HomeMy WebLinkAboutNC0001422_Authorization to Construct_20030325State of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director 1�• NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Mr. Michael Shawn Longfellow, Plant Manager CP&L Sutton Steam Plant 801 Sutton Steam Plant Road Wilmington, North Carolina 28401 Subject: Authorization to Construct Permit Issuance ATC Number 001422A01 CP&L Sutton WWTP NPDES Permit NC0001422 New Hanover County Dear Mr. Longfellow: A request for an Authorization to Construct (ATC) was received by the Division and final plans and specifications for this project have been reviewed and found to be satisfactory. There is no fee for an ATC, so your check is being returned (please excuse the oversight in not returning it sooner). Authorization is hereby granted for the CP&L Sutton - New Ash Pond improvements. Specifically, this ATC allows: • Vertical dike extension of the New Ash Pond, • Raised from 34 feet to 40 feet (MSL), • One foot thick clay liner, • New riser with skimmer and riser bridge for outfall from New Ash Pond, • New ash discharge lines and removal area, • New ash removal truck ramp, • and all additional piping, valves, control equipment and appurtenances. Once modifications approved under this ATC have been completed and an Engineer's Certificate has been submitted the permittee is autfwrized to operate the units listed above. The Division of Water Quality approves this project in terms of compliance with NPDES limits: we defer to CP&L and their consultants for approval of structural integrity, etc. of the dike extension. This Authorization to Construct is issued in accordance with NPDES Permit No. NC0001422 issued December 27, 2002, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in the permit. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143 -215.1 and in a manner approved by the North Carolina Division of Water Quality. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. 1 61 7 MAIL SERVICE CENTER, RALEIGH, NORTH CAROLINA 27699 -1617 -TELEPHONE 919- 733 - 5083 /FAX 919- 733 -0719 AN EQUAL OPPORTUNITY AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED/ 10% POST- CONSUMER PAPER VISIT US ON THE WEB AT http : / /h2o.enr.state.nc.us /NPDES Mr. Longfellow NC0001422 2 The Wilmington Regional Office, telephone number (910) 395 -3900, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified water pollution control treatment system operator to be in responsible charge (ORC) of the water pollution control treatment system. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the water pollution control treatment system by the Certification Commission. The Permittee must also employ a certified back -up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8G, .0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III, and IV facility at least daily, excluding weekends and holidays, and must properly manage and document daily operation and maintenance of the facility and must comply with all other conditions outlined in Title 15A, Chapter 8G, .0204. Once the facility is classified, the Permittee must submit a letter to the Certification Commission which designates the operator in responsible charge within: (A) Sixty calendar days prior to wastewater being introduced into a new system or (B) within 120 calendar days of the following, (i) after receiving notification of a change in the classification of the system requiring the designation of a new ORC and back -up ORC or (ii) a vacancy in the position of ORC or back -up ORC. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and is a condition of this Permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by G. S. 143 -215.6 for violation of or failure to act in accordance with the terms and conditions of this Permit. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143- 215.6A to 143- 215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to the NPDES Unit, Division of Water Quality, 1617 Mail Service Center, Raleigh, NC 27699 -1617. ` Mr. Longfellow NC0001422 .' 