Conventional Symbols See Sheet 1 -C Thru 1 -F For Survev Control Sheatc SITE 1 v. SITE 2 �— SITE 3 0 �Q M �Q �d � oc cp JO YOU .m �I a CLI 6 T O � � NLO 5 I OC I to wens t CL -0 \� POLLOCKMU / 0 o":"? e® . c 2== - -�` STA. 300 +00.00 —L— BEGIN TIP PROJECT R -2514D a 10 At r E GRAPHIC SCALES DESIGN DA TA 50 25 0 50 100 ADT 2015 = 10,600 Z w� ADT 2035 = 15,700 u >o Nam" I PLANS DHV = 7 % 50 25 0 50 100 D = 65 % a W -- I - -� T= 7 *u, .? F- -a PROFILE (HORIZONTAL) V = 70 MPH c �w TTST =4 % DUAL =3 % 5 -.V � A uitA� t0 5 o t0 20 FUNC CLASS = FREEWAY °ag �� •E � ��� PROFILE (VERTICAL) STATEWIDE TIER WETLAND AND SURFACE WATER IMPACTS PERMIT--- g ^° SITE 1 N Q Q Z SITE 9 SITE 7 TFN Mi �F SITE 14 00 ft),- wS `J F— SITE 15 >o L'--SITE 18 SITE 17 SITE 16 SITE I '; PROJECT LENGTH Prepared In the Office oaf. DIVISION OF HIGHWAYS 1000 Birch Ridge Dr., Raleigh NC, 27610 LENGTH OF ROADWAY, TIP PROJECT R -2514D = 5.894 Miles 1012 STANDARD SPECIFICATIONS LENGTH OF STRUCTURES, TIP PROJECT R -2514D = 0.489 Miles RIGHT OF WAY DATE. JAMES A. SPEER, P.E. TOTAL LENGTH OF TIP PROJECT R -2514D = 6.383 Miles SEPTEMBER 27 2013 PROJECT ENGINEER LETTING DATE. DANIEL W. GARDNER, JR., P.E. JUNE 16, 2015 PROJECT DESIGN ENGDO;ER HYDRAULICS ENGINEER ROADWAY DESIGN ENGINEER P.S. r PRELIMINARY PLANS 00 NOT USB POR CONSTRUCTION Qp ROepy o' o� 0 TRAgaQ�p~' 0 o":"? e® . SITE 2== - -�` PRELIMINARY PLANS 00 NOT USB POR CONSTRUCTION Qp ROepy o' o� 0 TRAgaQ�p~' Us Z 0 oC S �2001 Vt4jt,107 82V SRS DETAIL LATERAL G RAS SED SWALE (Net to Scefj IERS FARM, INC 0 po 6S 'FILL PG TN A ION I PC 256 I~I Min. D= 1.5 Ft. 7 PG as 0- 4 ft. 12 PC 55 I I b= 5k. a PC em I I FROM STA.300+00 LT. TO STA.301+50 LT. -L- 2 PC a . . .. .. .. / L -£,;4 DETAIL IL' - PIPE OUT�OMNEL Length. 16 Ft. el= 1.5 Ft. 8 Tons of Cf.. Est— 76 SY GoJoVjh, PROJECT REFERENCE NO. 1 SHEET NO. R-29514D RAW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER I DO NOT USE P01 WNSTRUCTION Owl V Mlml�zml �1!10144:jw : st AK0 30-yl � UL— — — — — MmDENOTES IMPACTS IN SURFACE WATER I EVE C".7"" SEE SHEET 32 FOR -L- PROFILE may, Ir ENS Ualk u, ,h 4'vawm- - - 931 All MEIN I # (f f4ify Allp" - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 8k0 S CHLINE 29 50. STA. 50 00 SEE SIHEET — Y ' 3A Kill PERMIT DRAWING IMMIX I aJmIg*— I SHEET 6 OF 84 RUA" R, 4 ,SITE/ 2 Wi w LL LU Ln ILI 4n 0 l< cn L I" z dft X C) vow M rVa 12� J NOTE: TOTAL TAKE DENOTES FILL IN S WETLAND DENOTES MECKA IZED CLEARING N MD It - LLU C E StiEET 30 0 SE GXAPHIC SCALE ou.0 34+ RECEIVED '3 -- — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — ----------------------------------------------------------------------------- N Z O DETAIL 'L' DETAIL 'W DETAIL 'X' LATERAL BASE DITCH LATERAL N• DITCH LATERAL N' DITCH ( Not to Swle) (Nol b Sole) (N.I b SoIeJ b DETAIL 'AA' P wl �. -_ FILL I Nalu y —I 3:1 OR F/ATfER +_. Grovnd 17FL SLOPE Gin 1�. FO D Sb fiR I:ff. p D Min. D= 1.5 Ff. B Min. D= VAR D B= 4 H. IA E b= 5 Ff. FROM STA - 375 +07 TO STA383 +00 RT.-I- FROM STA. 364 +00 TO STA370 +50 RT.4- FROM STA11 +00 TO STA14 +50 RT.- LIRV3- Typeo15ner- 60 TO IUp.Pnp DENOTES TEMPORARY f DETAIL 'Q' DETAIL 'BB' FROM STA 372 +30 TO STA 1372 +62 RT. L- ® o�n p f, o f OBch FROM STA17 +39 TO STA17+65 LT. -0RV3- IMPACTS IN SURFACE WATER -�to�° slope PRELIMIN RY PLANS LATERAL GRASS SWALE SPECIAL CUT BASE DITCH B W NOT USE PO CONRTRUCf L "°'b S 'J DETAIL 'EE' Min. D= 1.5 Ft. IHaa smb) B= 2 Ff. b GRASS s-.LE DENOTES IMPACTS IN -0Rrt" ?:r 3� 1;Ff. MI G...d o< FmM (Naa scol.) FROM STA. 17 +00 TO STA18 +00 RT. -DRV3- D slave °° D PAI N� u ml , N,e„el FROM STA 18 +28 TO STA.20 +16 RT. -DRV3- I e I Min. D= 1.5 H. D 9. SURFACE WATER PERMIT DRAWING 4. 2 H. {�:.1 Mln. D= 1.5 N. b= 5 H. B= VAR to 3 D. Min. D= 1.5 H. DETAIL 'U' 8= 3 H., FALSE SUMP SHEET 11 F 84 FROM STA 14 +50 TO STA 16 +50 RT. -0RV3- FROM STA 23 +02 TO STA. 24 +25 LT -0RV3- FROM STA 370+50 TO STA 372 +30 RT.-L.- DENOTES HAND (Notio Swle) --*- -- CLEARING Media,Dilch "`h - 54 — - ,. 2' — ® RICHARD H PARKER, SR ET U# DENOTES MECHANIZED t'S— "' 2d—.I ZD,' ® 0T �3 TRACT T29 CIALINE( DITCH j - g ,R° CLEARING S =Ditch Slope ¢ Proposetc ® TLeRp TRACT 5 LINED I 5 DETAIL 'E' OB Grade L Ditch Grode L p�I SPECIAL CUT BASE DITCH - 5� // 0.0% To 2.0% 20' 01114,016.T1 6.0% 40' • d ®�(� PSRM LINED 30' 0v 60% 50' T SEE DETAIL 'MM' r / ®� E E —� I I t/ / C — __ .F I I - -- --- e1R--- -- --- - S4. / /// 234 PG 3447 UX NAD 83/ SRS 2007 L1,9 ui fe RIP RAP AT EMBAN 1 SEE DETAIL AA S� / V1 0 = 3.1 CFS p� p�q / ' VIO = 1.4 FPS . 00 Q10 = 1 . CPS c0 /a v VIO = .7 fP5 y F / Lu l/ LL NOTE:NO DECK DRAINS 1 1A55'Il' _ uj Lij SEE DETAIL Q' GRASSED SWAN \N P RAP F I __ F F F F F F m REQUIRED FOR THIS to �-- F f - CLAS ' T \c b+.��`,,,, STRUCTURE 35 —' — — — — — P *bRK DG o\ v / ;o 15' RCP -JV � o 9 2' BASE ECU L CUT O1 15' RCP-IV Lu 2G 2G1 G 2 2GI 2G1 2G1 Lu V) BEGIN BRIDGE 15' RCP-4V' 15' RCP4V Q 370 +65 -L- G E TO DRAT F5 O 3� 3G1 i S DETAIL'G 00 \.AL ® ` END BRIDGE 375 +40 -L- / eeq- 2 I g 0 2G12G 2GI eJp6 _ x 4S fLFCx `` 2GI \ °n 15' R -IV 3 15' RCP-IV IS- RCP4V _j F_�_ - _� 1 ` _ -Sf 1 Lu F 1 I J ` _ a 1 / BAS /k / LATERAL E DITCH z ( 3' LATERAL - _ / LATERAL BASE DITCH / / / / SEE DETAIL 'L' .j \s �• SEE DETAIL LATERAL N' DITCH GRASS LINED SEE DETAIL k/ 54 kl RICHARD HI, PARKER. SR. ET/ UX . Do W3 PC in THM TRACT RIP RAP 1 I 1 I I / i 1 . 1 n �W� TWT '� RICHARD PARXER.ET UX war E- r r� 32.4 Qa F` rA ,Try RICHARD PARKER. ET UX 00 254 P6 344 CUE BASE DITCH )SEE DETAIL 'BB' SBG - "SHOULDER BERM GUTTER" RE EI!E v ^;� D -Civ) - tD'Crf�j SEE SHEET 35 FOR -L- PROFILE SEE SHEET 52 FOR -DRV3- PROFILE PROJECT REFERENCE NO. S SHEET NO. DETAIL 'AA' P RIP RAP I R -25140 9 9 IA E PAW SHEET NO. 10, min. DMn 1o'mm 10• F F D DENOTES FILL IN R ROADWAY ENGINEER SIGN E ENGINEERS Gmde WETLAND D DETAIL'cG' SPECIAL CUT GRASSED SWAIE GEOTF(nLE ( Nof to Sm a 60 TO IUp.Pnp DENOTES TEMPORARY f DETAIL 'Q' DETAIL 'BB' FROM STA 372 +30 TO STA 1372 +62 RT. L- ® o�n p f, o f OBch FROM STA17 +39 TO STA17+65 LT. -0RV3- IMPACTS IN SURFACE WATER -�to�° slope PRELIMIN RY PLANS LATERAL GRASS SWALE SPECIAL CUT BASE DITCH B W NOT USE PO CONRTRUCf L "°'b S 'J DETAIL 'EE' Min. D= 1.5 Ft. IHaa smb) B= 2 Ff. b GRASS s-.LE DENOTES IMPACTS IN -0Rrt" ?:r 3� 1;Ff. MI G...d o< FmM (Naa scol.) FROM STA. 17 +00 TO STA18 +00 RT. -DRV3- D slave °° D PAI N� u ml , N,e„el FROM STA 18 +28 TO STA.20 +16 RT. -DRV3- I e I Min. D= 1.5 H. D 9. SURFACE WATER PERMIT DRAWING 4. 2 H. {�:.1 Mln. D= 1.5 N. b= 5 H. B= VAR to 3 D. Min. D= 1.5 H. DETAIL 'U' 8= 3 H., FALSE SUMP SHEET 11 F 84 FROM STA 14 +50 TO STA 16 +50 RT. -0RV3- FROM STA 23 +02 TO STA. 24 +25 LT -0RV3- FROM STA 370+50 TO STA 372 +30 RT.-L.- DENOTES HAND (Notio Swle) --*- -- CLEARING Media,Dilch "`h - 54 — - ,. 2' — ® RICHARD H PARKER, SR ET U# DENOTES MECHANIZED t'S— "' 2d—.I ZD,' ® 0T �3 TRACT T29 CIALINE( DITCH j - g ,R° CLEARING S =Ditch Slope ¢ Proposetc ® TLeRp TRACT 5 LINED I 5 DETAIL 'E' OB Grade L Ditch Grode L p�I SPECIAL CUT BASE DITCH - 5� // 0.0% To 2.0% 20' 01114,016.T1 6.0% 40' • d ®�(� PSRM LINED 30' 0v 60% 50' T SEE DETAIL 'MM' r / ®� E E —� I I t/ / C — __ .F I I - -- --- e1R--- -- --- - S4. / /// 234 PG 3447 UX NAD 83/ SRS 2007 L1,9 ui fe RIP RAP AT EMBAN 1 SEE DETAIL AA S� / V1 0 = 3.1 CFS p� p�q / ' VIO = 1.4 FPS . 00 Q10 = 1 . CPS c0 /a v VIO = .7 fP5 y F / Lu l/ LL NOTE:NO DECK DRAINS 1 1A55'Il' _ uj Lij SEE DETAIL Q' GRASSED SWAN \N P RAP F I __ F F F F F F m REQUIRED FOR THIS to �-- F f - CLAS ' T \c b+.��`,,,, STRUCTURE 35 —' — — — — — P *bRK DG o\ v / ;o 15' RCP -JV � o 9 2' BASE ECU L CUT O1 15' RCP-IV Lu 2G 2G1 G 2 2GI 2G1 2G1 Lu V) BEGIN BRIDGE 15' RCP-4V' 15' RCP4V Q 370 +65 -L- G E TO DRAT F5 O 3� 3G1 i S DETAIL'G 00 \.AL ® ` END BRIDGE 375 +40 -L- / eeq- 2 I g 0 2G12G 2GI eJp6 _ x 4S fLFCx `` 2GI \ °n 15' R -IV 3 15' RCP-IV IS- RCP4V _j F_�_ - _� 1 ` _ -Sf 1 Lu F 1 I J ` _ a 1 / BAS /k / LATERAL E DITCH z ( 3' LATERAL - _ / LATERAL BASE DITCH / / / / SEE DETAIL 'L' .j \s �• SEE DETAIL LATERAL N' DITCH GRASS LINED SEE DETAIL k/ 54 kl RICHARD HI, PARKER. SR. ET/ UX . Do W3 PC in THM TRACT RIP RAP 1 I 1 I I / i 1 . 1 n �W� TWT '� RICHARD PARXER.ET UX war E- r r� 32.4 Qa F` rA ,Try RICHARD PARKER. ET UX 00 254 P6 344 CUE BASE DITCH )SEE DETAIL 'BB' SBG - "SHOULDER BERM GUTTER" RE EI!E v ^;� D -Civ) - tD'Crf�j SEE SHEET 35 FOR -L- PROFILE SEE SHEET 52 FOR -DRV3- PROFILE Z 0 H 0 M I Nor to Smlo) �� LATERAL N' DITCH LATERAL N' DITCH RIP RAP AT EMBANKMENT 1 Nab -1) I Nat b Sate) I N.t to Soo.) b o'roin. Natural .t -_ 'ILL ,�_ 3:1 OR FUTIER Ground SLOPE B Min. D= 1.5 H. Min. D= VAR B= 4 H. 5 H. b- 5 H. b= 5 H. GEOTIXIIIE 6= FROM STA 375 +07 TO STA.383 +00 RT. -L- T a °IOn".- 60 TONS,CL IR:p -R. FROM STA. 364 +DO TO STA 370 +50 RT. 4- FROM STA.11 +0D TO STA 14 +50 RT. -DRV3- G.obaib= e� _-- _._INolb Sal.J ... -_ •••••• INnb Sab) •••••• b -0AY.t- 3.7 D slop. D P°Nes dta W i Mn. D= U B ° B= 2 fl. 1, �,1 Min.D= 1.5 k. b= 5 H. B= VAR to 3 H. FROM STA. 14 +5D TO STA 16 +50 RT. -DRV3- FROM STA. 23 +02 TO STA. 24 +25 LT -DRV3 54 1 I LATERAL GRASS L / SEE DET ' S4 LIAgp M. PARKER. SR. 00 65 PG T29 / TIM TRACT 1 100 /: 0 100 200 "'1 090 FROM STA. 372 +30 TO STA. 372 +62 RT. FROM STA 17 +39 TO STA. 17 +65 LT. -DR' DETAIL 'EE' GRASS SWAIE INotb Smb) al Natal Min. D= 1.5 H. B= 3 H. FROM STA370 +50 TO STA372 +30 RT.-L- J RCHARO PARKER.ET UK 09 254 PC 544 DENOTES FILL IN WETLAND ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES IMPACTS IN SURFACE WATER DENOTES HAND CLEARING DENOTES MECHANIZED CLEARING DETAIL 'GG' SPECIAL CLTT GRASSED SWA1E (Not to Scale) roun D 3'`e Fronl t DRch Slope B Min. D= 1.5 F. FROM STA. 17 +00 TO STA. 18 +00 RT. -DRV3- FROM STA. 18 +28 TO STA. 20 +16 RT. -DRV3- DETAIL 'U' FALSE SUMP (Not to Scale) Mecli- DNch SBG - "SHOULDER BERM PROJECT REFERENCE NO. 1 SHEET NO. R -2514D 9 RAW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN ,4RY PLANS I DO NOT USE Po CONSTRUCTION 14 I i is . r CITY SEE SHEET 35 FOR —L— PROFILE SEE SHEET 52 FOR —DRV3— PRO SEE SHEET 52 FOR —DRV4— PRO SEE SHEETS S-1 THRU S—B FOR f,2 E %r-,' E I V.---'D DICivii-avIVID CfPi M ■��E�E�E�E�E�E' MEN EEEEEEEE �E'EE ' EEiiE�E'iiE',E''E!!■E■EEEE�■E■ =■■■■■■■■■■■■■■■ MEN ■■■ MEN ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■�� : ��[� ■ ■; MEN ■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■■■■■■ ■: ■ ■o ■��� ■ ■■■ ■ ■■■■■■■■E■■■ ■■ ■■■■■ ■■■■�o■■■■■■■■■■■■■■■■o■■■■,m■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■: ■■■■■■ ■. ■ ■ ■■ ■ ■ ■■■■■■■■■■■■■■■■■■■■■.■ ■■■■MEMO■■■ ■E ■■ ■■ ■.■■■■ ■■ ■■? :! t■■ ONE ■■ M■ONE ■■■■■■■■■■■■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ME■ ■M■■IME ■ ■ ■ ■sl■MM■E ■E■ ■E ■��E■ ■ ■ ■■ ■ ����■� ■ ■ ■■ ■■ ■�■�■■■M■■■■■■EE ■■■■■■■■■■■■■■■■■■ I�!! �E���■■■■■■■■ L���= �■■.�I■■■■■a ■■■■■■■■■■■■�!� ��■■■ �■ �■ �■ ��■■■ �■■■ �i■. .... ■ ■r■■■■■■� ■. ■.:.■.IM�EME� ■t ■ESE ■ ■ ■ ■ ■ ■ ■ ■' ■ ■■■■■■■■■■■■■ ■■■■■■■■■ ■■■ ■� �■■■■■■■■■■■■■■■■■■■ or. HE Now ■ !!■■■■■■■■■■■■■■■■■■■■■■■ ri�i�ii�l�t '!1 ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■� ■ ■�t1W�!111�!!l ■O■ ■■ ■■■■■■■■■■■■■■■■■■ E�11■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■� ■ ■ ■ ■ ■ ■MEIIII ■I�.T�� ME■ MEN M■■■ ENO ■■■■■■■■■ MMMNIIMM ■■■■MEEEEEEE ■ ■ ■E ■ ■ ■ ■ ■���� ■��� �0 =■EEO SEE EE 0 �■���_■E_������ �ri��1�iT��i�i��i�����_NEEIMI EEMM ■■ ■■ ■E ■■ ■ ■_ ■■■■■■■■■■■■■■ MEN ■■■■■■■■■■■■■ WOMM ■■■ ■■ ■ ■■ ■ ■ ■ ■ ■ ■ ■■M ■■M■ ■ ■ ■ ■ ■ ■ ■ ■■ 1EM NO■ ■■■■■ ■ ■ ■�■"■ ■ ■ ■ ■M ■ ■ ■E■ 0 ■0�!�' ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■EN: �NONE ■■■■■■■■■■■■■■■ rE■■■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■■r ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ 0 ! ■ ■ ■ ■�� ■ ■ ■■ ■ ■ ■ ■ ■ ■■ ■ ■ ■■ l■Ji ■ ■ ■��� ■� ■m ■ ■ ■ ■ ■■. ■N ■ ■O ■ No M �� ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■Cli ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ W mEEEEE: EE��E�E�EEE�EEEEEEEEEE�E�EE�EEEEEE� =_EE ■�■� ■■�■��� ROME ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ ELIoffu ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ ■ ■ ■ ■ ■■ ■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■O om ■ ■ ■ ■ ■ ■ ■■■E ■EMEMEME .. ._..■J ■ ■ ■ ■ ■ ■L•_��. ..■�■ ��I ■ ■ ■ ■ ■ ■ ■ ■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ENI RE■■MM■ MGM ■ ■ ■ ■ ■ ■■ ■0 0 MEMM■ MEMO■■ 0 ■ ■ ■ ■M■■ ■■1■■EEE■EMM■MEMEMEMEIMN - ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ M! E■■■■■ O■ ■ ■ ■ ■o ■ ■ W ■ ■ ■ SEMEN ■ ■ ■ ■ ■ ■■ ■■ ■ ■ ■ ■ ■■ ofummums � mom ■ ■ ■ ■ ■ ■ ■ ■ ■■ ■ENS ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■os E ■ ■■ ■ ■M ■ ■O ■E mommisi ■ Mom NONE mom BE Boom ME■■■■EE ■■■ ■ ■ ■■ .00100000000000 .0 ■EM■ME■E■EME ■ME■ ■ ■ ■ ■mom -1IMEN ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ M ■MEME■ ■ ■■ E■ mom ■i ■ ■U I ■■■M ■■ ■ ■ ■M ■ ■E MENEM MEMOS ■■■■ ��■■■■■■■■■■■■■■■■■ ■ ■E■ ■s� MEMO ■ ■■■MMMMEMMMM■ ■ ■ ■ ■ ■E E■■■■ is MENEME MEN , Run!ERN EREEMEME EN — Z O a Ley i k: r 11' 50 I 100 200 V/ // / / //J 1"1LL IN WC1LANU DENOTES FILL IN WETLAND DENOTES BAND ' >' CLEARING DENOTES MECHANIZED + + + + CLEARING INEER N i i SEE SHEET 35 FOR -L- PROFILE SBG - "SHOULDER BERM GUTTER" SEE SHEETS S-1 THRU S4 FOR STRUCTURE PLANS N Z O I it ))iiiri�/I�� I Ilil I r - �I(IIIIII(11� I IIIII ( II Illllllrl I I 1 11111 I Lt III 1 I 1 1 IIti 11 1M l 54 � IIII \III y N�I)I l � RICHM PARKER ET UX I : 08 344 PG 444 I RK HM PARKER ET UX / 00 a44 Pc 444 / / � � � 1 y . � I 1 / r`' �' �;1 ✓( 0�� �rl : WORK BRIDF G (, 1 � � `—- m i � I •.: ie�Te Ili I!Ir I I � 1 � � ``I� ®—F CE sm I iII I r-> P RAP e / NO FENCE f I / I If / Y//tim NOTE:STANDARLhUgAINS: FROM SY0. 3Y TO ,570.389 +50 RT FROM (9AI R3�J5 TdSTK399 +50 LT. z1 , LflEB7 FL oAtns„ I2� / �l /�j 1� Ix / r / r 100 50 0 100 200 own J � D TB NO. W.V SHEET NO. ROADWAY DESIGN HYDRAULIC ENGINEER ENGINEER NAD 83/ SRS 2007 PRELIMI! .JRY PLANS I DO NOT USB PO CONSTRUCTION 56 PERMIT DRAWING THOMAS B. MDORE. ET AL SHEET 20 OF 84 ^ -0 306 PO 430 a\ Y K. DENOTES TEMPORARY FILL IN WETLAND Ll� DENOTES FILL IN WETLAND REC iirGD DENOTES HAND CLEARING D Mii -} I iD CI-i" DENOTES MECHANIZED e CLEARING SEE SHEET 35 FOR -L- PROFILE - "SHOULDER BERM GUTTER" SEE SHEETS S-1 THRU S-? FOR 01 w ua Lu / W / / ® ® 3 ® 2 I�I 00 o�ps a o- 2GI Lu z V — RICHM PARKER ET UX 08 347 PO 494 I it ))iiiri�/I�� I Ilil I r - �I(IIIIII(11� I IIIII ( II Illllllrl I I 1 11111 I Lt III 1 I 1 1 IIti 11 1M l 54 � IIII \III y N�I)I l � RICHM PARKER ET UX I : 08 344 PG 444 I RK HM PARKER ET UX / 00 a44 Pc 444 / / � � � 1 y . � I 1 / r`' �' �;1 ✓( 0�� �rl : WORK BRIDF G (, 1 � � `—- m i � I •.: ie�Te Ili I!Ir I I � 1 � � ``I� ®—F CE sm I iII I r-> P RAP e / NO FENCE f I / I If / Y//tim NOTE:STANDARLhUgAINS: FROM SY0. 3Y TO ,570.389 +50 RT FROM (9AI R3�J5 TdSTK399 +50 LT. z1 , LflEB7 FL oAtns„ I2� / �l /�j 1� Ix / r / r 100 50 0 100 200 own J � D TB NO. W.V SHEET NO. ROADWAY DESIGN HYDRAULIC ENGINEER ENGINEER NAD 83/ SRS 2007 PRELIMI! .JRY PLANS I DO NOT USB PO CONSTRUCTION 56 PERMIT DRAWING THOMAS B. MDORE. ET AL SHEET 20 OF 84 ^ -0 306 PO 430 a\ Y K. DENOTES TEMPORARY FILL IN WETLAND Ll� DENOTES FILL IN WETLAND REC iirGD DENOTES HAND CLEARING D Mii -} I iD CI-i" DENOTES MECHANIZED e CLEARING SEE SHEET 35 FOR -L- PROFILE - "SHOULDER BERM GUTTER" SEE SHEETS S-1 THRU S-? FOR Z O H K CAI I (91 ( DETAIL 'E' SPECIAL CUT DITCH (Herb Smla) re.r 5bsr 3. b dS°t pe � D P Min. D= 1.5 Ft. FROM STA.404 +50 TO STA.409 +00 LT.4- INelto Smle) b vn d D l,p. Slop 9 Min. D= 1.5 Ft. MaK d= 1.5 k. b= 5 H. I` TEmOSp1AS B.1100ORLET AL De 906 PG 320 DEFAIL'G' SPECIAL CUT GRASSED SWALE (Noll. Sm1.) N o r I A,\ o< Front r un D D'dch Slop. Min. D= 1.5 Ft. FROM STA 400 +95 TO STA. 402 +50 LT.-L- FROM STA.404 +50 TO STA. 408 +50 RT. -I- FROM STA. 399 +70 TO STA.400 +95 LT,-L- DETAIL 'H' SPECIAL LATERAL GRASSED SWALE ( Not to Scale) No I � os Fill Ground D 4`es Slope Min. D= VAR FROM STA 402 +50 TO STA 404 +50 LT. -L- DETAIL 'U' FALSE SUMP ( Not to Scale) Medion Ditch _ 9' �I 2'�. a ChaA Ba1mvJ - - Zd —.I JUh r-S- S =DAch Slope G Proposed DETAIL 'J' LATERAL BASE DITCH `HAD 8y SRS 2007 b rove J.� D 3\ 1:N. rill Sep B Min. D= 1.5 H. \ 8= 2 F. b= 5 H. FROM STA 403 +00 TO STA. 403 +50 RT. -I- 57 DETAIL 'FF' MEDIAN V DITCH (Nerro Sml.) Shwker Shevldar C E. WE. SW, HERS DB I10 PG 221 reim �.