Loading...
HomeMy WebLinkAbout20020672 Ver 3_More Info Received_20150306si" S�A1� 4� �d W r° u3 � Nxn � �� C � �� STATE OF NORTH CAROLINA DEPART'��,NT OF TRANSPORTATION PAT MCCRORY GOVERNOR MEMORANDUM TO SUBJECT: REFERENCE: Dear Ms. Chapman, ANTHONY J. TATA SECRGTARY March 6, 2015 Ms. Amy Chapman Transportation Unit Supervisor Public Hearing Officer's Report for the Proposed Monroe Connector/Bypass, TIPs R-2559/R-3329, Union County Division of Water Resources Public Hearing Officer's Report for the Monroe Bypass — Memorandum dated February 20, 2015 After review of the referenced memorandum, we wish to clarify the "merger process" referred to in the Recommendation set out on page 3 of the document. The Monroe Connector/Bypass project followed the Section 6002 Project Coordination Plan. The plan is described in Appendix A-5 of the Draft EIS and can be found on the on the project website: http://www.ncdot.�av/proiects/monroeconnector/download/monroe DEIS AppendixA.pdf Under this plan, agencies involved in the environmental review process communicated regularly to assure that the project would meet, among other requirements, the requirements of NEPA and Section 404 of the Clean Water Act (CWA). These communications included regular agency coordination meetings as documented in the Draft, Final, Draft Supplemental Final, and Fina) Supplemental Final EIS documents (see the Monroe Connector DEIS, Section 9.2.3.3., Table 9-6; Monroe Connector FEIS, Section 3.2.1, Table 3-1; and the Monroe Connector DSFEIS, Section 5.3.2, Table 5-2; and Monroe Connector FSFEIS, Section 3.3; for a list of the Environmental Agency Coordination Meetings). Additionally, meetings to discuss 30% hydraulic design occurred for Section 3B on March 14, 2012; for Sections 2A and 3A on April 11, 2012; and for Sections 1, 2A and 26 on May 9, 2012; and meetings to discuss 100% hydraulic design for Section 3B and a portion of 3A on April 11, MAILING ADDRESS: Te�ePHONe: 919-707-6100 LOCATION: NC DEPARTMENT OF TRANSPORTATION FAX: 919-212-5785 'I OZO BIRCH RIDriE DRIVE PROJECT DEVEIOPMENT AND ENVIRONMENTAL ANALYSIS RALEIGH NC 27610-4328 159H MAIL SERVICE CENTER WEBSITE: WWW.NCDOT.ORC� Rn�eicH NC 27699-1598 NCDOT Memorandum to NCDWR - Public Hearing Officer's Report for the Proposed Monroe Connector/Bypass, TIPs R-2559/R-3329, Union County, Page 2/2 2012; for Sections 2C and the remainder of 3A on July 23 and 24 2014; and Sections 1, 2A, and 2B on September 17, 2014. The Section 6002 Project Coordination Plan is intended to address permitting concerns and help assure that impacts to buffers, streams, and wetlands are avoided and minimized to the greatest extent practicable. The Monroe Bypass project was thoroughly vetted through the process described in the Section 6002 Project Coordination Plan. Thank you. Since ly, , . ,✓ Richard W. Hancock, P.E. Manager Project Development and Environmental Analysis Unit cc. by electronic mail: Belinda Henson, Water Quality Programs Supervisor, Fayetteville Regional Office Cyndi Karoly, DWR Wetlands Branch Chief Jeff Poupart, DWR NPDES Section Chief Jay Zimmerman, DWR Acting Director