STATE OF NORTH CAROLINA
DEPART'��,NT OF TRANSPORTATION
PAT MCCRORY
GOVERNOR
MEMORANDUM TO
SUBJECT:
REFERENCE:
Dear Ms. Chapman,
ANTHONY J. TATA
SECRGTARY
March 6, 2015
Ms. Amy Chapman
Transportation Unit Supervisor
Public Hearing Officer's Report for the Proposed Monroe
Connector/Bypass, TIPs R-2559/R-3329, Union County
Division of Water Resources Public Hearing Officer's Report for
the Monroe Bypass — Memorandum dated February 20, 2015
After review of the referenced memorandum, we wish to clarify the "merger process" referred
to in the Recommendation set out on page 3 of the document.
The Monroe Connector/Bypass project followed the Section 6002 Project Coordination Plan.
The plan is described in Appendix A-5 of the Draft EIS and can be found on the on the project
website:
http://www.ncdot.�av/proiects/monroeconnector/download/monroe DEIS AppendixA.pdf
Under this plan, agencies involved in the environmental review process communicated
regularly to assure that the project would meet, among other requirements, the requirements
of NEPA and Section 404 of the Clean Water Act (CWA). These communications included regular
agency coordination meetings as documented in the Draft, Final, Draft Supplemental Final, and
Fina) Supplemental Final EIS documents (see the Monroe Connector DEIS, Section 9.2.3.3.,
Table 9-6; Monroe Connector FEIS, Section 3.2.1, Table 3-1; and the Monroe Connector DSFEIS,
Section 5.3.2, Table 5-2; and Monroe Connector FSFEIS, Section 3.3; for a list of the
Environmental Agency Coordination Meetings).
Additionally, meetings to discuss 30% hydraulic design occurred for Section 3B on March 14,
2012; for Sections 2A and 3A on April 11, 2012; and for Sections 1, 2A and 26 on May 9, 2012;
and meetings to discuss 100% hydraulic design for Section 3B and a portion of 3A on April 11,
MAILING ADDRESS: Te�ePHONe: 919-707-6100 LOCATION:
NC DEPARTMENT OF TRANSPORTATION FAX: 919-212-5785 'I OZO BIRCH RIDriE DRIVE
PROJECT DEVEIOPMENT AND ENVIRONMENTAL ANALYSIS RALEIGH NC 27610-4328
159H MAIL SERVICE CENTER WEBSITE: WWW.NCDOT.ORC�
Rn�eicH NC 27699-1598
NCDOT Memorandum to NCDWR - Public Hearing Officer's Report for the Proposed Monroe Connector/Bypass,
TIPs R-2559/R-3329, Union County, Page 2/2
2012; for Sections 2C and the remainder of 3A on July 23 and 24 2014; and Sections 1, 2A, and
2B on September 17, 2014.
The Section 6002 Project Coordination Plan is intended to address permitting concerns and help
assure that impacts to buffers, streams, and wetlands are avoided and minimized to the
greatest extent practicable. The Monroe Bypass project was thoroughly vetted through the
process described in the Section 6002 Project Coordination Plan.
Thank you.
Since ly,
,
. ,✓
Richard W. Hancock, P.E. Manager
Project Development and Environmental Analysis Unit
cc. by electronic mail:
Belinda Henson, Water Quality Programs Supervisor, Fayetteville Regional Office
Cyndi Karoly, DWR Wetlands Branch Chief
Jeff Poupart, DWR NPDES Section Chief
Jay Zimmerman, DWR Acting Director