� ram 4 A01 WB6PG26 FROM STA 398 +50 TO STA. 401 +50 -L- FROM STA-A01+50 TO STA-404+0D -L- RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER IPRELIMII .JRY PLANS w NOT U56 PO CONSTRUCTION L4 III 57 G E. WLLEe SP, HERS 08 WD PC 221 w 6 PO 26 F-Z�I DENOTES FILL IN WETLAND ® INDENOTES EXCAVATION WETLAND DENOTES MECHANIZED . . CLEARING — "SHOULDER BERM GUTTER" Lu Lij SEE SHEET 36 FOR —L— PROFILE SEE SHEETS S-1 THRU S—$ FOR STRUCTURE PLANS 0 C14 i® W W Lu Lu M 11 C LEROY WAY. JR. 08 297 PG O7 CREIGHTON R. BARBER. ET AL / OB 377 PG 613 J, / NOTE:NO DECK DRAINS REQUIRED FOR THIS STRUCTURE 130 / E''sEUexr --' F (1304 jr. F F F --- / F F — F 58 JSFo VELBA J. BRYAN, ET AL OB 291 PC 186 \ TRACT TWO / F F PROIECF REFERENCE NO. I SHEET NO. R -2514D 1 13 RW SHEET NO. S'3/ SRS 2007 ROADWAY DESIGN HYDRAULICS `AD ENGINEER ENGINEER \ PRELIMIN RY PLANS / CELIA W. HADDOCK, ESTATE Do NOT URE Po CON9TRUGTION / ESTATE FILE 99 -E.9 PERMIT DRAWING SHEET 27 OF 84 MICHELE 11. STATEN a . v 08 397 PG 990 \ I i I / pp / 6a FLORENCE sTRAY1HORN I' OB 29 PG 124 / / CHARLES D. GREEN QIO = 2.1 CF OB 313 PG 372 YIO = 0.3 FP o— F z� F O F / A -- / 1308 f f1 / 5SIMMONS NATHANIEL NEWS C/0 KATHERINE S. WAY 58 DB 63 PG 44 MELBA J.BRYAK ET AL 08 TG TRACT Two AC RO LEROY WAY. JR. 08 297 PG O7 CREIGHTON R. BARBER. ET AL / OB 377 PG 613 J, / NOTE:NO DECK DRAINS REQUIRED FOR THIS STRUCTURE 130 / E''sEUexr --' F (1304 jr. F F F --- / F F — F 58 JSFo VELBA J. BRYAN, ET AL OB 291 PC 186 \ TRACT TWO / F F PROIECF REFERENCE NO. I SHEET NO. R -2514D 1 13 RW SHEET NO. S'3/ SRS 2007 ROADWAY DESIGN HYDRAULICS `AD ENGINEER ENGINEER \ PRELIMIN RY PLANS / CELIA W. HADDOCK, ESTATE Do NOT URE Po CON9TRUGTION / ESTATE FILE 99 -E.9 PERMIT DRAWING SHEET 27 OF 84 MICHELE 11. STATEN a . v 08 397 PG 990 \ I i I / pp / 6a FLORENCE sTRAY1HORN I' OB 29 PG 124 / / CHARLES D. GREEN QIO = 2.1 CF OB 313 PG 372 YIO = 0.3 FP o— F z� F O F / A -- / 1308 f f1 / ` `63 EARL MBI CBS FLAT CAD I .. F o �or F F f F F F F — F F / NOTE:NO DECK DRAINS REQUIRED FOR THIS 64 STRUCTURE JOHN A. M URPHY. ET UX I DB 193 PG 904 PLAT CAB A SLOE 142 -A / I WR.LIAB IIJURPHYAT LTK / D3 192 PC 906 I PLAT CAB A SLOE 142 -A 6 0, � a ERE V.KENYEAR 09 271 PG 761 l` PLAT CAB A SLOE W2•A xwm%,� / a ` SBG - "SHOULDER BERM GUTTER" SITE ej ' / 6 1311 F F / Q10 = 4.7 CFS / Y10 = 0.6 FPS 5@ CHARLES 0. GREEN DB 313 PG 372 DENOTES FILL IN WETLAND 1® L, j Lu UI Lu V) W 4► ® ° DENOTES MEC. (r�ANI,ZED ° a CLEARI trt �• `/ SEE SHEET 37 FOR -L- PROFILE SEE SHEET 53 FOR Y5- PROFILE SEE SHEETS S-1 THRU S-Z FOR S _o N I 1 4� VELUA I BRYAN, ET AL DB 22, PC " TRACT THREE TRACT ONE n LEROY TTAY' JL OB 27T PG SIT 2007 / CELU IT. HADDOCK. ESTATE / ESTATE FILE 99 -E -9 MICHELE Al. STATEN DS 297 PO 990 ERIC L KENYEAR Do 2D PO 761 ` PLAT CAB A SLOE 142 -A �a SBG — "SHOULDER BERM GUTTER" PROJECT RW SHEET NO. DWAY DESIGN HYDRAULIC ENGINEER ENGINEER PRELIMIN,4RY PLANS DO NOT USB FOA CONSTRUCTION Ml DENOTES FILL IN WETLAND DENOTES MECHANIZED CLEARING ,-vt`�,j,L; J 0, iv fo SEE SHEET 37 FOR -L- PROFILE SEE SHEET 53 FOR -Y5- PROFILE SEE SHEETS S-1 THRU S-i FOR 5 N O uj Lu LLJ �ui V C ii PROJECT REFERENCE NO. SHEET NO. R -2514D 14 / K- PAY SHEET NO. ROADWAY DESIGN HYDRAULICS m ENGINEER ENGINEER C R / H / K K- / OO NOT USB Po CONSTRVCTION R� s'y SRS 204 % PERMIT DRAWING Pc OEILA 8.1PC sw AL SKEET 30 F 34 oe �I ssc _ F _ J — F F F F �O DETAIL 'J' LATERAL BASE DITCH INetro Sock) b Grov 3.J D 3\ liH. A S eys I D1 1.5 k. 0- 2 1. =.J Be 1 Ff. b= 5 Ff. FROM STA 445 +00 TO STA 446 +50 RT. -L- CHARLES 0. GREEN OB 30 PO 272 010 = 3.0 CTS w I \ F , / 010 = 3.9 CFS / VIO = 0.9 FPS I \ =— F F VIO = 1,1 FPS \ _ _ F — _F F F / 1I RCP-IV € i F _ F p'e F F F _ /x * I yf10 0.6 FPSS 2' LATERAL BASE DRCH C C _ 010 = 2.1 CFS a GRA55 LINED F F - VIO = 0.3 FPS D DETAIL 'U' FALSE SUMP (Not to Scale) Med'on Ditch 9' .I2 cSon Belm4 —.,. -- 201--� GI S =Ditch Slope G Proposed Ditch ` W2 PG 92 / K. / \\ SITE 6 l� Ull G. N. NOBLE, PER DEED 08 HF PG 20 DENOTES FILL IN WETLAND CHARLES 0. GREEN 09 91! PG 272 DENOTES IMPACTS IN SURFACE WATER K- (POND) * * * ® * ® * * * I� p ��Do \ ilf PG J 010 = 2.0 CFS Vlo = 1.0 FPS / K" �. AWN /� \ _ F _ J — F F F F �O DETAIL 'J' LATERAL BASE DITCH INetro Sock) b Grov 3.J D 3\ liH. A S eys I D1 1.5 k. 0- 2 1. =.J Be 1 Ff. b= 5 Ff. FROM STA 445 +00 TO STA 446 +50 RT. -L- CHARLES 0. GREEN OB 30 PO 272 010 = 3.0 CTS w I \ F , / 010 = 3.9 CFS / VIO = 0.9 FPS I \ =— F F VIO = 1,1 FPS \ _ _ F — _F F F / 1I RCP-IV € i F _ F p'e F F F _ /x * I yf10 0.6 FPSS 2' LATERAL BASE DRCH C C _ 010 = 2.1 CFS a GRA55 LINED F F - VIO = 0.3 FPS D DETAIL 'U' FALSE SUMP (Not to Scale) Med'on Ditch 9' .I2 cSon Belm4 —.,. -- 201--� GI S =Ditch Slope G Proposed Ditch SEE I I I. to s® ui ui ui uj cn 11 50 0 100 200 �6 / K. \\ SITE 6 l� 67 G. N. NOBLE, PER DEED 08 HF PG 20 DENOTES FILL IN WETLAND DENOTES IMPACTS IN SURFACE WATER (POND) * * * ® * ® * * * DENOTES MECHANIZED CLEARING SEE I I I. to s® ui ui ui uj cn 11 50 0 100 200 F- LU Lu V) ui ui W 4!' o is �� 1 ITI Q10 = M = - -] F REFERENCE NO. I SHEET // 010 = 3.6 CFS \ Q10 3.9 21 p /YIO = 0.9FFP5 / F F VIO = 11 FPS FS —F- —( _ / �•- F T F F \1. F F Q70 = 0. _ F \ F \ VIO = 0. P F F F F W \ _ 34— CNARLESp� WEEN \ 00 A3 pG 272 \ / DETAIL 7 LATERAL BASE DITCH w RN/' SH w b rA w / / � \ R R ROADWAY DESIGN ENGINEER a Slope I� ��'� Min.D= 1.5 R. t.°.! B= 2 H. / IE w !! FROM 5TA 445 +00 TO STA. 446 +50 RT. -L- / IE / H - /0 / � �� � E 83/ /�, _ SRS 2 O~ / DO NOT U9 // F PERMIT / K K. __ewf DELLA B. ILL. ET AL •161 PG 361 SHEET M 2 PG 92 w / CHARLES CREEK \ \ 34 — — — — — 0B 313 PG / \ K, \ — — — - -�. e` `34' DO Ili PG 20 Is � PGeOCHORD_ // 010 = 3.6 CFS \ Q10 3.9 21 p /YIO = 0.9FFP5 / F F VIO = 11 FPS FS —F- —( _ / �•- F T F F \1. F F Q70 = 0. _ F \ F \ VIO = 0. P F F F F W \ _ 34— CNARLESp� WEEN \ 00 A3 pG 272 \ / Sv L DETAIL 7 LATERAL BASE DITCH w (Nam S T.) w b rA w � 3.J D 31 1'iN. a Slope I� ��'� Min.D= 1.5 R. t.°.! B= 2 H. b= S Ft. w !! FROM 5TA 445 +00 TO STA. 446 +50 RT. -L- Sv L 3y DETAIL 'U' FALSE SUMP ( Not to Smle) Medic, 9' 2' S =D•dch Slope fL Proposed Ditch Dit< Gre e L Ditch Grade L 0.0% To 2.0% 20' Over 4.0% To ar o 30' Over 6.0% 50' — F/ *'p / Q10 = 1.8 CFS ' LATERAL BASE DfiCH C C 0.6 FPS y GRA55 LINED SEE DETAIL 'J' SIT -/(6 l — D. N. NILE, PER DEED / ( OB I17 PG 20 DENOTES FILL IN WETLAND DENOTES IMPACTS IN SURFACE WATER (POND) • • DENOTES MECHANIZED CLEARING - "SHOULDER BERM GUTTER" SEE SHEET SHE NO. HYDRAULICS ENGINEER N RY PLANS B Po CONSTRUCTION DRAWING 31 ®F 34 tn Lu ui Ln Li ui 0 I 41 I I Ell-' f 100 50 0 100 200 O N K s S DETAIL 'J' LATERAL BASE DITCH Y. (Nab Smkl b s �e B= 2 H. b= 5 Ft. E_ FROM STA 448 +00 TO STA 450 +17 RT. -L- WRIGHT A. HILL HEIRS DB MPG 485 PC •A•SLIDE ITS DETAIL 'L' LATERAL BASE DITCH INolb Scoiej b D 3� lhl. fill Sbpe It B= 4 R. b= 5 R. FROM STA.454 +00 TO STA.456 +60 LT.-CL FROM STA.456 +60 TO STA.457 +80 LT._ FROM STA.450 +17 TO STA.457 +50 RT.-L- �f__ TERRY LLOYO.ET LIX u I / oa 2TB 71/ lW I Pc •A• SLIDIO E ITS uj u�q� VO ®1} 1 00 IP LLJ I J u F I _F --L— 2 1 a- -� RCP-7V PROJECT REFERENCE NO. SHEET NO. 'u' R -25140 15 DETAIL SHEET NO. FALSE SUMP I PN/ (Notto Scola) ROADWAY DESIGN HYDRAULICS Madan Oifdr _ s 2QQ1 ENGINEER ENGINEER 9• 'f121I`- *RlDHT A.HLL HEIRS 8,y S- awn Eelooj —.rte -- as --.I GI OS SLI E IT NA� J' 1 PC 'A• SLIDE' 5 / S =Ditch Slop. Ck Proposed Ditch PRELIMINl RY PLAN DifC Gr.. L Ditch Grade L / DD NDT V5A F'o corsrxucnoN 0.0% To 2.0% 20' Over 4.0% To 6.0% 40' er 30' Over 6.0% 50' E_ 10.'LPAL POMFflLWE EASEMENT PERMIT DRAWING SHEET 33 OF 34 4' LATERAL BASE DITCH T PC •A• SLIDE 175 j CLAUDIA H. HADDOCK. ET AL ( / OB 267 PG STS •A• / PC SLR ITS T PC •A• SLIDE 175 _ OB 278 PG TID -- PC •A• SLIDE ITS 4' LATERAL BASE DITCH GRASS LINED SEES LIN D 69 G8 CLAIIDIA H. HADDOCK. ET AL OB 297 PG STB E 4' L TERAL BASE DITCH GRA55 UNEO SEE DETAIL F F F — — F F F F TERRY LLOYD. ET LIX PC •A• SLIDE 175 �-- OB 278 PG TID -- PC •A• SLIDE ITS APLOCATIATE / J 7U (HISTORIC PROPERTY) MARY B BROBN FOSCLE PLANTATION HOUSE RESTORATION A NORTH CAROLINA NON-PROFIT CORPORATION 08 0 PG 129 DB 97 PO 743 —� PLAT CABINET A SLR % 100 50 1 100 200 Kyly) DENOTES FILL IN WETLAND • * DENOTES MECHANIZED CLEARING ■ BI- SEE SHEET FOR 38 —L- m DETAIL 'J' DETAIL 'L' DETAIL 'U' LITERAL BASE DITCH LITERAL BASE DITCH FALSE SUMP Sml.l (N.Iro srdaJ b b (Not to Scale) _ Med'on Ditch - G.0 3.P D ,jA 1'iFf. Gm. 3.2 D 12' B Min. D= 1.5 H. B Min. D= 1.5 F1. 'I1 B= 2 F. B= 4 F. Cboa Kalov,{- --see— 20' --�I 1 5� 6= 5 H. 6= 5 F. S =Ditch Slope 4 Proposed Ditch FROM STA 448 +00 TO STA. 450 +77 RT. -L- FROM STA. 454 +00 TO STA 456 +60 LT. 1- Ditch Grade L Ditch Grada l FROM STA.456 +60 TO STA 457 +80 LT.-L- 0.0% To 2.0% 20' Over 4.0% To FROM STA. 450 +17 TO STA 457 +50 RT. -L- V) I V uN a a w a _ 100 -c— PONERLINE EASE — BRIGHT A. HILL HERS OB ISIPC 495 PC "A7 SLIDE ITS � � 0 - / TERRY LLOYO.ET UN ^ZED r>e 2w pa,'TIB (— �-A- SLID� ITS 2' LATERAL r--- 7l \ N - I I \ I N } a O N `D U' 4' LATERAL BASE DITCH GRASS LINED � SEE DET L AL's r-30 / �r 7,-"�7—� r- I IS 2pp1 DT A. 405 P� 8y SR PC -A-SLOE ITS / _E _ RAM SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS W NOT USX PO CONKTRUCTION PERMIT DRAWING SHEET 34 OF 84 E 'sue I j CLAUDIA H. HADDOCK. ET AL I / OB 297 PC 578 / PC "A' SLIM ITS - BASE DITCH 4' LATERAL BASE DITCH GRASS LINED SEE DETAIL'L' -- _ F '` F l F F F —/— — F Lu ui X SEE DETAIL'L' r /� / 1 _� -7 CLAIIOA H. HADDOCK. ET AL TERRY OB are Prof. ET U% PPCC'A YE578 �— PC A* SLIDE ITS [- I LOCA MORE / 70 (HISTORIC PROPERTY) MY R. BROW POSCIff PLANTATION HOUSE RESTORATION A NORTH CAROLINA NO!- PROTIT CORPORATION DB as PG 129 08 SIT PC 749 PLAT CABINET A SLIDE 96 100 50 0 100 200 N W Ntll ^g aw .�Ed ONe DENOTES FILL IN WETLAND * * * * DENOTES MECHANIZED * * ** * * * CLEARING I I EI VED OW SEE SHEET FOR 38 -L- PROFILE i C/ \ uj \ uj I V) I V uN a a w a _ 100 -c— PONERLINE EASE — BRIGHT A. HILL HERS OB ISIPC 495 PC "A7 SLIDE ITS � � 0 - / TERRY LLOYO.ET UN ^ZED r>e 2w pa,'TIB (— �-A- SLID� ITS 2' LATERAL r--- 7l \ N - I I \ I N } a O N `D U' 4' LATERAL BASE DITCH GRASS LINED � SEE DET L AL's r-30 / �r 7,-"�7—� r- I IS 2pp1 DT A. 405 P� 8y SR PC -A-SLOE ITS / _E _ RAM SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS W NOT USX PO CONKTRUCTION PERMIT DRAWING SHEET 34 OF 84 E 'sue I j CLAUDIA H. HADDOCK. ET AL I / OB 297 PC 578 / PC "A' SLIM ITS - BASE DITCH 4' LATERAL BASE DITCH GRASS LINED SEE DETAIL'L' -- _ F '` F l F F F —/— — F Lu ui X SEE DETAIL'L' r /� / 1 _� -7 CLAIIOA H. HADDOCK. ET AL TERRY OB are Prof. ET U% PPCC'A YE578 �— PC A* SLIDE ITS [- I LOCA MORE / 70 (HISTORIC PROPERTY) MY R. BROW POSCIff PLANTATION HOUSE RESTORATION A NORTH CAROLINA NO!- PROTIT CORPORATION DB as PG 129 08 SIT PC 749 PLAT CABINET A SLIDE 96 100 50 0 100 200 N W Ntll ^g aw .�Ed ONe DENOTES FILL IN WETLAND * * * * DENOTES MECHANIZED * * ** * * * CLEARING I I EI VED OW SEE SHEET FOR 38 -L- PROFILE Z O 70 (HISTORIC PROPERTY) FOSCUE PLANTATION MOUSE RESTORATION A NORTH CAROLINA NON - PROFIT CORPORATION 08 317 PO 743 PLAT CABINET A SLIDE 96 —0_ _ _ —. — _ \ � / __ - -_ _ —__ _ —_ _ _ _12_ / I I / • I I r 100'CPeL POWER-E EASEaENT DETAIL 'U' FALSE SUMP Not to Scale) r Medan D'kh 9. II 2, then lblexj —, �o•-- -.I'°1 GI S =Ditch Slope (j Proposed Ditch DETAIL 'NN' PIPE ODUET CHANNft (Notro Scoiel Length= 10 H. N,Ni,N.jEo d= 2.0 Ft. Est.= 12 Tons dClass IRip -Rap ��Ic'wlllorjl O P D L FOSCUE F PROPERTY) FAMILY LIA EDPARTRSHP, A NORTH CAROLINA LIMTEO PARTNERSIv DB 274 PO 895 PLAT CAWT A SLIDE 96A DLl_ _ _ _. _ _ _ —c _ _ I� C F7R 9 � F F F _ F _ F –_ F F F ._ _ _ F_ F F F F — F 100 50 I 100 200 70 FOSCLIE(PLANT TIIONPNROU EE RESTORATION A NORTH CAROLINA NON- PROFIT CORPORATION OB 37 PO 743 PLAT CABKT A SLOE % DENOTES FILL IN WETLAND • * ` ` DENOTES MECHANIZED • ®•* ` @ CLEARING DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER F F _ F F F F F F Q10 = 3.5 CFS VIO = 1.1 FPS PROJECT REFERENCE NO. I SHEET NO. R -2514D l6 P,W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS DD NOT VRB PO CON9TRULTION PERMIT DRAWING SHEET 36 OF 84 SEE SHEET 38 FOR -L- PROFILE MR NO' r �r SEE SHEET 38 FOR -L- PROFILE Z O 70 (HISTORIC PROPERTY) FOSCIA PLANTATION HOUSE RESTORATION A NORTH CAROLINA NON- PROFIT CORPORATION OB 9T PO 743 - PLAT CABNET A SLOE 96 DETAIL 'U' FALSE SUMP (Not to Scale) Med'.n D'fch _ I T 9' -sf12' •- than edmrrl - -rl� 20' —.I GI S =Ditch Slop. G Proposed Ditch DETAIL 'NN' PIPE OUIIET CILWNEL (N.. Safe) Wr cNwN .so l.nglh= 18 Ft. ty—W) d= 2.0 Ft. Est.= 12 Tons of Cl.. I Rip -Rap SAS 01" 8°j 7, L FOSCN FAMILYI LII EDPPARTmPERSIaP, A NORTH CAROLINA LIATED PARTNERSHIP 274 PO B9'S PLAT C49INET A SLOE 964 SHEET NO, RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DO NOT USE Ml CONSTRUCTION v �e 100'CPIL PONEHLINE EASEMENT F- Lu - -- _ - - - -- - ------ - - - -a- - - - - -- - Lu OSTATION /- \�j LLB — \ F F F F ,_ F ._. F i F F _ F F F F F ._. _ F F ._ / _ f c� (Al F F L F_ ai .� F F ® 465 4710 v + F ` F F F F F F F _ F F F F F F . / ! �£1 F \ F Q10 - \�$ CFS C 'B' RIP PAP F F N / / YIO = 7.3 1 C E 1 TONS l\ :Ec 1 EST. SY GEOTEgLE W J / /+.� \ LLB z L C NEL z �, � PIPS END AIL' N' �V ,kTg, I TI J (HISTORIC PROPERTY) / / FOSCUE PLANTATION HOUSE RESTORATWN a A NORTH CAROLINA NON-PROFIT CORPORATION / OB 37 PG 743 1 PLAT CAMT A SLOE 96 DENOTES FILL IN WETLAND 1°� * DENOTES MECHANIZED 4 CLEARING GRAPHIC SCALE DENOTES IMPACTS IN SURFACE WATER 100 50 0 100 200 DENOTES TEMPORARY IMPACTS IN SURFACE WATER N Z 0 H OC a N M Iw ENGINEER PRELIMIN R-Y PLANS DO NOT V88 PO CONSTRUCTION I -F J PERMIT DRAWING / SHEET 41 OF 84 L / -a�- - - - - - - - - - -G- - - - - - - - - - - - - -IG- - - - - - - - -- - - -O/ - - - - - - - - �- - - - - -- F - - -- F - - -- F -- F Fs{c sIc F 'k F F F Q10 = 3.5 CFS CL 'EI' RIP RAP g ' \ Q10 V10 = 3.8 CFS CL 'E = 1.3 FPS EST.' V10 = 1.1 FPS EST.1 TONS GEOTEXTILE N N \ EST. : R N \ 1 PIPE, OUT ET CH NEL. SkE D AIL ' N' DENOTES FILL IN WETLAND C • $ +� DENOTES MECHANIZED h 0 o a as CLEARING GRAPHIC SCALE DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY 50 25 ® 50 100 IMPACTS IN SURFACE WATER O C S E I® LLI yW ILO'CPAL POMEHINL EASEMENT m SITIE ,. a L ___ ___ __ . . . . . . . uj F F F ci co 01.— 0! �! F WA I F f F / W � 69.1 /F\ X @ STEPHEN P. CLARY PG 787 DO i89 Y8T flll t I I I 72 STEPHEN P.CLARY 08 289 PG To? 1 1 I I � 1 ,3 1 _ _ F ` F F F �,d F - f , , , , I e I I I 1 I 01, SAS RM1Y SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEE0. I ENGINEER IPRELIMI! ?JRY PLANS I DO NOT U96 PO CONSTRUCTION ' PERMIT DRAWING SHEET 44 OF 84 / (HISTORIC PROPERTY) / "HISTORIC LAMTED PARTNERSHIP, A NORTH CAROLINA LOOTED PARTNERSHIP / 08 2T4 PG 895 PLAY CABNET A SLUE 95A a� I �, 61J 100'CPdL PLWEItLIHE EASEMENT \ � � I I 9 A9 uj LLJ LLJ F F F F F F F F\ F �O =� Wo C4 30, �a C �A G 3GI / In F _ _ _ F �� — I F F_ _ _ _ — _ _ —dl F F F F F F f F F F F DENOTES FILL IN WETLAND • DENOTES MECHANIZED r* * '� CLEARING � o 71 (HISTORIC PROPERTY) FOSCUE FAMILY LOOTED PARTNERSHIP. A NORTH CAROLINA LOOTED PARTNERSHIP OB 274 PG 899 PLAT CAMT A SLIDE 95A a RED, E NED CIC N 1,1d ili COPY SEE SHEET 39 FOR -L- PROFILE PROJECT REFERENCE NO, SHEET NO. R -25/4D 20 PAY SHEEP NO. ROADWAY DESIGN HYDRAULICS \ \ KYERFEA MP Et15ER COMPANY ENGINEER ENGINEER FORMERLY BATE LIAR COMPANY �,OD \\ DOUGLAS C. FURGASON, ET U% � 05 � � S(LS \08 a99 PG 496 \ \ PLAT CAB. B x109 P6 -� a �' av&" BOOR c•r PG 475 e 9 PRELIMIN RY PLANS CONSTRUCTION \ PERMIT DRAWING \\ 75 \ 73 BRENDA s NtxF�s SHEET 50 F 84• ESTATE FgE d -E•� A. FOSTER BORDEAUX. TRUSTEE ROGER A. F6dlkE5 76 ass PG 549 \ \ Fks1 A ° ODOR PO 62 � x� \ Pc an rstoN Pc 6 ip oro� c•T Pc 4TS .. .. r 11 pip, Lu \� 00' PWNW EnSEHT / •R \ 100'[P8L POwEXLW E4EN \ ilYll / /S Lu GAS 'SATE TblTE 1 E — 0-- ---- --- -- -1— F— — - -- — — — --/ UJI \ E - - URIE 20% 0 ® �J [2LF I \ s NO TE: NO DECK DRAINS Q a :— _>! F F _ F� / N \ / ; �a C \i r REQUIRED FOR THIS \ y P� SIRUCIURE I ELECTC sT T 0 p� H 2i 4P' 2�' s r \ \ \ i ! •,=°t' °NC / I I ' \ / I °4� 0V \O \\ e•� SB f I p �yI -N' Sp oil 1 F F F F' o OB a91PG so � O \ \ _p_ O F 74 MELBA L METTS \ \ . F © Lu ID zF F F F f f _ F vs�� \ \\ I F F I 5 I F F O Q / / NOTE: NO DECK DRAINS IS �B •TB �j REQUIRED R THIS \\ / , / .. .. .. .. .. .. .. .. t1B 161 PC 661 KER 77 i // // STRUCTUREFO I°- �� .tote A TWASO / ; 0 A. FOSTER BORDEAU%P TRUSTEE s / / 2!9 PG Bs Pc o PC SLIDE art P / xIDE as4 5s/ /� j L 2 P IDG 6 G. Rt011 IS BPG SS ET 11% g PC IP SLOE 254 PG 53 = CIETAIL'00' STEPHANE S.KEECR �I PIPE OVRET ciikmm Dill 226 PO 645 ® Nol DENOTES IMPACTS IN — I. SmM; _ Pt SLOE 234 Pc 53 SURFACE WATER'S y Len= 12 Ft. (v.