3 One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Ms. Susan A. Wilson, P.E., telephone number (919) 733 -5083, extension 510. Sincerely, 4+ an W. Klimek, P.E. cc: Central Files IIPDES Vnit, teri nit Wild Wilmington Regional Office, Water Quality Louise England, CP&L 3932 New Hill - Holleman Road New Hill, NC 27562 -u DIVISION OF WATER QUALITY November 5, 2002 MEMORANDUM To: Susan Wilson From: Ed Beck Through: Rick Shiver Subject: Authorization to Construct Request CP &L Sutton Steam Plant ATC001422A01 New Hanover County NOV 7 2002 ; r The permittee proposes to raise the elevation of the dike walls in the ash pond by six feet to provide an additional five to six years of storage. The elevation is to be raised from the current elevation of 34 feet to 40 feet msl by the placement of suitable material from an onsite borrow area. A clay liner is to be installed and connected to the existing clay liner. The project will include the extension of the ash discharge line within the pond and the raising of the outfall structure. An accompanying engineering report indicates that the proposed construction method should result in a stable structure. A permit has been issued for the beneficial reuse of ash from the facility and it is currently being used in road construction within the region. It is recommended that authorization be given for the subject proposed project. eb: AC 1422AO1.112 cc: Wilmington Regional Files Central Files 10/2442002 11:05 9103433296 Stjate of North Carolina -Department of Environment and Natural Resources Wilmington Regional Office Division of Land Resources Land Ouality Section Michael F. Easley,Governor William G. Ross Jr., Secretary CP &L SUTTON PLANT PAGE 02 D I EGEDVE� OCT 2 2 2DO2 J October 17, 2002 NCDENR NoRrH CARouNA DEpARnaENr or ENVIRONMENT ANo N,PuRAL RZsouFRCEs NOTICE OF RECEIPT OF EROSION & SEDIMENTATION CONTROL PLAN CP &L A Progress Energy Company Mr. Michael Shawn Longfellow, Plant Manager 801 Sutton Steam Plant Road Wilmington NC 28401 Dear Mr. Longfellow: This office has received a soil erosion and sedimentation control plan for the project listed below which was submitted as required by the North Carolina Sedimentation Pollution Control Act (NCGS 113A- 57(4)). Please be advised that this Act requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil erosion control plan prior to the commencement of said land disturbing activity (NCGS 113A- 54(d)(4)). The act further states that this plan must be filed a minimum of 30 days prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days of receipt. Failure of the approving authority to approve or disapprove the submitted plan within the 30 day period will be deemed approval of the plan. Commencement or continuation of a land- disturbing activity under the jurisdiction of this Act prior to the approval of an erosion and sediment control plan is a violation of the Act. A copy of any erosion and sediment control plan which could involve the utilization of ditches for the purpose of dewatering or lowering the water table is forwarded by this office to the Division of Water Quality (DWQ). It is suggested that you contact the Division of Water Quality at (910) 395 -3900 If the ditches shown on your plan will lower the water table. The approval of an erosion and sediment control plan is conditioned on the applicant's compliance with Federal and State water quality laws, regulations and rules. If you have questions, please do not hesitate to contact this office. Your cooperation in this matter is appreciated and we look forward to working with you on this project. CNM /bfr cc: WiRO -LQS PROJECT NAME: PROJECT NUMBER: LOCATION: RIVER BASIN: SUBMITTED BY: DATE RECEIVED BY LOS: Sincerely, Carol N. Miller, CPESC Assistant Regional Engineer CP &L Sutton -1984 Ash Pond Dike Expansion NH -03104 Sutton Steam Plant Road - New Hanover .County Cape Fear CP &L A Progress Energy Company October 16, 2002 127 Cardinal Drive Extension, Wilmington, N.C. 28405 -3845 • Te)ePhOne 910 -395 -3900 • Fax 910 -350 -2004 An Equal Opportuniry Affirmative Action Employer � CP&L File No: SUT 12520A ln�l`i(aZ OCT 14 2002 DENR - WATER QUALITY PO'NT SOURCE BRANCH Mr. David Goodrich North Carolina Department of Environment and Natural Resources Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699 -1617 October 10, 2002 AUTHORIZATION TO CONSTRUCT — ASH POND VERTICAL DIKE EXTENSION Dear Mr. Goodrich: In accordance with 15A NCAC 211 .0138, enclosed is the required documentation for an Authorization to Construct for a vertical dike extension of the new ash pond at Sutton Steam Electric Plant, NPDES permit NC0001422. The new ash pond dike will be raised by six feet to an elevation of 40 feet (mean sea level) and will provide an additional 5 to 6 years of ash storage. Construction is expected to begin in May of 2003 at the earliest. Please contact Louise England, Senior Environmental Specialist in the Environmental Services Section with CP &L at (919) 362 -3522, if there are any questions concerning the information in this submittal. Respectfully y9iirs, Michael Sha n Longfellow Plant Manager Enclosures Sutton Steam Plant 801 Sutton Steam Plant Road Wilmington, NC 28401 LAW RESOURCES CREATING SOLUTIONS CAROLINA POWER & LIGHT COMPANY L. V. SUTTON STEAM ELECTRIC PLANT 1984 ASH POND VERTICAL EXTENSION WILMINGTON, NORTH CAROLINA LAW JOB NO. 3072&4-5036 September 9, 2002 BY LAW ENGINEERING AND ENVIRONMENTAL SERVICES RALEIGH, NORTH CAROLINA REPORT PREPARED BY Shane C. Clark, E.I. Project Engineer J. Allan Tice, P.E. Corporate Geotechnical Consults Assistant Vice - President Registered, North Carolina 6428 Jeffrey A. Mann, P.E. Senior Engineer 10 A1 AR, Sl AL ` All I 644 LAW Engineering and Environmental Services, Inc. 3301 Atlantic Avenue • Raleigh. NC 27604 919 - 876 -0416 • Fax: 919 -831 -8136 19129ZT -93 00aBi wa]7IWIIG Rl 1.1 Location: The CP &L Sutton 1984 Ash Pond is located at the L.V. Sutton Steam Electric Plant (north latitude 34° 17' 50" and west longitude 77° 59' 30'J, approximately 3 miles north - northwest of Wilmington, New Hanover County, North Carolina. The existing ash pond is located approximately 3,000 feet north of the plant boilers and on the east side of the Cooling Lake. A map showing the location of the dam, the county name, the state roads, the access to the site and the outline of the ash pond is included on the plan cover sheet. 1.2 Dam: The existing Ash Pond is contained by earth dikes forming a closed basin. Ash lines enter on the south end and outflow exits through a vertical concrete riser and pipe spillway near the northwest corner. The dikes have a crest elevation of 34 feet (msl) and the top of the riser is at elevation 31.5 feet. The pond is bordered to the south by the 1983 Ash Pond, which is used only for temporary ash storage. The ponds are hydraulically separated by a sand dike with a sandy clay liner on the 1984 Pond side. Under the present operation, ash deposition begins in the southern portion of the pond and migrates northward. Two diversion curtains transect the ash pond from east to west, and are used to increase detention time and ash settling within the pond. The portion of the dike south of the southern -most diversion curtain has mostly sedimented ash against it with little water. A contractor has been removing sedimented ash from the south portion of the pond for off site beneficial reuse at various times since December, 2001. The existing dikes were constructed using sands from within the Ash Pond and from adjacent borrow areas. A clay liner was constructed across the bottom and up the interior side slope for seepage control. No construction easements are necessary as CP &L owns all property expected to be affected by the construction. 1.3 Surrounding Area Conditions: The west dike of the ash pond lies approximately 40 feet east of the cooling lake. A narrow area between the dam and the lake, adjacent to the lake, is covered with low -lying vegetation. A wetlands review of the property was performed by LAW and a narrow band within the tree line adjacent to the cooling lake was found to contain wetlands. This band extended a few feet closer in the outfall area. No wetlands were noted north of the pond. A gravel road (Sutton Lake Road) parallels the eastern and northern sides of the ash pond. The roadway is owned by CP &L, but is open for public access to the cooling lake. Failure of the ash Page 1 of 7 Design Report CP&L L Sutton Plant Ash Paid Vertical Extension Wilmington, Nash Carolina pond dices could cause damage to the lake or roadway, but no loss of life. A low hazard classification is appropriate for the dam. Proposed Modifications: To provide for increased ash storage capacity, CP&L proposes to raise the crest of the existing dam by approximately 6 feet, to elevation 40 feet (msl). The planned operating level will be elevation 37.5 feet, msl. The maximum height for the modified dam will be 28 feet, and the storage volume will be 1,835 acre -feet for the 81.1 -acre impoundment area. Additional storage life of about 5 to 6 years is projected with the extension. Based on the planned height and storage capacity, the modified dam will be an intermediate size dam under the North Carolina definitions. The work will include placing earth fill on the crest and downstream side of the existing dam, extending the existing clay liner within the dam, and extending the existing riser structure. 