&w) ` N C'ESViE 01h DENOTES TEMPORARY d- 1.0 k. 3 " IMPACTS IN SURFACE WATER Et. 4Tons of Cleu lRp Rop E GRAPHIC SCALE FROM STA. 20 +t TO 50.520 +27 -L- n DETAIL 'U' E Z DENOTES FILL IN FALSE SUMP E *o F (Not to S.I.) C. ROBERT BR0^% E T Lot ` f WETLAND Med'en Ditch _ 00 196 po 56 100 50 0 100 200 al 2' Pt SLIDE ax PG ss • DENOTES MECHANIZED ch.13.I.nj --1 201 >I GI SBG — "SHOULDER BERM GUTTER" 'n CLEARING S =Ditch Slope 4 Proposed ORch SFCB — "SINGLE FACED CONCRETE BARRIER" DR< Gm e l Ditch Grode L o.D% Ewe To 2. 20' Over4,0% To 6.0% 40' SEE SHEET 40 FOR A— PROFILE S g� er . o 4.M 1 30' Over 6.0% 50' SEE SHEET 53 FOR —Y6— PROFILE PROJECT REFERENCE NO. SHEET NO R - SHEET NO. RW 20 \\ \ ROADWAY DESIGN HYDRAULICS 6'EYERHAEUSER COMPANY ENGINEER ENGINEER \ - FORMERLY BATE LUMBER COMPANY ryO�1 DOUGLAS C.FURGASON.ET UK 00 IN PC 364 SAS DO 299 PC 496 NO �\ �\ PLAT CAB.B SLIM 76-90 OTYESbN 602 08 C•T PC 47S �pQ $ PRELIMIN RY PLANS \ \ \ DO NOT USE FO CONSTRUCTION PERMIT DRAWING BRENDA S. HUGHES SHEET 51 OF 84 73 \7 ESTATE FILE O -E -98 A. FOSTER BORDEAUX. TRUSTEE ^\ n ROGE DMM S 76 OB 2S9 PC 949 'qw BM C -7 PC 473 PC I- SLIDE 272 PC 6 \ _ �0 \ 1 y \ E� PAE 6 f \ 3 a \ � \\ Abe \�\ \ �f �/ 1 1 T� . TO UJI ^'E'^ \ \ \ \\ IOO'CPGL EASEMENT \� I �34 J WA � N\ \ Lu�° �,�ol/mp \ 1 \ \ ( \� S`6 G I5 TEST \ / / / W 0 \ \ \i \GC 4—� /\ / �6 i \ ,.-.Tr.." M'♦ 1 ` \ A P \ /STATION Tv� S �' /•� / \ \ 3 �' 4 - - -- - c - - -- 1------- - -cam -- c— E Lu_ -- - > -- - -- -- -k -� -- t -- e- - - - - -- E— o®0 E . 5 SY GEOTEXTILE F JRIE Z /6 OO F I ` \ s/ \ 0 � - - -� F �F, F F / H �\ \� \ ' NOTE: N�QUIDRED OR THIS ® srRUrn1RE ® "� 15' R -IV / j ( I j ; / / yC l \1 \ �\\ a� 1 ® ELECTRIC ) — _ - -- ® / a c \ *10 / \i 7 ..F ail N 2%47 2b° °�� \ /� o=°t \ c / 1 / \ / i IF— LO .IV F F CL W RIP RAP F.. Fin 74 Lu EST.1 TONS F \ / �/ / / / \ \ >•� Lu EST. 5 SY GE O F RI 2 ..._ F ` F F F F F F r S �F IPE O 1C NEL • - .. .. .. r / ', .��w\ y 1 I — SFE AIL' O' CHARLES F. pALXER ° [If / /NOTE: NO DECK DRAIN KI Pc 6e 77 SSTTRUUCTEURFFO�T Is 7T3 / © / / / ° JON A rL AS° j A. FOB I ALM. TRUSTEE 40E 212 PC 6 v \ `3R —34— , k� o e C.ROBERT BROWK ET UX — € Do 160 PG 553 9 PC '9- SLR 294 PC 33 DETAIL '00' STEPHANIE S. XEECR PIPE OUTLET CHANNEL OB 226 PG 643 d PC t SLR 294 P6 59 (Nol b Smle) DENOTES IMPACTS IN SURFACE WATER may° n f/n Length= 12 H. N.,bw l DENOTES TEMPORARY Est. =14 Tons ofClaulRpaap GRAPHIC SCALE IMPACTS IN SURFACE WATER 'p w FROM STA 520 +16 TO STA 520 +27 -L- A DETAIL 'U' E *o DENOTES FILL IN (Not 5sroel C. ROBERT SOWN ET uX WETLAND Medea OR�I _ 06186 PD 906 € * 100 50 ® 1 00 2 00 2' ��& a94 39 L2 wN Cl,on Belwa 20'—�I GI DENOTES MECHANIZED s— SBG — "SHOULDER BERM GUTTER" E R e� a CLEARING 5 =Otld slope fL Pmpased DBch SFCB — "SINGLE FACED CONCRETE BARRIER" -rnw Nkomo DRC Gro e L Dilch Grade l e o.oss Ta z.o% zo overa.ox ro b.o% ao SEE SHEET 40 FOR —L— PROFILE $ E9 ly,y er 30' over 5.0w 5D• SEE SHEET 53 FOR —Y6— PROFILE .*** SEE SHEETS S-1 THRU S—? FOR STRUCTURE PLAI PROJECT REFERENCE NO. SHEET NO. o R -&W SHE 20 \ PNS SHEET NO. � ROADWAY DESIGN HYDRAULICS \ _ 6• ENGINEER ENGINEER eX�sr Raw \� \` Ih E /S„ PRELIMIN RY PLANS DO NOT U58 FO CONSTRUCfION L \ C� r PERMIT DRAWING 9�� 100' CP &L POWERLINE EASEMENT SHEET 52 OF 84 \ TB Aloft \T GAS TEST \ \ STATION Tv' v /� - -- — --- G - - - - — — — — -- - - -12" — — — 05"o' I T E I -- -- -- \ — — -- E '8' EST.1 TONS -- - - - - - -- -- —% EST. 5 SY GEOTEXTILE F� H URI� 20% \ / C —�� - - -- F — F F -- F _ �� �X ��n BMW I • °� 15" RCP -IV ELECTRIC 4GI`�-2-G1/0' BST cn Fs I 520 , N 27° 47' 2 °6" _- - GR HTR � N _ r 15" -IV NSF F ^ m j F F F _ CL 'B' RIP RAP ui EST. 1 TONS F _ — — BURIE 20° EST. 5 SY GE XT — — _ _ F - r PIPE OUT ET C NNEL DENOTES IMPACTS IN TB SEED TAIL ' O' SURFACE WATER TB - - DENOTES TEMPORARY / .<ZC 2 E a IMPACTS IN SURFACE WATER Z F DENOTES FILL IN / '� 73 I SCALE Edo WETLAND C -1 A. FOSTER BORDEAUX, T 50 25 ® 50 100 ��� ° ° • • DENOTES MECHANIZED �A • • •• • ° • CLEARING DB 259 PG 349 "" / PC V SLIDE 272 P z O N O) (9 N d! N (O d! Ll, NO. RN! SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER t E PRELIMINARY PLANS DO NOT U$6 Po CONSTRUCTION i - PERMIT DRAWING SHEET 57 OF 84 �y i ------------- - - - - -- -- - - - - -- BURi�D 1' �0 ` ------------------------------ TB // —�, — 1--- c-- - - - - -- — — — — — — c — — TB E� 12 - -- — ------ c-- - - - - -- ----- - 1 11 - - - -- -- "D c2D F — — — F F EST. 5 SY GEOTEAQ �- - - -�� ---- -- - - -- F - - -- F F - - -- F F F F �o---- _ - - - - -- HW - —I .. m End Er'.t ­V DCM-Md`,D C'N N Z K 80 PROGRESS ENERGY FORMERLY CAROLiNA POWER 6 LIGHT COMPANY 1 RKEVS 270 KY SUBSTATKIN OS 67 PG 576 08 166 PG 217 1 G - _ p _ _ _ _ _ - _ - _ _ - - G - _ _ - \ \ __ ______v_-\ W su VO I' in 0 DETAIL 'U' FALSE SUMP I Not to Scale) ,g Median DRch _ 9' — .I2' II.- GI r-5—' S =Ditch slope 4 Proposed Ditch - Ea�-- PROJECT REFERENCE ROADWAY DESIGN HYDRAULICS O� ENGINEER ENGINEER �O SAS �- �P� PRELIMIN RY PLANS DO NdT VSB Po CONSTRUCTION RUTH S. 770.1 M ORTON 269 9ti PLAT CA PERMIT DRAWING CAI LB SL SLOE SHEET 60 OF 84 2' _ - -__ .. .. .. .. — ____— e�___�— .. .. .. .. .. _G___�____ 81 JACKS W. M7RAYA 83 o80 18 240 PG 419 / RUTHE MT. BLAND RD 17 PG 56 Do 197 PG 271 PROGRESS ENERGY FORMERLY CAROLINA POWER A LIGHT COMPANY E RWMfS 270 KY SMTATIa11 OB GS PG 776 1 Eff, j OA I DENOTES FILL IN WETLAND * * * DENOTES MECHANIZED * * •* * * * CLEARING SBG — "SHOULDER BERM GUTTER" Jim 0 ,$1 I I RECEIVE SEE SHEET 41 FOR —L— PROFILE z O N_ o< 0 80 PROGRESS ENERGY FORMERLY CAROLINA POWER A III COMPANY ER7EWS 290 RY SUBSTATION ) OB 65 PG 576 OB 166 PG 210 p--------- .---- _e_ - - -\\ 2 1 e� I 0 IN Ili I 'FIT! 11111 ff DETAIL 'U' FALSE SUMP ( Not to Soule) Median ONch _ II 2' I 9' l chop e.Iwj 20' GI S =Ditch Slone ¢ Protwsed Ditch " WIN RUTH S.MORTON DS 269 PG " PLAT CAB. B SLIDE 9S0•t 81 83 JACKIE W. 11I 80 OB 260 PG 4t9 RUTHE ML BLAND 19 PG 55 OB 69 PG 2W PROGRESS ENERGY FORMERLY CAROLINA POWER A LIGHT COMPANY lR1EM5 290 RY SUBSTATION 1 DO 65 PG 576 I I Avg o" drA DENOTES FILL IN WETLAND * * * * DENOTES MECHANIZED * * ** * * * CLEARING o O�1 S� S� 0� SBG - "SHOULDER BERM GUTTER- IN REFERENCE NO. ENGINEER I ENGINEER IPRELIMINARY PLANS I DO NOT USE PO CONSTRUCTION mm���w� E 12' -- - - - - -- I® w w w w 0 I o SEE SHEET 41 FOR -L- PROFILE m DETAIL 'L' LATERAL BASE DITCH (N.. x .) b Grow 4.1 D I Slope B Min. D= 1.5 H. B= 4 Fl. b= 5 H. FROM STA. 564 +85 TO STA. 569 +06 RT. -I- FALSE SUMP ( Not to Scots) Median Ditch , 9 2'I. Chan Below) zo• GI . S t S =D'dch Slope G Proposed Ditch y� II I V I I \ESTATE OF CLENVE L. BROWN & SEYO" C. BROWN c5T�3°" @ 08 206 PC IM PC RUTH Cp8,e®TON — — —G7Z— — c IL pp E S56•I c®i 1_u LU Im m., LUC8. VIORYAN \ 08 ITS PC 28Y F E / I F6 ♦ ©© � O 84 pp S. MORTON cb 74 PC bE l50.1 ! L 08 LE P BRYAN PC 22 1- W 100 50 0 100 200 d >� I modem S E. U* 9 •Ec(ats PROJECT REFERENCE NO. SHEEF NO. ° R -2514HE 23 RhY SHEET NO. I/ �e II _ ,�36\ ROADWAY DESIGN HYDRAULICS I136 ENGINEER ENGINEER yl LA 1e05E5 ST R de 9! PG 790 ) ,9 \ / ,lei .. — --� _ — _ —•G— �� �G \ PRELIMIN RY PLANS DO NOT U96 PO CONSTRUCCION I'� fLECTRL ;2.G _ _JP PERMI DRAWING to co - SHEET 64 OF 84 L CATHODIC PROiEC�ION � \ / . ,� �`' I •� � � I / \ �36; _1 SAS "ITE 18 (( \ FAMILY OUTREACH NORD OF DELIMERANM MMWSTRIES.RHC. I \\ \ L L. 0 WS II a OB 299 PC T� W / _K 'O SLR 27 \ E E F F E F E E � f —E II — w F —F F F F — — — f ._ uj F F F _ _ F F F _ 9A F F _ F F � F f F _ ui Iui ELVMZ2 � I F 5 + \ 4� 2G1 FS r to GI GI 15- RCP4v F F TF F F F F UJI Jc 0 I N 4' LATERAL BASE DITCH / \\ _z \ / LINED SEE EE DE DETAIL 'L' // \ It 0sw 3lE 09• / FA4RY OUT�ACT>rgORD ERANCE �STR IES. W_ 11 9 JOSEPH L. MEADOWS _ 00 N PO 620 \ B o PC 'B' SLOE 2T F7j DENOTES FILL IN WETLAND * * * * DENOTES MECHANIZED * $ * CLEARING RECDVED lo, SEE SHEET 42 FOR —L— PROFILE SEE SHEET 54 FOR Y7— PROFILE SEE SHEET 55 FOR Y8A— PROFILE L-- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - \ 4i' J 97 r- ® AARON L.MALLARDAY UX ® OB 02 PO OST , / c TO. .. NOTE: NO DECK DRAINS CHORD ST UUCTURE THIS \ __F _ f WORK ACCESS N / m VIO = 3.0 FF a' .SITE/ 23 i £I 98 MACON AND JDyCE DUINCAN TRUSTEES OF THE DUNCAN REVOCABLE TRUST 08 26" PD tae PC F SLIDE 162 H 2' BASE END GRADE \\ STANDARD 'rDITCH —L— STA. 623 +35.00 LINED SEE SS DETAIL W LINED GRASS NOTE:DECK DRAINS REQUIRED APPROX.2 CY ODE FROM STA 623 +90 TO STA. 624 +3B RT. -L- 97 FROM STA. 625 +70 TO STA 626 +18 RT. -L- o AARON L. MALLARD. ET Lot RI 06 02 PO 051 DETAIL 'A' DETAIL 'o' LATERAL GRASSED SWALE LATERAL GRASSED SWALE CC s (Nutt. Soule) INot to Smle) c b b N. W.1 �— FILL NeNml f._ FILL Ground D L5F7, SLOPF Ground D 1 iFL SLOPE Min. D= 1.5 Ft. Min. � � Min. D= 1.5 Fr. y t."+J B= 4 Ft. ' °-' B= 2 Ft. oN 6= 5 F. b 5 Ft. b � d+ FROM STA 627 +15 TO STA 627 +50 RT. -L- FROM STA 15 +25 TO STA 18 +05 RT. YIORPA- 3 � In DETAIL 'R' DETAIL 'U' STANDARD M DITCH FALSE SUMP E m IN.I io Smbl (Not to Soule) Z _ Med'e— _D'tch _ GI E O Mn. D= VA0. tS_. -L- STA 623 +20 RT. S =DBdi Slope 4 Proposed DBch PAY SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER 0� ti �' PRELIMIN RY PLANS fl, DO NOT USB PO CONeTRUCFION C. PO PERMIT DRAWING SHEET 80 OF 84 ®DENOTES TEMPORARY 2G1 Z FILL IN WETLAND 'RCP -IV 2G1 v — --F— F F C � ti - OTCB - DENOTES HAND tj , 9II LU ® C%4 ®� r L �_ T F _m Ce �. - r - - - -- -PLUG SCALE m RETAIN —/ "\ I —i RETAIN / II - - - -_ -- R FILL W/ II FLOWABLE FILL -- - - tr F B �' 1 RETAIN DI =T 1 —T -� — - -J— — G�i! i �— A Ell -T V s 0 —L IS' HDPE / ,Y- , It IFLOWaiLE FILL —_ - - - - -- —_ _ - - -- _— I V O ILA Lu C// ~ - - - - -- 1 / O ----- - / - - - -- REraN — Md To Z < - - -- -- � TONS _ - -2GI - \ 15' RCP 4Y 15' RC - lif n J \ F F LLJ COLLAR AND ND q10 \701SfS FS 2GI/ VID END GRADE \\ STANDARD 'rDITCH —L— STA. 623 +35.00 LINED SEE SS DETAIL W LINED GRASS NOTE:DECK DRAINS REQUIRED APPROX.2 CY ODE FROM STA 623 +90 TO STA. 624 +3B RT. -L- 97 FROM STA. 625 +70 TO STA 626 +18 RT. -L- o AARON L. MALLARD. ET Lot RI 06 02 PO 051 DETAIL 'A' DETAIL 'o' LATERAL GRASSED SWALE LATERAL GRASSED SWALE CC s (Nutt. Soule) INot to Smle) c b b N. W.1 �— FILL NeNml f._ FILL Ground D L5F7, SLOPF Ground D 1 iFL SLOPE Min. D= 1.5 Ft. Min. � � Min. D= 1.5 Fr. y t."+J B= 4 Ft. ' °-' B= 2 Ft. oN 6= 5 F. b 5 Ft. b � d+ FROM STA 627 +15 TO STA 627 +50 RT. -L- FROM STA 15 +25 TO STA 18 +05 RT. YIORPA- 3 � In DETAIL 'R' DETAIL 'U' STANDARD M DITCH FALSE SUMP E m IN.I io Smbl (Not to Soule) Z _ Med'e— _D'tch _ GI E O Mn. D= VA0. tS_. -L- STA 623 +20 RT. S =DBdi Slope 4 Proposed DBch PAY SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER 0� ti �' PRELIMIN RY PLANS fl, DO NOT USB PO CONeTRUCFION C. PO PERMIT DRAWING SHEET 80 OF 84 RK *AC SS' MACON AND JOYCE DUNCAN TRUSTEES OF THE OUNCAN REVOCABLE TRUST ( l •4'BASE LATERAL GRASSED SWALE / DB 2360 PC es V H : 1 SEEDETAIL'A' , PC F SLIDE 162 N TO .. TO ®DENOTES TEMPORARY FILL IN WETLAND •.J,.• / DENOTES EXCAVATION IN WETLAND DENOTES FILL IN WETLAND �� « • DENOTES MECHANIZED DENOTES HAND tj CLEARING LLJ CLEARING F I: ' I i ui GRAPHIC SCALE _ - F 100 50 0 100 200 - -RETAIN - - -- - - -- -- - - - -- -- u5 /fHV I! —_ - - - - -- —_ _ - - -- _— V O —D! - - - -- - - - -- ---- - - - - -- -- -------------------------- us Mri n < --------------------- � - - - - -- V) J �. LLJ RK *AC SS' MACON AND JOYCE DUNCAN TRUSTEES OF THE OUNCAN REVOCABLE TRUST ( l •4'BASE LATERAL GRASSED SWALE / DB 2360 PC es V H : 1 SEEDETAIL'A' , PC F SLIDE 162 N TO .. TO SBG — "SHOULDER BERM GUTTER" P s SEE SHEET 44 FOR —L— PROFILE SEE SHEET 58 FOR — YIORPA— PROFILE SEE SHEETS S-1 THRU S—t' FOR STRUCTURE PLANS ®DENOTES TEMPORARY FILL IN WETLAND •.J,.• / DENOTES EXCAVATION IN WETLAND DENOTES FILL IN WETLAND �� « • DENOTES MECHANIZED DENOTES HAND + • CLEARING CLEARING I: ' I i GRAPHIC SCALE : 100 50 0 100 200 I 1 SBG — "SHOULDER BERM GUTTER" P s SEE SHEET 44 FOR —L— PROFILE SEE SHEET 58 FOR — YIORPA— PROFILE SEE SHEETS S-1 THRU S—t' FOR STRUCTURE PLANS i 0 l ® \ AARON L. MALLARD. ET U% \ \ \ ® \ 00 IV / \�� SHEET 81 OF 84 I ' AND JOYCE DUNCAN No z • -, N L _ �j /' �\ �\ tRUSTEES OFC TXE DUNCAM REVOCABLE TRUST NI - 'd8 2364 PO ell L _ — —. — -- TB: � ,m / � �c F SLOE 162 X � � � bf� .• / 'v` 1 R1qf, 4 :NQ DEPK DRAINS )ems ESUIRED FOR TH IS / J P® tw Cii RD STRUCTURE ) /j / /, // / . / / l �'` -. 24.x- J / .i / .•� N WORK ACCES ' N /I ® \ = 30TP5 9130 2 BASE SEE DETGRASCSSED SWAL 1 „I.T / \` Lu /i 2GI `?0 _. _ f =_ _ � ce 9 RETAIN ey PLUG & FILL W US IAPY O Z " {'= L RETAIN �\ / / lI ( ( l y II —_ - -- FLOWABLE FILL RETAIN --- - - - - -- •� -- - - - - -- N 46— -- RkTATN DI `I / i5' b— HDPE / FLOWAB FILL. IS' HOPE _ - -- __ - ----------- - - - - -- _ - - - - -- �6 -G RETAIN —40 US NM',! uj— — —2 - -- — — -36— — — — — — — — -- _ - - - - -- _ _ _ — — 38— — 36— — 1 59 N TTY —\-T5. I — — - --D� -- 34— - — — — � _ 34— — — � 336 _ III 3 m \ \ _ — PS� —-'O -� -F —sr x-32\ — — 3 @oL[AC — Wns RCP IV -24 Lu W R�C'A , f Z MACON AND) DLNCAN f LW. T"TEES OF THE REVOCABLE TRUST �- -� �✓ I 1 \\\ / J I' S 00 4' BASFI.IATERAL GRASSED AIE� / /.. / PC TIDE PC 62 X SEE DETAIL 'A' / }� ` END GRADE ` 1 \ �� TB TB / I I w / ' , / / ASS 9CDITCH -L- STA. 623 +35.00 GRASS UNED , NOTE: DECK DRAINS REQUIRED SEE / APPROX.2 CYDD� FROM STA-623+90 TO STA.624 +38 RT. -V- �\ -- FROM STA. 625 +70 TO STA. 626 +18 R�- % \\ �� j / / DENOTES TEMPORARY tie / AARON /i.MALLA%.ET�wI Z/. .. FILL IN WETLAND DETAIL A DETAIL 'Q' ; ��g''.. J� //. DENOTES EXCAVATION F DENOTES FILL IN LATERAL GRASSED SWALE LATERAL GRASSED SWAIE .✓ ® IN WETLAND WETLAND (Notto Scale) (Not to Scale) jam/ Noturol w._ FILL Nofuroi r- DLL Ground ;) D I. , SLOPE Ground •P D I• , SLOPE //� � �� �� • DENOTES MECHANIZED DENOTES HAND e I Bin. 4 =H 1.5 k. I p I 8 -n 2 ff.l•5 fL (( \ 9 : tit CLEARING CLEARING It-.l b= 5 Ff. 1�.1 b= 5 Ft. FROM STA 627 +15 TO STA 627 +50 RT.-L- FROM STA-15+25 TO STA 18 +05 RT. YIORPA- DETAIL 'R' DETAIL 'U' \rte ) ` 11� I ' GRAPHIC SCALE STANDARD N DITCH FALSE SUMP / I •L INwro sal.) INot to Scale) .tiYO )N 1 _ Medi 111:1:1 _ N 9. Clore eeloWj --er— 2a'' --�i cl 100 50 0 100 200 Min.D= c. -L- STA 623 +20 RT. S =Ditch Slope 4 Propoud Ditch I/ / DBch Gm e L Oifch Grade L / /I)y v— 2.0% i 20' Over4.0% To 6.0% 40' N / SEE SHEET 44 FOR -L- PROFILE r 2.571, 10 30' 1 Over 6.0% 50 ti' m , ! I SEE SHEET 58 FOR -YIORPA- PROFILE SBG - "SHOULDER BERM GUTTER" SEE SHEETS S-1 THRU S-i FOR STRUCTURE PLANS PROJECT REFERENCE NO. SHEET NO. R -25140 1 27 PAY SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER O^ ryo ti Ya PRELIMIN DD NO'f OSB Po RY PLANS CONSTRUCTION 404' 2 PERXAIT nDAWING ® \ AARON L. MALLARD. ET U% \ \ \ ® \ 00 IV / \�� SHEET 81 OF 84 I ' AND JOYCE DUNCAN No z • -, N L _ �j /' �\ �\ tRUSTEES OFC TXE DUNCAM REVOCABLE TRUST NI - 'd8 2364 PO ell L _ — —. — -- TB: � ,m / � �c F SLOE 162 X � � � bf� .• / 'v` 1 R1qf, 4 :NQ DEPK DRAINS )ems ESUIRED FOR TH IS / J P® tw Cii RD STRUCTURE ) /j / /, // / . / / l �'` -. 24.x- J / .i / .•� N WORK ACCES ' N /I ® \ = 30TP5 9130 2 BASE SEE DETGRASCSSED SWAL 1 „I.T / \` Lu /i 2GI `?0 _. _ f =_ _ � ce 9 RETAIN ey PLUG & FILL W US IAPY O Z " {'= L RETAIN �\ / / lI ( ( l y II —_ - -- FLOWABLE FILL RETAIN --- - - - - -- •� -- - - - - -- N 46— -- RkTATN DI `I / i5' b— HDPE / FLOWAB FILL. IS' HOPE _ - -- __ - ----------- - - - - -- _ - - - - -- �6 -G RETAIN —40 US NM',! uj— — —2 - -- — — -36— — — — — — — — -- _ - - - - -- _ _ _ — — 38— — 36— — 1 59 N TTY —\-T5. I — — - --D� -- 34— - — — — � _ 34— — — � 336 _ III 3 m \ \ _ — PS� —-'O -� -F —sr x-32\ — — 3 @oL[AC — Wns RCP IV -24 Lu W R�C'A , f Z MACON AND) DLNCAN f LW. T"TEES OF THE REVOCABLE TRUST �- -� �✓ I 1 \\\ / J I' S 00 4' BASFI.IATERAL GRASSED AIE� / /.. / PC TIDE PC 62 X SEE DETAIL 'A' / }� ` END GRADE ` 1 \ �� TB TB / I I w / ' , / / ASS 9CDITCH -L- STA. 623 +35.00 GRASS UNED , NOTE: DECK DRAINS REQUIRED SEE / APPROX.2 CYDD� FROM STA-623+90 TO STA.624 +38 RT. -V- �\ -- FROM STA. 625 +70 TO STA. 626 +18 R�- % \\ �� j / / DENOTES TEMPORARY tie / AARON /i.MALLA%.ET�wI Z/. .. FILL IN WETLAND DETAIL A DETAIL 'Q' ; ��g''.. J� //. DENOTES EXCAVATION F DENOTES FILL IN LATERAL GRASSED SWALE LATERAL GRASSED SWAIE .✓ ® IN WETLAND WETLAND (Notto Scale) (Not to Scale) jam/ Noturol w._ FILL Nofuroi r- DLL Ground ;) D I. , SLOPE Ground •P D I• , SLOPE //� � �� �� • DENOTES MECHANIZED DENOTES HAND e I Bin. 4 =H 1.5 k. I p I 8 -n 2 ff.l•5 fL (( \ 9 : tit CLEARING CLEARING It-.l b= 5 Ff. 1�.1 b= 5 Ft. FROM STA 627 +15 TO STA 627 +50 RT.-L- FROM STA-15+25 TO STA 18 +05 RT. YIORPA- DETAIL 'R' DETAIL 'U' \rte ) ` 11� I ' GRAPHIC SCALE STANDARD N DITCH FALSE SUMP / I •L INwro sal.) INot to Scale) .tiYO )N 1 _ Medi 111:1:1 _ N 9. Clore eeloWj --er— 2a'' --�i cl 100 50 0 100 200 Min.D= c. -L- STA 623 +20 RT. S =Ditch Slope 4 Propoud Ditch I/ / DBch Gm e L Oifch Grade L / /I)y v— 2.0% i 20' Over4.0% To 6.0% 40' N / SEE SHEET 44 FOR -L- PROFILE r 2.571, 10 30' 1 Over 6.0% 50 ti' m , ! I SEE SHEET 58 FOR -YIORPA- PROFILE SBG - "SHOULDER BERM GUTTER" SEE SHEETS S-1 THRU S-i FOR STRUCTURE PLANS ■ ■ ■ ■ ■ ■ ■■ ■ ■ ■ ■■ ■ ■e ■■■■■■■■■■■■I1 2E � ' MIN42 ■■■■■ ■■■■ ■ MEMO � ■■eee■eeeeeeee ■■ee ■e■■ ■eee ■eeeeeeeeee -■ • ENGINEER ■ ■■ ■■i ■� ®• ■� ENGINEER �■ ■ ■■■■ ■ ■ee ■ ■ ■ ■ ■■ee eeeee ■ ■ ■ ■ ■ ■■■ ■ ■ ■ ■■■ ■ee■ ■eee ■ ■ ■ ■■ eeeeeeeeee ■■eee■ eee ■eeeeeeeese■eeeeeeeeeeeeeeeeeee �■�e�■�■■■ wee eee■■■■■■■■ e�■■■ see■■e■ ■eeeeeee■e■e■�■�■�_____. ■ee■eeee ■■ ■ ■■■es ■■ eee■ eee■■■ eeee■ ©eeeeee ■e■e■ee�nTr�■■ �■���.�..� ■eee■■e■■■■■e ■ ■■ eee ■ ■eeee■■■■■eeeeee■■■■■■e�� ■■�■■ �■■ea■■■■e■■■■■■■s■e�a�, -. - eee■ e■ ■ ■e■■■■■■■■�� ■ ■��e■e■■■ee■■■■■� es■■e■■■■■■■ee■■■gl e11PR■■■■■■■■■■e■■■e ■ 22m ■■■■■■■e■■■mm , Brie■■ ee■■ e■■ e■ ■eeeeeeeeeeeee■ee■■■■eee■r���e� eeee■ ■ee■■■� ■e■ ■e■■�' ■■eeee Now ■=... . -- - wee.... ■ ■ ■ ■■�e ■ee�eeeieee■■■ee■■ ■■■■■■■■■ ■■■■e ■ ■ ■=1 ■SQ ■lJL'lSll':L ■��m- .. i IV a �eeeee■e■■e■■ ■e■■■e■eeee ■ ■ ■- -- ■ ■ ■e►e■■r■■�ie ■■■e■■■■e■■i eee■■■eee■■■eeeeeeee ■■ eeeeeeeeee ■ ■ ■=== eeee■■eeee■■■■� �■■eee■ee■■ee■eee■ee eee ■■eee■■■eeeeeeeeee■■ee■e■e ■ ■■ ■■ems ■ ■■e■■■■■■■■■■■ eee■■■■ ee■ e■■ eeeeeeeeeeeeeeeee MEN ■■■■e■e■■■e. ■eee■ eee■ eee■ eeeee■ eeeeeeeeeee ■■eeeeeeeeeeeeee■■eeeee■■■� �e■e■■ ■■■■ee■e■■■■■ ees■■■ ee ■eee■e■■■■e■eeeeeee■■■ ■e ■� ■� ■�� 10 .11 12 13 14 15 16 17 18 19 20 21 22 23 24 ■ ■■■ eeeee■■ e■■ e■■■■ ee e■■ ee ee ■e ENE e■■■e■■■■■■■■■■■■ePelve■m ■eee■■■■ eeee■■■■■ eee■■■■■■■ ■■■■■■e■■■■■e■e■■■■■■■■owUlA &m= .■■■■e■■ eee■■■■■ eee■ e■■■■ ee ■ ■ee ■ee■■ ■■e■■e■■■ee■■e■■e■■�e� M■ e■��e�■ eee■■■■■■■■■ ee ■� ■ ■■ ■ ■ ■e� ■ ■ee�e■■■�■�■�■�■�■�� Me■■e■■■■eeee■e■eeeeee■e■ee ■ ■■ eee■ ■e■eeeeeee■ee■■ee ■ ■. ■■■ tee■ ■e ■■ eeeeee■ eeeeeee■ eeeee■ a ■■ee■ ■■e■■■eee■■ee■�e■ee■e■►WWI �■ eee ■e■ ■ ■ ■ ■■eeeeeeeeeeeeeee� eeee ■eeeeeeeeeee■■e■ ■ ■■ee��� ■■■■■■■■■■ i■■■■■■■■■ ■■ee■■e■efit � ■N■■■■■■■■■e■e■ENN■■ a ■ ■ ■e■ ■eeeee■ ■■■■■■■■■ ■■■■■■■ eee■■■■ ■ ■ ■eee!��!_..■■� ■■■■■■■� ■e■■■ ■■eeee■■■■■■■ee ■■aee eee ■e■e ■ ■w ■■■eee■■eee■■■■ ME ME E.� mmmlmr ■ ■■0 roam■■■■■■■■ ■■■■■■■■■■■ ■m` - -_ . !■ ■� ■ ■ ■� ■eeeee ■�e■ eee ■ ■ ■ ■■ eee ■ ■ ■ ■�■■■■■■■ ■■■■ ■t NONE ■E1®■■!� OM■■■■■■■■■■■■■■■■■■■ ■ ■e ■e ■ee ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ee■�■e■■■■ a ■ ■� �■e ■�■■ee■e ■�■ eee■■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■■ee■■ne■ee■■emm m■■■■■■■■■■■ L�■■■■■■■■■■■ s■■ ■■■■■■■■ ■■■■ ■■■■■■■■e■■�.��.,.� m ENE ■ Ayy■■■■■ eeUi■■■■ e■ ■■e■■■■■e■e■■■■■■ ■■■■■■■e■■■■ -e ■■�!� -■■■ Pt�i■■■■■■■ U�U■■■■■■■■■■■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■e ■ ■ ■ ■ ■e ■ ■1'T:'- wi■■■■ a■■ e■■ eeL■■■■■ e■■■■■■■ ■■■■■a■■ee■■■e■■ee■■■e■■®�eemmm 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 302 +50 to 303 +50 -L- 48" RCP -IV 0.01 <0.01 218 31 Bank Stabilization 16 2 329 +50 to 331 +50 -L- 36" RCP -IV 2.49 0.05 17 +00 to 18 +48.13 - Y3RPA- 17+00 to 19 +00 - Y3RPD- 3 372 +50 to 374 +50 -L- Dual Bridges <0.01 <0.01 0.07 0.66 17 +51 to 22 +00 2@ 8'X8' RCBC 0.08 0.02 <0.01 0.01 5 50 -DRV3- 11 +50 to 12 +50 -DRV4- 4 389 +02 to 399 +75 -L- Dual Bridges 0.76 0.06 0.06 0.12 1.19 48" RCP-IV- 5 432 +00 to 434 +00 -L- 36" RCP -IV 0.86 0.05 6 437 +00 to 446 +00 -L- 1.60 0.13 0.03 TOTALS: 5.79 0.06 0.06 0.44 1.84 0.04 0.01 239:00 81.00 0.00 Site 2 is a total take, and all of the wetland has been accounted for, including the wetland that is outside of the ROW. There is permanent fill in wetlands at sites 3 and 4 due to the piles for the proposed bridges. NC DEPARTMENT OF TRANSPORTATION Also, there is temporary fill in wetlands at sites 3 and 4 due to the piles for the work bridges. DIVISION OF HIGHWAYS The pile areas are too small to show in the permit drawings, but they have been accounted for in the wetland summary. JONES COUNTY WBS - 34442.1.1 (R- 2514D) SHEET 1 of 4 5/2912014 � UP, t .V , WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 7 458 +02 to 458 +33 -L- <0.01 0.01 8 463 +00 to 463 +50 -L- 0.23 0.02 9 473 +00 to 475 +00 -L- 54" RCP -IV 0.54 0.06 0.05 <0.01 196 20 Bank Stabilization 18 10 476 +50 to 480 +00 -L- 36" RCP -IV 0.38 0.02 11 490 +50 to 496 +00 -L- 36" RCP -IV 0.96 0.09 12 504 +00 to 506 +00 -L- 36" RCP -IV 0.31 0.06 13 520 +07 to 520 +23 -L- 36" RCP -IV 0.01 <0.01 0.01 <0.01 230 21 Bank Stabilization 12 14 527 +50 to 529 +50 -L- 0.34 TOTALS: 2.77 0.00 0.00 0.26 0.00 0.06 <0.01 456.00 41.00 0.00 Site 7 includes 0.25 Ac. permanent fill to a pond. Site 8 includes a total take of the remaining 0.05 Ac. of wetland to the right of the roadway. NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS JONES COUNTY WBS - 34442. 1.1 (R- 2514D) I Revised 3131/05 SHEET 2 of 4 5/29/2014 � UP, t .V , 33 s <7 jrefi , WETLAND PERMIT IMPACT SUMMARY WETLARID IMPACTS SURFACE WATER IMPACTS Station (From /To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) and Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) ite io. 15 530 +12 to 531 +75 -L- 78" RCP -IV 0.03 0.02 0.06 <0.01 2 27 Bank Stabilization 26 6 16 535 +00 to 536 +67 -L- 42" RCP -IV 0.01 <0.01 282 21 Bank Stabilization 14 E 17 548 +16 to 552 +75 36" RCP -IV 1.39 0.16 18 562 +00 to 563 +00 -L- 18" RCP -IV 0.58 0.10 11 +00 to 13 +50 -Y8A- 584 +00 to 588 +00 -L- 36" RCP -IV 1.35 0.20 19 33 +50 to 35 +00 -YSA- 591 +50 to 592 +50 -L- 36" RCP -IV 0.30 0.06 20 41 +00 to 41 +50 -Y8A- 608 +00 to 612 +50 -L- 1.58 0.01 0.03 0.06 644 21 26 +00 to 30 +00 -Y10- 0.00 0.01 0.57 0.00 j 0.13 <0.01 1258 48 0 5.23 DTALS: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS JONES COUNTY WBS - 34442. 1.1 (R- 2514D) SHEET 3 of 4 5 29 2014 33 s <7 jrefi , WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 22 26 +07 to 26 +67 0.02 - Y10RPA- 23 19 +00 to 20 +00 BRIDGE <0.01 0.01 0.17 - Y10RPA- Bank Stabilization 624 +49 to 625 +64 BRIDGE 0.02 -L- 627+15 to 627 +40 Grassed Swale <0.01 0.01 0.02 -L- TOTALS: 0.02 0.00 0:01 0.03 0.18 0.00 0.00 0.00 0.00 0.00 OVERALL PROJECT TOTALS: 13.82 0.07 0.07 1.29 2.02 0.23 0.02 1953.00 170.00 0.00 Structure @ Sta. 18 +43 to 20 +43 - Y10RPA- - 15ft2 permanent impacts - 3000 ft2 temporary impacts Strucure @ Sta. 623 +81 to 626 +31 -L- - 70ft2 permanent impacts - 3900 ft2 temporary impacts Revised 3/31/05 ECE ED C L N a 0 w L 4- t 7 C0 v N of Ul J } L L 0 z a C U) C E L 0) a w z C L N • a 9 r; f See Suet f -A For Index of Sheets See Suet f -B For Conventloml Symbols sP.�tE $TA'R p4o14(,T 4B64R106 N4 �N6 STATE OF NORTH CAI[$®I[ INA Utility Permit Drawing N.C. R -25149 E`® DIVISION OF HIGHWAYS Sheet! ����� ®�— 34442.1.3 FE Elm 91 N Q *DESIGN EXCEPTION REQUIRED FOR SAG VERTICAL CURVE K FACTORS AND STOPPING SIGHT DISTANCE ( —Y2— & —Y3 —) THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. THIS IS A FULL CONTROLLED ACCESS PROJECT WITH ACCESS AS SHOWN ON PLANS, CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. yon a� GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Y Office of: Prepnred in the r HYDRAULICS ENGINEER DIVISION OF HIGHWAYS ADT 2015 = 6800 vpd 10 25 0 50 1Qo ADT 2035 = 15900 vpd DHV = 7 % LENGTH ROADWAY OF TIP PROJECT R -2514B = 3.906 MILES i000 Dr„ Raleigh MC, s�s�o UCA NS 2012 STANDARD SPEC<1lCATTGNS PLANS D = 65 % LENGTH STRUCTURE OF TIP PROJECT R -25148 = 0.250 MILES P.E. 25 T = 7 0� a RIGHT OF WAY DATE: JAMES A. SPEER, PE id Q 50 �QO V = 70 MPH TTST =4% DUAL =3% TOTAL LENGTH OF TIP PROJECT R -2514B = 4.156 MILES DECEMBER 17, 2013 ROADWAY DESIGN ENGINEER PRCVECT ENG"E" PROFILE (HORIZONTAL) FUNC CLASS = FREEWAY LETTING DATE. JOHN LANSFORD, PE PROJECT DESIGN ENGINEER 0 5 Q 10 �0 STATEWIDE TIER A, JUNE 16, 2015 P.E. srcNAruRa _ PROFILE (VERTICAL) Qg idOppy 4 Z e 9' ca o iAAi1 ® @��aQ PROJECT REFERENCE NO. SHEET NO. R-25148 U E-02 DETAIL A DETAIL B DETAIL WW SHEET NO. 'V SPECIAL LATERAL 'D[TCH DETAIL ROADWAY DESIGN HYDRAULICS LATERAL 'V` DITCH SPECIAL LATERAL WE DITCH MEDAISI H Utility Permit Drawing ENGINEER ENGINEER I No 1. 3'.1.) IN., 1. 4.1.1 (N.I. 70 of RN Sheet o2 q Fill 3I.P. hL .—d D D - �01 Mln. D-1.5 FT. LBj hkfn,0-1,5 FT. ... .. .......... 6-5 FT. B=5 FT. Min. 0 -VAR. 4, STA 11 +50 TO 14 + 85 -L- STA. 15+15 TO 19+00 RT. -L- STA. 74 +85 TO 15 +00 eo'f"ZA' -L- STA.I4 +45 TO 17+80 LT -L- STA. 19+00 TO 21+50 RT, ODE-289 CY BEGIN STATE PROJECT R-2514B -L POT STA. 12+00.00 / lb IQ REVISED 07-15-2014 - _w -L- POT Sto. /0*00,00 ;1 SEa/Al' GRADE -L- STA.15P45,00 ��/ PROP, JjG TEL, LINE ;R wEYERRAEUSER CO. BL- 10 +00.00 -L- DS 311D PO 245 +50.00,- 10 +00.00 -L- TIE SLOPE TO Do 302T Pr, 6W .1 98.06, �t. TOP OF PIPE , PG 26 98.00' Lt. + 100, SPECIAL LATERAL 'VDITCH TIE TO cq 13 x�, TAPER SEE DETAIL . L . A.. DITCH. CN z Wi 'T __7 ---------- �� �5 . . . ...... 0 t I- TAPER =DUCT tvA-155 A RES. INNERD)JjZT 7 .11•r EX 'uNM�T 'm - - - - - - - - - - T NERIICT 3 �_ r - - - - - - - - - -- - - - - - - - U L NNEROLCT MEDIAN 'V' DITCH --W--TO JACKSONVILLE SEE DETAIL AA T 100, 35D' E __5 Q WI_ TAFER -f- 94 p u1j + P AFAIN U N� IL19LJ:;* I REMOVE 1"s VE' 40'_ LIAR 100, F F F A CiiDl LL! �C .4D (T _x 48'C Ralaln PARTIAL TIO c -71C i,�l 'EX19T.. RECORD IN AMA N X Rlw I-I u4u x DEPICTED F FIELD .1 STIGATION dio E_ '�.%-FM TO Pk C'L REaAR 5 ®i CL RIP RAP -7 TONS 0 SEE DETAIL B AND UP' Y OWNE NIT CT SLATERAL' ole TIE SLOPE TO SPECIAL LATERAL 5' BASE DITCH P IN 0 +00.00 -L- TOP OF PIPE SEE DETAIL C 3 TONS 0 OTEXTILE-22 BY �6 c6 1 1 �j - X 9T.88' Rt. + JONAL14ANMTO. Ds 31 po 792 GEOTEXTILE=11 Do 341 , CO 108. 1" 310 PC 245 115-00'Rt- 0 1 a i I I I TIE TO EX, +00 N CLA M 7 PG 660 ro Ex 1 .08', zti 4 DITCH DITCH c� W TONS BY L RAF- 7 E.T'E_LE 22 +00 1 .08' . ISDAD 8ST A ssr cli DECK II I DC"^VC AM DCCCT t AND vi C: c BEGIN CONSTRUCTION -L- POT STA. // *50.00 I ,I C•°1 Oy Fy APPROX. 120' EXIST FENCE Pk N 11,111011 r P, RONNIE L. ADAMS D5 40PO $07 08 755 PC 734 D8 1227 PC 306 CIS 2" PO 64 NO CLAIM A GTD DENOTES 'GRADE TO DRAIN' SEE SHEET 24 FOR -L-- PROFILE L- — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — - I PROJECT REFERENCE NO. SHEET NO. R- 25148 UE -03 I RhY SHEET NO. Utility Permit Drawing ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER Sheet of 9 DETAIL D Ep TAIL E DETAIL F LATERAL BASE DITCH LATERAL BASE DITCH (Rm b sml.I I NOW s.WJ STANDARD 'V' DITCH ... ... . h (Nol b S,alxi Q A. Gmun 3y 1'A•I. NI Geu Jy ry•1 tA1. FIII N I mL 4� I D lleW D SIaM mood .� Ground Gj . :04.'.: 107' is QS& '': @ORaC0Y3FKLfCr70PI;'.:i =i� I I Mh 0 -1.5 FT. 1. I AUn. D -VAR, 'J D I.°+! B -4 Fr. 1�•! 8 =] FT. MIn.D -1.5 FT. r� b -5 FT. b =5 FT.. -I- STA. 24 +51 TO 25 +89 LT., DDE =175 CY -L- STA. 28 +87 TO 45 +58 RT., DOE -895 CY _L_ STA 23 +93 LT., ODE -4 CY �o -L- STA. 32 +50 LT., DDE -31 CY REVISED 07.15.2014 I ' I I I I p 1 WEYERRA USER Co. PG DO 310 PO 245 Do I { L43 2 PPG 650 26 L BEGIN PROP. FULL C/A TREE FARM 1 +40.85 -L- TREE FARM I +65.00 -L- 68.09', STANDARD N' DITCH LATERAL 4' BASE DITCH 100.00" +(7. 0 -L- ® 113.00' Lt. SEE DETAIL F SEE DETAIL D 113.00', Lt. +30.0Q -L I ® CL B RIP RAP-1 Tors +70.00 5.00' Lt. PROP. 0/H POWE , i 1 00', II5.0D' Lt. TREE FARM -BL- 12 ceoIP RAP -7 BY ND PROP. FULL r/A & CATV LINES 115.00' 4. ®Be in Pro TIE TO +04.00 -L- BEGIN PROP. PARTIAL C/A STANDARD 'V'DITCH D Fence DITCH' ° B . ' L -BL- II PROP, U/G TEL. LINE SEE DETAIL F BMI2 EL.= 45.38' I i BL STA.28 +06 TIE TO EX. CL B NP AAP -2 TONS PDE L 5 . 33 +30, 113' LT - GFOTEXTILE -7 SY _ ° -� - -- - - - - -- _ - 1x ANM-A earutlLFts1!Aa.udx . wvtatt -tl un..alLSasa _.,. urv.ux eae wLlnalcdlY lV� LDr.U�aVY YIn c Vi _ F�eER am INNFAOUC.T -\ INSJ NO F --F- f- — - --F- -- - --F- — - f- - — C � - _ _ _ O T FO -- ---- - - - - -- - - - - - -- i 0 iT0 1 _i —____ _ - - - _____ ________L_ y �I :F Lei RCP I/5 !/ ZJ'EtST Ln `iF PARTIAL RECORD INFORM 1n N N 4W® N DEPICTED FROM FEW INVESTIGATION p 4 o N MOVE O 4M® AND UTILITY OWNER CONTACT 4 PS nl ai:i5: L1.! I N 3GI 5O 4'PS ®y N ABAY ED RR Bfd CSX — — — —� — — — — — .- — — — — J — — — — — — — — — — — — — — — — — — %Z SdJ/%BAV RR — — — — — — — — — - I LLI _ - -- _ -- -- _ _ _ - -- - N °g 1 t Too F f F F F f F f L!a LJJ R (3 ��Prop. WW Fence er R rop. Fence 48' WW ISRW )( PARTIAL 0.ECRD INFORNATION n p W R/ u0u � WEYERHAEUSER CO. DETAND TROM OWNS I CONTA ATIO ,T a 1 W 300 PC 245 SEE RETAIL I E DITCH AND urlLlrr OWNER caxracr I m Q fl Q f? 2 { 4 i} t0 { +40.79F -L- 1 NO 3027 O M 650 10o.00'Rt. 1 PROP. 4 W.L 'u F BEGIN PROP. PARTIAL CIA I O I a F BEGIN PROP. WW FENCE I TREE FARM Ld TREE FARM U) TREE FARM I v L I � I m I � l() I � I m I n I u I -D I o I C I � \ n. I � E m I i I Z rn � C I NN I C C O � I � s O „ I ai SEE SHEET 24 FOR -L- PROF /LE I of SEE SHEET 2 -A FOR MEDIAN TURN DETAIL I F CONCRETE ISLAND I I I - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - I P PROJECT REFERENCE NO, I SHEET NO, R -25146 UE -04 DETAIL EE DETAIL D I LATERAL BASE DITCH LATERAL BASE DITCH I (NN Io Scal4 IHA to SwMj h h Grovnd D 7•�, FlII Ground ,�•� 1A, Rif sl D » I � MIn.O -VAX °o' B Mln. D - 1.i FT. sla I 6-3 FT, 11-4 FT. h-5 FT., 4 -5 FT. 4, STA, 28 +87 TO 45 +58 RT., ODE-895 CY -4- STA.44 +64 TO 53 +44 LT., DDE -1123 CY R'YI SHEET NO. ROADWAY DESIGN HYDRAULICS Utility Permit Drawing ENGINEER ENGINEER Sheet 9- of--L- . ,10 ':;; oo;rwsr vsarron ?eati!sTRScriecz!�g �;: I I I � �QQ I REVISED 07- 15.2014 I _ I I I O a' i I i I PROP. U/0 TEL. 9 1 O dEYERHAEUSER CO. LINE M 310 PG 245 PROP, 0/H POWE DB 3027 PG 650 -L- SC Sto. 42 +11.4! & CATV LINES us 2 p 26 1 'B yr I I Z 0 � - 13 TREE FARM -L- TS Sta. 40 +1l.4/ f rl +11.41 -L- +56.00 ' 100'00,' +11.41 -L- +11.41 -L- I 115: 115.00' Lt. 115.00' Lt. 00.00' Lt• I 00 0.00' PROP. 12" W. L PU I +30.00 -L- 142.00' TREE FARM I L Lt. -B 14 TIE TO EX. DITCH RLkGe -L- +52.00 -L- Lt. 142.00' Lt. ERAL 4'BASE DITCH EE DETAIL D U8 TREE FARM STIE To CL E RIP RAP -1 TO GEOT .�. + + I I I F rROr REMOVE 18 P _.35a'LC Ld.I i 60 z 24r ACCESS POINT � C EGIN PROF. - fiUE Rif F F F reor olx ra unr to oix ran rwr om •©uBAAiPs F F F p F _ F _ F F N 49' 04' ___� n -- M _� - TH 3 FB 2GI _i.L �DI o M F --` "' ai4" 50' 060 CL a III RAP -1 oN E E E +11.41 F �._�_i F _ 060 2GI -0 r ursTxc BR _ I 8K WA C4 • A N 1 >� _ wx 11 Q �� _ -� in F do o 'a ' - -•.c_' "� ��'_�a -� {ij -- �• E W �- - s - I I a I I i END P ROP, +92.00 +ARTIAL UA 100,00' Rt, 100.00' Begin Wyy m Rt. Wyy Fence ° m N Z a t -L- GEOTEXTILE -5 sY 100.00' Rt. 30.00 -L- +11.41 L- 1000 ' Rt Fence TREE FARM 100.00' Rt. ��1RIIERAL 3' BASE DITCH 106.00' S£I•DETAIL E PROP, 4" W.L END PROP. PARTIAL UA BEGIN PROP. FULL U +47.00 -L- O WEYERHAEUSER Cd. rop. /W +90.00 -L- he 22�PO 26 650 145.00',Rt. Pls Sta 41 +4475 �Iss - -�� AO5 ✓ � I p /p �' I De m I +10.00 -L- p - f\f I I t. TIE To Ex a I BEGIN ITCH � 1I I I FU +70.00 -L- / I 1 q + 8. I tInd WW FAce a I PROP. 1f 1 Begin j0.OQ FULL UK +08,00 -L- 4 ( g as co "c 0. t.Q I I o ISBKD u `L -L- P1 Sto 5511 PIS Ste 67+9636 ASSIrrER � 49PG 5m ; K +60.00 Ili PROP. -L- w FenEND © q 0 0 q + _ r R� P. FULL UA BEGIN PROP. PARTIAL C/A -L OBLITERATE IX 100.00', DITCH 00' Rt. + oaF3 IaaEO ET AL RtAeDO 102 MATTOCKS D8 1029 PG 481 64 = P25 56.6° q - 3504' 44B -(LT1 es = P25' 56.8' m Ls = 200.010' 0 = P25' 56.6° Ls = X10.00 - N 49V5' I' ~'a'E' % LT = 133.34` L = 2,5/8.80` LT = /33.34' --- ---� I z ST = 66,67` T = 1,30273' ST = 66.67' 4,OX W I SE = 0.04 1 C �NPN 1 0 SEE SHEETS 24 -25 FOR -L- PROFILE -y SEE SHEET 2 -A FOR MEDIAN TURN DETAIL i N CONCRETE ISLAND I F-y 6-n I I• L- - - - - - - r. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - I I PROJECT REFERENCE N0. SHEET NO. I I � . i DETAIL D DETAIL LATERAL BASE DITCH DETAIL F SPECIAL LATERAL 'V' DITCH INO1. Qcab) STANDARD 'Y'DITCH [Now 3ro1.) b INo $wll c,.vna D ? 