2.0 DESIGN CRITERIA 2.1 Controlling Regulations: CP &L dams are exempted from regulation by the North Carolina Dam Safety Law, since they are under the control of the North Carolina Utilities Commission (NCUC). However, CP&L has agreed with the NCUC on inspection matters to apply guidelines promulgated by the U.S. Army Corps of Engineers in 1976. For design of new dams or modifications to existing dams, permits are not required from the North Carolina Dam Safety Section. For purposes of design control, LAW has generally adopted the guidelines in the North Carolina Dam Safety Regulations unless noted otherwise. 2.2 Geology. New Hanover County, which occupies a peninsula between the Atlantic Ocean and the Cape Fear River, is part of the Atlantic Coastal Plain Province. The upper deposits across New Hanover County consist of sand, clay, silt and marl of Pleistocene and Miocene Age. These overburden materials are typically underlain by the Castle Hayne Limestone stratum of Eocene Age. The Castle Hayne Limestone consists of limestone, shell marl and sand. The thickness and areal extent of the Castle Hayne Limestone is very irregular as a result of its deposition on the eroded surface of the underlying PeeDee Formation (late Cretaceous Age) and the subsequent erosion of the upper surface of the Castle Hayne Limestone. The PeeDee Formation consists of silt, sand, and clay interbedded with lenses and layers of limestone and sandstone. 2.3 Seismicity: Based on the inspection guidelines agreed upon with the NCUC, the Corps of Engineers seismicity criteria have been used. The L. V. Sutton Steam Electric Plant is located in Zone 1 of the Uniform Building Code Seismic Zone Map contained in the Corps of Engineers' publication "Earthquake Design and Evaluation for Civil Works Projects". Damage potential is listed as minor, and a seismic coefficient of 0.05g is applicable to structures in this zone. Page 2 of 7 Design Report CP&L L. V. Sutton Plant Ash Pond Vertical Extension Wilmington, North Carolina The Corps of Engineers' inspection guidelines state that "in general, projects located in seismic zones 0, 1, and 2 may be assumed to present no hazard from earthquake provide static stability conditions are satisfactory and conventional safety margins exist". 2.4 Construction Materials: 2.4.1 Soils: The existing dike was constructed in 1984 out of existing site soils. Previous analyses assigned soil properties of 35 degrees for a friction angle and 110 pounds per cubic foot for a total unit weight. The 5 -year independent consultant inspections conducted by LAW for CP &L and recent site visits indicate the existing dike is structurally stable and has no sign of external seepage. The extension will be constructed with sandy soils from two nearby borrow pits. Samples were obtained, classified according to the United Soil Classification System (USCS) and tested for the minimum and maximum densities. Due to the soils in the borrow areas being similar to the soils used for the existing dikes, no strength testing was conducted. Based on profiles generated by I 1 typical cross sections of the existing dike and the new profile overlay, we estimate that approximately 220,000 cubic yards of soil will be required to construct the new dike extension. We assume CP &L will likely use clay similar to what has been used previously on dike construction and repair on this site. No additional testing has been performed. 2.4.2 Riser: A precast concrete section is planned for extending the riser. One section will be installed during this project and the contractor will be responsible for providing an adequate number of sections and approved sealing material to reach the design pool elevation. CP &L has used similar sections for previous extensions 2.4.3 Chain -link Fencing: The existing fencing and poles are to be removed from the toe of the slope along Sutton Lake Road and the loading ramps. The fencing is to be relocated according to the plans. Additional fencing may be needed to supplement what is available on site. This additional fencing will be the responsibility of the contractor, and should be the same grade and style as that removed. 