1 M. NII Lis Min. D -1.5 FT. alOF° roan q, D Ormond cmund I.J D t 9np. B °4 FT, MIn, D -1.5 FT. b -S FT. I -L- STA.44 +64 TO 53 +44 LT., DDE -1123 CY -YIA- STA. 10 +53 TO 16 +66 RT., DDE =669 Cy 7+ D -YAA I - A- STA.110 +85 TO 113 +300 RT. 2015 Y1 R'W SHEET NO. __ 2135 P @iR1It DC�WIi Ig ROADWAY DESIGN HYDRAULIC3 jIN H PROPOSED US 17 e 4 CJ" o f ENGINEER ENGINEER Q. 32� "'1 t 77 7 L 159 47 Z 114 E*IIITI_itT3P32ti ::; i:=.La I1gT R56,`BOA-CO4SR &UFL10L - EXIST, US 17 7.00 I PROP. OJH POWE O 49 I 6 CATV LTNEB [- P` BMIS EL,= 45.65' PROP, U/O TEL. LINE P/Sto 55+•/434 REVISED 07/ 1014 WEYERHAEUSER 31aEU5ER Co. T Iq5, +3 .00 - - I BL TA. .0 - +33 p = 04 448' (LT) p0 3a PG 245 155.00' Rt. I 0'. L STA.50 +66,2'LT 153.00' Rt. I D = f25' 566 DD 3027 PG 650 `� L = 2,5/8.80' u0 2 PG -L= POO STA,58 +77.28 NLW At "AL ® LATERAL 4' BASE DRC t� T = 1,30273` +10.00 -L- -Y/- f0 / JONES-ONSLOW - ® SEE DETAIL Dg 4 REM R = 4,000.00 10000'' EMC POWER NEW ® CL B RIP RAP -1 T + SE = 0(14 125.00' Lt. GEOTEXTILE =5 TIE TO IX, 1 1115.0 . � +7 40 Pro . yy�, F orccH 115.00, � 1 00' Lt. _- --- PUE Pro ante 07 X30.00 Lt. PAR IAL PUE �- PUE -PUE S�� NEW BEGIN PUE ante I � d � P ._-- ---- -- PUE- -" -��J� u P _--- �_ CL B RIP RAP-1 TON F F _ _ NM' v Qj GEOTEXTILE -5 SY F �- 0, I +P F F Pr . WW Fence F P 70 P - f - - 10' P� � e.9 - -- -c- e 4' PS I y, o W� r FS 2G1 REM Q © a ° °• o o v.� I �F 0701 ?� scl - - . 8 _ 70 2GI + � 0001p 1 1 P 0' +70 - - A � E� 70 c €1 I + \ TAPE c o rR FAR4 ? 00' Rt. ,,.� ? Q 50' R o rn 100'TAPER e p f - - f} Lr P Pent \_ 156.15' Rt. 50, 5 ' RT TURN LANE I F F S� 100.00' Rt. 65 R p p� 5 ta.8 + .00 F `F F I p .Sta,62 +06,00 -L- �° -1 RTI L 1 +50.00 -L- Q uvnw v.uw.. F 121• t. BEGIPI FULL UA A' 125.00' Rt. +75.00r N EMC POWER * -Yl- PC TI%,l0fl7.20 +50.00 -YI- /� mp A' 61.77' Lt. -L- I \ + 00 -L- 140.0 Ili. t. PS m +69.00 -YI - -BL2- 2 EXISTING +33.00 -YI 30.00' Lt. 12 ,� • 157.00' Rt. I F CO. 30.00' Rt. F +30.00 -YI- 516.603 SQ FT I OBLI7ERAT IX. �\ PG 245 o d DITCH f�,Q50 PUF +29.00 - +I 0 -YI- D ,� 219 = 0.012 ACRES PROP. 4" W.L +45.00 -YIA- F �s P�Op U p P +95.00 tYl- 65 00' Lt. 113 SITE 4 �t \t -Y /A- POT Sta. 18t46& 40.00', `\ End 45.00 L Bepin C/A 110 Cl Begln WW Fence I 53.06' Lt. /Nry� End WW Fan, +17.00 -YI- L 0 1TEYERHnEUSER CO. " r e. +17.00 30.00' Lt. I OB 3R7 245 ta.57 +40 -Lj0.0o'Rt. o p W _ Pa.° F +42.00 -YI- I 08 30TT PD 650 +40.00 -Y Ls BEGlN W /DEN /NG 30.00', p 74.00 t. I p I AN R /N 40.00'. c fro, -Y /A- POT St0.16¢40A0 53.(x' L / \ _ e(i� -Yt- POC st". I (C /L Cut- Oe -SGa of 17'.000.00 -YIA-) n F -YEA- PoT Sto, I €S I 3762.671 SO FT +42.00 - - ° 1 +6s. 1 -� = 0.09 ACRES oo'' F ' o', x SITE 3 40.00' Lt. q� p - BEG /N RESURFACIN c °.e "4 - 17 + �YI- O NAa OrrOEq SAL -YIA- to. /3f50DD �\ \ q a ` 3 .Oq t. o \ " +F �. 130.00' Lt. I W29 PC r4 -YIA- �ey� E F 7�q \ `- - 1 -Yl PT $t &67,64 0.00' Lt. ono"' ^\ e - I - -Y /A- -Yl- F e app / c P/ to /0¢95.62 PI Sto 13¢82.20 +I .77 -YIA- +50. 1n- �� F ENO.G13N$T to l f A = 59'0/'37.8°(RT1 p = 64°48'494'(LTl Qe ,Sp Lt. poE ,n '��? p goo ____ / D 570 44.8° D = 9' 57' 521 � " "DOheo � / •/ C \\ ,fo � °� /� + I - 1 C L= 103.02` L= 650.45' s l a T = 56.61` T ° 365D0' SPECIAL LATERAL N' DITCH / \ Y 30.Od', R 575 = = (10 SEE DETALA 7 / +42. -YIA- YIA R /00017 SE = 0.02 SE 006 O Lt. Lt / 60. c �� ��\\ F �� tp �/ I i TODD DEXTER WILLLAM$ \ + 0' " D8 M PG T5T 1 PROP. PAVEMENT REMOVAL u 4 N D 2 2A I Q i -- -Y /A- PT Std. #+42D4 tL1 g €} °O \ \ m CONCRETE ISLAND r N L -YIA- PC $to. /Ot39.01 4% � \ I m nm OEPICTEDAFROUC FORD M°VES7iOATION \ �,v, ". •��9'a�p 'Y \\ I SEE SHEET 25 FOR -L- PROFILE AND UTILITY OWNER CONTACT / SPECIAL LATERAL N' DI I Q/ SEE SHEET 32 FOR -YI- PROFILE H // ! l rs J sEE DEraa a +07 Y = \ D C' I Pm SEE SHEET 35 FOR -YIA- PROFILE p '�YDO 310 PC 245 nu, Rt. b - a De 3027 PG 650 TREE FARM +67.64 SEE SHEET 2 -A FOR MEDIAN TURN DETAIL 2 I g > 30.00' Rt. 00 p n 57, � icy o' Rt. I - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Utility Permit Drawing I P 13 DETAIL I d w PROJECT REFERENCE NO. SHEET NO. TOE PROTECTION I ROBERT LEROY & JOYCE R PA MER (N. le s,el.1 CIy` 3 � 2HLINE SHEET UE- � Y s� NO. __ -_ SPECLLL Y� C8 2SY3 PG 298 F, SEE DETAJL A �Iy ILA- ; I / S ••�- C 07 ROADWAY DESIGN HYDRAULICS TZ Prop. U 1'6 / F 50100 ENGINEER ENGINEER +4 .0 -Y2A- d + -Y A- -Y2A - P �SZ 277 +31.00 -Y A- o / 1 \ \ -t.s Pr. I Prop. D -5 FT, ceaealk 53.00' Rt. ? C I Type .rune,- CL B RIP PAP N + Y NEW I P P +32.77 -Y2A- E - Y2A - SPECIAL CUT OITCH -Y2A,- STA. 25 +00 TO 25 +50 LT.+ 7 Y - 37. 0' Rt. KT. see DlraL H 2A DE -R ( / w roi s;gis` nPvc;F�iiroS:; - S E- --- -E H305• REMOVE I REVISED 07115-2014 ���� „19 � TERAL 'Y' DITLIA• . - I 20` 46.6' W _ - - - - - e. 16 SEE DETAIL L za•ss. +4 ^' / Y PARKER, ET UX 125.00' Lt. 145.0 lt. I a t NEW J ERT� ��PC 52 1 SEE DEETAI MBASE DITCH eylff- Pro 8 H"' n° LLp 1;; PG`B.5 C C - -.C- -- �. C _ SEE DETAIL HDRCH ! - p, Sl+ F.] enCe ROBERT LEROY & JOYCE RPARKER _` - Prot 13 DB zsr3 Pc 290 c c 3 s, c 17 - OE PROTECTION 1720 t C C ' C Gj� ;I �3gs SETH 0. LS SEE DETAIL I SPECLAL LATERAL' DITCH --- -_ ~- - -Ci C C C - G - C - C SEEFOETAIL A ` +��00 -L- Y / C BTRIIPP RAP91 TON ' i '- SEE DETAIL HDITCH F - F� "H' F 1707 F LATERAL N'OITCH NEW AERIAL -a _`_ `_ / �•E o Tog PG pA4RUS+a�• 15 .5 E C t 125.00' L }'. \0.EMOVE _ 21 PG 201 3 3 GRAU 350 7" SEE DETAIL l EMCEPOWERLOW s o o' \ � - m. 8.�g � $ 9,;•9 s 7104 Be , rid 4 l 1N, P Con.. Bearer y _ _ f } 10 $ I �' GI -D 701 ©� - • , l -L- PAC Ste. //6107.49 w � O '� Asa, Itt v 1 I ® 6PS NUATOR TYPE P B-77 ENUATOR G + ® +- �NC410R TYPE 8-77 • TYP 8-77 A 4' PS 6 P® Ln k BEGIN SBG ills / 4' P 1103 F I 7777 V Brid • �p -I- STA, 108 +08 RT. GI END SBG +1 -0 - ta. 2 + In �4 I L0 �8 2G1 CAT-1 -L- Sv tto +70 RT. 125" 0' Rt s °e/ o CL B RIP RAP -1 TON 1102 I ® 1 1108 F - GEO' ILE -5 SY a < P- Grwu 350 rLa y RE +50.00 -L- J6'• -� _ F P F 111e IF F - �- II CL I RIP RAP -17 TONSF Ur DITCH C B R� RAP_i 1 �BG / 125.00' Rt. ,s C F GEOTEXnIE -2B SY J5. CL B RIP RAP =7 TON C ---• +86. 0 O 7 f(g [sy � \ 1EOTEXTILE =5 SY 1116 C O , WW Fence I t, 1106 tl C �SPECIA.L CUT DITCH -LATERAL 'Y DITCH 2G / T' SEE DETAIL N I Pro o. F CL B RIP RAP -1 TON SEE DETAIL L +6 .� GEOTEXTILE =5 SY .0 t. /F 1105 N7 C \ Pro -.� PROP. U /t3 TEL. LINE f O / / _ Fa, 23 +45,59 C� i /� N,32°,nce k EI P1Sto l9+ _Pl Sta.26 +31.42 e9 / RT LfAOr & JOYCE R FATHER ° d 3'E = 2539 8 2143.8'(LT) v RoeE D8 2373 PG 295 2 p F // C I D 2 43' 421x �,°� o L / - I® T= 47833` T =/8 6' F R = 2JOO.00` R = ,Z11 ` \ PROP. 0/H POWE I SE = 04 SE � 0.04 / T t I 51.72 -Y2C- & CAN LINES 14 �F c I RO 96` ROx- 96` �g�q -L- PAC $10.111+ TIE TO PROPOSED ° 14 / / / �? -Y2C- Y2A- \ 35/57`Rt DITCH +48.00 -Y2C= ITT / / / 42.87 -Y2D- -Y2 I -L- P1 Sta 16 +347 t>$ ssr PG _ _ w 'Rt. I P/ Sla 109 +56.52 kP/ Sto 12+90A4 p = 81171S1(R7) \ / \ 47.00' Rt. 65 t N a n /p + -Y 30.0 0 = /3' 3r 33.6' (RT) / MOVE / , 37.00' t. `Y20- PT Sta.15+42,87 D = 0 34 551 � = 49' 49` 3-99 (RT) D = 32 44 25.6' RETAIN. -,/� � ro 9, +98.00 Y2C- iArEau / / � D = 76 23' 39T L = 24828 m �� P/ Sta n+05.45 L = 232414 2a r3aJ 63.0 t. SEE DET IL / / / / +17 Y2 + 38.0 ' T. -Y20- L = 65.22' T = /5023` o e tti4 +48,00 -Y2C- p = 89 /7582 (LT) R = 945A0 T = 3483` R = 175A0 0 �. F 47.00' Rt. / / SE = OA25 R = 75.0(Y SE = A4 /a �` c + l F / / I -Y2D- PC Sta. 12+9521 D = 63.39` 43P SE = NC RO = 60' \ c 1 Pr W +0 Y2- / L =14027 DETAIL M PELAII l sr.c NEW I .o / / c/Y o� uI +95.21 -Y2D- R =889, s '� / 30.00' Rt. 90O() I SPECIAL CUT BASE DITCH LATERAL NDITCH rt0 k Cy 7 •i ti / C SE = 42 (Nara swi-1 e / y 15 RO = See Plans BM5 /EL.= 4/.4g' FARMS. INC. Owed 1 OF y ,C 6 EEPT D nee �",H, nep. c y F : 3: / -EYA- STA 3l +26�' D -2.5 FT. Min. D -VAR +48.00 -Y2C- 3i, ' . l F -Y2- STA De 709 PG 104 -Y2D -. 2519672'LT ea z,PC za PI Ste 14 +4490 47.00' Lt. 1113 ° / SPECIAL CUT DITCH SLOE a -229 C 1 SEE DETAIL H = SrOS /O9 0T) -L- STA 117 +50 TO 136 +50 LT. -L- STA 110+40 TO 111 +50 LT., DOE -299 CY + -Y2 - F \ F \ 3 / r +56.81 -Y2D- = 32.44`25.6' y -Ir STA 110 +58 TO 112 +00 RT., DOE-401 CY ° 247.66" I DETAIL H Y2- STA.18 +25 TO 21 +00 LT., DDE -152 CY 60.0 ' Lt. l \ 1105 / / T 149,69' -Y2- STA 23 +72 TO 27 +14 RT., DDE -524 CY ' ;n y f 1117 -Y2 •. PT ta. /1+56'81 R = !15.00` SPECIAL CUT DITCH -Y2- STA, 76 +50 TO 21 +41 RT. DDE -563 CY NEW AERIAL L / - INe11e Seek) Y2- STA. 28 +18 TO 29 +13 R7<, DDE -26 CY +48,00 -Y2C E* rh", / +47 -Y2D- SE _ .04 Pnnl - Y2C - STA, 10+89 TO 71 +50 RT., DOE-69 CY'^�0 - -F / ` / 40.00' t. }� _ DHah 30.00', llCii 47.00' Lt. Z p e nep. DETAIL N SEE DETAIL C - Mi.. D -VAL SPECIAL CUR DITCH +08.00 " Rt. PROP, 12" W.L I � (Nelm awml a to'� -/ c +77.00 -Y2D - � 1.2 30.00' Lt. ' ° -L- STA 111 +50 TO 715 +50 LT. oIa, +00. 0 -Y - GB�pRIP AAP -5 S / - �R 30.00' Rt. C 4, STA 172 +D0 TO 115 +00 FIT. ere.ia vw elep. DUSTIN J. CANESTORP, ET UX rOp• U +75.(JV '- P. T / 12 P`3 "5to. t0 +6.54 _v­ ° - Y2A - STA,25+00 77 TO 28+00 RT. D d -Y2C- STA, 11+77 TO 12 +42 RT. AUn,D -VM, DB 2590 PC JS .00' Lt 117 N / Cs_ Y - -Y2D- STA. 10 +50 TO 12+00 T, L Y20. STA. STA L 10 +69 TO 12 +50 LT. I SM PC C %3 r Z / Ste 2 +79 6 Y2- Q I -L^ STA, 177 +50 TO 138 +00 RT. ' -Y2- PT Sta 29 +13.53 a I w SPECIAL LATERAL LLASE DITCH DETAIL A (Nam swl.) SPECIAL LATERAL N' DITCH m Sbpa FlA I � Ground p } 3 A Slap. cm �,� L°.1 M,,. D -1.5 FT. °nw1 J D I B -4 FT. -� - Y2A - STA.17 +35 TO 18 +86 RT. M!n. D -YAK I Q m -Y2- STA 27 +83 TO 28 +50 LT. °� - Y2A- STA19 +00 TO 22 +00 FIT, _M A- VA 10a.nn TA 171nn IT / +13.53 -Y2- / 56.00' Lt. SPECIAL 4nli L N' DRCH GTD = GRADE TOO DRAIN S®, ®® sEE L A SBG = SHOULDER BERM GUTTER SEE SHEET 27 FOR -L- PROFILE SEE SHEETS 32 -33 FOR -Y2- PROFILE SEE SHEET 33 FOR -Y2A- PROFILE SEE SHEET 35 FOR -Y2C- PROFILE SEE SHEET 36 FOR -Y2D- PROFILE I SEE SHEETS S- THRU S- FOR STRUCTURE PLANS SEE SHEET 2 -G FOR BRIDGE DETAIL TRAFFIC DIAGRAM FOR -L- AND -Y2- I L_ - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ I I P PROJECT REFERENCE NO. SHEET NO. i I I UE-07 IEXISTT „_ , �3vW SH _- DETAIL L � 6? 65 p9F _y2_ 7 t / 10 DES SHEET NO. DETAIL H LATERAL N' DITCH ~i I I X ROADWAY DESIGN HYDRAULICS I SPECIAL CUT DITCH AL I ' DI ENGINEER ENGINEER NO CLAIM (Nolte s..l.) Pro:a S Q DENWS W. ER 7 DS 638 PC 002 I n��.t s °ilea ar.una 1 fill Z O I I I D Mtn. D -VAR. 5� I \ ';PSI I7#ILt7kRY =PI7 Min.D -VAR. 6 =5 FT. '00 $� _oiiisr.':_use aQa;; ous ?i f ............. :_;_ I I -Y2- STA.12 +86.33 TO 14 +50 LT -Y2- STA 15 +28.43 TO 15 +50 LT., DDE =11 CY 1 w X -Y2A- STA,11 +56.52 TO 13 +00 RT 42- STA. 15 +50 TO 16 +38 LT., DDE -43 CY I -Y2A- STA. 12 +00 TO 12 +50 LT. -Y2- STA, 16 +50 TO 21 +41 RT., 0 DE -563 CY -Y2E- STA 11 +50 TO 14 +50 RT. -Y2- STA, 18 +25 TO 21 +00 LT„ ODE =152 CY I -Y2&. STA. 11 +50 TO 14 +50 LT. -Y28- STA 10 +50 TO 12 +50 LT., DDE -103 CY IyyS - rR DETAIL D DETAIL A O 1� I +45.49 - v LATERAL BASE DITCH SPECIAL LATERAL N' DITCH 30 0, \ REVISED 07.15 -2014 (Nat fa feab) INOW &.1.) � ESTATE FILE 03E -154 Iq � � •w•E I De 285 PC 292 os 2 >G T o , I NEN6 fAf. FIII n NEW J I I J ° ° Fill +00.0 Y2- D . 1; I 1 1 ¢�I a a a Utility Permit Dr awing °-d u. Win. D -1.5 FT. B.4 FT. 5 a n 5 Fr. 70.00' R t. L J Sheet- of Nrl.D-Vra -Y2- STA. 14 +00 TO 14 +58 RT., DOE CY BEGIN GY)NST, -Y2- STA. 15 +27 TO id +50 RT. -Y2E- STA: 10 +50 TO 11 +50 RT. „•, - - A•/ +00.00 -Y2- -Y2E- STA 70 +50 TO 11 +50 LT. I G W 30.00',0 F.- DETAIL Y DETAIL X Q3 1 w I STANDARD BASE DITCH I H o `^- +48.00' Lt. S I SPECIAL CUT BASE DITCH 1 (Noll scald (Nelm sml.) C 1 RE F Gmund mound I D D Ate, of +72.00 -Y2- 1 - - I roan F slap - 105 B � �� t• 1 6 _ I Min.O -1.5 FT. 1.=d B-4 FT. FT. 4N �j* Nlnsn f b < d.0' B -4 Ff. B -4 FT. c�E'�R� AERIAL CL B RIP RAP- TO S C Q O -Y- -Y2A- STA 12 +20 LT. PI eta 10 +54.67 P/ Ste 14+00!7 -Y2- STA. 12 +50 TO 74 +00 RT. dES- ONSLOW GEOTEXTILE 0 N 1 \ 0 POWER 9Z T SEE DETAIL HDe A 0 = 76° 397 (RTl D = 76'23'397' (RTl -Y2B- I f�. I I I 44.98 t. w o T- 50-08' T= 29, I SPECIAL CUT 4' B I H I PI Ste 10+62.40 SEE DETAIL I 11 - Y2E - PC Sta. 10 +28J5 7 = 6 = 80.05' 18A' 64TJ +90.00 2 R = 75,W SE _NCB o D = /90 59 03.4° \ Ii I i a a a SE =See Plans L = 4193• t' I T = 2521' N, I +40.00 -Y2E - R = 30�, a goZJ LATERAL 4' BASE DITCH I 30.00' Lt. -Y2E- PT Sta. /0 +79J3 SE = NC \ JSF sE f{tygjy /4 / N 1 +79.00 -Y2E- SE L +79.13 -Y2E- _y2_ \ Yff a. 10 ( II 1 30.00' Lt, -Y2A- CL B RIP RAP A\ 2 F I \ F NLS NPO S23 ERO P1 Sta /9 +86.38 Pl Sta I /t0 /A4 P/ Sfa 16 +3412 13 + _y /� DIY PG 523 1$ I p = 25.39 48.5' (RT) p - 79W 02,6-(LT) L = 8f l7' 18J' (RT) D = 2.43' 42J' D = 57'17' 44.8° D = 32' 44' 25e OOSERT LEI' JOYCE R PARKER 30.00' °� L = 940,62` L = 138Jt' L 248.28` DO 2313 FIG 2% \ 39� � f C SPECIAL LATERAL N' DITCH /5 T = 478,33' T = 8�3 T = 150,23' OBLITERATE E I{ \ BEE DETAIL A SPECIAL I TAIL CLIT HDITCH I R = 2J00A0' R = /00.00' R = 175.017 DITCH I SE = OA4 SE = 6,02 SE = 04 -Y2- PC Sto. /5+06B5 vIi 2Q \ \ + -y _ - Y2E - PC Sto.13 +70.31 RO = W RO See Plans RO = 60 CL B RIP RAP- o -Y2A- PT Sta. / / +5652GEOTE%TILE 5 2 I \ \ 38.00' Lt. +70.31 -Y2E- I LATERAL 4' BASE DITCH / \ \ \ 30.00' Lt. SEE DETAIL D / 10 I I 10 -Y2E- PT $+0.141,27!4 .52 -Y2A- 1 'MO ?� F C/L CU /-�-SOC JONES.ONSLOW 40.00'R1. 35 i 1 " \ -Y2E- POT CONSTRUCTION N zr• � I \�� ND CONSTRUCTION I C POWER PECIAL DITCH i9,c I 3p% \ \ C -Y2E- POT Std, 141,86.24 &RCATVOLINE3W EE DETAIL toe I II 00- ? a F -Y - Sta, +-',&75: _ va 11 LATERAL 'Y'DRCH3S PROP, U/0 TEL. LINE I x O 35399 Lf,+ Y I 'i. CHW I EE DETAIL L O- I + 60.00', NEW a I , + _y _ r C 54.00' Lt. i 65.0 Lt. \ C +25.00 -Y2E - 75.00' Rt. , A P- TONS +60.00 -Y A- GE =3 F + 7n _ PC Stta. � +3 79 -Y2B- OF ' \ \ \ e 67.00x' • Lt. +7 62.00', A RETAIN '' \ N / PT Sta. 10 +79J2 -Y28- 77.00' +76.00 -Y28- yI Q F 66.00' Lt. A m v +79.12 -Y2B- E �0 I SETH 0. ELLS L'1 0. ' •F . POT STAND 4' BASE DITC y ry o� I I m 4'O q86 25T %�; SEE DETAIL H SEE 0 SPECIAL CUT DITCH o Sta. /O+W.00 - - Y i,TaKER FIAa" f 2, us 22 POI PUC Sta. /7+'00.00yy•1 ! I LATERAL N' DITCH C ` \ ' 3 a SEE DETAIL L +70.33 -Y2E 3 \ \ \ $ +38.00 -Y2- n PROP.12° W: SEE DETAIL ' �° I 39.00'. + 42.00' Rt. C +18.00, Lt. -- I o "c -Y2- + 4 2114 0 21 3 105.00 Lt. 70.00' Rt. +98.00 -L- W I NEW AERIAL CL B RIP RAP-1 To JONES- ONSLOW EOTEWrILE -5 C G - ! m +00.00 'Lt6 486.00'Lt. ^r j$ i E / EMC POWER - E I e END CONST, -Y - N SLEEPY CREAK PA m ' +84.49 -Y2A- x _ 101 I / ta./ + 00 709 F'G 104 .: . / 30.00' Rt._ �� 1 JA�en k 0E B 229 - Y2A - PC Sta. 14 +84 +11.00 -Y2- m 1 d ® / /$ / 0S REMOVE 1 u, 126.00' Lt. ITCH - 7 y A,� ° SBG - SHOULDER BERM GUTTER ROBER08 23T3 PC 298YCE R PARKER +12 Op -v^ T - f tl 1 1 '^ ry LATERAL N' I H SEE SHEET 32 FOR -Y2- PROFILE +25.00 -Y2A- HG�/ �E_Q i SE Tf O SEE SHEET 33 FOR -Y2A- PROFILE "t X� + - A- 13 3 ' 21 s^? Q _ De 709' ye SEE SHEET 35 FOR -Y28- PROFILE ® 0 ' Rt. , 9 50 SEE SHEET 37 FOR -Y2E- PROFILE 0® V +00.00 -Y2A- ®® I I -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - O v c a 0 d E m o_ Z DETAIL I TOE LP°RO PROTECTION 1. e< _ G d L . vIN F -1 d LS FT. -5 FT, GrofueiM T f Uner CL 8 RIP RAF -25 TONS GEOTEXI'LE -55 5Y -Y2- STA 28 +50 TO 29 +00 LT. DETAIL Z CHANNEL RELOCATION ( Nof I. Sa16) NIZI _Noluro� FlII-S\� Z.r�ounn D d \ Min. D -4 FT. E GEOTEXntE W.I. ch°niwl Mu. d -5 FT. B -6 FT. CL [RIP RAP- EST.46 TONS; GEOTERTILE -EST. 65 SY -Y2 -STA 31 +00 TO 31 +96 RT., DDE -246 CY -Y2- PI SIO 33'x2772 4 = 4° 54' 06A' (U) 0 = 2'23'14.4' L = 205,32' T = /0272` R = 2Ad0,00' -Y2- STA. 28 +18 TO 29 +13 RT., DOE -26 CY BEGIN RESURFACING CC) PROP, 0/H POWE 15 1 f POT STA32R�,00 -Y2- O & CATV LINES SLEEPY CREEK FARLfJ, 1 O STA. 31+00 -Y2- Do 709 PG *4 -Y2- PC St , 32¢25 Lo L6 21P0 201 1 TOE PROTECTION SLIDE R -99q I / r _ STA. 32 +00 -Y2 X. I T +IS - 2- ao PROP. U/Q TEL. LINE 55.00,E W, +00 00 Lt2_. +00.00 -Y2- +9 2- / 30.00', x1st. /W, �j / STA. 29 +24 -Y2- 40.00' Lt. o' t �i° ROAR sT ux W2 PG y S 5655'08' Y' NEW R aN TRACT 2 97,41' IST. 10 g8B E 44 1YHIIE-0`A16 $ R S3� F y5 RUC7URE- 4,5 na �_ .. .. .. .. m W W / DETAIL L O 1 LATERAL 'Y' DITCH E o" y E°elel LL 4 1(Ngte � cro° D fulw JAn. 0 -VAR -Y2- STA. 28 +18 TO 29 +13 RT., DOE -26 CY BEGIN RESURFACING CC) PROP, 0/H POWE 15 1 f POT STA32R�,00 -Y2- O & CATV LINES SLEEPY CREEK FARLfJ, 1 O STA. 31+00 -Y2- Do 709 PG *4 -Y2- PC St , 32¢25 Lo L6 21P0 201 1 TOE PROTECTION SLIDE R -99q I / r _ STA. 32 +00 -Y2 X. I T +IS - 2- ao PROP. U/Q TEL. LINE 55.00,E W, +00 00 Lt2_. +00.00 -Y2- +9 