2.4.4 Retaining Wall: The contractor is responsible for constructing a wooden retaining wall, as detailed in the plans, around the overflow structure on the exterior side of the dike. 2.4.5 Overflow Structure Access Bridges: The contractor is responsible for replacing the existing access bridge to the outlet skimmer structure on Page 3 of 7 Design Report Ash Pond Vertical Extension CP&L L V. Sutton Plant Wilmington, North Carolina the interior side with the same or comparable structure, and providing a similar type structure for the overflow structure on the exterior side. New timber piles will be required to support the structure. These piles should be approximately 8 inches in diameter and be driven to support approximately 2 tons each. 2.4.6 Ash line extension: The contractor is responsible for extending the existing ash lines in the ash handling area using SDR 32.5 8 -inch high density polyethylene pipe (HDPE) as noted on plans. 2.4.7 Erosion Control: The contractor is responsible for maintaining the requirements of the erosion control plan as detailed in the plans. 2.4.8 Miscellaneous: Geotextile and geogrid materials will be used for slope protection and stabilization as well as roadway reinforcement. On the separator dike between the 1983 and 1984 Ash Ponds, the dike extension will extend over the sedimented ash in the 1984 pond. Some areas may need to have geogrids placed on the surface for reinforcement. Requirements for these are shown on the drawings. 3.0 DESIGN ANALYSIS 3.1 Stability: The stability of the proposed modifications was evaluated using circular arc failure surfaces based on a random grid pattern. The modified Bishop method of analysis was used in the STABL -611 program. Seismic analyses were also performed on the final slopes using a horizontal acceleration factor of 0.058. Soil properties were determined from laboratory analyses and historical information. The initial analyses were based on a 3:1 (H:V) slope; however, due to space constraints created by the cooling lake and the ash pond exterior slope riser structure, 4 different slopes are used in the final design. The following table lists the general location of the slope, the steepness of the slope and the corresponding factor of safety for the slope. Slope Location Geogrid Reinforced 3:1 All interior dike faces No 2.5:1 All exterior dike faces with No the exception of those along the cooling pond Factor of Factor of Safety Safety (Static) (Seismic) 2.1 1.8 1.7 1.5 Page 4 of 7 Design Report CP&L L. V. Sutton Plant 2:1 Exterior dike faces along the cooling pond 2:1 Two tier retaining wall and 2:1 sloping backfill immediately between the overflow structure and the dike face Yes 8 -foot strips of Tensar UX 11OOHS or equivalent running perpendicular to the face with 4-foot vertical spacings Yes 12 -foot strips of Tensar UX 11OOHS running perpendicular to the face with 2.5 -foot vertical spacings. The retaining wall will be laterally supported by placing 6 "x6" timbers perpendicular to the wall face and compacting the backfill around each Ash Pond Vertical F.xtension Wilmington, North Carolina 1.5 1.5 1.4 1.4 The planned construction materials are sandy and have no cohesion, therefore, local, shallow sliding of the surface of the exterior slope is indicated in the computer analyses. Existing slopes with fair to moderate grass cover, have performed well and do not show signs of sliding. To limit the surficial erosion, all dike faces will need to be hydro-seeded with drought tolerant grasses to aid in reducing potential surface sloughing. Based on our analyses, the static and seismic factors of safety are acceptable for this design. 3.2 Seepage: The existing dikes have not shown evidence of seepage either on the dike slopes or along the toe during past inspections. The clay liner has been effective in controlling water. Based on extension of the clay liner upward for the new construction, the seepage condition is expected to be unchanged. 4.0 PERMITS AND SCHEDULES 4.1 Permits: The only permits understood to be necessary are an erosion and sedimentation permit and an authorization to construct. The plans include erosion and sedimentation control features, and a separate narrative and plan sheets have been prepared for submittal to the Wilmington Regional office of the Land Quality Section. The authorization to construct will be prepared by CP &L based on the plans. It is not clear at this time if a separate grading or land - disturbing permit will be required by New Hanover County. 4.2 Construction: Assuming plan approval and an authorization to construct are received by December 31, 2002, construction is tentatively expected to begin in late 2003. The actual start will depend on the effectiveness of the diversion curtains at enhancing use of the existing storage capacity. The diversion curtains are to be removed prior to the dike raise construction. Page 5 of 7 Design Report CP&L L.Y. Sutton Plant Ash Pond Vertical Extension Wilmingrom North Carolina 4.3 Filling: The ash pond will remain in service during the construction period, although CP&L can lower the water level by temporary diversion of ash discharge into the 1983 pond. The last construction activity will be to place the riser extension. Filling to the new pond design elevation is expected to take 5 to 6 years based on observation of the current pond performance. 5.0 MAINTENANCE PLAN 5.1 Maintenance Plan: CP&L personnel at the Sutton Plant conduct maintenance activities as needed. Plant procedure SUT 1.142 (Rev 1) calls for regular visual observations of the dam and outlet works. Minimal maintenance is expected to be necessary, consisting of brush cutting as required. Mowing has not been necessary on the existing dam, and is not expected to be required on the expansion. Page 6 of 7 Design Report Ash Pond Vertieal Extension CP&L LY. Sutton Plant Wilmington, North Carolina List of Slone Stabilitv Analvses Figures in Annendia Slone Stabilitv Analvses (Static) Figure 1 Interior 3:1 (H:V) Figure 2 Exterior 2.5:1 (H:V) Figure 3 Exterior 2:1 (H:V) Figure 4 Exterior 2:1 (H:V) and two tier retaining wall Slone Stabilitv Analvses (Seismicl Figure 5 Interior 3:1 (H:V) Figure 6 Exterior 2.5:1 (H:V) Figure 7 Exterior 2.5:1 (H:V) Figure 8 Exterior 2:1 (H:V) and two tier retaining wall Page 7 of 7 . .%i �. .1 �_ y • t - ,l.ti, � `l 51 f .. D . ,. � , •� ,.fj f. { t�T. '�` �t' �• a r YY rr 't'• + . .;'���,t� 7+ Rl: {, - •„+. ' A Ei�•.,?.t. +!L y� it �L�r�t�. L�i,�,q. �, �h.,,, •.r<s � �jR. � µ ,: .b:�`Yf''y' •. _1'� } ti _;,�5t��i••Q � J..• 7 :•�' '^ !•R•_ T� _ ' - . �- t'.'! �` r l ''�' ' .. �, ,{ ,1, ' �, r�'_�.'4s�' L � {Y � ��,, ��� Ji�� -', t � �. q: " � � t.,'' • t � - �1 �, � ' Sri � r�,tya: 4 Vii•, �� �'�$ Y t t� , ' ... , i i 1., ; ,� J': , q•1, �'t it' -•a ! ""!y rn +I {A�'',`��•',5' ♦ 'S,' �ft..t v-ty 1�:r •� •' 5�` ,� �`ty'y'�1, .xi-� t' it ` ✓ • � , �; ,'P� 4Q- •j� � t � f - ,s�f y � r � t` t j} s' •],.'� t, �' �'• 'r - •� � ' 7+ y�:• � ,Y, ,,•. � i� N ^ ' r t�' {its ,�,4 IA ,,`;;a�"•� � _ •\ ����t't �; • 3; �' r 'mot ,�M` i Z. t , r1l k.A 1p.�_lll ko L� 1.�. -6• �- � ♦ .�t -,;, -!rt • ' • -. �, ,yam. � L� 4 •. ,. - � , �y ,� rev ,�• t t �. �, a ,,iG• 'dT' 4 .. ,. .r,.t� J . r . t ` �r'`) rte, .' , r• � •�. o r,l� �A •w A ,. � -Y - .. it ;� 4 ,K. .f f , si N -'� L , 4�` t -0• lk A.i 16 �.r , Design Report Ash Pond Vertical Extension CP&L L. V. Sutton Plant Wilmington, North Carolina S10De Stability Analyses (Staticl Figure 1 Interior 3:1 (H:V) Figure 2 Exterior 2.5:1 (H:V Figure 3 Exterior 2:1 (H :V) Figure 4 Exterior 2:1 (H :V) and two tier retaining wall Slone Stability Analyses (Seismic) Figure 5 Interior 3:1 (H:V) Figure 6 Exterior 2.5:1 (H:V) Figure 7 Exterior 2.5:1 (H:V) Figure 8 Exterior 2:1 (H:V) and two tier retaining wall a. 40 - i �e f wi 2 i 30 - 2 20 - 10 - 0 0 STIED c 1 N I L 2 I I I I i I I I I I 10 20 30 40 50 60 70 80 90 100 110 STABL61-1 FSmin =2.13 Safety Factors Are Calculated By The Modified Bishop Method CP &L Sutton Dike Raise 3:1 Slope C:ISTEDWINI- SECT3.PL2 Run By: Shane Clark 915/2002 10:19AM 70 1 1 1 1 1 i # FS Soil Soil Total Saturated Friction Piez. a 2.13 Desc. Type Unit Wt. Unit Wt. Angle Surface b 2.16 No. (pcf) (pcf) (deg) No. c 2.18 New 1 102.4 119.0 34.0 0 d 2.20 Old 2 110.0 130.0 35.0 0 60 - e 2.22 f 2.22 g 2.25 h 2.25 i 2.28 