2- / 30.00', x1st. /W, �j / STA. 29 +24 -Y2- 40.00' Lt. o' t �i° ROAR sT ux W2 PG y S 5655'08' Y' NEW R aN TRACT 2 97,41' IST. 10 g8B E 44 1YHIIE-0`A16 $ R S3� F y5 RUC7URE- 4,5 na �_ .. .. .. .. m W W uj e coiPOL _ 6u 4040 503 SQ FT Z i VA L N W JONES- ONSLOW EMQ2POWER DUSTIN .L C/ANESTORP, ET Ux ProC 0812590 PG 35 138.0 V6 49 PO 105 SLIDE L -963 STA. 30 +38 -Y2 -I Y, f�i •o aoa� QN� •�'s To'zo• . fl' 222.33 s o� i N BARBARA H S81 AIN 5 8T.23'4T' E RRu`LOCROO 095 Get.'A A Son• ot-0 G�%l.E pr,0 PCO S 30 42- �f N 3 TI.2 ---�- AU 350 T�� PUE �titi> SAVIIOR�1 V� e nw+ �u P0C 5TA33¢I -Y2- + 700 Sr I 0.0 u 2 4.3 S. SAWYER, ET ET — Xist. /W, m TAP ,�pp,�� zp, a a 1L5B'oe VIR c. 4 NEW m De PG w00 -Y _ JONE'�=O LOW zo.ea, STA. 30 +85 -Y2 - SM52 EL =29.23' 44, t. EMC POWER 1 +00. - 2- -EYA- STA 38 +57 C /Sr —OpTfON 30 0' -Y 2- STA 33 +29, 97' RT 5 T16A 8 C SEE DETAIL �i 58.00 Rt. .58.08' +85.00 -Y - STA. 32 +51 Y2- s r ,10.x0' 30.00'; Rt. 4Fl -011', f POWER POLE: et- FILL IN WETLAND 913,040 SQ FT < 0.01 ACRES �� 0.020 ACRES SITE SITE 1 DENOTES HAND CLEARING oEFgsE P 831 PIG 12 r V6L ARNOLD 2W K 804 ux DENOTES WETLAND L IN � / os 283E Pc p3 s2. E�z LB 51 PO 43 SLIDE La380 2B yea LB 51 PG 43 SLIDE L-1380 / LOT is ��e,a•P LOT 5 NO CLAIM \ NO CLAIM i I \I I S T361Z 9 E/i I t- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - PROJECT REFERENCE NO. R`W SHEET NO. ENGINEER REVISED 07.15.2014 Utility Permit Drawing Sheet 8 ®tom_ O DP -BY- 62 O 1 13 Ni E E o" y 4 LL 4 Y, f�i •o aoa� QN� •�'s To'zo• . fl' 222.33 s o� i N BARBARA H S81 AIN 5 8T.23'4T' E RRu`LOCROO 095 Get.'A A Son• ot-0 G�%l.E pr,0 PCO S 30 42- �f N 3 TI.2 ---�- AU 350 T�� PUE �titi> SAVIIOR�1 V� e nw+ �u P0C 5TA33¢I -Y2- + 700 Sr I 0.0 u 2 4.3 S. SAWYER, ET ET — Xist. /W, m TAP ,�pp,�� zp, a a 1L5B'oe VIR c. 4 NEW m De PG w00 -Y _ JONE'�=O LOW zo.ea, STA. 30 +85 -Y2 - SM52 EL =29.23' 44, t. EMC POWER 1 +00. - 2- -EYA- STA 38 +57 C /Sr —OpTfON 30 0' -Y 2- STA 33 +29, 97' RT 5 T16A 8 C SEE DETAIL �i 58.00 Rt. .58.08' +85.00 -Y - STA. 32 +51 Y2- s r ,10.x0' 30.00'; Rt. 4Fl -011', f POWER POLE: et- FILL IN WETLAND 913,040 SQ FT < 0.01 ACRES �� 0.020 ACRES SITE SITE 1 DENOTES HAND CLEARING oEFgsE P 831 PIG 12 r V6L ARNOLD 2W K 804 ux DENOTES WETLAND L IN � / os 283E Pc p3 s2. E�z LB 51 PO 43 SLIDE La380 2B yea LB 51 PG 43 SLIDE L-1380 / LOT is ��e,a•P LOT 5 NO CLAIM \ NO CLAIM i I \I I S T361Z 9 E/i I t- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - PROJECT REFERENCE NO. R`W SHEET NO. ENGINEER REVISED 07.15.2014 Utility Permit Drawing Sheet 8 ®tom_ O DP -BY- 62 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS URFA E WATER IMPACTS Site No. Station (From /To) Structure Size / Type Permanent Fill In Wetlands ac Temp. Fill In Wetlands ac Excavation in Wetlands (ac) Mechanized Clearing in Wetlands ac Hand Clearing in Wetlands ac Permanent SW impacts ac Temp. SW impacts (ac) Existing Channel Impacts Permanent ft Existing Channel Impacts Temp. ft Natural Stream Design ft 1 - Y2 -29 +24 TO 31+00 Aerial Power CATV lines 0.09 Sheet UE -08 1 -Y2- 30 +38 Power pole <0.01 SHEET UE -08 2 - Y2 -32 +00 TO 32 +51 Aerial Power &CATV Lines 0.02 Sheet UE -08 3 - L -56 +12 TO 57 +40 Aerial Power &CATV Lines 0.09 Sheet LIE-05) 4 '- L -61 +75 TO 62 +06 Aerial Power 0.01 Sheet UE -05 TOTALS: <0.01 1 0.00 0.00 0.00 0.21 0.00 0.00 0.00 0.00 0.00 Note : 6.25 sq. ft. (Each) = 0.0001 ac (Each) permanent impact in the wetlands from pole installation. Total = 93.75 sq. ft. = 0.002 ac = < 0.01 ac NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ONSLOW COUNTY TIP PROJECT (R- 2514B) Revised 7/ 1 Utility Permit Drawing Sheet--'? of 51 o, G w r u c a c L a G -) C c c G. E 1_ nID c G) c)'u) Sn J.� fit J� cv) d. C; f 0 Im , 1110 , SSIS o / / Chadwick CpR�OATyk�V ' nPOROlSTS / 1115 ✓ - ( /' ONkS, ONS�O� Ty00 jl1t 58 _ "fY 111e /CROATAM i Fir rTL BEGIN PROJECT ils 1 '�Av1 VICINITY MAP STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS UTILITY PE"IT PLANJ JONES CO UNTY TO SOUTH OF NC 58 NEAR POLLOCKSVILLE TYPE OF O, RELOCATION I TELEPHONE AND POWER T.I.P. NO. SHIiL >T \O. R -2514C UE -1 Utility Permit Drawing Sheet I of �(? Revised 1130/15 Vmftl •r NSRS 00 MIT pfd THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES, THIS, IS A PARTIAL,CONTROLLED;ACCESS PROJECT WITH ACCESS _BEING, AT DESIGNATED POINTS ONLY. INDEX OF SHEET'S SHEET N0, DESCRIPTION UE-1 TITLE SHBET UE -2 THRU UE -16 UTILITY ENGINEERING SHEETS GRAPHIC SCALES 50 25 0 50 1 0 PLANS 50 25 9 5O 100 PROFILE (HORIZONTAL) 10 5 0 10 20 INCOMPLETE PLANS SEE SHEET I" FOR -DET4- PLAN M NOT U58 POR R/W ACQUISITION, SEE SHEET 18-B FOR -DET5- PLAN YRE#LIMI1'�Ai�Y t�LAN$ SEE SHEETS 26 -A & 26 -B F OR -DET3- PLAN `_'D0 >°TF9!`:iR'F9NSrrirTjor: W4T"ER AND SEWER OWNERS ON PROJECT SEAL PRJIPAW IN 171E OFFICE OF. DIVISION OF HIGHWAYS UTILITIES UNIT (1) WATER -JONES COUNTY UTILITIES ENGINEERING (2) FIBER OPTIC - CENTURYLINK b (3) POWER - DUKE ENERGY PROGRESS IS55 MAIL SERVICES CENTER RALEIGH NO 21699 -ISSS a� PRONE (91➢)701 -6Q ➢0 _�.�_i`� =_` OF TM FAX (9191250 -41SJ or .E. UTILITIES SECTION ENGINEER UTILITIES SQUAD LE,4DER PROJECT ENGINEER UTILITIES PROJECT DESIGNER O R r c J W u N C li A a -L- -Leus- PROPOSED US 17 Pls Sto 12 +17,85 P1 Sto 16+95.31 P1 Sto 13 +12b8 7 700 c IZ.DOO es - 4' Ir 325' A = 2714'57e(LT) A = 46'08' 20b' (RT) 11,400 0o Pyo 17,700 Ls = 240.00' 0 = 3'29'37r 0 = 1505'54.9' LT 160,04' L = 779.97 L = 24158 ST - 80.04' T = 397,51' T = 12777' v R = Ib40.W R = 300A(Y "I SE _ .06 SE = SEE PLANS c, RO = 240' ADT �w YO35 TRAFFIC DIA AM 0 Q (B L- 10R251PO 5 +00.00 - Q -BL- 106 PINC (ENO R25_148) 243 +$ .3 -b * _ 4 - POWER POLES ' To STA.19r44 IRTI FILL IN WETLANDS 11 ; \ \ J, G LAROOUE, HEIRS A j ` Y D8 *9 PG 559 * *� I N 24° 37' 27.7• E 8" * I 1 ibis Slo Q I 245+29 0 I �s 617' 16b' = L 236,36' y9 % iSl { 118.24354.33' LL ,01 s * * E. ' / Q I`1 / I 4`* feL IP RAP ONS JOPEN WATER LINE 797' o aryl , -E "� BEGIN P R— 14C 7 SET .0 9n / FRANK JENKINS HEIRS 08 WPG 444 �•_ ` ` m8 3 PG T * ss s 1 1 SPE BASE OITGH 'k * DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: REVISED: VIP � r � I PLANS UTILITX CONSTRUCTION O FRA%JENKWS HEIRS IN PC 494 r: lip ff 08 Q2 PC 245 c .� rlf''��� /�,;�. wwwwww do MIME M. T WA � ..., iii ��0� ,,,,,� �'�a ����'� ��... r ♦��� %�% ��1� �� iunnc �•1 1J.1P •�� / /n..,�'ll may, ` i .ii :i :i °, •�nu■c ,A ^ R�'J� AM FRANK JENKIN TAT �z sheet ;L of ;W RECEP ,�,_� � , //` a ,......� [�► I nrr• • PATSY VERE I: ISIP0 494 . _ 7FTY I: . �i DENOTES • WETLAND DENOTES EXCAVATION DENOTES HAND IN WETLAND CLEARING SEE SHEET 29 FOR -L- PROFILE T� 4 * _ 4 - POWER POLES ' To STA.19r44 IRTI FILL IN WETLANDS *\ ; ARING 35 ON 11 E LL ,01 * * E. ' CUT JOPEN WATER LINE 797' o aryl , 'k * DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: REVISED: VIP � r � I PLANS UTILITX CONSTRUCTION O FRA%JENKWS HEIRS IN PC 494 r: lip ff 08 Q2 PC 245 c .� rlf''��� /�,;�. wwwwww do MIME M. T WA � ..., iii ��0� ,,,,,� �'�a ����'� ��... r ♦��� %�% ��1� �� iunnc �•1 1J.1P •�� / /n..,�'ll may, ` i .ii :i :i °, •�nu■c ,A ^ R�'J� AM FRANK JENKIN TAT �z sheet ;L of ;W RECEP ,�,_� � , //` a ,......� [�► I nrr• • PATSY VERE I: ISIP0 494 . _ 7FTY I: . �i DENOTES • WETLAND DENOTES EXCAVATION DENOTES HAND IN WETLAND CLEARING SEE SHEET 29 FOR -L- PROFILE T� O c m r :n z a L Ge 01< ,f 1 - POWER POLES Utility Permit Drawing 3221.6° FILL IN WETLANDS Sheet 3 of a0 F K >E >E Revised 1/30/15 K- R • �� X R H- >F R FRANK JENKINS HER$ OB IM PO 494 K- K R Y8 3 PC T k- SITE 3 PROP. 6" WATER LINE IE 1,� HAND CLEARING .03 +23. O - R EXCAVATION .01 ° Y 2 79 AL+BROSE ROBERTS, JR. R 0Ek.(22 PC 245 R +23.8 N. 1F 180.00 K- H S 05'55'39' E OPEN CUT PROP. 0/H POWER WATER LINE 73' .EY HETRSW 8 Q M ID'w'Dr 0. 64:E'S7 s- 'T G� y i ►u� I �a=ig f H SEE DETAIL , DITCH LATERAL 8'BASE DITCH MAINTAIN EXISTING DITCH R SEE DETAIL A K k L r K- Ib R S R I< IF It DETAIL A DETAIL DETAIL C DETAIL B LATERIALLe BASE, DITCH LATERAL LATERAL BASES DITCH MEDIAN V DITCH e r to nl _ aro;r• 1',fL NI .e. :/ 5 !y1, !71 - F I Oto-aM 54+ . AI. Fll J.Z F%y °r D '!'• 1'aoo oyoa ° 3'• + Ron `MIn.0- 4 D 7'• 41 y: +� d6o' q P B AUn.O- 2.6 ft. B. 0.0 H. . 1 1.5 Ft. 1i�1 S. DA fl. I , I Mn. O- 2,0 Fl. I«°.1 5- 6• S.0 F1. 6- 5.0 H. c- -L- STA. 20 -15 TO STA. 24+00 MID I -L- ZMI /YOU TO ZIA. 1-10 RI L ]IA. JU -OU 10 OIA.- — LI - L- SIA21'�IU 10 i1P. JV C�V LI DDE -564 CY ODE -2610 CY DOE -2251 CY DRAWN BY: MEH S O491'39'E CHECKED BY- COB so.ao APPROVED BY: CDB NAD 83i SR REVISED: NORTH CAROLINA .•I4 DEPARTLIENT OF m TRANSPORTATION N UTILITIES EMOIMEER IMO SEC* PH ONE7(919)707-�690 UTILITY CONSTRUCTI Mo +71'39'M �ad 9 FAX:(919)250 -4151 PLANS ONLY o= UTILITY CONSTRUCTIM DOROTHY WARD 08 164 PC 668 23. 0' (LT-1 ER FRANK J s D4•s39 E .14 PROP. UG TELE. 130.00'(LT.) 323.00'(LT.) O DAVID WARD. ET UK •3 •w DB 13T PC 164 x45..21 ILT. __. f,J V) Lj uj V) 6 L/ LW z /� W L1� DENOTES FILL IN WETLAND F/M DENOTES HAND DENOTES EXCAVATION CLEARING IN WETLAND NOTE; ALL DRIVES ARE 12' UNLESS NOTED OTHERWISE, PAVE ALL DRIVES TO BACK OF TURNOUT RADIUS. 7 PROJECT REFERENCE NO. SHEET N0. R-25M 14 - POWER POLES DESIGNED BY; MEH [_FILL IN WETLANDS DRAWN BY: MEH NAB 8,3/ CHECKED BY: CDB RS 2007 APPROVED BY' CDB REVISED: FRANK JENKWS HEIRS 214' TRENCHLESS INSTALL TELE NORTH CAROLINA 08 181PO 494 77' TRENCHLESS INSTALL WL DEPARTMENT OF M8 3 FIG I TRANSPORTATION O Utility Permit Drawing UTILITIES EN01 ERING SEC. Sheet q of,�o PHONE.0191E074690 UTILITY CONSTRUCTIO FAXI(919 1250-4131 PLANS ONLY PROP. U/0 TELE. Revised 1/30/15 UTILITY CONSTRUCTION . >^'� sy I • .. ' ` 2034 ............... .. ...... ........... .... ..... 1.2291 TRENCHLESS INSTALL TELE GREEN CO LAND. I.I.C. -218 TRENCHLESS INSTALL WL De 351 PG 256 11 04'25ff2il W 14 4'05•04'W E N 04*07'04' W )k PC C SLIDE 37-2 _7 228.76' la SITE 15 -4,30 . TRENCHLESS INSTALL TELE, 1280' TRENCHLESS INSTALL L Y, NORM: I ILL HAND CLEARING 121 OB 2 PG 841 PROP. 3" WATER LINE 20 PROP. O/H POWER +40.00 -L- WOODROW F.L EMP_ E T UK Do 1 0 r14 ML 3' BAS! ONCH 151.00'( T.) 0 w 142 X_ k OOOROW LASSITER, ET UX Lo +70.00 4- 0 on + + 7. 04*34'3Y W 5.00, If BEGIN C/A FENCE 16 +1 _L_ +5 4, 125.0 12 T C E '600 E '600 El Ni (03, HC N uj Lu Lu �SEPLTZf I OUT, ,gf u T S�j 2 24 r i A Af uj uj Lu V) . ".. -111.11 0 O offlf� MI.. -7 R T CL B_111? RAP- - - - - _TMI TT w" Is, R �: _ i 0 L ITR 0 CL & PJ LISM-TONS- [Za_ - CL 11 KI !QNS -EST. 7 SY 4390TEXrILE SYG E'TE7111F 0 4 WWI_- 4-m ;t M 0 US IT MAIM Sr 2Z 85T S11IDMAIL 6 US MYY 171AC 56 Z4 8ST DITCH - + r r = T X CIO ------- _44a" I- 9 qpw ZW711 If - - - - - - - - uo - - - - - - - - - - - - - - - - - - - - - -- - - - 10 PS 10, 1 4- —F _F _F _F F _F f F F F r� "T �R� ff Yn Pik A f 8 A ui F If ED STATES DEPARTMENT OF AGRICULTURE IF — F If ui z If oB 8* O M + z N- SEE SHEET I-E rE V. 40.95' UNITED STAT DEPARTMENT OF AGRICULTURE K m S. 0 39 PO 286 SITE 7 15. RIf T. HAND CLEARING I� c K_ SITE 28 n HAND CLEARING,011 ISITE 29 SITE 6 IHAND CLEARING 01 HAND CLEARING <.01 DETAIL 0 DETAIL 0 LATERAL BASE DITCH MEDIAN Y DITCH 'z Wx G_ D I'll, nil V." )An. 0- 1.1 Fl, -L- STA. 36+50 TO STA. 37+60 MED _L_ STA. 31 + 10 to STA, 52 + 00 LT -L- STA. 411 +00 TO STA. 41+00 MID DOE-2610 CY DENOTES FILL IN L WETLAND DENOTES HAND , JE�� CLEARING NOTE: ALL DRIVES ARE 12' UNLESS PAVE ALL DRIVES TO BACK 0 F- LU Ej V) F- NOTE; rrcudc�; ncrcn�n�� nv• -• -- - R -25140 UE 5 .�.d• 1 m i I f�i� ' > " #[ ? > <:iPFItE�T6� %fI!i�Ic;E? EARL `..;p.:: :�! ...:.:.::.:..r:�.::. DESIGNED BY: MEH <?NEJ %.V 7 %: >:ROA:: >!.011i:l:ftl�r >V11 ECU Uay.: DRAWN BY: MEH CHECKED BY: QDB �4 _'• } � i Ev ' '� QE D' j1}11) .9 Nlm X�g2' CECIL R. HILL; Er ux 06 177 PC F52 n�y DB 216 PG 639 Fi+ �N 1 - POWER POLE FILL IN WETLANDS IF I ROY L. KING, ET Ux DS 166 PG ws APPROVED BY: COB 83 SRS 2007 REVISED: NORTH CAROLINA DEPARTMENT OF TRANSPORTATION UTILITI UTILITY CONSTRUCTIO l ❑ --, p GREEN u 0 lAt,p, LLC. I �e �:rl i .I OB 51 kG 256 l2�•.i} x�x I}" - 3 - J Pc csLroS 3r -2 QQ "E N w5 K 5 ° "' x 24 _ Utility Permit Drawing Sheet .j Of� PHONE7(9 9))707-6690 FAx:t919)250 -4151 PLANS ONLY I(J TI L I TY CONG �TR (;T r l^, I. FLOWERS, E7 x RAY9,j N,,QS,;, 9Y 270 P° 219 OBTW P 2894 27 Q £ . ,XPD8JK6 PG6 (WIDOW 3 P A? a PROP. 0/H POWER I x x Revised 1 /30/15 \x 29 ' E 2• • Q I O i I! xS ^- 1 -� x-� x 17 xx48•ELECxJ no.oD' 74` TRENCHLESS INSTALL TELE. Q __. _ PROP. UG F/0 CABLE 1 c.BANKS,dR,er x N 34_Q� 26 w f� 4• D8 190 PO 894 Q ,. - 5 4' J'90' Ci 5 09'1 ' I I : I I N 4• • w .110.80• 'ft, 102. 65. 118100• I c ( raACT 3 ' 4 5 PROP, 6" WA o. oll__ ❑, m ER LINE ; 1- ' p 1 0.00' (LT.' [:'S.i`. z 2 . - •' p m +21,00 -L- _ _ X m 125:00' (LT.) u ° 22 08 152 PO 22C O X .' 5 I f J73.00 (LT.) ❑ BRA EY 18LL u w DORIS L, H0. (l�E ESTAT 2' END C/A FENC 08 236 PO 645 Q Ox I 174.00' (LT,) ce T 508 ° m D8 33T PG 506 BB B, f1EATH, ABBY 8. HEAT III 2 Q' O �. j /SEPTIC u a .00 -L- ' Ci a n �2.8 is 71C +45.00 -tr °•LATERAL J' BASE DITCH ET U% ET U% 1 I , x 5 I YSTEU Li 19SEE DETAIL D X26 PG �8 DB 226 PO 33 Fp =51.0 H 161.00 L +10.00 RACT 2 TRACT 1 °. I I I- 125.00' (LT.] +12.0 -l- SEPTIC SYSTEM m - AEOIN qA FENCE 135.00' Il .) °v I I x CL 5 RIP RM i 15.56 -L 135.00' T.J ISgxp - I e 4Y I LT, +7 .00 -L• 15 50 `(T•1 ' mt E,,.,I I E5T.5 TONS u 14 00'(LTJ •� y _ _ -- - -- - �- z _ .� "dm' w \ ,y PAUlB$ J. KIN° L41 11 _ / 5'S�.I I : SEPTIC 11- \125 0` LT.J �- p6 KI PC 222 L V o + / ~ \ I • M-I I f A 7 125.00a r/LT. 125.00' (LT.) Hifl I ' \ SEPTtC 1 z 5Y57EMr '6 1 + _ L f y 195.00' mt25 asED $ .14 SY GEOTOMI.Ec. :- I o / x" � � 1 f m m 15,00` ttlT, bl 0' LT, ( ) +5 .0 - L I 142.. 133. `ILT. +00.00 -U .. '' + - 1 1 - p .. 2 7 �0 C' i 125.00'. LT 1�P 2'� . „( 140.COyL•.j_ I 15E0 1 I +41 B -La { E Y L, KBE 9t m 161.0 _L ISFD 173.00'(LT OB 166 G 627 u-.: .t 1 5,C0' (li.) 1 f/A FENCE L� ( X1,9 d _ t40'LT I f DIT NAEL �T � [!�9'f1' FENCE OB 344 PG 230 LAb(ilhl JJ ��AASE U% r 01M 'I' 0 t .a. . w 7 s 4 4' 1,' y' u.F4• uj Ej - � - g1"-! .- T ' Y - �PEMO� V - . - IS� RCP _, _ - - - _ - ._ RCP -r ro IS RIS' r - 15- ' R- P c--i E- -L - ro= _ -_- - _ Y � • - - - - - ._ - N 40M II MEDIAN N' DITCH 6 N 4® V + 4oe- s a SEE DETAIL A { f +t F f ` mA KT W01- LA - Op _ aver „ --em- - - _..._. - _ - - ..- - - - .�- , t»y - - -plq ^ x 10' PS 10' PS + f V) - - - - - -N- - - - F F F F F F T F F '� - - - - - F M F f F F F F F P f f f P K- f F NF R . K- K- K- UNITED STATES DEPARTMENT OF AGRIC TUBE t K- lE . UNITED STATES DEPARTMENT OF AGRICULTURE E E k- '� � C S HEET z OB 89 PO 285 tF 08 89 PC 285 SEE I -E ELEV, 41.22' E " -L- POT Sra.46 +34,83= K, R -Y PO Sta. / +6OJ9 -BL- 3 PINC 54 +80.92 F H IF H -BL- 2 PING 43 +93c45 II• K- � x- x' � x- SITE B HAND CLEARING ,01 DETAIL B DETAIL D MEDIAN V DITCH LATERAL SASE DITCH (Ra.m Sal,) 1Na1 ie k°MI DETAIL E LATERAL 8ASE .DITCH INe•ro Iw.O II+ -�yl 'edia 9fe1 Oroum �'Ie x0 rou h y74 Ik' D'0� tAl. 0 30� Sieo, S'aM A AUn. O• 1.5 ft, A Min. D. 1.0 R 1. 9.0 Ft. A• 3.0 FI. -I, ST.-. 46x90 TO STA, 48+00 MED h. 5.0 F.. h- 5.0 FI. -1,• STA 10 +50 to STA, 52 +00 LT -L- STA. 51 +00 to STA. 61 -00 IT DENOTES FILL IN F WETLAN D DDE =2610 CY DOE -765 CY DENOTES HAND CLEARING NOTE; N N N N v Y 0 Z 9 w 5 0379'26' E 5 03.34.26 E 5 03.34.26' E 03'34'26' �J 216.41' 105.02' 104.99' 60,00' \a 2 - POWER POLES P> FILL IN WETLANDS as 90' TRENCHLESS INSTALL TELE. o E S 092715• E :3 I96.21' RAYMOND C. BANK HS,,JR.ET UX W 2� SITE 9 1 I �g HAND CLEARING 04 ° EXCAVATION < °01 LA 2-8 2.8 � 1 5E1 m pip Utility Permit Drawing Sheet 0 of ,20 Revised 1/30/15 DETAIL E LATERAL BASE DITCH (N911e 7u14J b DETAIL F P.o LATERAL EASE DITCH V.P. (HUN JuMJ DETAIL LATERAL 'V' DITCH (Nnlu ko'•I N6 9b1. 0nun ��{ li�ltln� OnuA 'TB\ 1• G 0 AQ ISff. !aw 0. ,/ 4•w,,,. -- 2ieund —oro"M — b- 5.0 H. Mln.O- VAA 9� ° °� •� n••rw e- J.G FI, m ym19• minlmvm b= LOfi. dM•b d.ph 3.0 Ff. !il•bw 4WIIrq -<^ STA, 82 +00 to STA 61' +Otl LT ODE =765 CY b� 3.0 k. '0 01It•'"u"'"° -L- STA. 61 +00 La STA. 66 +00 LT -L- STA 66 +00 to STA, 78 +30 LT DDE -439 CY sf?A:`EtsI N4f3l' PI iS14 > <_ R•25140 I UE -6 DESIGNED BY: MEH DRAWN BY: MEH CHECKED BY: COB APPROVED BY: COB NAD B� REVISED: `SRS NORTH CAROLINA DEPARTMENT OF TRANSPORTATION I UTILIT115 ENGINEERING SEC• PHONE:(919)707--$690 UTILITY CONSTRUCTIOI FAX:(919)?50-4151 1 PLANS ONLY UTILITY CONSTRUCTION NOTE: ALL DRIVES ARE 12'1 PAVE ALL DRIVES TO t5 gal W z ®1 u W1 t9 1- DENOTES FILL IN WETLAND DENOTES EXCAVATION IN WETLAND DENOTES HAND CLEARING NOTED OTHERWISE. OF TURNOUT RADIUS. Z O N I C 61 O r a 0 0 Z 0 \* UCIVVIC3 CLHYMtILJIv IN WETLAND F / yj DENOTES FILL IN i i WETLAND LARRY E.EUBANK DS $6 PO Tt2 WB 10•E PO 46 4 FOOD- Z1001 4, STA. 66 +00 1. STA. 76+30 LT DDE -439 CY -L-STA. B6D�E =1905GY' 29 +00 LT -4- STA. 61 +50 TO STA. 83+50 LT DOE -47 CY -P,.." a, 9 ....... 