j 2.29 50 - a. 40 - i �e f wi 2 i 30 - 2 20 - 10 - 0 0 STIED c 1 N I L 2 I I I I i I I I I I 10 20 30 40 50 60 70 80 90 100 110 STABL61-1 FSmin =2.13 Safety Factors Are Calculated By The Modified Bishop Method rr2�r . `+ CD t1j 60 - 40 - 20 - a. f 1 1 2 2 2 i i 1 1 20 40 60 80 100 STABUH FSmin =1.68 Safety Factors Are Calculated By The Modified Bishop Method 120 140 CP&L Sutton Dike Raise 2.5:1 Slope C:ISTE DWI NI- SECT2.Pt_2 Run By: Shane Clark 9/9/2002 11:41AM 100 # FS Soil Soil Total Saturated Friction Piez. a 1.68 Desc. Type Unit Wt. Unit Wt. Angle Surface b 1.70 No. (pcf) (pcf) (deg) No. c 1.71 New 1 102.4 119.0 34.0 0 d 1.74 Old 2 110.0 130.0 35.0 0 e 1.76 f 1.78 g 1.81 80 — h 1.84 i 1.84 j 1.92 60 - 40 - 20 - a. f 1 1 2 2 2 i i 1 1 20 40 60 80 100 STABUH FSmin =1.68 Safety Factors Are Calculated By The Modified Bishop Method 120 140 CP &L Sutton Dike Raise 2:1 Slope along Cooling Lake 50 - 25 0 0 STED w R6 RBI RI 2 _ _ L a h i i f e do c I 2 I I I 25 50 75 100 STABUH FSmin =1.51 Safety Factors Are Calculated By The Modified Bishop Method 2 125 C:ISTEDWINI- NEWFILE.PL2 Run By: Shane Clark 9/5/2002 9:30AM 100 # FS Soil Soil Total Saturated Friction Piez. a 1.51 Desc. Type Unit Wt. Unit Wt. Angle Surface b 1.51 No. (pcf) (pcf) (deg) No. c 1.52 New 1 102.4 119.0 34.0 0 d 1.52 Old 2 110.0 130.0 35.0 0 e 1.54 f 1.54 g 1.55 h 1.56 i 1.58 75 — 1 1.59 50 - 25 0 0 STED w R6 RBI RI 2 _ _ L a h i i f e do c I 2 I I I 25 50 75 100 STABUH FSmin =1.51 Safety Factors Are Calculated By The Modified Bishop Method 2 125 # FS a 1.48 b 1.49 60 — c 1.50 d 1.51 e 1.52 f 1.52 g 1.53 h 1.53 i 1.53 j 1.54 40 — 20 — 00 STED c� CP&L Sutton Outfall Structure C:ISTEDWINI- SECT5C.PL2 Run By: Shane Clark 9/5/2002 10:57AM Soil Soil Total Saturated Cohesion Friction Piez. Desc. Type Unit Wt. Unit Wt. Intercept Angle Surface No. (pcf) (pcf) (psf) (deg) No. New 1 102.4 119.0 0.0 34.0 0 Old 2 110.0 130.0 0.0 35.0 0 Wood 3 125.0 130.0 10000.0 45.0 0 2 a `i 2 20 40 60 80 STABL61-1 FSmin =1.48 Safety Factors Are Calculated By The Modified Bishop Method 100 a J c 40 ; ge f i 2 30 - 2 20 - 10 - 0 0 STED zi 1 2 1 I i I i 1 10 20 30 40 50 60 70 80 90 STABL61-1 FSmin =1.81 Safety Factors Are Calculated By The Modified Bishop Method 2 �• 100 110 CP &L Sutton Dike Raise 3:1 Slope C:ISTEDWIN%- SECT3.PL2 Run By: Shane Clark 9/512002 10:20AM 70 1 1 1 1 # FS Soil Soil Total Saturated Friction Piez. Load Value a 1.81 Desc. Type Unit Wt. Unit Wt. Angle Surface j Horiz Eqk 0.050 g< b 1.84 No. (pcf) (pcf) (deg) No. c 1.86 New 1 102.4 119.0 34.0 0 d 1.88 Old 2 110.0 130.0 35.0 0 60 — e 1.89 f 1.89 g 1.92 h 1.92 i 1.93 j 1.94 s0 - a J c 40 ; ge f i 2 30 - 2 20 - 10 - 0 0 STED zi 1 2 1 I i I i 1 10 20 30 40 50 60 70 80 90 STABL61-1 FSmin =1.81 Safety Factors Are Calculated By The Modified Bishop Method 2 �• 100 110 v�q 60 1- 40 — 201— I CP &L Sutton Dike Raise 2.5:1 Slope C:ISTEDWINI- SECT2.PL2 Run By: Shane Clark 9/9/2002 11:40AM 100 # FS Soil Soil Total Saturated Friction Piez. Load Value a 1.47 Desc. Type Unit Wt. Unit Wt. Angle Surface Horiz Eqk 0.050 g< b 1.49 No. (pcf) (pcf) (deg) No. c 1.49 New 1 102.4 119.0 34.0 0 d 1.51 Old 2 110.0 130.0 35.0 0 e 1.54 f 1.55 g 1.58 80 — h 1.60 i 1.61 60 1- 40 — 201— I I a. c f h b 1 d 1 ` 2 2 2 2 s 20 40 60 80 100 120 STABL61-1 FSmin =1.47 Safety Factors Are Calculated By The Modified Bishop Method 140 I °g 1%] CP&L Sutton Dike Raise 2:1 Slope along Cooling Lake 50 - 25 - 0 0 STED 1 —Ru a J f � e b 1 R7 R6 i 2 RS ' R+ / 2 R3 800 R1 25 50 75 100 STABL61-1 FSmin =1.36 Safety Factors Are Calculated By The Modified Bishop Method 125 C:ISTEDWINI- NEWFILE.PL2 Run By: Shane Clark 9/512002 9:31AM 100 # FS Soil Soil Total Saturated Friction Piez. Load Value a 1.36 Desc. Type Unit Wt. Unit Wt. Angle Surface Horiz Eqk 0.050g< b 1.36 No. (pco (pcf) (deg) No. c 1.36 New 1 102.4 119.0 34.0 0 d 1.36 Old 2 110.0 130.0 35.0 0 e 1.38 f 1.39 g 1.40 h 1.41 i 1.42 75 _ i 1.42 50 - 25 - 0 0 STED 1 —Ru a J f � e b 1 R7 R6 i 2 RS ' R+ / 2 R3 800 R1 25 50 75 100 STABL61-1 FSmin =1.36 Safety Factors Are Calculated By The Modified Bishop Method 125 Ir no G "1 00 # FS a 1.36 b 1.36 60 - c 1.37 d 1.38 e 1.38 f 1.38 g 1.39 h 1.39 i 1.39 1 en 40 — a 20 40 60 80 STABL61-1 FSmin =1.36 Safety Factors Are Calculated By The Modified Bishop Method 2 100 CP &L Sutton Outfall Structure C:ISTEDWIN\- SECT5C.PL2 Run By: Shane Clark 9/5/2002 10:58AM Soil Soil Total Saturated Cohesion Friction Piez. Load Value Desc. Type Unit Wt. Unit Wt. Intercept Angle Surface Horiz Eqk 0.050 g< No. (pcf) (pct) (psf) (deg) No. New 1 102.4 119.0 0.0 34.0 0 Old 2 110.0 130.0 0.0 35.0 0 Wood 3 125.0 130.0 10000.0 45.0 0 a 20 40 60 80 STABL61-1 FSmin =1.36 Safety Factors Are Calculated By The Modified Bishop Method 2 100 • .