7 -6590 UTILITTLANSNSSTTRUCTI01 FAx:(979)250 -4191 UTILITY CONSTRUCTION WEYERHAEUSER COMANY PC T SLOE 33 - DRV2A- STA.10 +50 TO STA.11+25 (LTI NOTE; SBG - "SHOULDER BERM GUTTER" ALL DRIVES ARE 12' UNLESS NOTED OTHE PAVE ALL DRIVES TO BACK OF TURNOUT SEE SHEET 2A-5 FOR DRIVEWAY PROFILE 0, OR -L- PROFILE R, ?k�:= ff��ttARtt.iinn�Ft tl Nib!}Ai~i ?' AAA :}Qi}Nt �y1 *i::;l.:�:1' >i, kK V�`?l. 9. fi%:l: Qfl :'sr'P.t%JT.J�.lt�:ik�:t::�t! %: OESI GNE0 BY DRAWN BY: 'ALL TELE,1 CHECKED BY APPROVED BY REVISED: NAD 83� SRS 2007 DEEPTRTME -P,.." a, 9 ....... 7 -6590 UTILITTLANSNSSTTRUCTI01 FAx:(979)250 -4191 UTILITY CONSTRUCTION WEYERHAEUSER COMANY PC T SLOE 33 - DRV2A- STA.10 +50 TO STA.11+25 (LTI NOTE; SBG - "SHOULDER BERM GUTTER" ALL DRIVES ARE 12' UNLESS NOTED OTHE PAVE ALL DRIVES TO BACK OF TURNOUT SEE SHEET 2A-5 FOR DRIVEWAY PROFILE 0, OR -L- PROFILE 0 z 0 D fJ CLEARING IN WETLAND- -N-OTE; SBA - "SHO( TRUCTIO NLY ION r I (PROP. 0/H POWERI WEYERHAEUSER COLIIPANY PC '8' SLUE 33 34 PROP, 6" WATER LINE \ I a� �r I r. I ! I 1 I I 1 I I 1 I r : I I . : I ! 3' TRENCHLESS INSTALL TELE. 199' TRENCHLESS I7NITALL 1 1 / / I 1 106.00' 110,00' 135.00' 7Lq. / 109.00 / .K -- PROJECT REFERE. �- REFERENCE NO. ... _ SH E T N0. _ �- R -25140 UE -9 2GI DESIGNED BY: MEH ES 3 TONS DRAWN BY: MEH io BY GEotmILE 10, R� CHECKED BY: COB APPROVED BY: CDB I I M REVISED: NORTH CAROLINA 15' Rep DEPARTMENT OF t 1 TRANSPORTATION -III UUL111ES ENGINEERING SEG. PNOHE:(9i9)707 -6690 UTILITY CONSTRUCTIO. FAX:(9191250 -4131 PLANS ONLY - — F —P �. F f F F uj M _ �ulYttl_�u1B1� !P Ih7�NitFbl6Rt♦ - J♦Ll+l 18' CRAP W-1 ol I a� �r I r. I ! I 1 I I 1 I I 1 I r : I I . : I ! 3' TRENCHLESS INSTALL TELE. 199' TRENCHLESS I7NITALL 1 1 / / I 1 106.00' 110,00' 135.00' 7Lq. / 109.00 / .K -- PROJECT REFERE. �- REFERENCE NO. ... _ SH E T N0. _ �- R -25140 UE -9 2GI DESIGNED BY: MEH ES 3 TONS DRAWN BY: MEH io BY GEotmILE 10, R� CHECKED BY: COB APPROVED BY: CDB I I M REVISED: NORTH CAROLINA 15' Rep DEPARTMENT OF t 1 TRANSPORTATION -III UUL111ES ENGINEERING SEG. PNOHE:(9i9)707 -6690 UTILITY CONSTRUCTIO. FAX:(9191250 -4131 PLANS ONLY - UTILITY CONSTRUCTION k4p e 3k SRS Sao, PROP. U/G TEED Utility Permit Drawing Sheet -!T— of c2 D R • d 1/30/15 1 POWER POLE I6, TRENCHLESS INSTALL TELE. evlse FILL IN WETLANDS �f 5' TRENCHLESS INSTALL WL rHAh1n ITE 17 CLEARING 10 100.00' (LT.) 101.0 LT,I 2 CARP W/ 2 lLBOWS EST _.._ LATERAL VIOSE DRCH _.._ - WEYERHAEUN r- _ �- LT! RIP RAF PC Ir 2GI ES 3 TONS �° io BY GEotmILE 10, R� 2 ELBOWS I I M 15' Rep / t 1 -III — F —P �. F f F F uj M - - -- - -- -' - - — !P Ih7�NitFbl6Rt♦ - J♦Ll+l 18' CRAP W-1 ol z ,k Al „s-' \ 2 ELBOWS EST. i CONCRETE UNITED STATES DEPARTMENT OF AGRICULTURE 'L- s BOLLARDS OB a�9 PG zes � 115.00 yftT,1 BEGIN WILDLIFE FENCE I IT. 195.00' 0.T.1 END WrLID flNCE A� A` / DEPARTMENT OF :: :. po 28S 't LATEM A� SEE DETAIL H u In s 520 IRT Od IV— — F F- F a P F DETAIL LATERAL NDIT<H I"f so"' SEESHEEE7 f- tn.n<><kkL; . ! fAn. D- 1.0 H. B• 3.0 Fi. MIn.D�1.G Fl. b• 5.0 fi. h•5.0 ff. -L- STA. 104 -50 fo SM142+00 IT DOE -4025 CY -L• STA. 174 +87 TO STA. 115-10 RT ms DDE•5 CY ,8' 21 DETAIL H LATERAL $M NOTE: SSG - "SHOULDER f SEE SHEET 2C -1 FOR DENOTES FILL IN WETLAND DENOTES HAND CLEARING SEE SHEET 32 FOR -L- PROFILE C dCE DETAIL. ce. cucE —i FO�p -DRV1 . PRO --...� .,AMC _ �- 2GI Od IV— — F F- F a P F DETAIL LATERAL NDIT<H I"f so"' SEESHEEE7 f- tn.n<><kkL; . ! fAn. D- 1.0 H. B• 3.0 Fi. MIn.D�1.G Fl. b• 5.0 fi. h•5.0 ff. -L- STA. 104 -50 fo SM142+00 IT DOE -4025 CY -L• STA. 174 +87 TO STA. 115-10 RT ms DDE•5 CY ,8' 21 DETAIL H LATERAL $M NOTE: SSG - "SHOULDER f SEE SHEET 2C -1 FOR DENOTES FILL IN WETLAND DENOTES HAND CLEARING SEE SHEET 32 FOR -L- PROFILE C dCE DETAIL. ce. cucE —i FO�p -DRV1 . PRO --...� .,AMC _ �- �° 1107 I I M 15' Rep / t 1 -III — F —P �. F f F F uj M Ae 18' CRAP W-1 ol z ,k Al „s-' \ 2 ELBOWS EST. i CONCRETE UNITED STATES DEPARTMENT OF AGRICULTURE 'L- s BOLLARDS OB a�9 PG zes � 115.00 yftT,1 BEGIN WILDLIFE FENCE a 195.00' 0.T.1 END WrLID flNCE A� A` / 't A� u In s I k Od IV— — F F- F a P F DETAIL LATERAL NDIT<H I"f so"' SEESHEEE7 f- tn.n<><kkL; . ! fAn. D- 1.0 H. B• 3.0 Fi. MIn.D�1.G Fl. b• 5.0 fi. h•5.0 ff. -L- STA. 104 -50 fo SM142+00 IT DOE -4025 CY -L• STA. 174 +87 TO STA. 115-10 RT ms DDE•5 CY ,8' 21 DETAIL H LATERAL $M NOTE: SSG - "SHOULDER f SEE SHEET 2C -1 FOR DENOTES FILL IN WETLAND DENOTES HAND CLEARING SEE SHEET 32 FOR -L- PROFILE C dCE DETAIL. ce. cucE —i FO�p -DRV1 . PRO --...� .,AMC c i a Q N y i N A z 9 R -2514C UE -1U : #{� E` DESIGNED BY: MEH DRAWN BY: MEH CHECKED BY. COB APPROVED BY: COB S/QS ao / REVISED: 2- POWER POLES O% NORTH CAROLINA FILL IN WETLANDS TRANSPORTATION S %TE 20 HAND CLEARING .02 gC0 • UTIL ILNCTIO EXCAVATION <.01 PANSONLY OPEN cUT UTILITY CONSTRUCTION Utility Permit Drawing WATER LINE 66'--- Sheet 10 of -� 0 - JaSEPH L. JACKSON, ET UX Revised 1/30/15 IWATER CUT LINE 43' oe SaPC ISr /" 39 WEYERHAEUSER WEYERHAEUSER COMPANY PC 'B• SLOE 33 34 LATERAL 3' 11ASE DITCH — \ - SEE DETAIL E — ir- -- -_ -- - — __ -- TV- ---- _-- ✓� BURY 1.0' 2 10OWS N 3% END sec -L- 117 +95 RT / 35 a RIP -' --- A, N M.BLACKM(It• EXCAVATION <.01 <�� K Ar NORGAN BUTLE.. )CABLE TRUST ' ;f C r' AT_1 M ; B IT2 Po 539 •' ( +07.00 -L- / c �o r- -- /1.�7Jy 110,00' hT.) GLENN ALLEN S STr - I °l OB 265 PG 98T JESSE L�5 ET 5.,,., Po65� ��0ry y4 QV F LL.I 36 NB 4 E . tiP 38 i ISFO +67.00 k O q TON EST.' SY GEOTIVI •L^''.!:.bll'gi "._ ` ^�— _ — — — J ! - - .A•�iel�ll UP R -2514C UE -1U : #{� E` DESIGNED BY: MEH DRAWN BY: MEH CHECKED BY. COB APPROVED BY: COB S/QS ao / REVISED: 2- POWER POLES O% NORTH CAROLINA FILL IN WETLANDS TRANSPORTATION S %TE 20 HAND CLEARING .02 gC0 • UTIL ILNCTIO EXCAVATION <.01 PANSONLY OPEN cUT UTILITY CONSTRUCTION Utility Permit Drawing WATER LINE 66'--- Sheet 10 of -� 0 - JaSEPH L. JACKSON, ET UX Revised 1/30/15 IWATER CUT LINE 43' oe SaPC ISr /" 39 WEYERHAEUSER WEYERHAEUSER COMPANY PC 'B• SLOE 33 34 LATERAL 3' 11ASE DITCH — \ - SEE DETAIL E — ir- -- -_ -- - — __ -- TV- ---- _-- ✓� BURY 1.0' — —rv� SITE 18 N 3% END sec -L- 117 +95 RT / 35 HAND CLEARING 02 -' --- A, N M.BLACKM(It• EXCAVATION <.01 <�� K Ar NORGAN BUTLE.. )CABLE TRUST ' ;f C r' AT_1 M ; B IT2 Po 539 •' ( +07.00 -L- / c �o r- -- /1.�7Jy 110,00' hT.) GLENN ALLEN S STr - I °l OB 265 PG 98T JESSE L�5 ET 5.,,., Po65� ��0ry y4 QV F LL.I 36 NB 4 . tiP 38 6 1 ISFO +67.00 k O q TON EST.' SY GEOTIVI — —rv� LATERAL'V'OITCH i I SEE DETAIL N I 1 I I 1� I 1 I I I ! I I I I IL. N END sec -L- 117 +95 RT / 1Ac` -' --- A, <�� K Ar 000M, ML-MME5%- AT_1 M ; % - � � I _ god Z eleow9 1203 1114 -- � \ A� ®i I 1109 F F -- F F F Luj TON EST.' SY GEOTIVI ` ^�— _ — — — J ! 1104 ,K EST 2�TONS - / I no.ao'lprJ EST.7 SY 43EOTEXTILE n .00'IRrl / uSEE StiE T r -t —�I `� �91' TRENCHLESS INS °°'1 - 11 RT.) i • 110,00'IRT.) ,- A: ELEV, 2.52' 123.00 M1T. // - a ,Ic / �( `� Al -� UFBTED STATES OEPAflTMENi OF ACRjCIA.TIRTE A` L EST. I SY 60T LE 1 0. RT. / UN V LLu �I 1 6.00' ,� 715,00' T, 08 89 F'G 285 L� FNO LD IFE FENCE BEGIN C/A FENCE / � LTES DEPARTMENT OF °el 3'BASEDITCH \�� A � SITE 18 Q STANDARD �., HAND CLEARING .01 i yI Y I SEE PETAL L EST. 37 C.Y. DDE a' TIF TO EIOSTING 8' I I I I SITE 19 SITE 20 LATERAL'V'OITCH i I SEE DETAIL N I 1 I I 1� I 1 I I I ! I I I I IL. <�� K Ar 000M, ML-MME5%- ... ���� Ivan.• �J EST. I SY 60T LE LTES DEPARTMENT OF 1.: :. PO 285 Q , - ' //MEWS rZI MAN s a u U) N A a ID X(3, y� I SITE 22 DETAIL E LATERAL BASE DITCH Ina+a lal.) ,een 0 A MIn. O- 1.0 k. B- h= 5.0 F. -4 STA 104 +50 1. STA. 112 +00 ET ODE -4025 CY PROJECT REFERENCE NO• .... R•251 4C UE-1i i�€ 3?::: ESl tiz:t� ? ?FOAz`- C{3Nvitt3GTIi)N: / DESIGNED BY: MEH DRAIVN BY: MEH / CHECKED BY: CE)6 � APPROVED BY: Mpg REVISED: NaAD / J NORTH CAROLINA DEPARTMENT OF Sits 200 1 ! / a UTILIITIES EMINCERIHO SEC PHONEI( 919)70T-6690 UTILITY CONSTRUCTIO NES (WIDOW) ! ! FAX:(919)250 -4141 PLANS ONLY EARING .03 GCE " _ -J..J __...n _e FUTILITY CONSTRUCTION Utility Permit Drawing Sheet 11 of )0 Revised 1/30/15 NOTE: -L_ Pls Sta 135 +5382 Of Sta /39¢5054 es = X 38` 50.9' O = 19 04' 40e (RT) Ls = 24OX tl 3' 02` 224° LT = 160.03` L = 62745` ST = 80.03' T = 31676' CLEARING f? 1.885AY SE _ .06 NO = 240" NOTE: DENOTES FILL IN WETLAND DENOTES EXCAVATION IN WETLAND DENOTES HAND CLEARING UNLESS NOTED OTHERWISE. ) BACK OF TURNOUT RADIUS. 0 n r ro 14 ILL, s v N :V NYE `N H- '1b14Li I UC- IG DESIGNED BY: MEH ' z;Trr•xd ANNIE R. PNGE. O: t: T: >US:;` ® ®FtUA ? ?i�9QNA.C:rSI:EI DRAxN BY: MEH _ Og 114 PC 8TT 'Se•T`• r „� o CHECKED BY: C' PROP. UG TELE REVISED. er: COB- 'O�R�eLEfres 9 j NAD 83/ SRS 2007 NORTH CAROLINA ' S � j1p DEPARTMENT OF J - I, C Dx6 c'"(FRCH I TRANSPORTATION LITIES ENOIFEERLNO SEC . "rZ5r25E \/ 1 aNfR J.0 ;, I J ONEi(919)7074690 UTILITY CONSTRUCTI01 Cr °X aL' "S' PROP. Ei" WATER LINE 1 x:(91 9 1250 -4 1 91 PLANS ONLY _-I 0 14I F1D 451 °� PD ITY CONSTRUCTION OC PROP, 0 /HyPOWER "< 166' TRENCHLESS INSTALL WL vERON1CA M _ � ® 6� p8 254 PO 9W ' X I r98.TS ' -:� 1 `I TALl1A0E I / ESHE I -E ~ " z HAND E 23 CLEARING .03 J DOCK 161PG � L ' tt Ev. 4 ,13• �� $ 93' TRENCHLESS INST \ J s5FIT 1 I OE" A. HEWITT .\ I f $ 52 55 t // OPEN CUT ( EOWAFO DUDLEY 1 1 TERRY M. JARAUN 55.4 I uaaY SIMM s -02 E- Er { I WATER INE 1 D8 326 PO 971 930 ESrATE E 02 E -82 {o / M08 v. BE . JR. ❑ ( ABUNDANT BLESSINGS a 00 ES PC S I ` 6 MINISTRIES INC. O TS'ITY 00 4 PC 85 {� / DB 19 S Dq'2<'16'E J SYS TEU D8 PO 555 r - 13a, 0• f6 NEW HOPE CHURCH 7 44 - � � {'� / h'B 85E C +1 -L- � { Of GOD i2o.aD ``u. / � - =4 136 00' 1LT.� {� { / + 7.00 -L v°; 120.00' (LT.1 120.00' (Li.l I 120 00' LT.. C/O OLIVER J. COLLINS < + 4 - U1 LATERAL 3' RASE DIT '{ / , @0,00' '7 G. S1ATH'/ 49.00' L . ISRLAD - R�GIN FENCE\ ,A m 170.00 LT.) - S� WR.L 91 Ux I s 08 247 PG 459 SEE DETAIL E pG 912 I J AFB 5 PG 72 y - 133. lT, �F / ) H LATERAL 3' RASE DITCH 5 EPilu I I us pE 86 / IZ ,00 1 PC 0 SLUE R7 133.00') T, TEML 9 RASED HI - 120,00' T. - PC A �' I 0 GIN UA FENCE 145.00' LT. E DETAIL F +7 120.00 LT. ! -6 .44 - 120.00', T. BEGIN FENCE , F•k V (/ I20.00'(LT.) .I E tE0 SY T OTEXiII I Lu ILA RAL 3' ASE 0!TCM END UA ENCE 15EE DETA E 35.00,jaj END 1 At IF, T• 10 I N C/A FENCE I jl J s 0 1 �J G CHO D . Ti s _ � - -- V- 2�V ---- .__ -_ -� -_ - -_ ` P- R• = -__ IS, �qq 0' flCP = ,S6 .JPE 1/p�+�,��yy ® [� US mw MC 53 ♦ 5T 8 Q s r�� _ N g 1 $ ki N ®y a® {8- -T T F E F y T i c r „ REM VF iR P l� s4 0 - -- - - -- - - - -- "g I _ R f p f F F F F F F st TYP. 1+ F R F 4(- -__ P F F F - F -- J -_ _ F F -�_ « 1407 1 CHORD R H N. R H, 1F -ytj I 44 1+ ! 700.00 RT,J 100.00' (ftT.j 1+ R It = 00,00' POINTS Lu J. MANLY 176SCUE, JR. HEIRS H. K- 100.00' (RT.1 I z OB 131 PG 257 R J. MANLY FOSCUE, A HE] R H q j •) W' �J TIE EXISTING DITCH 6L. q 'ENCE 4✓ HISTORIC PROPERTY PLACED PER La E TO PROPOSED DITCH \ +50,00 -L• oo v�W M 116,00' RT. ELIGIBLE FOR NRHP UTILITY RECORD R r 115.00'(RT.) 14g4`�11�:0'JNI,{�'R�RjITq� s+ LATERAL. "DITCH K_ R BLUE ROCK STHUCTtp(ES,IW. I+ SITE 24 Ir SEE DEra1�H x t HAND CLEARING .03 N- It R D8 300 PO 444 6S EXCAVATION 02 " -t- Pt Sfa 139+50.54 P/s Sta 143 +41.47 A - 19' 04' 40.6 (RT) es = 3' 38` 50.9' D - 3' 02` 22.4' L$ = 240.(X1' L - 627,65' LT = I60.03` T - 31676' ST = 80.63' R = I.885.00' SE = 06 RO = 240' Utility Permit Drawing t / Sheet PL of ;20 72'CHL 8 JSBN I 1 x--- -x Revised 1/30/15 s �� DENOTES EXCAVATION DENOTES HAND IN WETLAND CLEARING DETAIL E DETAIL C DETAIL H DETAIL F LATEW BASE DITCH LATERAL BASE DITCH LATERAL V DITCH LITERAL BASE DITCH (Nett fa:Q INAI I° tm'Q INmm f <dQ IN.I 1° SeoM) Orv-a tlA ♦p1 I'k. rry c,ev :F �°1 1�1. KL v' 1 •--- Fit crov, o' l• / 0 3'• d sleet 0 " Yap 0rwna 0 ` B Min. O. 1.0 fl. MID. O- 1.0 H, q 1 8 B. 1.0 Ft. AUn 0 -1.0 fl. �KO °ioN . b. S,0 H, b -5.0 Ft. MIn,D- VAR, h- S.0 FL fiu. u h- 5.0 F, 8. 3.0 N. Yd, -L- STA, 104 +50 to STA 142 +00 LT ODE -4025 CY -L- STA. 151 +60 to STA.181 +00 LT b- 6.0 R. -L- STA 131 +39 TO STA. 156 s50 0.T -I. STA. 147 =00 IA STA. 151 +50 LT DDE -264 CY DOE -6255 CY DDE =261 CY -L- STA. 142 +00 IA SEA. 147 +00 LT DDE -202 CY NOTE: ALL DRIVES ARE 12' UNLESS NOTED OTHERWISE, PAVE ALL DRIVES TO BACK OF TURNOUT RADIUS, m a u ui �t a A41F14 Bie�"•11EErt N tN&��XN a •S� 2smus BLUE ROCK OB 3 / I WILBER STRAYHORN, IW •1 � ' 'i ET UX LATERAL MDITCH - i SEE DL T (i5 «I S o6 DORIS HUMPHREY I DS 163 PC 409 I DB 324 415 I jll7� INC. N 0451.97' E n a ,PROP^. UI o 1 08 137 PC 217 � S 04.51.47' N NO9 '• If vs.00 00 FORREESSTTER °a xYft fAeAatn .' o OB 137 PC 206 F ' AVQN CARTER 08.365 PO 676 S 09'51.97' W A:F✓R.2J m a u ui �t a A41F14 Bie�"•11EErt N tN&��XN a •S� 2smus BLUE ROCK OB 3 / I .�... I •1 � ' 'i - .tl��� LATERAL MDITCH - i SEE DL T (i5 a I'� N I e H £ WILLIAM F. E' DB 324 415 jll7� INC. 2'CHL Q JSBw n r ins s �►,s►��� z- .L -- WIT -m ii �r ► ar+r!'��F�� m a u ui �t a A41F14 Bie�"•11EErt N tN&��XN a •S� 2smus BLUE ROCK OB 3 / I .�... I •1 � ' 'i - .tl��� LATERAL MDITCH - i SEE DL T (i5 a I'� N I e H £ WILLIAM F. E' DB 324 415 66 INC. 2'CHL Q JSBw ) 1 I .' DENOTES .HAND CLEARING 1 - POWER POLE FILL IN WETLANDS PROP. 0/H POWER IN Utility Permit Drawing fELE, Sheet 1.3 of 920 Revised 1/30/15 18E 196' TRENCHLESS INSTALL TELE. 189 TRENCHLESS 1 TALL WL ° A i 68 ' - I LE4w00D WILLIAMS HEIRS I \ FZ7 ,\+ ESTATE FILE T4 -E -22 LATERAL S'BASE DRCH AROETT SEE DETAIL C 'rB TIC 2.00 -L• 120.00' ( TEU 67 I IT. _ \ \ MA t5F0 D8R72 PC 196 �ml IN C/A �kNCE"- I' r'- -EEW,\ C B Alp RAP 4141 F <07,OOrii� ES B TONS 170.00'117) I. WIT" PROJECT REFERENCE N0. SHEEI Nu- R-26 UE-13 >PFik;zlG{_ NARY >P» ?f> >? DESIGNED Br: MEH Nii ` 17(1''�lOR USE: »:FOR:: >C:ONB:TR iGT >IflN DRAWN BY; EH of CHECKED BY: CDB m�+ APPROVED BY: B _ 8y SRS 2007 REVISED: rIAD NORTH CAROLINA ® DEPARTMENT OF TRANSPORTATION ,� U/1LITIES ENOINEEAING SEC• PHONE:L919 )707 -690 UT IL IPLANSNONLrCTf01 ® ryljg UTI LITY25C40NSTRUCTION / � m / N E Y.Ta L E BRANT, ET YIR PROP, 6" WATER LINE, De 227 Pc 431 � IsexD 3 \IJAMES. as iF.G DER. JR. BEGIN A F 92 VAN S. SN1TN 00 169 PC 160 OB w6TPO 78•ET Ux % \' W$ ALEXA ER SMITH. IN ,sFD 14� 11 80.00 -Wk ,n PC 04'I 170.00 (LT. 0 4 , 71 FND VA �ENGE \ 120.00` L7.` CLASS 8 Al RAF "d 6 -L- f5f. 0 TONS 175. 01f i \ \\ (209I'N T. ) 147 OQ UA F CE I i .I h© 1514 ISBEO ST, 10 Sy CjfOTEXTILE \ �( �___ — _ zTV — 1507 /iiv zrvg IIIV 35. ,n[� — IB' OCP =i _ _ REMOVE SYSTEM - I 1 , -� -- -- -- ��ri ►ate . .._.. .- .- •.f��� - - .tl��� -m ii �r ► ar+r!'��F�� TERAL 'V' DITCH EE PETAL H ark V� :1 MABEL S. pEAVER MABEL 5':'a'EAVERe n DB 207 M-421 ? . / D8 207 PC 421 6 ruY� Q {.• SLE)E 266 PO I o e• L MC 'R' SLUE 266 PC i N . I 'A 69 �i LL 69 R # 73 74 7 SITE 25 72 HAND CLEARING ,09 F F DENOTES FILL IN I WETLAND _/ =15 RCP VR\D S . 1( 3 K- $� S -- N 1516 pl u 8 ® 105.00'(RT. LATEPA'Y'DITCH 7, E UA FiENCE / �° k SEE DETAIL N r _ �+.' .k �Q ¢ &'h .^� W S a p 105.00 AT.) �' aNyt t � �'b(n k $7 � � �� �' = n �' i .. mX o, o A "' 4 �8�•2 Q�. ..i N \ + ti 157.00' (AT.)' Sk . .� U` �0 145.00' (RT.) JOSEPH T UXYANT. 9y'" _ _ RT X 76 V, oe Br Pc 003 MATTREO MOO. , A. ET DB 639 AR. WILLIAMS 836 OCA wB 13E 3 , a of P ^ 9 0 0° L SAT 0 BEALL PAR 14 83A $AR H $MALLw00D H RS DB 153 PC 415 2 OLR Ml1RAEl QOY DB 53 PC 22T. ET UK / ACCESS HEEDED C/ ROBERT ORR I 206 PG 6�0 6f 8a I l W ET I D AIL ET AIL o LATERAL E DITCH LATERAL ' DITCH'S': ITC LATERAL N' ITCH INrfe al.: tv. Smh1 6 , INalro 'q a E D =1.3 F.. Ner q;i B- 0.0 0 �N h•5.0 0 a'o n°. '' 3, 5.0 F. ba - STA 151 50 to STM ^ +00 LT �- ST 5I =09 TO TA, 156 -50 T bDE -7d CY - STA. 6 =50 TO S A 158 +25 RT -L- STA.164 -50 to STA 79.17 RT DOE 964 CY ' I DYE =6255 CY /N I ST 158 -25 TO STA. 158+9 AT DDE -7 Cr DDE -147 Y NOTE: ALL CIRIVES ARE 12' UNLE 5 NOTED THERWISE. " ' sn ^ PAVP ALL DRIVES TO BA K OF TUR OUT RADIUS. E y�. yEy-�V�A i. TIN k� 1E y II� E N 05,05,11, E If OV4513- E U014 100. 