• /k/r ;y'; ► ; tip,, r � .ry .J r 'r Ar � •t �'� ..3..,�' '�I " '•yam .. - . ,- LABORATORY TEST RESULTS I, i , yti.. -.+a�" - - � _ �': .Y� -',� � •at�-_et�tti!:�i.e.�,��iY�vl � - - .:,{E� ��L� � D ' • .• /k/r ;y'; ► ; tip,, r � .ry .J r 'r LL PI D85 D60 D50 D30 D15 D10 Cc CU • ND ND 0.77 0.53 0.45 0.340 0.2751 0.2562 0.86 2.1 MATERIAL DESCRIPTION USCS AASHTO • COMPOSITE BAG #4 SP A -1 -b Project No.: 30770 -2- 5036 -02 Remarks: Project: CP &L SUTTON DIKE RAISE ND =NOT DETERMINED. • Location: COMPOSITE BAG #4 SPECIFIC GRAVITY IS ASSUMED. Date: 06 -26 -02 GRAIN SIZE DISTRIBUTION TEST REPORT LAW ENGINEERING. INC- Figure No. 11 % +75 mm • 0.0 LL PI • NO NO GRAIN SIZE - mm % GRAVEL % SAND % SILT % CLAY 0.1 99.9 0.0 D85 D80 D50 D30 D15 D10 CC CU 0.57 0.38 0.35 0.285 0.2288 0.1756 1.21 2.2 MATERIAL DESCRIPTION • COMPOSITE BAG #3 Project No.: 30770 -2- 5036 -02 Project: CP &L SUTTON DIKE RAISE • Location: COMPOSITE BAG #3 Date: 06 -26 -02 GRAIN SIZE DISTRIBUTION TEST REPORT LAW ENGINEERING, INC_ USCS AASHTO SP A -3 Remarks: NO -NOT DETERMINED. SPECIFIC GRAVITY IS ASSUMED. Figure No. 10 .� LAW ENGINEERING AND ENVIRONMENTAL SERVICES, INC. RALEIGH, NORTH CAROLINA - LABORATORY TESTING SUMMARY SHEET PROJECT NAME: CP&L SUTTON DIKE RAISE LAW PROJECT NUMBER: 30720 -2 -5036 Phase 02 DATE: 6 -21 -02 SAMPLE IDENTIFICATION OPTIMUM MAX. DRY LIQUID & PLASTIC LIMITS %FINER MAX: RELATIVE*MIN.. RELATIVE' BORING TYPE DEPTH MOISTURE DENSITY LL PL PI #200 SIEVE DENSITY DENSITY (feet) ( %) (Pcrn (Pcf) pcf1. BA -3 NP 0.1 103.5 88.6 BA -2 NP 0.1 104.4 89.2 BA -1 NP 0.1 107.8 92.6 REMARKS: * TESTED IN GENERAL ACCORDANCE WITH ASTM D4253 -00. ** TESTED IN GENERAL ACCORDANCE WITH ASTM D4254 -00. ND= NOT DETERMINED, NP= NON PLASTIC REVIEWED BY: 'lrG USCS CLASSIFICATION �� rv.. - rte" � _ _ .T»v ,.- - --,. ,., ,..ca�tz•r� �_ �, `� - �y�__T. . r y � r Mme; � . �;•-• � , '� �,� •- `,fir , Y •. . � •, � �.`. .. ... .. Fes. a �„ _ ... .. 1� � �1" I �. �L _ ._ �.- _ .. .- .. r. — �- •.�.i� r w ..fir � •Y Vo i TA ail COST ESTIMATE.. '(K'-'. if .46 �� ~ •� ��t7T�t_` � • � � _ ." _ • �. .. ' •fir .. '. _.. _ v r, �.�. Ir ; ( tv.j —1:.. - _ .I.��:1 ,� � � •y�i{ -'I [ 1 � I .. - .. .. .. .y. - +.�..'�. -q - � �A •'. ��1 I �: 4 L'; _I * �i � car �� .. .. '.ti -�. r��. _ ... r- - ��+�tr- , 11,4•. �• 'I i . � � -�' �; � •! is ��� . Y�� j �j. 1 =,. �'�. -•.Y .- t_�a'iF �i!?.s;Y _ri.i.���T ��'+��"r�_ �a�.i�l� � � �61r - Y:MMk.iY '.L�S_'all��l.`14 - 'Y'��7 '_'�i�.- �r'�J:C. }.u`.�•�' i _�i.F�- thy., ve' -_.. s.. r _ ^ .. 1984 ASHPOND VERTICAL EXTENSION COST ESTIMATE Description lQuantiby jUnits jUnit Price ITotal Construction and Material Testing 1 3 %1 1 $1,779,817.801 $53,395 Dike Construction Mobilization 1 $50,000.00 $50,000 Clearing and Grubbing leach 1 57 acre 1 $900.00 $51,084 Erosion Control Silt Fence 12,540 lin. ft $0.551 $6,897 - lydroseeded Lime, Seed and Liquid Fertilize 57 acre $489.00 $27,756 fiber mulch 274,718 sq. yd. $0.12 $32,966 Discharge Structure Bridge Skimmer Bridge 1 each $20,000.00 $20,000 Overflow Bridge 1 each $10,000.00 $10,000 Pile Driving Mobilization 1 each $8,000.00 $8,000 1 day driving 2 each $8,000.00 $16,000 Dikes Soil Fill 220,000 cu.yd. $5.00 $1,100,000 1' clay layer on interior slope 4000 cu.yd. $28.00 $112,000 Geosythetic (Geogrid) 2000 sq. yd $2.75 $5,500 Geosynthetic (Geotextile) 7600 sq. yd $1.80 $13,680 ABC for roadways 7500 tons $12.00 $90,000 , Retaining Wall at Overflow Structure Timber" 1000 s. f. $4.25 $4,250 Installation 1 760 s. f. 1 $4.50 $3,420 Retrofit Ash Discharge System Raise Discharge Pipes 1 event $50,000.00 $50,000 Modifications to Hydrovac Tanks 2 1 each 1 $30,000.00 $60,000 Extension of Exisiting Ash Lines 1000 lin. ft. $14.00 $14,000 Ash Handling Area Geosynthetic (Geogrid) 600 I sq. yd. 1 $1.70 $1,020 ABC 295 tons $11.00 $3,245 Truck Wash Station System 1 1 leach 1 $100,0001 $100,000 * Material Costs only ISub-Total I $1,779,818 Grand Total $1,833,212