00' 100.0 OS, 11 11� PROP, O/H POWER 103 PROP, 6" WATER WILLIE L. BRYANT, ET UX Da 320 PC is At �BERJAMIN BROWN , P T UX " 06 r56 PC A C 'A" SL 162 m M 0 •4 • 4 D9 -L- L TELF 12 13' TRENCHLESS INSTAL 6jo MINCE Ilk ND 6' TRENCHLESS INSTALL WL 92 k '4 1 OB ANT @ T Do fLO PC IST CYNTHIA 0, YOUNG, EDWAR'k RYANT,ET Ux AMES HENRY BRYANT F10 I MC '8'$L PO 1 -6- SLIDE 322 P 0 I , SEPTIC ET VIR 'ell 08 419 DO 246 PC "3 I 104 91 Be 29(po 677 -1 Swhch- 100 8. -L- 20. + 170.0 (LT.) FLORETTA S +3 1 LT. 8 3 3 3 RY..T 3 12 LT DB �,j g 11 20,00' (LT.) SEPTIC 110,00, 4 SYSTEM I , I q ISBKO SEPTIC BEGIN FENCE --+ -u UJI SYSIPA T.: T.) 120.0 V) ISOKO 1. 31 DITC L C I I Al —1— uj ei —0. --kQ-1-j Lu A6, z 0 0 T ------ RC —H 7- + 4w.6 ti + YL 00 Ip.- 4. V y K\\\W,- V i JiT , I • V0 0 Ij C c F M\ J A, Ad, Vv - 7 El p TICA0 z F71- 106.001. LOTTIE L 0 A V FENCE 105.00 IRT J V, DITCH SEE L N RONALD i I 101 09.26.9)• N SITE 26 (96 HAND CLEARING ELEANOR J. JACKSON, ET vIR EVELYN 11 11 14 pd EX PL % DO 2 PO 300 I JAMES RAY MOORS ESTATE 08 FILE S� , x DO 33 PG US Oxo- 09 X MOORE- JR., UX DE * WA"r THE. 129 PO 639 DETAIL P T DE AIL E z L DITCH CH 'NEL CHANGE SPE CH LATE ITCH ,,T 0110 Rals) �t � WIT I T la Propene Natural 3.0 ff. 3.0 F.': b a 1.0 Go 0A a Min. VAR, 5.0 ff d Ground n J." D Ed.t. ChOnli .0 Max. d- 2 S ----:L- —STx S -L- STA, 174�50 STA. 175�30 JRTI Mh B I -L- STA. I 1, 00 1. STA,185-50 LT IU C FIT Z� DOE-6255 CY MI.. b ODE -7M CY Typ 0 V—. cl— Rip flop ... . ...... - - - - - - - - - - - - - WEYERHAEUSER COUPANY (LTj DO '9 `' 9 SEE DETAIL R -L- 120.00'tLf.� G +3 L- LAII.IA1.3L EASE D11 IN CIA FENCE REMOVF. F OOT 9.00 T SEE aRI•GE 24 + 2 LATERAL 3'AASf DITCH S ES DETAIL C V Oro"" "K. Hr _ T, 04 ZMV!rl RX PROJECT REFERENCE NO. SHEET NU. R-26140 -14 DESIGNED BY: MEH DRAWN BY. CHECKED BY: QQB APPROVED BY! QQ 83/ SRS 2007 REVISED- - ----- NAD NORTH CAROLINA DEPARTMENT OF TRANSPORTATION UTILITIES ENOIKER11SEC' PH ONE (9 19)77 UTILITY CONSTRUCTIO FAXIii19250-o41561 PLANS ONLY UTILITY CONSTRUCTION Utility Permit Drawing ...... Sheet of 10 ....... Revised 1/30/15 PROP, UG TELE.1 WEYERHAEUSER COUPANY (LTj DO '9 `' 9 SEE DETAIL R -L- 120.00'tLf.� G +3 L- LAII.IA1.3L EASE D11 IN CIA FENCE REMOVF. F OOT 9.00 T SEE aRI•GE 24 + 2 LATERAL 3'AASf DITCH S ES DETAIL C V Oro"" "K. Hr _ T, 04 ZMV!rl RX v 2 vi t.r r� ♦ L76:yl� Utility Permit Drawing Sheet iO of •)0 n-c DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: REVISED: '2 DEPARTMENT OF a o , P /Sla /3 +4497 P(SIO 152723 TRANSPORTATION - d 1/3 0/15 PROP. 0/H POWER 43 I PROP, U/0 TELE. i Tf ) I I o '- I I o i SPECIAL UTERAI. 3' BASE DITCH j 0 SEE DETAIL AP T, �i I ,0 f I 1374.00'I0.T, d I I m 1 I +55.00 -LBUS- I I I IJI.UV'IM1I.f ,L ��_ 1 44 REMOVE 24' PROP. 6" WATER LINE 124' TRENCHLESS INSTALL TELE1 REMOVE 30' RCP TIE TO EXIST. SWALE O SEE ETRD AN DITCH N' -� REMOVE 15v CMP SPECIAL LATERAL , DITCH --� SEE DETAIL AO REMOVE 15" CMP 148 �J T � P. of. d� A A fA fI �I \ E \ REMOVE 24' CMP ) \ I / 1 i { I / 2611 I / O� Rev se STANDARD 3' BASE DITCH p = j• 44.35.3' (LT) A = 33'37'57. 4 (170 YUCLASS 8 RIP PAP Uf TIES ENGINEERNG SEC• x SPEC CH S STANDARD p STAND TCH S SPECIAL LATERAL _ (3N 1. 1mh7 I 543` 46.5• 0 = 22 02`12fi EST. 21 TONS RIP PAP PHONE:l919 )70T -6690 O UTILITY CONSTRUC710 a "v -.• c y rov.. �y� t r.ve 9 o A:�ov' o•e. "a e L 6533` L = 152.62 SPECUl. LITERAL. N' DITCH FAK:(919 1250-4 1 9 1 PLANS ONLY SEE DETNL AO `� 51 R = 0X R = UTILITY CONSTRUCTION 82.00' LT.) + _ 61.50 (LT.) 33.00' (L ,l 30.00' LT. 26X I F m SE = SEE PLANS SE = SEE PANS 35,00 50.00' a� � O � 0. ( .1 STANDARD DITCH SPECIAL CUT DITCH 'O 35.0 (_ DETAIL DITCH LATERAL 3' BASE DITCH •E _ 51.00' (LT.) SPECIAL LITERAL BASE DITCH L B SPECIAL xa'q PUE Il+elro sw'.] L "elh k^u1 .p SEE DETAIL D REMOVE .>: (NER Iwlh �revm __�L�Y".°t'�1'°��_��� �1 ia'p _ ogle h. .re ♦. o Fy `e' YeM Oran.• Mr• D t'.pde� jan I<v p \_.D L M%n.0• 2.0 fl. tAn. D= 2.0 N. B A9n.D• 111. 9. 3t1. G.¢•s1. Nin. D• 3.0 h. �,.•? =0 ry.0 fl. �\ I 0 3 H. 1. y. \ S- STA13 +70 TO STA 19 +44 (RTI -DRVI- STA 12 +06 TO STA 17 +00 (RT) :00 (LP _DRY1- STA 11 +4! TO STA. 18 T dune- CIv e N h -LBU / -LBUS- STA19 +77 (LT) \ E \ REMOVE 24' CMP ) \ I / 1 i { I / 2611 I / 0 R LBUS- STA.2' =00 10 STA21 +50 (ITT) !Nn.O• IA N. -ORVI- STA 11 +45 TO STA. 12+06 (RT) -DRVI- STA, 17 -0 (T) - TT1I .+ 1 -LBUS- STA. 21 +50 TO STA, 25 +00'RTj REMOVE 36' CMP i _ V�K \ DETAIL D LATERAL BASE DITCH Do 1.5 PI. �/ �� \ E B 30 P• REMOVE 24' CMP STANDARD 3' BASE DITCH p ' YUCLASS 8 RIP PAP x SPEC CH S STANDARD p STAND TCH S SPECIAL LATERAL _ (3N 1. 1mh7 I IN.Ih Leal l lnrth lw.l ( EST. 21 TONS RIP PAP t•. ,.,d !bP' r a "v -.• c �� +•Iro. rov.. �y� t r.ve 9 o A:�ov' o•e. "a e eu o4 a c!.w.e <•t � SPECUl. LITERAL. N' DITCH Mln, D- 1.5 f'. - - kM,. D. YAA SEE DETNL AO -ORVI- STA 11 +45 TO STA. 12+06 (RT) -DRVI- STA, 17 -0 (T) - TT1I .+ 1 -LBUS- STA. 21 +50 TO STA, 25 +00'RTj REMOVE 36' CMP i _ V�K \ DETAIL D LATERAL BASE DITCH Do 1.5 PI. �/ �� \ E B 30 P• REMOVE 24' CMP STANDARD 3' BASE DITCH YUCLASS 8 RIP PAP SEE DETAIL Al ESL 25 C,Y. ODE U EST. 21 TONS RIP PAP EST. 47 SY, P.O. -- SPECUl. LITERAL. N' DITCH SEE DETNL AO )U 51 + 82.00' LT.) + _ 61.50 (LT.) 33.00' (L ,l 30.00' LT. A u + 03.00 -LBUS- 35,00 50.00' LT. lT. 0. ( .1 +70.00 -DRIA ' (LT.1 'O 35.0 (_ RETAIN CL 5 RIP RAP EST, 3 TONS A I _ 51.00' (LT.) ST. 11 Sy OEOTE) 60 ++ lu PUE REMOVE A� 60 ILA 147 P \ \ I 1 X. i l / / T.) / N- i r -E- SPECIAL GUT BASE DITCH SEE DETAIL AI \ 0 5,0 N. / -LBUS- STI 13 +00 Io STA, 19 +40 LT m � 1 1 1>; 147 L1 1 � .62 T �� 1 0.00' (LT,) - 35.120' (LT.) / /A •/ / L STANDARD IV' DITCH SEE DETAIL Y 55.00' RT.) SLOPEo0.01866 SPECIAL CUT DITCH EST. 14 CY DOE SEE DETAIL AK PDE 70,00'IRT.J 0 -0RVI- 75. 0' RT. EO 47 R_ c0\ i �h ;1 its•; ,..,r;r -,: � . -.,,. SEE SHEET 40 FOR -LBUS- PROFILE WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands ac Excavation in Wetlands* (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 L 14 +85 - 21 +27.10 OH Power/ 6" Water Line 0.01 0.11 0.35 2 LBUS 10 +99 - 14 +00 OH Power/ 6" Water Line <.01 0.10 0.15 3 L 23 +8274 - 24 +54.75 6" Water Line 0.01 0.03 4 L 30 +09.12 - 30 +33.16 OH Power/ 6" Water Line <.01 0.01 5 L 33 +24.70 - 35 +37 OH Power/ 6" Water Line 0.12 6 L 37 +03.24 - 37 +10.52 OH Power/ 6" Water Line <.01 7 L 37 +79.43 - 40 +68.89 OH Power/ 6" Water Line 0.12 8 L 49 +53.15 - 49 +73.23 OH Power 0.01 9 L 61 +85.84 - 62 +63.94 OH Power/ 6" Water Line <.01 0.04 10 L 64 +85.68 - 66 +69.71 OH Power/ 6" Water Line 0.09 11 L 64 +82.90 - 65 +02.91 OH Power 0.01 12 L 76 +79.36 - 76 +89.85 OH Power <.01 13 L 78 +03.15 - 79 +72.19 OH Power 0.10 14 L 80 +73.42 - 81 +67.23 OH Power/ 6" Water Line <.01 0.01 0.02 15 L 95 +17.90 - 100 +16.87 OH Power/ 6" Water Line 0.01 0.18 16 L 92 +90.92 - 93 +10.19 OH Power 0.01 17 L 106 +37.92 - 108 +92.00 OH Power 0.10 18 L 122 +89.61 -123 +09.95 OH Power 0.01 19 L 127 +14.66 - 127 +70.53 OH Power/ 6" Water Line <.01 0.02 20 L 128 +15.72 - 128 +89.88 OH Power/ 6" Water Line <.01 0.02 21 L 130 +03.89 - 131 +31.42 OH Power/ 6" Water Line <.01 0.02 0.04 22 L 135 +44.57 - 136 +16.23 OH Power/ 6" Water Line <.01 0.03 23 L 146 +17.42 - 148 +52.41 6" Water Line 0.03 24 L 149 +60.12 -150 +62.20 OH Power / 6" Water Line 0.02 0.03 25 L 160 +31.11 - 162 +21.27 OH Power / 6" Water Line 0.09 26 L 172 +38.67 - 172 +69.97 OH Power <.01 28 L 36 +28.65 - 36 +48.73 OH Power 0.01 29 L 45 +80.71 - 46 +00 OH Power 0.01 20 Poles Power Poles 0.05 TOTALS: 11 0.07 0.27 1.63 Note: " TEMPORARY FILL AND TEMPORARY EXCAVATION WILL BE USED TO INSTALL THE 6' WATER LINE BY METHOD OF OPEN CUT Utility Permit Drawing Sheet A2 ®f Revised 02/05/15 4TN R-i-d 3/3105 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS JONES COUNTY WBS - 34442.2.4 (R- 2514C) SHEET 1 OF 1 Merged with Impact Summary Sheet 17 of 20 Utility Permit Drawing S heet-- 1–T—of –.2-0-- Merged with Impact Summary Sheet 17 of.20 Utility Permit Drawing Sheets ®f o BUFFER IMPACTS SUMMARY :IMPACT BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT STRUCTURE SIZE / ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 SITE NO. TYPE STATION (FROM /TO) CROSSING BRIDGE IMPACT (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) 25 POWER POLE L 182 +00 - 182 +20 519 519 TOTAL: 519 0 519 0 0 0 Utility Permit Drawing Sheet IMPACT BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT STRUCTURE SIZE / ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 SITE NO. TYPE STATION (FROWTO) CROSSING BRIDGE IMPACT (ft2) (ft2) (ft) (ft2) (ft2) (ft) (ft) (ft) 25 POWER POLE L 182 +00 -182+20 519 519 TOTAL: 519 0 519 0 0 0 Utility Permit Drawing Sheet 7-1 ®f= Rev. May 2006 01/23/2015 R -2514D NEU Narrative Utility Owners: ® Power: Duke Energy Progress Duke Energy Progress (Distribution) — (contact: Sheila Talton, 919 -481 -6126) Duke Energy Progress (Transmission) — (contact: Jamie Loy, 919 -546 -6034) Jones Onslow EMC (Distribution) — (contact- Ken Jones, 1 -800- 682 -1515, ext. 306) ® Telephone: Century Link (contact: Jeff Shepard 910 -577 -9357) CenturyLink — (contact: Anthony Melilli, 919 -577 -9359) CenturyLink — (contact: Mack Peel, 252- 824 -2407) ® Cable TV: Time Warner (contact: Vincent Brayboy, 910 -219 -6615) ® Water: Town of Pollocksville — (contact: Johnny Chadwick, 252- 224 -9831) Jones County Water — (contact: Mike Houston, 252- 448 -8000) ® Sewer: Town of Pollocksville — (contact: Johnny Chadwick, 252- 224 -9831) ® Gas: Piedmont Natural Gas (contact: Larry Priest, 919 -583 -2276) General Utility Relocation: All utility lines inside the project limits will be adjusted as necessary or relocated away from construction before project let. ® Power: existing power (Distribution) lines to be relocated: o Duke Energy Progress —L— at Sta 363 +00 — 369 +0o LT & RT —L— at Sta 543 +00 — 546 +5o LT & RT —DRV3- at Sta 16 +50 — 20 +75 LT & RT —Y3— at Sta 13 +80 — 38 +05 LT —Y3— at loop and ramp A and D —Y3A— at Sta 13 +25 —15 +81 LT —Y4— at Sta 23 +55 — 30 +00 RT —Y6— at Sta 10 +00 —19 +0o LT & RT —Y7— at Sta 13 +65 — 21 +25 RT —Y8— at Sta 24 +25 — 31 +4o RT, and including part of —Y9— At loop and ramp 10 Power lines will be relocated to the proposed locations with no impacts. 1 01/23/2015 -Y4- at Sta 26 +io - 29 +6o LT o Town of Pollocksville -Y3- at Sta 22 +80 - 35 +7o RT Sewer lines will be relocated to the proposed locations with no impacts. ® Cable TV: o Time Warner Time Warner has overhead CATV Aerial along the -L- line joint use with Duke Energy Progress and Jones - Onslow EMC. -Y- Lines the overhead is in joint use and attached with Duke Energy Progress and Jones - Onslow EMC. The underground is encroaching on the -L- and -Y- lines. CATV lines will be relocated to the proposed locations with no impacts. ® Natural Gas: o Piedmont Natural Gas -L- at Sta 521 +50 - 532 +20 LT -Y3- at Sta 20 +00 - 35 +20 LT Gas lines will be relocated to the proposed locations with no impacts. 3 w See Sheet 1 -8 For Conventional Symbols See Sheet 1 -C Thru f -I For Survey Control Sleets Q 913RIN CO STRU ION n0a 4 -Y3 ST +7 . a= MO �w r, � vE 0 2e N ° STATE OF NORTH CAROLINA DIVISIDN OF HIGHWAYS i r .�I LOCATION: I 1 =F TO THE NEW BERN BYPASS DRAINAGE, TYPE OF WORK GRADING, 1 STRUCTURES NEU PERMIT PLANS May 14, ,; STA. 12 +13.00 �o0e -NDSiJ D + �' O OA O �3�F . 370+ 5.00 �I )NSTRUCTION O .l TRENT RIVER \ . I -- ., - - mmMnc p4as(T 0.0.A0.sNK xn -N0. •C R -2514® seder 1 PE r Zi BEGIN CONSTRUCTIt' N END COI -Y7- STA. 16 +23.00 I w F78—A--Sr MA. END c• -Y10- +23.00 I a-� PROJECT LENGTH P /epored In the Office of: y HYDRAULICS ENGINEER DIVISION Off` HIGHWAYS 1000 Birch Ridge Dr., Raleigh NC, 17610 LENGTH OF ROADWAY TIP PROJECT R -2514D = 5 894 Miles 1011 STANDARD MCMCA77GNS ------ - - - - -- Utility Permit Drawing Sheet--t—of---L_ 60.'4 of uoarp�4,a: L PLANS DHV = 7 k r� ; ° D = 65 % LENGTH OF STRUCTURES TIP PROJECT R- 1514D = 0.489 Miles INTER C* 50 25 Q 50 1q0 RIGHT OF WAY DATE: JAMES A. SPEER P.E. o'o,* I ' T = 7 % $ PBCVECT svGlvm .ROADWAY DESIGN I N * TOTAL LENGTH OF TIP PROJECT R -2514D = 6.383 Miles SEPTEMBER 27, 2013 "r o� I�:Ww ENGINEER of eQ "a PROFILE (HORIZONTAL) V = 70 MPH TRna oT� ° TTST =4 % DUAL =3 °h LETTING DATE: DANIEL W. GARDNER, JR., P.E. N � 10 Q 10 20 FUNC CLASS = FREEWAY PROJECT DESIGY ENGINEER - - - - - -- -- - -- }� JUNE 16, 2015 I ?ice PROFILE (VERTICAL) STATEWIDE TIER SIGMAITURE. ex =j L— �U c± J J 0 END B DG -L- STA. 320+ ff BEGIN O RU I 0 GIN RI E r .0 - - A. 36 + IN R = +77.97 BE IN R N \ j I -Y3¢- TA. 10 +13.55 1 I - 4 C 4 N �GGs� t e I> 1 1 POLLOCKSALLE C3 — —_ 7 CC I ND N TI N ON I N -Y3- STA, 38 +00.Q; STA. 300 +00.00 -L- BEGIN TIP PROJECT R -2514D -° T THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. i ®0 T THIS IS A CONTROLLED- ACCESS PROJECT WITH ACCESS BEING LIMITED + C CLEARING ON THIS PROJECT SHALL BE PER ORMED TO LIMITS ESTABLISI GRAPHIC SCALES DESIGN DATA DT 2015 = z 5 50 25 0 50 1Q0 A a ' ADT 2035 = 15,700 c ° STATE OF NORTH CAROLINA DIVISIDN OF HIGHWAYS i r .�I LOCATION: I 1 =F TO THE NEW BERN BYPASS DRAINAGE, TYPE OF WORK GRADING, 1 STRUCTURES NEU PERMIT PLANS May 14, ,; STA. 12 +13.00 �o0e -NDSiJ D + �' O OA O �3�F . 370+ 5.00 �I )NSTRUCTION O .l TRENT RIVER \ . I -- ., - - mmMnc p4as(T 0.0.A0.sNK xn -N0. •C R -2514® seder 1 PE r Zi BEGIN CONSTRUCTIt' N END COI -Y7- STA. 16 +23.00 I w F78—A--Sr MA. END c• -Y10- +23.00 I a-� PROJECT LENGTH P /epored In the Office of: y HYDRAULICS ENGINEER DIVISION Off` HIGHWAYS 1000 Birch Ridge Dr., Raleigh NC, 17610 LENGTH OF ROADWAY TIP PROJECT R -2514D = 5 894 Miles 1011 STANDARD MCMCA77GNS ------ - - - - -- Utility Permit Drawing Sheet--t—of---L_ 60.'4 of uoarp�4,a: L PLANS DHV = 7 k r� ; ° D = 65 % LENGTH OF STRUCTURES TIP PROJECT R- 1514D = 0.489 Miles INTER C* 50 25 Q 50 1q0 RIGHT OF WAY DATE: JAMES A. SPEER P.E. o'o,* I ' T = 7 % $ PBCVECT svGlvm .ROADWAY DESIGN I N * TOTAL LENGTH OF TIP PROJECT R -2514D = 6.383 Miles SEPTEMBER 27, 2013 "r o� I�:Ww ENGINEER of eQ "a PROFILE (HORIZONTAL) V = 70 MPH TRna oT� ° TTST =4 % DUAL =3 °h LETTING DATE: DANIEL W. GARDNER, JR., P.E. N � 10 Q 10 20 FUNC CLASS = FREEWAY PROJECT DESIGY ENGINEER - - - - - -- -- - -- }� JUNE 16, 2015 I ?ice PROFILE (VERTICAL) STATEWIDE TIER SIGMAITURE. ex =j L— I 1 m PROJECT KEFFKENCE NO. SHEET NO, v I n 1 � R -25140 UE -02 MY SHEET NO. I 0.0ADWAY DF71GN HYDMUUCS I ' �EU PERMIT NS NGINEER ENGINEER Sr*/7r6 Pe wing A - 28'45224'(RT) D 0.i3 Revised Jan. 23, 2015 Sheet—o —r 5 I L - 5J83163' T 2,647,63 = :uorxo9�ns ra;;eoxaeicucnoc >. SE 4 / .025 g � SZ RO - 47 SO WILLIAM T. BLAND I DB 353 PG 364 PLAT CA& 8 SLUE 350.4 FORMERLY CAROLINA P KR &GLICHT COMPANY DENOTES HAND (RNENS 270 KY SUBSTATION 1 I DB E95 PG 576 CLEARING OB 166 PG 210 \ Vpl % DE WET[ANDL IN SITE I -BL- 66 PINC 2664-88.67 15204.43T SF 0.349 AC E --- °-------------- ° - - - -\ \ ` - -- --L-- - - - - --------°-- - - - - - - - - - - - - - -P ------- - - - - -" ----- ° - - - --- 1 E(EC0 %R1C �'?`•:°.."' -,�.. - -- c - ^- - -- — — — — .- - - -- ° V — — — — — — — — �-- ---- -r -- -° - -- .xu o(x ra dFRi pq BK( '28 SEE SHEET �r b b ELEV, 39.62' y- - PIN 259+35.51 a V I r +46.06 -14 Y< + . I -T7• r ,.� \\ � i � ._ _ - - - �- - - - - - - - - E- - 1.73 -L- 4. 19.36 4 -= - = Lu - _ +00.00 -I. F y ._ --_ f` y F F* _ F F F F — "yam- F — —F — f . I • F F P F F F �L�ea.I O 1 +a6� .r �10 `\ wI 9' / • 811 CAT -1 12' PS ® S 16 20 / 12' PS 8, , b \ v n I Mill Jr 3 - •k 4� x F$ 90 2901 f m, � \B � 4' S 4 n X a I * E 90 I, 70 4' PS 0 ry PS 90 � 10 PS BIYGBA 121 20 1 : n acr-ry Rw � — s F _ f -. F F F F lST.7'IF f ~J= F F ''` , IlD y ca: - P X FST, 110 .01 /4 T �• Ny, '�o� /(�(O F " '-F .t � -L- 553 +15 / T.I UTONSF P r �- I ® 7 sr G[oTEMIEE z \ r �e I +61.73 R. . X a Go [] A y � � 1; \ / +55.00 -E.. _ a a IV- Q I m ( � /.. A� n' cR� A 350w o Q Si T E (� 3: Y. 17488.7514 SF 09 9353 PQ 364 u I v 1 { � J 4015 AC / _ / / s� PLAT CA&8 SLUE 750•1 1! Ede / : ✓ S• I m JA8 Z 40 179 trPC PC 419 A [AB 2 / RUYNIE M. BLAND I o I I a 44 YB 13 PG 56 DB (93 PO 2F1 I 1 1 OR 5 ENERGY p* FORMERLY C OLpEA RER & LIGHT COMPANY Ep`' 1 a 1 l (E US 2 kY SUBSTATION) a A 55 PG 976 1 1 P 166 PG 2q / I a 1 I I w I! I m 1 I I ary 1 I - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -L- 550 +23 TO 552 +23 Aerial Power line (Transmission) 0.35 L -L- 547 +35 TO 550 +11 Aerial Power line (Transmission) 0.40 1 -L- 551 +57 LT Power Pole (Transmission) < 0.01 2 -L- 549 +03 RT Power Pole (Transmission) < 0.01 TOTALS: < 0.01 0.00 0.00 0.00 0.75 0.00 0.00 0.00 0.00 0.00 Note : Utility Permit Drawing Sheet.. ®f 9V S.2� i /,3 %oS Revised 3131105